Attachment 0050 - Technical Maturity Rubric.docx

DOCX document 23 KB Posted

Attached to
FMTV A2 Production Effort
Solicitation number
W56HZV16R0024
Issued by

About this file

Attachment 0050

View the file

Other files

File Type Posted
Questions_and_Answers_Reference_Number_68.pdf PDF
Conformed_RFP_through_Amd_0008.pdf PDF
W56HZV16R0024-0008.pdf PDF
Conformed_RFP_through_AMD_0007.pdf PDF
Questions_and_Answers_Reference_Numbers__66-67.pdf PDF
W56HZV16R0024-0007.pdf PDF
Attachment_0052_-_Vehicle_Dynamics_Data_Sheet_(30_Mar_2016).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Number_65.pdf PDF
W56HZV-16-R-0024_Conformed_Copy_through_Amendment_6.pdf PDF
Questions_and_Answers_Reference_Numbers_63-64.pdf PDF
Attachment_0067_-_Test_Summary_Report__(24_Jan_2017).pptx PPTX presentation
W56HZV16R0024-0006.pdf PDF
Attachment_0027_-_Government_Furnished_Property_and_Equipment_(10_February_2017).xlsx XLSX spreadsheet
Attachment_0055_Vehicle_Configuration_Tables_(16_February_2017).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Numbers_61-62.pdf PDF
Questions_and_Answers_Reference_Numbers_56-60.pdf PDF
Questions_and_Answers_Reference_Numbers_49-55.pdf PDF
Questions_and_Answers_Reference_Numbers_34-46.pdf PDF
W56HZV16R0024-0005.pdf PDF
NRMM_Distribution_Agreement.pdf PDF
Attachment_0046_-_Performance_Requirements_Matrix_(20_Dec_2016).xlsx XLSX spreadsheet
W56HZV16R0024-0004.pdf PDF
Attachment_0012_-_Logistics_Integrated_Master_Schedule_(15_Dec_2016).xlsx XLSX spreadsheet
W56HZV16R0024-0003.pdf PDF
Attachment_0052_-_Vehicle_Dynamics_Data_Sheet_(16_Nov_2016).xlsx XLSX spreadsheet
Attachment_0046_-_Performance_Requirements_Matrix_(16_Nov_2016).xlsx XLSX spreadsheet
W56HZV16R0024-0002.pdf PDF
Attachment_0051_-_VCI_Data_(16_Nov_2016).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Numbers_2-33.pdf PDF
Questions_and_Answers_Reference_Number_1_-_07_Nov.pdf PDF
W56HZV16R0024-0001.pdf PDF
Attachment_0068_-_Use_and_NDA.docx DOCX document
Attachment 0033 - Application of CPC.doc DOC document
Attachment 0029 - Fielding Schedule Template.xlsx XLSX spreadsheet
Attachment 0018- ATPD 2232 - Engines Preparation for Shipment and Storage Of.pdf PDF
Attachment 0023 - Maintenance Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0031 - Alternate Materials.doc DOC document
Attachment 0056 - Proposed Survivability Performance.xlsx XLSX spreadsheet
Attachment 0013 - NMWR Candidate List.docx DOCX document
Attachment 0020 - CDRS Search Request.pdf PDF
Attachment 0034 - CSDR Plan.pdf PDF
Attachment 0026 - Draft FMTV Trailer De-Processing Checksheet.xls XLS spreadsheet
Attachment 0057 - Certification of Small Business Size and Socioeconomic Status for Subcontractors Not Registered In SAM.docx DOCX document
Attachment 0021 - Warranty SIC Parameter Requirements.docx DOCX document
Attachment 0005 - Windchill User Guide.pdf PDF
Attachment 0012 - Logistics Integrated Master Schedule.xlsx XLSX spreadsheet
Attachment 0032 - Overpaint Criteria.doc DOC document
Attachment 0017 - Incoming Transaction Format.doc DOC document
Attachment 0014- Attribute Selection Worksheet.xlsx XLSX spreadsheet
Attachment 0035 - DD Form 254.pdf PDF
Show 40 more

Latest 50 of 76 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0050 Technical Maturity Rubric For evaluation purposes, Level 1 is considered the lowest level of Technical Maturity and Level 5 is considered the highest level of Technical Maturity

Levels
Description
Met / Not Met
Substantiating Data Reference
1
Requirements Analysis

Functional baseline completed

Design approach identified

Initial weight budgets developed

Initial space claim budgets developed for major systems

Requirements decomposition completed

Interface assessment completed

2
Preliminary Design Analysis

Allocated Baseline completed

Major components and sub-systems selected

Weight/Cost BOM completed

Interface Designs completed

System architecture identified

M&S efforts required to support Preliminary Design are complete

Allocation of key requirements to sub-systems and components; e.g. SWAP-C

3
Detailed Design Analysis

Detailed CAD drawings complete for all components and interfaces

M&S efforts required to support detail design are complete

Bench/Lab testing for major sub-systems completed

4
System Integration

Fabrication and integration of sub-systems and components completed

Successful system testing of key requirements completed

CAD drawings refined/informed by build/test

Ballistic Hull Tests satisfy system level ballistic/blast testing

5
System Testing Completed

Automotive Performance Testing Complete

RAM Testing over OMS/MP Complete

Failure Analysis completed

Requirements Compliance Matrix updated

CAD drawings refined/informed by test