About this file
This document contains a federal contract solicitation and related opportunity. The solicitation seeks bids for Repair Maintenance Hangar Building 1001 (B1001) project number LSGA212001 at the 125th Fighter Wing Jacksonville International Airport in Jacksonville, Florida. The project involves repairs and renovations to the ground floor spaces of the maintenance hangar to enable the F-35 fighter mission. Work includes demolition, interior construction and finishes, HVAC, plumbing, electrical, lighting, grounding, fire protection, telecommunications and access control/security systems. The estimated period of performance is 540 calendar days after notice to proceed. The NAICS code is 236220 with a $45 million size standard. The project magnitude is between $10-20 million. The solicitation is a small business set aside and will be awarded to the responsible bidder with the most advantageous price. No award will be made until appropriated funds are available.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The Purpose of this amendment is to 1) change the Bid acceptance period to 100days, to support Higher HQ and ACC review times and funding process. 2) incorporate via attachement the revised Draw ing and Spec's amendmnet 01 dated 04 March 2024. There are no other changes at this time.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S6Y24B0002
X 9B. DATED (SEE ITEM 11)
01-Mar-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Mar-2024
CODE
W50S6Y-USPFO FL 125 MISSION SUPPORT
14300 FANG DRIVE
JACKSONVILLE FL 32218-7933
W50S6Y 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S6Y24B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The offeror acceptance period has increased by 40 from 60 to 100.
The following have been modified:
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00 010 - BID SCHEDULE, NOTES
SECTION 00 100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00 600 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 700 - CONTRACT CLAUSES
SECTION 00 800 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01 000 - GENERAL REQUIREMENTS
REV 1 ATTACHMENT-1-LSGA212001_B1001 Hangar Combined Specifications B-3_3.4.24 REV 1 ATTACHMENT-2-LSGA212001_B1001 Hangar Combined Drawings B-3_3.4.24 ATTACHMENT 3 – J&A LSGA212001-A-Best Locks & Cores ATTACHMENT 4 – J&A LSGA212001-B-Advantor Security Systems ATTACHMENT 5 – J&A LSGA212001-C-Monaco ATTACHMENT 6 – J&A LSGA212001-D-JC Metasys ATTACHMENT 7 – 125 FW Form 2 Installation Access Request Dated SEP 2023
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
W50S6Y24B0002
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Rev 1-LSGA212001_B1001 Hangar Combined Specifications B-3_3.4.24 Rev 1-LSGA212001_B1001 Hangar Combined Drawings B-3_3.4.24
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
ATTACHMENTS
The following Attachments will be provided to you as separate documents not directly incorporated into the solicitation itself. Below is a list of all the documents you will be provided seperately:
REV 1 ATTACHMENT-1-LSGA212001_B1001 Hangar Combined Specifications B-3_3.4.24 REV 1 ATTACHMENT-2-LSGA212001_B1001 Hangar Combined Drawings B-3_3.4.24 ATTACHMENT 3 – J&A LSGA212001-A-Best Locks & Cores ATTACHMENT 4 – J&A LSGA212001-B-Advantor Security Systems ATTACHMENT 5 – J&A LSGA212001-C-Monaco ATTACHMENT 6 – J&A LSGA212001-D-JC Metasys ATTACHMENT 7 – 125 FW Form 2 Installation Access Request Dated SEP 2023
WAGE DETERMINATION
Construction Wage Determination (WD)
In order to access the most applicable and up to date Construction Wage Determination for this requirement, please use the website link provided below to pull the most current wage determination. You may need to copy and paste the link into the web browser for it to work properly:
Most Current WD: WD-DB FL20240202 Mod 1 Dated 01.12.24
Webiste Link: https://sam.gov/wage-determination/FL20240202/1
In the case if for some reason the link isn’t working in general, here is the search criteria we used to decide and chose the type of Wage Determination for this requirement. Only use the information below if you need to complete your own SAM.Gov Construction Wage Determination Search to access the document:
1. State – FL
2. County/Independent City – Duval
3. DBA Construction Type – Building
(End of Summary of Changes)