Question and Answer 03.docx
DOCX document 15 KB Posted
- Attached to
- F-35 ADD/ALTER SQUADRON OPERATIONS 404
- Solicitation number
- W50S9F-21-R-0001
- Issued by
-
Department of the Army National Guard
About this file
This solicitation requests proposals for construction services to alter and add to an F-35 Squadron Operations facility at Dane County Regional Airport in Madison, Wisconsin. The scope of work includes reconfiguring approximately 4,300 square feet of existing space for new F-35 Autonomic Logistics Information System functions and Optimization of the Human Weapon System training, upgrading wall types in a vault to meet security standards, constructing 300 square feet of Sensitive Compartmented Information Facility space and 1,000 square feet for Pilot Extraction Simulator Training. The pre-proposal conference will be held on December 28, 2020 and proposals are due by January 20, 2021. The contract will have a one year period of performance and a value between $1-5 million. The solicitation requires brand name products and subcontracting will be limited.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-35 Add/Alter B404 Q&A 3
Q9. Your Q&A #2 stated bid bond must be original, please explain the process & timing on delivery of original?
When looking into this question I realized that the requirement for an original bid bond has been changed: “to respond to the Coronavirus Disease 2019 (COVID-19) national emergency, contracting officers shall utilize the deviations from the Federal Acquisition Regulation (FAR) and the Defense Federal Acquisition Regulation Supplement (DFARS) authorized in attachments 1 and 2, respectively, to provide flexibility with regard to original documents, manual signatures, seals, and notarization in order to facilitate certain essential contracting procedures.” Therefore, due to Class Deviation 2020-O0016, the original bid bond is NOT REQUIRED. I apologize for the confusion.
File details come from the government source that posted it. Updated .