Attachment 0050 - Technical Maturity Rubric.docx

DOCX document 23 KB Posted

Attached to
FMTV A2 Production Effort Federal contract opportunity
Solicitation number
W56HZV16R0024
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Attachment 0050

View the file

Other files for this federal contract opportunity

Other files attached to FMTV A2 Production Effort, newest first.
File Type Posted
Questions_and_Answers_Reference_Number_68.pdf PDF
Questions_and_Answers_Reference_Numbers__66-67.pdf PDF
Attachment_0052_-_Vehicle_Dynamics_Data_Sheet_(30_Mar_2016).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Number_65.pdf PDF
W56HZV-16-R-0024_Conformed_Copy_through_Amendment_6.pdf PDF
Questions_and_Answers_Reference_Numbers_63-64.pdf PDF
W56HZV16R0024-0006.pdf PDF
Attachment_0055_Vehicle_Configuration_Tables_(16_February_2017).xlsx XLSX spreadsheet
Questions_and_Answers_Reference_Numbers_34-46.pdf PDF
W56HZV16R0024-0005.pdf PDF
NRMM_Distribution_Agreement.pdf PDF
Attachment_0046_-_Performance_Requirements_Matrix_(20_Dec_2016).xlsx XLSX spreadsheet
Attachment_0012_-_Logistics_Integrated_Master_Schedule_(15_Dec_2016).xlsx XLSX spreadsheet
Attachment_0046_-_Performance_Requirements_Matrix_(16_Nov_2016).xlsx XLSX spreadsheet
Attachment_0051_-_VCI_Data_(16_Nov_2016).xlsx XLSX spreadsheet
W56HZV16R0024-0002.pdf PDF
Questions_and_Answers_Reference_Numbers_2-33.pdf PDF
Questions_and_Answers_Reference_Number_1_-_07_Nov.pdf PDF
Attachment 0026 - Draft FMTV Trailer De-Processing Checksheet.xls XLS spreadsheet
Attachment 0057 - Certification of Small Business Size and Socioeconomic Status for Subcontractors Not Registered In SAM.docx DOCX document
Attachment 0012 - Logistics Integrated Master Schedule.xlsx XLSX spreadsheet
Attachment 0005 - Windchill User Guide.pdf PDF
Attachment 0027 - Government Furnished Property and Equipment.xlsx XLSX spreadsheet
Attachment 0004 - PdM MTV Drawing and Modeling Standards and Best Practices.pdf PDF
Attachment 0028 - Lateral Transfer Request Form Template.xls XLS spreadsheet
Attachment 0055 - Vehicle Configuration Tables.xlsx XLSX spreadsheet
Attachment 0016 - Logistics Product Data - Packaging Data Products.doc DOC document
Attachment 0007 - Instructions for Preparing RFV Forms.pdf PDF
Attachment 0044 - Small Business Participation Factor Workbook Instructions.docx DOCX document
Attachment 0008 - Instructions for Preparing ERR Forms.pdf PDF
Attachment 0018- ATPD 2232 - Engines Preparation for Shipment and Storage Of.pdf PDF
Attachment 0029 - Fielding Schedule Template.xlsx XLSX spreadsheet
Attachment 0033 - Application of CPC.doc DOC document
W56HZV16R0024.pdf PDF
Attachment 0025 - Draft FMTV Truck De-Processing Checksheet.xlsx XLSX spreadsheet
Attachment 0024 - Projected FMTV Fielding Locations.xlsx XLSX spreadsheet
Attachment 0006 - Instructions for Preparing ECP Forms.pdf PDF
Attachment 0015 - Publications Matrix.pdf PDF
Attachment 0043 - Small Business Participation Factor Workbook.xlsx XLSX spreadsheet
Attachment 0031 - Alternate Materials.doc DOC document
Attachment 0023 - Maintenance Tool Kit Component List.xlsx XLSX spreadsheet
Attachment 0056 - Proposed Survivability Performance.xlsx XLSX spreadsheet
Attachment 0032 - Overpaint Criteria.doc DOC document
Attachment 0017 - Incoming Transaction Format.doc DOC document
Attachment 0045 - TIR and FACAR Report Data.pdf PDF
Attachment 0049 - TDP BOM.xlsx XLSX spreadsheet
Attachment 0003 - TDP Option Selection Worksheet.docx DOCX document
Attachment 0053 - Failure Definition - Scoring Criteria.doc DOC document
Attachment 0061 - Hardware and Software List.xls XLS spreadsheet
Attachment 0067 - Test Summary Report.pptx PPTX presentation
Show all 50

FMTV A2 Production Effort has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0050 Technical Maturity Rubric For evaluation purposes, Level 1 is considered the lowest level of Technical Maturity and Level 5 is considered the highest level of Technical Maturity

Levels
Description
Met / Not Met
Substantiating Data Reference
1
Requirements Analysis

Functional baseline completed

Design approach identified

Initial weight budgets developed

Initial space claim budgets developed for major systems

Requirements decomposition completed

Interface assessment completed

2
Preliminary Design Analysis

Allocated Baseline completed

Major components and sub-systems selected

Weight/Cost BOM completed

Interface Designs completed

System architecture identified

M&S efforts required to support Preliminary Design are complete

Allocation of key requirements to sub-systems and components; e.g. SWAP-C

3
Detailed Design Analysis

Detailed CAD drawings complete for all components and interfaces

M&S efforts required to support detail design are complete

Bench/Lab testing for major sub-systems completed

4
System Integration

Fabrication and integration of sub-systems and components completed

Successful system testing of key requirements completed

CAD drawings refined/informed by build/test

Ballistic Hull Tests satisfy system level ballistic/blast testing

5
System Testing Completed

Automotive Performance Testing Complete

RAM Testing over OMS/MP Complete

Failure Analysis completed

Requirements Compliance Matrix updated

CAD drawings refined/informed by test