Attachment_0046_-_Performance_Requirements_Matrix_(16_Nov_2016).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- FMTV A2 Production Effort Federal contract opportunity
- Solicitation number
- W56HZV16R0024
About this file
Attachment 0046 - Performance Requirements Matrix (16 Nov 2016)
View the file
Other files for this federal contract opportunity
Show all 50
FMTV A2 Production Effort has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 0046 - Performance Requirements Matrix | |||||||
| Technical Subfactors | PS Paragraph | PS Requirement | Offerors Proposed Level of Performance | ||||
| Subfactor 1 | |||||||
| Payload | FMTV-PS-R-216 | Payload. Each vehicle (both A‐cab and Armor Configuration) with essential mission role equipment, weapons and mounts, crew, crew equipment and trailer shall be capable of transporng the following payload: | |||||
| Threshold | Objective | Proposed (lbs) | |||||
| M1078A2 |
M1079A2 M1080A2 5,000 lbs 6,000 lbs M1078A2 M1079A2 M1080A2
M1083A2 M1084A2 M1085A2 M1086A2 M1092A2 M1096A2 10,000 lbs 16,000 lbs M1083A2 M1084A2 M1085A2 M1086A2 M1092A2 M1096A2
| M1087A2 | 5,000 lbs | 6,000 lbs | M1087A2 | ||||
| M1088A2 | 25,000 lbs at fifth wheel | N/A | M1088A2 | N/A | |||
| M1148A2 | 17,600 lbs | 20,000 lbs | M1148A2 | ||||
| M1157A2 | |||||||
| M1273A2 | 20,000 lbs | N/A | M1157A2 | ||||
| M1273A2 | N/A | ||||||
| Subfactor 2 | |||||||
| Survivability | FMTV-PS-R-125 | Survivability. See Annex B in Attachment 0001 (FMTVA2 Performance Specification): |
Mineblast Underwheel: PS-B-38 (T) Mineblast Underwheel: PS-B-39 (O) Mineblast Underbody: PS-B-41 (T) Mineblast Underbody: PS-B-42 (O) IED Underbody: PS-B-24 (T)
| IED Underbody: PS-B-25 (O) | Complete Attachment 0056 (Proposed Survivability Performance). | ||||||
| Subfactor 3 | |||||||
| Ride Quality | Crew Compartment Ride Quality. The vehicle at VCW in A-Cab configuration shall attain no more than 6 watts average vertical absorbed power at all crew compartment seating positions (excluding the gunner's seat sling) while negotiating the following RMS courses and speeds (mph): | ||||||
| All Crew Compartment Seating Locations: | Threshold (mph) | Objective (mph) | All Crew Compartment Seating Locations: | Proposed (mph) | |||
| FMTV-PS-R-181 | 1.0" RMS: | 20 | 30 | 1.0" RMS: | |||
| FMTV-PS-R-183 | 1.5" RMS: | 15 | 23 | 1.5" RMS: | |||
| FMTV-PS-R-185 | 2.0" RMS: | 13 | 20 | 2.0" RMS: | |||
| FMTV-PS-R-5443 | 2.5" RMS: | 12 | 18 | 2.5" RMS: | |||
| Crew Compartment Ride Quality. The vehicle at GVW in Armor configuration shall attain no more than 6 watts average vertical absorbed power at all crew compartment seating positions (excluding the gunner's seat sling) while negotiating the following RMS courses and speeds (mph): |
| All Crew Compartment Seating Locations: | Threshold (mph) | Objective (mph) | All Crew Compartment Seating Locations: | Proposed (mph) | |||
| FMTV-PS-R-182 | 1.0" RMS: | 30 | 45 | 1.0" RMS: | |||
| FMTV-PS-R-184 | 1.5" RMS: | 22 | 33 | 1.5" RMS: | |||
| FMTV-PS-R-186 | 2.0" RMS: | 16 | 24 | 2.0" RMS: | |||
| FMTV-PS-R-5444 | 2.5" RMS: | 14 | 21 | 2.5" RMS: | |||
| Cargo Area Ride Quality. The vehicle in Cargo Troop configuration shall attain no more than 6 watts average vertical absorbed power at all cargo troop seating positions while negotiating the following RMS courses and speeds (mph): | |||||||
| Cargo Area: | Threshold (mph) | Objective (mph) | Cargo Area: | Proposed (mph) | |||
| FMTV-PS-R-5446 | 1.0" RMS: | 23 | 35 | 1.0" RMS: | |||
| FMTV-PS-R-5447 | 1.5" RMS: | 17 | 26 | 1.5" RMS: | |||
| FMTV-PS-R-5448 | 2.0" RMS: | 14 | 21 | 2.0" RMS: | |||
| FMTV-PS-R-5449 | 2.5" RMS: | 12 | 18 | 2.5" RMS: | |||
| Subfactor 4 | |||||||
| Mobility | FMTV-PS-R-177 | ||||||
| FMTV-PS-R-178 | Mobility. All vehicles excluding M1088A2 in Armor Configuration at GVW shall have a VCI1 (fine grained) value no greater than 42 (T), 36 (O) at the CTIS tire inflation pressure for snow/mud/sand. | Proposed one-pass VCI: | |||||
| Distribution Statement A* - Approved for Public Release; distribution unlimited. (*Distribution Statement A only applies when form is not filled in) |
File details come from the government source that posted it. Updated .