Pre-Proposal Slides - F-35 B404.pptx

PPTX presentation 4 MB Posted

Attached to
F-35 ADD/ALTER SQUADRON OPERATIONS 404 Federal contract opportunity
Solicitation number
W50S9F-21-R-0001
Issued by
Department of the Army National Guard

About this file

This document provides details for a federal contract solicitation to alter and add to an F-35 Squadron Operations facility. The solicitation seeks a firm fixed-price contract for construction services including minor demolition, renovations, and new construction at the 115th Fighter Wing in Madison, Wisconsin. Work includes altering approximately 4,300 square feet of existing space to accommodate new functions and upgrading wall types to meet security standards. The contract value is estimated between $1 million to $5 million. The North American Industry Classification code is 236220 and small businesses are encouraged to compete. The response due date is January 20, 2021 and evaluation criteria include technical merit, past performance, and price. The government intends to award without discussions.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 ADD/ALTER SQUADRON OPERATIONS 404, newest first.
File Type Posted
08 71 00A Hardware Sets Schedule B404_Add02.pdf PDF
F35-ADAL B404 Addendum 2.doc DOC document
F35-ADAL B404 Addendum 1.doc DOC document
W50S9F21R00010004.pdf PDF
08 71 00_Add02.pdf PDF
08 11 13_Add02.pdf PDF
Question and Answer 07.docx DOCX document
XGFG182010 F-35 ADAL B404 Type B3 Drawings (G-011 Revised).pdf PDF
W50S9F21R00010003.pdf PDF
Question and Answer 06.docx DOCX document
W50S9F21R00010002.pdf PDF
Question and Answer 05.docx DOCX document
EXHIBIT H PROPOSAL PRICE SCHEDULE V2.docx DOCX document
B404 Walk-Through Photos.pdf PDF
Question and Answer 04.docx DOCX document
Question and Answer 03.docx DOCX document
Question and Answer 02.docx DOCX document
Geotechnical Report.pdf PDF
Question and Answer 01.docx DOCX document
W50S9F21R0001.pdf PDF
Pre-Proposal Attendance Sheet.pdf PDF
EXHIBIT D LETTER OF COMMITMENT.docx DOCX document
ATTACHMENT 09 SAP SINGLE SOURCE DETERMINATION HALLMAN LINDSEY.pdf PDF
EXHIBIT G SMALL BUSINGESS SUBCONTRACTING PLAN FORMAT.docx DOCX document
ATTACHMENT 06 SAP SINGLE SOURCE DETERMINATION ANDOVER.pdf PDF
ATTACHMENT 08 SAP SINGLE SOURCE DETERMINATION ATI.pdf PDF
ATTACHMENT 10 SAP SINGLE SOURCE DETERMINATION JOHNSONITE.pdf PDF
ATTACHMENT 12 SAP SINGLE SOURCE DETERMINATION MARSHALL BEST.pdf PDF
EXHIBIT C PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
ATTACHMENT 05 SAP SINGLE SOURCE DETERMINATION ADVANTOR.pdf PDF
W50S9F21R0001.pdf PDF
ATTACHMENT 01 PLANS AND SPECIFICATIONS Vol 1 of 2 Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 02 PLANS AND SPECIFICATIONS Vol 2 of 2 Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 04 AFE PILOT LOCKER DRAWINGS Project No.XGFG182010 dated 20Jul2020.pdf PDF
ATTACHMENT 07 SAP SINGLE SOURCE DETERMINATION ARMSTRONG.pdf PDF
ATTACHMENT 13 SAP SINGLE SOURCE DETERMINATION MILLIKEN.pdf PDF
ATTACHMENT 14 SAP SINGLE SOURCE DETERMINATION VENDURA.pdf PDF
ATTACHMENT 15 PRE PROPOSAL SITE VISIT INSTRUCTIONS.docx DOCX document
EXHIBIT F SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
ATTACHMENT 03 DRAWINGS Project No.XGFG182010 dated 31Jul2020.pdf PDF
ATTACHMENT 11 SAP SINGLE SOURCE DETERMINATION KRIEGER.pdf PDF
ATTACHMENT 16 SFS FORM 12.xls XLS spreadsheet
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
EXHIBIT H PROPOSAL PRICE SCHEDULE.docx DOCX document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wisconsin Air National Guard Solicitation W50S9F-21-R-0001

Add/ Alter F-35 Squadron Operations 404 Solicitation No. W50S9F-21-R-0001 Project No. XGFG182010 28 December 2020

PRE-PROPOSAL CONFERENCE

Construction Location 115th Fighter Wing Truax Field ANGB Madison, Wisconsin

INTRODUCTION

Mr. Robert Boesen: Procurement Contracting Officer (WI USPFO) MSgt Kate Fox: Contract Specialist/Administrative Contracting Officer (115th FW) 2d Lt Cory Corson: Civil Engineer, Contracting Officer Representative (115th FW) Lt Col Mike Dunlap: Base Civil Engineer/Commander (115th FW)

Scope (work) of Contract Add/alter building 404, Squadron Operations Magnitude - $1,000,000 to $5,000,000 A Firm-Fixed Price Contract will be awarded Project is being solicited as an Unrestricted action The Contract will be awarded using Tradeoff Source Selection Procedures resulting in the Best Value to the Government Evaluation Factors – Technical, Past/Present Performance, Small Business Participation and Price

Period of Performance Base + Option 1 365 Days after Notice to Proceed (NTP) Contract Line Item Number (CLIN) Structure:

Base = CLIN 0001 – 0003 Option = CLIN 0004

SOLICITATION, PLANS & SPECIFICATIONS

Website – https://beta.sam.gov Solicitation Exhibits Questions & Answers (Q&A) Document Amendments Check Regularly Specifications & Plans/Drawings – must be registered and have password on beta.Sam

IMPORTANT REMINDER

The following is a brief overview of the proposal requirements

The Government intends to award without discussions and there may not be a chance for discussions, corrections, or revised proposals.

DISCLAIMER

Offerors are strongly cautioned to carefully read ALL the requirements of the solicitation and comply accordingly Give only the information being requested Understand ALL requirements Have a clear and organized proposal

Proposal Evaluation Evaluation Factors for Award is detailed in RFP section 00120

Carefully review section 00120 when preparing proposal

Comply with section 00100 and 00110 requirements

Failure to furnish a complete proposal may result in elimination from consideration

BEST VALUE

Best value is defined as an award based on the greatest overall benefit in response to the requirement. Award is based on price and other non-cost related factors.

Award in this process does not necessarily mean the lowest price wins

Evaluation Factors and Relative Importance Factors 1, 2 and 3 are approximately equal.

When combined, the non-cost factors are approximately equal to the Price Factor.

Factor 1: Technical Merit Listed in descending order of importance Sub-Factor 1, Demonstrated Experience and Key Personnel Sub-Factor 2, Quality Control Sub-Factor 3, Construction Schedule and commissioning approach/timeline Factor 2: Past/Present Performance Factor 3: Small Business Participation Factor 4: Price Not rated Price evaluation will determine if the proposed prices are fair and reasonable

I KNOW YOU ARE ALL ANXIOUS TO GET TO THE SITE, HOWEVER, KNOWING HOW YOUR PROPOSALS ARE GOING TO BE EVALUATED AND KNOWING WHAT TO SUBMIT IS JUST AS IMPORTANT. YOUR PROPOSAL CAN BE ELIMINATED IF YOU DO NOT FOLLOW THE PROPOSAL INSTRUCTIONS. SO PLEASE STICK WITH ME IN THE COMING SLIDES.

SUBMISSION REQUIREMENTS

Section 00110 of the RFP Details the Required Information and Format of the Proposal Proposal 3 Volumes (Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat or dropped to DoD Safe)

Volume 1 – Price Proposal (to include bid schedule) & Pro forma

Volume 2 – Part 1: Technical Proposal Part 2: Past/Present Performance Info

Volume 3 – Small Business Participation Plan

READ THROUGH THOROUGHLY FOR SUBMISSION REQUIREMENTS. ONLY GIVING SUMMARY OF REQUIREMENTS IN THIS SLIDE PRESENTATION, YOU MUST FOLLOW THE PROPOSAL. THIS SLIDE SHOW IS NOT BINDING. THE SUBMISSIONS DO NOT HAVE TO BE FANCY. WE ARE NOT EVALUATING ON HOW MANY GRAPHICS YOU INCLUDE OR HOW FANCY YOUR BINDERS ARE.

Volume 1 Cost/Price Info & Pro Forma Docs Basis of Estimate

Section 00110-Introductory Page. Refer to paragraph 4.1.1.2 for details.

Offer-SF 1442, Offeror portion, Blocks 14 to 20c

Put pricing in CLINs in Section 00010 & Exhibit H, Proposal Schedule

Original Bid Bond & Power of Attorney

Section 00600 – Representations & Certifications Complete Reps & certs on sam.gov Complete & return Reps & Certs in Section 00600

Executed Joint Venture Agreement (if applicable)

Subcontracting Plan (large business only)

Volume 2 Part 1 – TECHNICAL

NO PRICES/COST IN THIS VOLUME

Sub-Factor 1Max No. of Pages
Experience & Capability Proposal10 single pages and resumes to 2 pages each, exclusive of table of contents, tabs, and dividers. If more than 10 submitted, only first 10 pages will be evaluated.
Sub-Factor 3Max No. of Pages
Construction Schedule and commissioning approach/timeline2 pages per topic (items a through h). Schedule itself is not subject to page limits; however any narrative accompanying the schedule submission is limited to 5 pages, excluding tabs and indexes
Sub-Factor 2Max No. of Pages
Quality Control5 single pages. If more than 5 submitted, only first 5 pages will be evaluated.

Submission Requirements

Demonstrated Experience

Min of 2 max of 3 completed or currently well underway projects.

Turn over no more than 6 years preceding this solicitation

Letters of Commitments from subcontractors, Exhibit D

Exhibit A-Performance Relevancy Questionnaire

Key Personnel

Project Manager, Site Superintendent, Quality Control Manager and Safety Manager

Section 01000 for min qualifications

Exhibit B-Subcontractor/Team/ Key Personnel Info and Consent Form

Letter of commitments from subcontractors, Exhibit D

Technical Approach Plan

Will be incorporated into the contract

Complete all topics listed (a – h)

Construction Schedule

Gantt chart

Estimated NTP date

Within period of performance in 52.211-10

Technical Ratings (Section 00120):

Utilizes combined technical/risk rating method descriptions

VOLUME 2

PAST/PRESENT PERFROMANCE INFORMATION

Past/Present Performance

Current/on-going performance complete to 50% or greater

Within 6 years preceding this solicitation

Performance Relevancy Questionnaire, Exhibit A. No more than 3

Reference Package, Exhibit C

JVs and Formal Teaming Agreements: each company shall complete Exhibit A and obtain Exhibit C

Consider the currency and the relevancy

Final CPARS in lieu of references packages for a project

Key Personnel may be evaluated

Gov may use: PPIRS, FAPIIS, eSRS, interviews or personal business experience

Volume 2 Part II – PAST/PRESENT PERFORMANCE INFORMATION

Exhibit A – Part 1 – Performance Relevancy Questionnaire Use Exhibit Format Complete no more than three (3) forms for Relevant Contracts Quality > Quantity Completed or Substantially Completed (50%) in the last six (6) years Send Questionnaires for the Exhibit A Projects to your references Do this Early! – Must be received by the Contracting office by the solicitation close date

Exhibit A - Part 2 –Provide the following one (1) time:

Describe compliance with FAR 52.219-8, Utilization of Small Businesses (2A) 2B problems/corrective actions 2C assessed Liq Dam in last 6yrs 2D terminated projects in last 6yrs 2E compliance with safety standards Exhibit C – Reference Questionnaire Package “Prepare & submit to the owners of the projects listed in Exhibit A”

Volume 2 Past/Present Performance (cont.)

If you do not have relevant past/present performance and are using the experience of key personnel, predecessor companies or subcontractors, ensure you clearly state this in the proposal.

In order to consider the work of subs and teaming partners not currently employed by proposing contractor, the subcontractor must complete Exhibit B – Information and Consent form.

Volume 2 – Part II Past/Present Performance Information

Past/Present Performance Ratings (Section 00120):

Volume 3 Small Business Participation Plan

Offerors shall use Exhibit F

Offerors shall identify the extent to which all listed SB categories in the solicitation will be utilized

Goals are an estimated percentage of total contract dollars (total proposed amount including options)

This is not a subcontracting plan and it is required from both, small businesses and large businesses.

Min goals for each category are identified in Section 00120 of the solicitation

Volume 3

Small Business Participation Plan Ratings (Section 00120):

Important Reminders Award is contemplated to be made without discussions. Do not anticipate a chance to make corrections or changes.

Your first proposal will probably be your ONLY proposal.

Read the solicitation requirements carefully and then read them again. Read through all the exhibits.

Consider using Sections 001100 and 00120 to “rate” yourself before submitting the proposal. Is it complete?

When using a subcontractor to obtain/enhance relevancy provide Subcontractor Information and Consent Form (Exhibit B) and provide a Letter of Commitment (Exhibit D) or it will NOT be considered.

The subcontractors you submit with your proposal have to be used for the project after award.

Submit a complete proposal in accordance with instructions-use formats provided.

Prime Contractors are responsible for coordination among the divisions with subcontractors.

All amendments will be posted on beta.sam.gov-only OFFICIAL site where information will be disseminated.

After closing, no information will be available until award.

Award will be posted to beta.sam.gov.

PLEASE DO NOT CONTACT THE CONTRACTING OFFICE REGARDING AWARD. WE CANNOT GIVE RESULTS OVER THE PHONE NOR GIVE A TIME FRAME FOR AWARD. YOU WILL HAVE TO CHACK BETA.SAM.

Page 2 of SF 1442, acknowledge all amendments.

IF DO NOT ACKNOWLEDGE AMENDMENTS, CAN BE ELIMINATED.

How Questions Will be Handled See Section 00100 paragraph 3 for details.

Questions and RFIs are due NLT fifth day prior to closing (COB Wednesday, January 13th).

Answers to questions should be posted not later than two working days prior to closing (COB January 18).

DO NOT call technical personnel or AE directly.

Amendments will only be issued if there is a change in the solicitation, specifications, or plans.

How Questions Will be Handled

TODAY

We will not be answering any questions today. You must submit them in writing following the process in the solicitation. This gives everyone, even those who are not attending this conference, an opportunity to see the Q&A’s.

PLEASE, read through everything first before submitting questions. Do not read through a section, send a question, read through another section, and send a question….

Answers to Questions All questions and answers will be posted on beta.sam.gov.

Will not be answering directly to emailed questions. Check beta.sam.gov regularly for Q&A’s.

If there are necessary addendums, they will be issued by an amendment and posted.

Helpful Websites https://beta.sam.gov Solicitation posting, amendments, Q&A’s Wage determination https://www.acquisition.gov FAR/DFAR/AFAR-Clauses https://sam.gov Must be registered when submit proposal or will be disqualified

Proposal Due Dates Proposal Due 2:00PM CT on Wednesday, January 20, 2021 Don’t forget to have references sent in by this time

Proposal MUST be signed by Officer of your Company

No Facsimile

Address in proposal if sending. If mailing, please email me the tracking number

Instructions for drop off are in Attachment 15. Must contact katherine.fox@us.af.mil by 3:00PM on January 18th if dropping off via DoD Safe.

Wisconsin Air National Guard image3.png image4.png image1.png image5.png image6.png image7.png image8.png image9.png image10.jpeg image2.png

File details come from the government source that posted it. Updated .