About this file

This solicitation requests proposals for construction services to alter and add to an F-35 Squadron Operations facility at Dane County Regional Airport in Madison, Wisconsin. Key details include renovating approximately 4,300 square feet of existing space for F-35 simulator functions and upgrading existing vault space to meet intelligence community standards, as well as constructing 300 square feet of SCIF areas and 1,000 square feet for pilot extraction simulator training. The work must be completed within 365 days of notice to proceed and adhere strictly to provided plans and specifications. The contract value is estimated between $1 million and $5 million. The pre-proposal conference is scheduled for December 28, 2020, with proposals due January 20, 2021. Evaluation criteria are technical capability, past performance, and price. Award will be made without discussions to the responsible offeror presenting the best value.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 ADD/ALTER SQUADRON OPERATIONS 404, newest first.
File Type Posted
08 71 00A Hardware Sets Schedule B404_Add02.pdf PDF
08 11 13_Add02.pdf PDF
F35-ADAL B404 Addendum 2.doc DOC document
F35-ADAL B404 Addendum 1.doc DOC document
W50S9F21R00010004.pdf PDF
08 71 00_Add02.pdf PDF
Question and Answer 07.docx DOCX document
XGFG182010 F-35 ADAL B404 Type B3 Drawings (G-011 Revised).pdf PDF
Question and Answer 06.docx DOCX document
W50S9F21R00010002.pdf PDF
EXHIBIT H PROPOSAL PRICE SCHEDULE V2.docx DOCX document
Question and Answer 05.docx DOCX document
B404 Walk-Through Photos.pdf PDF
Question and Answer 04.docx DOCX document
Question and Answer 03.docx DOCX document
Question and Answer 02.docx DOCX document
Geotechnical Report.pdf PDF
Question and Answer 01.docx DOCX document
Pre-Proposal Slides - F-35 B404.pptx PPTX presentation
Pre-Proposal Attendance Sheet.pdf PDF
W50S9F21R0001.pdf PDF
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 09 SAP SINGLE SOURCE DETERMINATION HALLMAN LINDSEY.pdf PDF
EXHIBIT G SMALL BUSINGESS SUBCONTRACTING PLAN FORMAT.docx DOCX document
ATTACHMENT 03 DRAWINGS Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 11 SAP SINGLE SOURCE DETERMINATION KRIEGER.pdf PDF
ATTACHMENT 16 SFS FORM 12.xls XLS spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT H PROPOSAL PRICE SCHEDULE.docx DOCX document
ATTACHMENT 06 SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
ATTACHMENT 08 SAP SINGLE SOURCE DETERMINATION ATI.pdf PDF
ATTACHMENT 10 SAP SINGLE SOURCE DETERMINATION JOHNSONITE.pdf PDF
ATTACHMENT 12 SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 05 SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
W50S9F21R0001.pdf PDF
ATTACHMENT 01 PLANS AND SPECIFICATIONS Vol 1 of 2 Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 02 PLANS AND SPECIFICATIONS Vol 2 of 2 Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 04 AFE PILOT LOCKER DRAWINGS Project No.XGFG182010 dated 20Jul2020.pdf PDF
ATTACHMENT 07 SAP SINGLE SOURCE DETERMINATION ARMSTRONG.pdf PDF
ATTACHMENT 13 SAP SINGLE SOURCE DETERMINATION MILLIKEN.pdf PDF
ATTACHMENT 14 SAP SINGLE SOURCE DETERMINATION VENDURA.pdf PDF
ATTACHMENT 15 PRE PROPOSAL SITE VISIT INSTRUCTIONS.docx DOCX document
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

115 MSG/MSC - CONTRACT ADMINISTRATION

ATTN: MSGT KATHERINE FOX

3110 MITCHELL ST

MADISON WI 53704

XGFG182010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the closing date to 29 January 2021 and the extended the DoD safe reqest date to 27 January 2021.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 8

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jan-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9F21R0001

X 9B. DATED (SEE ITEM 11)

15-Dec-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jan-2021

CODE

USPFO WI 115 MISSION SUPPORT CONTRACTING

3110 MITCHELL ST BLDG 500

MADISON WI 53704-2591

W50S9F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W50S9F

FACILITY CODECODE

EMAIL:TEL:

W50S9F21R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 25-Jan-2021 02:00 PM to 29-Jan-2021 02:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

Section 00110 – Proposal Preparation

SECTION 00110

1. PROPOSAL PREPARATION INSTRUCTIONS

1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00100, FAR Provision 52.215-1, Instruction to Offerors – Competitive Acquisition.

1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.

2. PROPOSAL CONTENT

2.1. Prospective offerors shall submit the following volumes in three separate packages:

2.1.1. Volume 1, Volume 2, and Volume 3: Each volume shall be submitted electronically. Provide one electronic copy of all of the Volumes proposal information. Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat or dropped to DoD Safe in accordance with attachment 15.

2.1.1.1. Volume 1, Price proposal, pro forma documents (to include bid schedule).

2.1.1.2. Volume 2, Part 1-Technical Capability Proposal.

Subfactor 1 – Experience and Capability (limit narrative to 10 single pages and resumes to 2 pages each) Subfactor 2 – Quality Control (limit summary of plan to 5 pages) Subfactor 3- Construction Schedule and Commissioning Approach/timeline (schedule no page limit;

narrative – no more than 5 pages)

2.1.1.3. Volume 2, Part 2-Past/Performance Information..

2.1.1.4. Volume 3, Factor 3-Small Business Participation Plan.

2.2. After compiling all required information, submit CD/DVD’s to the following office:

ATTN: MSgt Katherine Fox 115th Fighter Wing Contracting Office 3110 Mitchell Street Madison, WI 53704

Or request DoD Safe droppoff link by emailing katherine.fox@us.af.mil no later than 27 January 2021 at 3:00pm CST.

2.2.1. Mark the front of the envelope/box with the following: “PROPOSAL No. W50S9F-21-R-0001, DO NOT OPEN--- Competitive Acquisition”.

3. PROPOSAL FORMAT

3.1. Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.

3.1.1. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.

3.1.2. Offerors are cautioned to submit enough information to enable the evaluation committee to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.

3.1.3. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10 min.). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines shall be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided. Where page limits exist, a page is defined as one single side of a page. Double-sided pages count as two pages. Unless otherwise stated, tabs, indexes and dividers do not count in the page count.

3.1.4. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’s name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.

3.1.5. Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify sections as appropriate.

3.1.6. Electronic Copy: Provide one electronic copy of ALL volumes. Electronic copies shall be submitted on CD/DVD save in Microsoft Word or Adobe Acrobat format.

3.1.7. If revised proposals are requested, all proposal revisions shall be submitted on colored paper as page changes with each page identified by date and page number. Revised pages shall be printed on one side and punched with a 3-hole punch along the left margin. The number of revised copies to be submitted is the same as the initial proposal in accordance with FAR 15.306 (a). Requests for such information do not constitute discussions.

3.1.8. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.

4. PROPOSAL VOLUME CONTENTS

4.1. Each offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals that do not include the requested minimum information may be eliminated from further consideration for award.

4.1.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS

4.1.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00120 of this solicitation. The Government is not, and does not intend on, requesting certified cost or pricing data. See proposal price schedule table in Exhibit H for details. In order to better understand the prices proposed, the contractor shall provide a narrative to explain the thought process, approach, and rationale used to arrive at the proposed prices. The narrative shall also discuss the three largest cost items. The Government is not seeking a review of separate cost elements nor is looking for further breakdown of the prices proposed. The narrative should be provided with the price proposal in Volume 1.

4.1.1.2. Provide an introductory page to include Cage Code, DUNS Number, Tax Identification Number (TIN), points of contact, authorized negotiators, contact phone, and email addresses. Also, include your business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.

4.1.1.3. Offer and Section 00010 – Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442.

An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR

4.102. One copy of the SF 1442 is required to have an original signature. All amendments to the solicitation must be acknowledged on the second page of the SF 1442.

4.1.1.4. Section 00010 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced to be considered. In addition, the following proposal schedule must accompany the proposal package in Volume 1. See Exhibit H to this solicitation.

4.1.1.5. An original bid bond and valid Power of Attorney are required with submission of the proposal at the time and date stated on the SF1442 block 13. Bid bond must be on the most current SF24 form and must include original signatures and raised seals or original stamps for both the principal and surety(ies). Rejection of a bid bond shall be in accordance with FAR 28.101-4, Noncompliance with bid guarantee requirements. Power of attorney must have a raised seal or original stamp of the surety company showing a date between solicitation open and close verifying the original power of attorney is still in full force and effect.

4.1.1.6. Representations and Certifications- Section 00600- insert the required certifications and representations and return only those shown in section 00600. Return the entire Section 00600 with your proposal. All other required representations and certifications are to be completed on line in the System for Award Management (SAM) www.sam.gov.

4.1.1.7. All potential offerors are required to register in the System for Award Management. See FAR Provision 52.204-7 System for Award Management.

4.1.1.8. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

4.1.1.9. Subcontracting Plan: If the Offeror proposing on this solicitation is a large business concern, in accordance with the definition as identified in FAR Clause 52.219-1, “SMALL BUSINESS PROGRAM REPRESENTATION”, the firm must submit a small business subcontracting plan in accordance with FAR Clause 52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN and DFARS 252.219-7003 Alt I, “SMALL BUSINESS SUBCONTRACTING PLAN” (see Section 00700 of this solicitation for the full Clauses).

4.1.1.10. The Small Business Subcontracting Plan shall be thorough, complete, and in accordance with AFARS Appendix DD and FAR Clause 52.219-9, as it will be incorporated into the contract upon award of the contract to the Offeror, if acceptable and upon final approval of the Contracting Officer. The Small Business Subcontracting Plan format at Exhibit G may be utilized.

4.1.1.11. The Plan shall include a description of the types of services the firm proposes to subcontract with small business (SB), small disadvantaged business (SDB), woman owned small business (WOSB), HUBZone business, and service-disabled veteran-owned small business (SDVOSB), along with the proposed percentages of their participation, to demonstrate a plan to meet the subcontracting goals that will apply to these contracts. The Offeror shall provide specific information on proposed subcontracted effort for this project.

4.1.2. VOLUME 2, PART 1, OFFEROR TECHNICAL CAPABILITY PROPOSAL

4.1.2.1. Volume 2 Part 1 is comprised of three (3) subfactors. Subfactor 1 Experience and Capability; Subfactor 2 Quality Control and Subfactor 3 Construction Schedule. For the following sub-factors, the factors are listed in descending order of importance.

4.1.2.1.1. Government acknowledges that the technical proposal will involve discussion of some of the same projects/contracts discussed in the Past Performance volume. While Past Performance examines how an offeror performed in the past, so as to determine the probability of success on future projects, this subfactor examines the offeror’s experience with complex multidiscipline project management and execution and how the offeror demonstrates an understanding of the contract’s requirements taking this experience into consideration. Government intends to use Performance Relevance Questionnaire & Company Specialized Experience Part 1 (Exhibit A) information in the evaluation of experience for Subfactor 1. A reiteration of the information provided in Exhibit A is neither required nor desired. Offeror should reference this information by providing a short summation of their relevant experience to meet the submission requirements of this subfactor.

4.1.2.2. Sub-Factor 1, Experience & Capability Proposal. The Experience and Capability Proposal is limited to 10 single pages and resumes to 2 pages each, exclusive of table of contents, tabs, and dividers. Pages in excess of the limit will not be evaluated.

4.1.2.2.1. Demonstrate offerors technical experience and capability to perform a project of this magnitude and complexity. Discuss and provide experience of key construction personnel including, but not limited to, Project Manager, Site Superintendent(s), Quality Control Manager (on site) and Safety Manager. Refer to Section 01000, Part 36, for the minimum qualification requirements for key personnel. Discuss any previous projects that are similar to this project in terms of scope, size and complexity. Specifically discuss experience with Intelligence Community Directive, (ICD), 705 (Sensitive Compartmented Information Facilities) building standards. If no experience, state and indicate in detail how you plan to overcome this lack of experience for both personnel and project. The onus is solely on the offeror to indicate in detail how the offeror plans to overcome this lack of experience. (Resumes or experience cut sheets are limited to 2 pages each and are not part of the page count.) In the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered. The Exhibit D Letter of Commitment is required for the Subcontractor to be considered.

4.1.2.3. Sub-Factor 2, Quality Control. The proposal narrative is limited to 5 pages and demonstrates that the quality control staff, with lines of authority, is adequate to meet the contract’s requirements. The proposed Quality Control answers should provide a detailed explanation of how quality issues are dealt with on various types of construction projects and as a minimum, meetings, inspections, submittal reviews, correction of non-compliant work and how you intend to ensure non-reoccurrence and reporting of quality problems to Government officials. (Note: A Quality Control Plan is not required with this proposal).

4.1.2.4. Sub-Factor 3, Construction Schedule and commissioning approach/timeline is obtained for the purposes of evaluating an offerors understanding of the requirements of the schedule and commissioning. The Schedule itself is not subject to page limits; however any narrative accompanying the schedule submission is limited to 5 pages, excluding tabs and indexes.

4.1.2.4.1. Provide Construction Schedule in a Gantt chart that shows the complete project schedule from Notice to Proceed date of April 1, 2021 (estimated) to include all construction activities as well as concurrent activities, and outline the critical path activities that will show successful execution of the construction project within the 365 day period of performance requirements per FAR 52.211-10. Also, include a narrative discussing the scheduling processes and resource allocation that ensure completion and control of schedule progress from beginning to the end of the project.

4.1.3. VOLUME 2, PART 2, OFFEROR PAST/PRESENT PERFORMANCE

4.1.3.1. Volume 2 Part 2 is obtained for the purpose of evaluating Past/Present Performance. Past/Present Performance includes current/on-going performance that is complete to 70% within 6 years preceding this solicitation for the prime contractor and major subcontractors intended to be used for the performance of this solicitation. If a project submitted was completed by the offeror’s major subcontractor, the offeror is responsible for coordinating with their major subcontractor and submitting a completed Performance Relevancy Questionnaire.

Volume 2 includes the offeror’s Performance Relevancy Questionnaire, Exhibit A Parts 1 and 2; and any discussion and or additional information, awards, letters, etc. concerning past/present performance the offeror includes.

Offerors are cautioned to complete all the questions on the Exhibit A Parts 1 and Part 2. Detailed instructions are included in Exhibit A.

4.1.3.2. Offerors shall use the Past Performance Reference Package, Exhibit C, to obtain references from past and present clients.

4.1.3.3. Past/Present Performance, which includes current on-going (present) performance that is complete to 70% or greater within 6 years preceding this solicitation will be evaluated using the evaluation criteria set forth in Section 00120 of the solicitation. If the offeror represents the combining of two or more companies, joint venture or formal teaming agreement, for the purpose of this RFP, each company shall complete Exhibit A’s and obtain Exhibit C references. The Government may contact these references and may consider this information as well as information obtained from any other sources when evaluating the offeror's past/present performance.

4.1.3.4. Offerors shall discuss their performance using the Performance Relevancy Questionnaire format, Exhibit A, Part 1. Prepare not more than three (3) of these documents. Contractors should select their projects carefully because the quality of the contractor’s relevant performance is more important than the quantity of projects submitted.

4.1.3.5. Use the Exhibit A format to provide information that demonstrates a history of performance on contracts that are similar in scope, complexity, and cost magnitude to this project’s plans and specifications. Explain what aspects of the contract you find relevant to the proposed effort and identify how each contract ranks, in terms of relevancy, with respect to the other contracts addressed in proposal.

4.1.3.6. Offerors should consider the currency and relevancy of the past/present performance information to be considered, the performance must have been completed during the past six (6) years. The period begins six (6) years prior to the solicitation release date and includes current performance. Performance that is more current may have greater impact than older performance.

4.1.3.7. In determining relevancy to the solicitation requirement, offerors should consider the similarity of construction methods employed, size, scope, cost magnitude, location, client type (e.g. federal government) and complexity of work performed to those required for the proposed effort. Location should also be considered.

4.1.3.8. Offerors are encouraged to include with their proposal information any problems encountered on the identified contracts and the offeror's correction actions.

4.1.3.9. Past Performance References-REQUIRED-A “Final” Performance Evaluation (Construction)(also referred to as CPARS Evaluation) issued for a project may be included in lieu of sending out reference package for the project. OR Offerors shall prepare and submit to prior clients(s) of all the projects listed on your Exhibit A submission a Reference Package (Exhibit C)(Detailed instruction are included in Exhibit C Package). This includes correspondence explaining the requirement to obtain an independent evaluation of prior contract performance, and the Past Performance Questionnaire for use in evaluating Past Performance. Inform references that completed Performance Questionnaire should be returned to the contracting officer via email at: katherine.fox@us.af.mil to arrive NO LATER THAN the closing date for receipt of proposals. Offeror must not review the Past Performance Questionnaire prior to submission. They are to be submitted by the client/evaluator directly to the Contracting Officer. Offeror’s should follow-up and encourage references to get the questionnaires to the Contracting Officer in a timely manner.

4.1.3.10. In assessing past performance, the Government may also consider the past/present performance of the offeror’s key personnel, Project Manager, Quality Control Manager and Site Superintendent, as it relates to previous projects. In the event the intended key personnel for this solicitation’s project do not have demonstrated past performance in the project(s) submitted in the Exhibit A’s, the Government reserves to obtain reference information additional information is required.

4.1.3.11. Each key person without prior past performance history demonstrated on the submitted Exhibit A shall provide a summary of experience or a resume. As a reminder and in accordance with Section 00110 and 00120 in the event the intended person is not part of the offeror’s organization at the time the proposal is submitted then a completed Exhibit B, “Subcontractor/Team/Key Personnel Information and Consent Form” is also required or the information will not be considered. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.

4.1.3.12. Offerors are advised that the Government may use all data provided by the offeror in this volume and data obtained from any other sources, to include, but not limited to, data independently obtained from other Government or commercial sources; from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program/Project Managers, Contracting Officers or rely upon personal business experience with the offeror. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. While the Government may elect to consider data obtained from other sources, the burden of providing current accurate and complete past/present performance information rests with the offeror.

4.1.4. VOLUME 3, SMALL BUSINESS PARTICIPATION PLAN

4.1.4.1. All offerors shall identify the extent to which Small Businesses (SBs), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran- Owned Small Businesses (SDVOSBs), HUBZone Small Businesses, and Woman-Owned Small Businesses (WOSBs) would be utilized in the performance of this proposed contract. For small businesses, as defined by the North American Industry Classification System (NAICS) Code applicable to this solicitation, the offeror shall identify their own participation as a SB, VOSB, SDVOSB, HUBZONE SB, SDB, or WOSB, and it will be considered in evaluating the proposed extent of participation of small businesses (use Exhibit F – Small Businesses Participation Plan Format).

4.1.4.2. Offerors must propose goals for Small Business Participation. Small business participation goals are to be an estimated percentage of total contract dollars (total proposed amount including options). Provide an overall goal to be accomplished through collective small business participation from any type of small business, to include all small business programs, and propose individual goals for each small business program utilizing Exhibit F. The work to be performed directly by a small business prime offeror will be included the offeror’s Small Business Participation goal.

4.1.4.3. This factor includes a minimum Total Small Business Participation goal (for all types of small business combined) for this acquisition of 32% of total contract dollars (total proposed amount including options).

4.1.4.4. Separate and distinct from the Small Businesses Participation Plan, large business offerors must also submit a Subcontracting Plan, as required by FAR 52.219-9, under Volume 1. Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan. The Subcontracting Plan will be based on subcontracted dollars rather than total contract dollars but shall reflect and be consistent with the commitments to small business firms outlined in the Extent of Participation of Small Businesses (i.e., dollars shown for each type of small business in each of the plans should match).

END OF SECTION 00110