Question and Answer 07.docx

DOCX document 16 KB Posted

Attached to
F-35 ADD/ALTER SQUADRON OPERATIONS 404 Federal contract opportunity
Solicitation number
W50S9F-21-R-0001
Issued by
Department of the Army National Guard

About this file

This document provides details regarding Solicitation Number W50S9F-21-R-0001 issued by the Department of the Army National Guard. The solicitation seeks a firm fixed-price contract to renovate and expand approximately 4,300 square feet of existing space and construct an additional 1,300 square feet of new space at Building 404 on Truax Field in Madison, Wisconsin. The work includes modifying mechanical, electrical, and technology systems as well as upgrading walls to meet security standards for classified operations. Interested offerors must attend a pre-proposal site visit on December 28, 2020 and submit offers by January 20, 2021. Evaluation criteria are technical approach, past performance, and price. The contract is for one year with a maximum value between $1 million and $5 million. The solicitation requires use of several brand-name products and subcontracting will be limited.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 ADD/ALTER SQUADRON OPERATIONS 404, newest first.
File Type Posted
08 71 00A Hardware Sets Schedule B404_Add02.pdf PDF
W50S9F21R00010004.pdf PDF
08 71 00_Add02.pdf PDF
F35-ADAL B404 Addendum 2.doc DOC document
F35-ADAL B404 Addendum 1.doc DOC document
08 11 13_Add02.pdf PDF
W50S9F21R00010003.pdf PDF
XGFG182010 F-35 ADAL B404 Type B3 Drawings (G-011 Revised).pdf PDF
Question and Answer 06.docx DOCX document
W50S9F21R00010002.pdf PDF
Question and Answer 05.docx DOCX document
EXHIBIT H PROPOSAL PRICE SCHEDULE V2.docx DOCX document
B404 Walk-Through Photos.pdf PDF
Question and Answer 04.docx DOCX document
Question and Answer 03.docx DOCX document
Question and Answer 02.docx DOCX document
Geotechnical Report.pdf PDF
Question and Answer 01.docx DOCX document
Pre-Proposal Slides - F-35 B404.pptx PPTX presentation
W50S9F21R0001.pdf PDF
Pre-Proposal Attendance Sheet.pdf PDF
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 09 SAP SINGLE SOURCE DETERMINATION HALLMAN LINDSEY.pdf PDF
EXHIBIT G SMALL BUSINGESS SUBCONTRACTING PLAN FORMAT.docx DOCX document
W50S9F21R0001.pdf PDF
ATTACHMENT 01 PLANS AND SPECIFICATIONS Vol 1 of 2 Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 02 PLANS AND SPECIFICATIONS Vol 2 of 2 Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 04 AFE PILOT LOCKER DRAWINGS Project No.XGFG182010 dated 20Jul2020.pdf PDF
ATTACHMENT 07 SAP SINGLE SOURCE DETERMINATION ARMSTRONG.pdf PDF
ATTACHMENT 13 SAP SINGLE SOURCE DETERMINATION MILLIKEN.pdf PDF
ATTACHMENT 14 SAP SINGLE SOURCE DETERMINATION VENDURA.pdf PDF
ATTACHMENT 15 PRE PROPOSAL SITE VISIT INSTRUCTIONS.docx DOCX document
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 06 SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
ATTACHMENT 08 SAP SINGLE SOURCE DETERMINATION ATI.pdf PDF
ATTACHMENT 10 SAP SINGLE SOURCE DETERMINATION JOHNSONITE.pdf PDF
ATTACHMENT 12 SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 05 SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
ATTACHMENT 03 DRAWINGS Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 11 SAP SINGLE SOURCE DETERMINATION KRIEGER.pdf PDF
ATTACHMENT 16 SFS FORM 12.xls XLS spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT H PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F-35 Add/Alter B404 Q&A 7

Q48. Question: Please clarify/confirm intent of single 12x60 located true north of B410 the temp use building?

Reference 01 50 00 Temporary Construction Facilities and Controls, Page 9, 3.6.1 Government Personnel Office & 3.6.2 Trailer-Type Mobile Office and Plan Sheet G-011. (Q10 & Q11 from Q&A #4 had questions but did not specifically address)

0. The trailer conflicts location of the infiltration gallery with a job that may have similar timing/duration. Please reference W50S9F-20-R-0001 Construct F-35 Flight Simulator Civil Drawings (C111, C121, C131, C141, C151)

0. If yes it is required

0. Please provide clear intent.

0. Power/Water/Sanitary mains locations for tie-ins, or if services are not available do contractors still have to service these with a temporary solution? i.e. temp holding tanks/generators/etc.

0. note 0.0104 notes network communications to trailers, is this desired for this trailer location also?

0. What is acceptable for these temp utility installations as long is it aligns with spec/drawings information and it works?

2. i.e. can temp Installation of use temp poles (Overhead), Laid on Ground/Surface, Excavated/Bored?

The only temporary facility for Solicitation Number: W50S9F-21-R-0001, Project Number: XGFG182010 Project Name: F-35 Add/Alter Building 404 is located west of B402 as shown on Plan Sheet G-001. The 12’x60’ temporary facility shown between B409 and B410 and temporary use of B410 was not removed from the final design documents. Please disregard.

Electric and Communication Cabling shall be run through separate conduits from the MG&E meter socket and B402 respectively using temporary poles and can be fastened to the perimeter fencing. Cables shall be protected from mowing/snow removal operations.

See XGFG182010 F-35 ADAL B404 Type B3 Drawings (G-011 Revised)

NOTE: This is the last set of questions that were asked. NO further questions will be accepted.

File details come from the government source that posted it. Updated .