Attachment 0067 - Test Summary Report (24 Jan 2017)

View the file

Other files for this federal contract opportunity

Other files attached to FMTV A2 Production Effort, newest first.
File Type Posted
Questions_and_Answers_Reference_Number_68.pdf PDF
Questions_and_Answers_Reference_Numbers__66-67.pdf PDF
Attachment_0052_-_Vehicle_Dynamics_Data_Sheet_(30_Mar_2016).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Number_65.pdf PDF
W56HZV-16-R-0024_Conformed_Copy_through_Amendment_6.pdf PDF
Questions_and_Answers_Reference_Numbers_63-64.pdf PDF
W56HZV16R0024-0006.pdf PDF
Attachment_0055_Vehicle_Configuration_Tables_(16_February_2017).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Numbers_34-46.pdf PDF
W56HZV16R0024-0005.pdf PDF
NRMM_Distribution_Agreement.pdf PDF
Attachment_0046_-_Performance_Requirements_Matrix_(20_Dec_2016).xlsx XLSX spreadsheet
Attachment_0012_-_Logistics_Integrated_Master_Schedule_(15_Dec_2016).xlsx XLSX spreadsheet
Attachment_0046_-_Performance_Requirements_Matrix_(16_Nov_2016).xlsx XLSX spreadsheet
Attachment_0051_-_VCI_Data_(16_Nov_2016).xlsx XLSX spreadsheet
W56HZV16R0024-0002.pdf PDF
Questions_and_Answers_Reference_Numbers_2-33.pdf PDF
Questions_and_Answers_Reference_Number_1_-_07_Nov.pdf PDF
Attachment 0026 - Draft FMTV Trailer De-Processing Checksheet.xls XLS spreadsheet
Attachment 0057 - Certification of Small Business Size and Socioeconomic Status for Subcontractors Not Registered In SAM.docx DOCX document
Attachment 0012 - Logistics Integrated Master Schedule.xlsx XLSX spreadsheet
Attachment 0005 - Windchill User Guide.pdf PDF
Attachment 0027 - Government Furnished Property and Equipment.xlsx XLSX spreadsheet
Attachment 0004 - PdM MTV Drawing and Modeling Standards and Best Practices.pdf PDF
Attachment 0028 - Lateral Transfer Request Form Template.xls XLS spreadsheet
Attachment 0055 - Vehicle Configuration Tables.xlsx XLSX spreadsheet
Attachment 0016 - Logistics Product Data - Packaging Data Products.doc DOC document
Attachment 0007 - Instructions for Preparing RFV Forms.pdf PDF
Attachment 0044 - Small Business Participation Factor Workbook Instructions.docx DOCX document
Attachment 0008 - Instructions for Preparing ERR Forms.pdf PDF
Attachment 0018- ATPD 2232 - Engines Preparation for Shipment and Storage Of.pdf PDF
Attachment 0029 - Fielding Schedule Template.xlsx XLSX spreadsheet
Attachment 0033 - Application of CPC.doc DOC document
W56HZV16R0024.pdf PDF
Attachment 0025 - Draft FMTV Truck De-Processing Checksheet.xlsx XLSX spreadsheet
Attachment 0024 - Projected FMTV Fielding Locations.xlsx XLSX spreadsheet
Attachment 0006 - Instructions for Preparing ECP Forms.pdf PDF
Attachment 0015 - Publications Matrix.pdf PDF
Attachment 0043 - Small Business Participation Factor Workbook.xlsx XLSX spreadsheet
Attachment 0031 - Alternate Materials.doc DOC document
Attachment 0023 - Maintenance Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0056 - Proposed Survivability Performance.xlsx XLSX spreadsheet
Attachment 0032 - Overpaint Criteria.doc DOC document
Attachment 0017 - Incoming Transaction Format.doc DOC document
Attachment 0045 - TIR and FACAR Report Data.pdf PDF
Attachment 0049 - TDP BOM.xlsx XLSX spreadsheet
Attachment 0003 - TDP Option Selection Worksheet.docx DOCX document
Attachment 0053 - Failure Definition - Scoring Criteria.doc DOC document
Attachment 0061 - Hardware and Software List.xls XLS spreadsheet
Attachment 0067 - Test Summary Report.pptx PPTX presentation
Show all 50

FMTV A2 Production Effort has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Test Summary FMTV A2 Program

10 Ton Dump Truck

2 ½ Ton Cargo Expansible Van

5 Ton Cargo w/ MHE

Wrecker

Tractor

UNCLASSIFIED

UNCLASSIFIED

Distribution Statement A: Approved for public release; distribution is unlimited.

To provide a concise summary of the test program for the FMTV A2. Included information is:

Purpose of Testing Major Tests Test Sites Test Assets Major Testing Planned Test Procedures Corrective Action Process Reliability/Maintainability Scoring and Assessment Process

Purpose of Test Summary

UNCLASSIFIED

UNCLASSIFIED

Testing provides information to system evaluators and ultimately to decision makers on a variety of issues. This information includes:

Conformance to the systems specification Conformance to user requirements Ability to safely operate and be maintained in a military environment

Purpose of Testing

UNCLASSIFIED

UNCLASSIFIED

Consolidated Schedule

UNCLASSIFIED

UNCLASSIFIED

Distribution Statement A: Approved for public release; distribution is unlimited.

Major Required Tests Production Verification Test (PVT) Location: Aberdeen Test Center, APG, MD Subtests:

Vehicle Performance Testing Primarily conducted to determine compliance with performance requirements of performance specification Reliability/Maintainability Testing Performed to determine conformance to reliability and maintainability requirements of the specification Conducted in accordance with the Operational Mode Summary/Mission Profile (OMS/MP) OMS/MP also specifies terrain mix (percentage of each terrain type the vehicle will be tested on) Events scored by an Army Failure Definition/Scoring Criteria (FD/SC)

UNCLASSIFIED

Major Required Tests Production Verification Test (PVT)(contd.)

Testing Cycle Performance testing (5 days/week- day shift) R&M testing (5 days/week – 2 shifts – day & night) Distribution of Data:

R&M events will be documented via Test Incident Reports (TIRs) Preliminary data often available prior to TIR release Vehicles will be available for contractor inspection (subject to Test Director/test needs) Significant Performance & Safety Issues also documented via TIR Failure Analysis and Corrective Action Reports (FACAR) Issue resolution will be documented via the FACAR Process Failed parts (when removed from a vehicle) will be available for contractor analysis Approval of a FACAR does not necessarily end the corrective action process Additional failures of an updated part may cause the FACAR to be reopened Follow on actions in the design or hardware update process may also result in reopening a closed FACAR

UNCLASSIFIED

UNCLASSIFIED

Production Verification Test (PVT)(contd.)

R&M Scoring Process Testers will provide a preliminary score Army Scoring Members (PM/Evaluator/User) will review and update scores as necessary Army FD/SC provides criteria Scoring may be online, via telecon, or via face-to-face meetings Scoring may be reopened if additional information is uncovered The contractor may provide relevant information to inform the scoring voters but are not allowed to be present during the actual scoring process/meeting

R&M Assessment Process The Government will attempt to estimate the impact of configuration changes on system reliability and maintainability characteristics and assess the scored data Assessment may be via telecon or via face-to-face meetings Assessment results normally are released by published meeting minutes Assessment is normally a one time even after the completion of test The contractor may provide relevant information to inform the assessment voters but are not allowed to be present during the actual assessment meeting

UNCLASSIFIED

UNCLASSIFIED

Production Verification Test (PVT)(contd.)

Equipment Modifications During the course of test, it may become necessary to modify the test vehicles if the vehicles are failing live fire or experiencing performance or reliability issues.

Modifications require a Test Work Authorization Document (TWAD).

TWADs are initiated by the contractor and approved by the government TWADs describe:

Nature of the change Test vehicles affected by the change Description of the changed or replaced parts Process for installation and/or installation instructions Approval of the TWAD does not constitute approval of the change for production An unsuccessful TWAD may result in another TWAD or another form of engineering change (if insufficient test time exists to prove out the fix

UNCLASSIFIED

UNCLASSIFIED

Production Verification Test (PVT)(contd.)

Contractor support required Training of operators/maintainers Spare parts Technical support (if required) Maintenance support (if required)

UNCLASSIFIED

UNCLASSIFIED

PVT Test Vehicles

Location: Aberdeen Test Center, Aberdeen Proving Ground, MD Start Date: 450 days after contract award (DAC) Note: Test will be run with F-24 fuel.

UNCLASSIFIED

Live Fire Test (LFT) Location: Aberdeen Test Center, APG, MD 5 Shots are planned Contractor will be able to attend shots and review equipment damage Contractor will be informed of each shot’s success/failure

Updates to equipment hardware may be required to successfully complete LFT Configuration changes for LFT will also require updates to other test assets at PVT Likewise, if a PVT “fix” is developed and it impacts the Live Fire Test, those changes must be added to the LFT vehicles on subsequent shots Significant changes to vehicle configuration (whether induced by Live Fire or PVT issues) may require retesting of updated LFT vehicles

UNCLASSIFIED

Live Fire Test Vehicles

Location: Aberdeen Test Center, Aberdeen Proving Ground, MD Start Date: 450 days after contract award (DAC)

Note: 5 Shots Planned

UNCLASSIFIED

Operational Testing (OT) Location: Yuma Test Center, YPG, AZ Soldiers will be used as Operators and Maintainer Testing will consist of missions or mission equivalent test events TIRs will be generated FACARs will be required Contractor support required Training of operators/maintainers Spare parts Technical support (if required) Maintenance support (if required)

UNCLASSIFIED

Operational Test Vehicles

Location: Yuma Test Center, Yuma proving Ground, AZ Start Date: 840 days after contract award (DAC)

UNCLASSIFIED

Logistics Demonstration Purpose:

DODI 5000.02 requires that analysis, T&E results, or independent reviews confirm the adequacy of the proposed maintenance plan and programmed support resources to meet objectives for peacetime readiness and wartime employment. It also requires that the ability to support any materiel be demonstrated before the materiel is placed in the hands of the Soldier. The Logistic Demonstration (LD) is conducted to confirm that support resources and tasks developed to sustain the materiel will function as intended and to ensure that the gaining unit has the logistics capability to achieve IOC. The LD is conducted on a production representative item.

Goals of the LD are to evaluate:

Supportability Maintenance Planning Product Support Package (spares, TMs, training package, special tools and, TMDE) MANPRINT related to operator and maintainer tasks

UNCLASSIFIED

Logistics Demonstration Vehicles

UNCLASSIFIED

image4.png image5.png image9.gif image10.gif image11.gif image12.gif image13.gif image14.emf image15.png image16.png image17.png image18.png image19.png image1.jpeg image2.png image3.png

File details come from the government source that posted it. Updated .