This document is a set of questions and answers related to Solicitation W50S6Y-24-B-0002 for the repair and renovation of the Maintenance Hangar Building 1001 (B1001) at the 125th Fighter Wing Jacksonville International Airport in Florida.

The solicitation is a small business set-aside for the repair and full renovation of the ground floor spaces of the maintenance hangar, including demolition, new interior construction and finishes, HVAC, plumbing, electrical, lighting, grounding, fire protection, telecommunications, and access control/security systems. The estimated period of performance is 540 calendar days after notice to proceed. The project magnitude is between $10M and $20M, with the North American Industry Classification (NAICS) code 236220 and a small business size standard of $45M. The government anticipates funds will be available prior to award, as this action has been identified on the National Guard priority list. Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the government considering only price and price-related factors.

View the file

Other files

File Type Posted
Repair Hanger Abstract OF_1419-4.25.24-KO.pdf PDF
Bid Submission Day Sign-In Sheet-25APR24.pdf PDF
W50S6Y24B0002_00004 Repair MTX_19Apr24.pdf PDF
Rev 3 Attach-2 Adend 3- Electrical E-ED.pdf PDF
Set 06_Q-A_W50S6Y24B0002 Hanger.pdf PDF
QA Set 05 W50S6Y24B0002 Hanger.docx DOCX document
Rev 2 Attach-2 U. P-110B Adend 2.pdf PDF
Rev 2 Attach-2 E-M. STRC Adend 2.pdf PDF
Rev 2 Attach-2 C. CS402 ADEND2 signed.pdf PDF
Rev 2 Attach-2 A. CD100 Adend 2 signed.pdf PDF
Rev 2 Attach-2 B. CU100 Adend 2 signed.pdf PDF
Rev 2 Attach-2 N-T. ARCH & Interiors Adend 2.pdf PDF
Rev 2 Attach-1_22 00 00 Specs.pdf PDF
Rev 2 Attach-2 D. CS403 Adend 2 signed.pdf PDF
W50S6Y24B0002_00003 Repair MTX_3Apr24.pdf PDF
Rev 2 Attach-2 II. TY-101 ADEND #2.pdf PDF
Notifier Panel Pics.pdf PDF
Set 04_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Rev 2 Attach-2 V-HH. ELEC Adend 2.pdf PDF
Set 03_Q-A_W50S6Y24B0002 Hanger.pdf PDF
W50S6Y24B0002_00002 Repair MTX_28Mar24.pdf PDF
Site Visit Sign-In Sheet-20MAR24.pdf PDF
Hanger Pre-Proposal minutes.pdf PDF
MTX Pre-Bid slides B1001.pptx PPTX presentation
Set 02_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Addendum 01_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Attach-7-125FW Form 2 Fillable (Aug 2023) - CAO 01MAR2024.pdf PDF
Rev 1 Attach-2-LSGA212001_B1001 Hangar Combined Drawings B-3_3.4.24.pdf PDF
Rev 1 Attach-1-LSGA212001_B1001 Hangar Combined Specifications B-3_3.4.24.pdf PDF
W50S6Y24B0002_00001 Repair MTX_5Mar24.pdf PDF
Attach-1-LSGA 212001_B1001 Hangar Combined Specifications B-3.pdf PDF
Attach-7-125FW Form 2 Installation Access Request dated Sep 2022.pdf PDF
Attach-4-JA-SS-LSGA212001-B-Advantor_Redacted.pdf PDF
Attach-2-LSGA 212001_B1001 Hangar Combined Drawings B-3.pdf PDF
Attach-3-JA-BN-LSGA212001-A-Best Locks_Cores-Redact.pdf PDF
W50S6Y24B0002 Repair MTX_29FEB24.pdf PDF
Attach-5-JA-BN-LSGA212001-C-Monaco-Redact.pdf PDF
Attach-6-JA-BN-LSGA212001-D-JCI Metasys-Redact.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W50S6Y-24-B-0002 Repair Hanger B1001 (MTX) Set 05 Q&A

03 April 2024

1. Spec Section 01 35 26, 1.6.1.1 states the SSHO may also serve as the Quality Control Manager.

The SSHO may also serve as the Superintendent. Spec Section 01 45 00, 3.4.2 states that the CQC Manager is assigned no other duties. Can the Superintendent be the SSHO and the CQC Manager? How many hats do we need for these three positions?

Gov Response: See Q&A set 02 #14

2. Spec Section 01 50 00, 3.5.1 – Is the contractor to provide an Administrative Field Office?

A-E Response: Yes.

3. Drawing CS100 – Where is the contractors laydown/parking/office trailer area?

Gov Response: See Q&A set 03, #2

4. What is the cost, if any, to the contractor to complete the badging and background checks for each employee?

Gov Response: No cost to submit the FW Form 2s.

5. Spec Section 01 50 00, 2.3.2 and 2.3.3 are temporary chain link fence panels and driven posts required. This section does not state what this fence is used for or the location. Can you let us know where this fence goes and how many linear feet?

A-E Response: Fencing in this section is to address any temporary fencing the contractor may need to control access and traffic around the construction site. This is not for permanent construction. This is contractor means and methods.

6. The specs require waste diversion and recycling of all construction debris. Will this entail separate dumpsters for all aluminum, steel, concrete, asphalt, etc?

A-E Response: The answer can be found in specification 01 74 19, paragraph 1.11 and the documentation requirements of the contractor’s approach shall be detailed in the Construction Waste Management Plan submittal (Ref. paragraph 1.7).

7. Will space be provided for multiple dumpsters to accommodate waste diversion and recycling?

A-E Response: Yes. Coordinated with COR once contract is awarded

8. Sheet CD101 appears to show bollards on the plan with note #5 but should be note #7. Please confirm all notes are correct.

A-E Response: CD-100 Note 5 corrected in forthcoming Amendment to include the pavement removal for bollards as well. Note 7 is pointing to bollards that need to be removed. Note 5 points to the pavement removal.

9. Sheet CD101 appears to show concrete pad removal with note #7 (bollard removal) but should be note #5. Please confirm all notes are correct.

A-E Response: CD-100 Note 5 corrected in forthcoming Amendment to include the pavement removal for bollards as well. Note 7 is pointing to bollards that need to be removed. Note 5 points to the pavement removal.

10. Sheet S-501 – A1 shows 6” bollards filled with 4,000 PSI concrete. Spec Section 05 50 13, 2.3 says use 3,000 PSI concrete. What PSI concrete should be used in the bollards?

A-E Response: Use 4000 PSI concrete.

11. Note #16 on sheet CU100 says to coordinate install of transformer pad with JEA. Who or what is

JEA?

Gov Response: See Q&A set 03, #14.

12. There does not appear to be an email address for proposals. Is this solicitation only accommodating hand delivered bids?

Gov Response: See SF1442 Solicitation, Section 00100, Item 5. This is an IFB

13. Will the bid opening be available online via teleconference?

Gov Response: NO

14. Note S3 on the structural drawings calls out infill of a precast wall with stucco. This note does not appear to be used on any of the drawings, please confirm.

A-E Response: See updated drawings in forthcoming Amendment for location of S3 conditions.

(S-101A,B,D and S-102A,B,D)

15. Notes A26-A29 on sheet A-110A calls for striping. There does not appear to be a specification for striping. Please provide adequate information regarding the striping referred to on this sheet.

A-E Response: Refer to requirements set forth in UFC 04 211 01. Reference UFGS 09 67 23.16 for instructions for hangar bay striping for 5 coat fuel resistant resinous flooring.

16. Please provide dimensions for all new aircraft center line striping.

A-E Response: The centerline striping is 6 inches in width and approximately 63 feet in length.

The nose gear stop stripe is 6 inches in width and approximately 6 feet in length. This applies to all aircraft centerline striping.

17. D5/A541 shows new metal composite panels. There does not appear to be a specification or basis of design to match the metal wall panels. Please provide a spec and a basis of design.

A-E Response: A basis of design cannot be provided without a sole source justification. The contractor is expected to select a new metal composite panel to match existing as close as possible.

18. There are notes throughout the plans calling for stucco to match existing exterior finish. Is the existing exterior finish stucco applied directly to a masonry wall, is it on a substrate, or is it an EIFS system?

A-E Response: There is currently no stucco at exterior walls; the exterior finish condition are assumed to be painted precast concrete panels with an aggregate finish up to one panel heigh. The intent is to patch or infill any exterior openings as noted with metal studs and a stucco finish system that will be painted to match the existing color of the exterior wall.

19. Sheet CS403 calls out new concrete filled bollards, however note #8 used on Enlarged Plan A6 appears to be pointing to the edge of the new concrete ramp. Please identify all new bollards on sheet CS403.

A-E Response: The bollard note (A6 Keynote 8) has been struck and the keynote removed from the plan in a forthcoming Amendment.

20. Note 10 on sheet CU-100 denotes silt fence. There does not appear to be any silt fence shown on this drawing, please identify any silt fence needed.

A-E Response: No silt fence is proposed for this project.

21. Structural Sheets S101A-D show new CMU walls on existing concrete slabs. Sometimes new CMU walls require thickened slabs or new footings. There does not appear to be any new thickened slabs or footings for the new CMU walls. Please confirm no new foundations are needed for the new CMU walls.

A-E Response: Thickened slab not required

22. There do not appear to be any indication of the elevation of the new CMU walls around the existing mezzanine as denoted by note S6 on sheet S-101A. Please identify the top of wall height.

A-E Response: See response to Q&A Set 04, #22

23. Sheet S-102A shows note 10 on the plan, however, there is not a note S10 on the keynotes. Please identify what S10 is denoting.

A-E Response: Keynote S10 has been removed in the forthcoming Amendment. Disregard

24. Note A4/S-501 shows removal of slab on grade for new plumbing (assumed to apply for other underground utilities as well). However, this detail does not appear to be used in structural, architectural or demo drawings. Is the Contractor to assume this detail applies to all new underground plumbing and other underground utilities?

A-E Response: This detail is a typical detail intended to be coordinated with mech/plumbing.

Contractor is correct in assuming that this detail applies to all new underground plumbing and utilities.

25. There appears to be existing underground plumbing and other utilities which do not get reused.

Do these utilities get abandoned in place or do the get removed?

A-E Response: All existing underground plumbing that is to be demolished or demolished/capped is detailed on the plumbing drawings.

26. If these underground utilities get removed should the Contractor apply the detail A4/S-501 for slab removal and replacement?

A-E Response: Correct, the same detail will apply in this condition as well. The detail has been updated in a forthcoming Amendment to reflect this condition.

27. The nature of a hanger with potential heavy loads on the concrete could likely have slab on grades ranging from 4” to 20” thick. There is a significant cost difference to demolishing 4” and 20” slabs. Please clearly identify an assumed thickness to be used for all slab demo and replacement.

A-E Response: See Slab plans on S-102A through S-102D for known slab thicknesses.

28. Sheet AD-101A Keynote D8 calls for demolition of existing wall assembly. However, the wall type is not specified in the drawing. Please clarify which walls are CMU, concrete, or gypsum.

A-E Response: Sheet AD-101A; the wall between room 108 and 103 wood framing with plywood on both sides. The wall shown in room 118 is either metal or wood stud partition at partial height with a gypsum board on both sides. Sheet AD-101B; keynote D8 points to an existing CMU wall to be demolished. Sheet AD-101D; the wall between room 172 and 174 is an original precast concrete panel, coordinate opening with structural precast details. The wall between room 185 and corridor 181 is a metal stud partition with gyp board.

29. It is unclear from the RCP Demo plans if all ACT systems are to be removed. Should the contractor assume all ACT is to be removed or only rooms clearly indicated as being demolished?

A-E Response: All ACT are to be demo-ed except for areas not in scope. Refer to ceiling noted with keynote D34 for clarification.

30. Note D8 on sheet AD-101A denotes wall assembly for demo. What type of assembly is this wall assembly, metal framed, CMU, precast concrete, etc?

A-E Response: Refer to response to Question 28.

31. Note D5 on sheet AD-101B calls for concrete slab demo for new plumbing. What is the slab thickness?

A-E Response: See response to Question #27

32. Note D5 on sheet AD-101B calls for concrete slab demo for new plumbing. Does the concrete get patched at this location after new underground plumbing is installed? If so, what detail applies to this condition?

A-E Response: Yes concrete will need to be patched after new underground plumbing/utilities are installed. See typical detail A4/S-501 for more information

33. Demo plans on sheets AD-101A-101D show several CMU walls to be demolished for new door openings. Many of these new openings are not shown on the structural plans with the other CMU demo. Do these door openings to be demolished on the AD sheets also need the double angle headers bolted through the header course of CMU block as shown on all CMU demo openings on the structural sheets?

A-E Response: Yes, refer to forthcoming amendment for additional openings.

34. Do all toilet partitions shown on A6/AD401 get removed?

35. Is the furniture shown on the “IF” sheets all furnished and installed by the Government?

A-E Response: Refer to prior RFI response Set 02 Q# 10

36. Sheet AD-101A shows what appears to be a concrete ramp from Vest 111 into the Main Shop

107. In this same area on sheet A-110A there does not appear to be a ramp there. Does this Ramp get removed?

A-E Response: See response to Q#37

37. Sheet AD-101A shows what appears to be a concrete ramp from Vest 111 into the Main Shop

107. In this same area on sheet A-110A there does not appear to be a ramp there. If this ramp gets removed, please identify the ramp material.

A-E Response: A new concrete landing and ramp will be poured over the old ramp. Refer to D2/A-541.

38. Sheet AD-101A shows what appears to be a concrete ramp from Vest 111 into the Main Shop

107. In this same area on sheet A-110A there is a large rectangle in a dark dotted line. Please identify what this dark dotted line represents.

A-E Response: The outline which refers you to sheet D2/A-541, the enlarged plan of the new ramp to be constructed.

39. Storage Room 106A on sheet A-110A shows note A26 pointing to a wall assembly. Note A26 denotes airstrip striping. Please correct this note in Storage 106A.

A-E Response: This keynote will be removed in a forthcoming Amendment.

40. The response to RFI #5 on Addendum 1 states that the new control panel for IDS and ACS systems are to tie into all new devices on the 1st floor and all existing devices on the 2nd floor.

Please identify the manufacturer and model of the existing IDS and ACS devices used on the 2nd floor so we can ensure compatibility with the new system.

Gov Response: SF1442 Solicitation, Section 00100, Item 11, for Brand Name and Sole Source items.

41. The response to RFI #7 on Addendum 1 states that the ACS and CCTV systems will be controlled by the BDOC. Please identify the location of the BDOC for tie in and the method for tying into the BDOC network.

A-E Response: Refer to drawing T-201

42. Regarding all ACS, IDS, IT and CCTV, etc systems, will the contractor make final terminations, or will the GOV provide a 3rd party to terminate all cabling?

A-E Response: The Contractor must do the final termination and testing of the patch panels.

43. Regarding all ACS, IDS, IT and CCTV, etc systems, will the contractor perform final programming or will the GOV provide a 3rd party to program systems.

A-E Response: Advantor must program IDS and ACS as a turn-key scope.

44. Regarding all HVAC DDC systems, will the contractor make final terminations, or will the GOV provide a 3rd party to terminate all cabling?

A-E Response: Contractor to make final terminations using the vendor approved by the Government to work on the DDC/EMCS system. See Specification Section 23 09 23.02, Part 2.

45. Regarding all HVAC DDC systems, will the contractor perform final programming or will the GOV provide a 3rd party to program systems.

A-E Response: Contractor to perform final programming using the vendor approved by the Government to work on the DDC/EMCS system. See Specification Section 23 09 23.02, Part 2.

46. Reference drawing E-007. What is the manufacture of the existing MSB-480 volt and the MSB- 208? These require some new breakers, and I would need this info to price them.

Gov Response: See response to Q&A set 02, #1

47. Reference drawing E-007. Busway feeders for the 150-amp outlets, is this feeder correct? Seems a bit oversized.

Gov Response: See response to Q&A set 02, #2

48. Reference drawing E-010. Are there any existing bus plugs that would require replacing? If so, what are they?

Gov Response: See response to Q&A set 02, #3

49. Reference drawing E-011. Outside room 130, there is an outlet with no type or circuit for the FBO outlet, please provide.

Gov Response: See response to Q&A set 02, #4

50. Reference drawings E-020 & E-021. There are grounding notes on these pages, but no grounding shown on the drawings, please advise.

Gov Response: See response to Q&A set 02, #5

51. Reference the T drawings cable trays. Is it the extensions to have two cable trays, one for low voltage and one for security or is low voltage and security using the same cable tray?

Gov Response: See response to Q&A set 02, #6

52. Reference civil drawing CU-100, note 17 to add a conduit. This doesn’t show up on drawing E- 007 one line. Please advise.

Gov Response: See response to Q&A set 02, #7

53. Reference the fire alarm drawing, there isn’t any fire alarm devices shown in any of the hangers.

Is this correct, please advise.

Gov Response: See response to Q&A set 02, #8

54. Not 43 on sheet A-201 says to infill all abandoned louvers. There only appears to be one abandoned louver on this drawing to be infilled. Please identify any other abandoned louvers which need wall infill and stucco.

A-E Response: Will provide in forthcoming amendment.

55. With the exception of solid surface shower walls, do all walls within the restrooms receive new wall tile?

A-E Response: See sheet A-402 Restroom elevations and sheet I-601 Finish schedule for finishes to be applied to restroom walls.

56. Door Schedule Remarks Note 1 on sheets A-601 and A-602 calls for existing doors to swing in direction of egress. Is the intention to remove the existing doors and frames and reinstall to reverse the door swing?

A-E Response: No. Note 1 applies to specified hangar egress doors only. See remarks column on door schedule for which doors note 1 applies. All these doors should already swing in the direction of travel, so no need to reverse door swing.

57. Door Schedule Remarks Note 1 on sheets A-601 and A-602 calls for existing doors to swing in direction of egress. Please clearly identify which existing doors need to have the swing changed.

A-E Response: No doors require swing change. See response to Question #56.

58. The note column on the door schedule on sheet A-601, door number 122 is denoted as existing door. The notes column says panic exist. Mag lock w/keypad. Is this to be interpreted as a new mag lock w/keypad on the existing door?

A-E Response: Yes, a new mag lock and keypad are required.

59. Door schedule general note #2 on A-601 and 602 says that all doors with an STC rating should have automatic insulated HM door and automatic door button. Please clearly define what this note intends to convey.

A-E Response: Will address on forthcoming amendment.

60. Door schedule general note #2 on A-601 and 602 says that all doors with an STC rating should have automatic insulated HM door and automatic door button. Do these doors have automatic openers?

A-E Response: Will address on forthcoming amendment.

61. Door schedule general note #2 on A-601 and 602 says that all doors with an STC rating should have automatic insulated HM door and automatic door button. Do these doors have electrified hardware? If so, why is it not indicated on door schedule by denoting “YES” in the column labelled “ELEC. HDW.?

A-E Response: Will address in forthcoming amendment.

62. The door schedule on sheet A-601 shows door frame type 5 with a transom panel. It is called out as HM transom panel. Please provide more details as to what this panel is and how it is to be constructed.

A-E Response: The transom is intended to have a metal panel insert.

63. Spec 08 71 00 3.6 - both hardware sets 21.0 and 23.0 list door 128 as receiving this HW set.

Please confirm which hardware set is to be used on door 128.

A-E Response: HW set 23.

64. A-602 Door Schedule shows 139A to have door type D01 and frame type F01. These door and frame types are not used on the door schedules. Please clarify which door and frame types apply to door 139A.

A-E Response: Door type A and frame type 1. Door schedule will be revised in forthcoming amendment.

65. Door 147B shown on the door schedule sheet A-601 does not have a door HW set listed. Please provide the HW set for this door.

A-E Response: Will address in forthcoming amendment.

66. Please clearly identify which doors have auto operators.

A-E Response: Refer to remarks column in the door schedule.

67. Sheet A-611 shows door head and jamb details. Three of the Five types call for HM door frames to be fully grouted. However, the Head and jamb details (i.e. C7/A-611) do not appear to be used anywhere in the plans. Therefore, the doors to receive grouted frames are not identified in the plans. Please clearly identify each door frame to be grouted.

A-E Response: Head jamb and sill conditions will be noted on door schedule in forthcoming amendment.

68. The finish plans include a circle with SS at what appears to be the exterior windows. The SS designation is not noted in the Finish Legend. What is SS at the windows?

A-E Response: See sheet I-601 Finish Legend – Misc. - line 1 and Window Notes.

69. There appear to be many existing windows shown on floor plans A-110A-110D, however, these windows are not shown on the interior finish plans I-101-104. Do ALL existing windows get new blinds, and the note SS?

A-E Response: Provide AB and SS as indicated on finish plans I-101 through I-104. Windows not shown on finish plans are at 5’-0” A.F.F. and do not receive additional work outside what is noted on architectural plans.

70. Do the existing doors HM doors and frames get painted?

A-E Response: Yes, existing hollow metal doors and frames shall be painted unless they are within an area not in scope.

71. Do existing window frames get painted or are they prefinished aluminum?

A-E Response: No paint required at windows.

72. Do the existing hangar bay doors and frames get painted?

A-E Response: No.

73. If hangar bay doors get painted, do inside and outside of doors and frames get painted?

A-E Response: See response to Q.72

74. Do existing exposed ceilings get painted or leave as is?

A-E Response: Yes, only if noted on room finish schedule.

75. If exposed ceilings are to be painted, does the duct work, conduit, etc get painted as well?

A-E Response: Yes, the exposed structure, ductwork and conduit shall be painted in accordance with the room finish schedule

76. Floor finish note #6 on sheet I-601 calls for concrete slabs at walk off mats to be recessed. These areas appear to be existing concrete slabs. Do the existing slabs at these locations need to be sawcut, demoed and poured back as recessed slabs?

A-E Response: See sheet I-601 Finish Legend – Floor – WM-1, Loose-lay walk-off mats are thrown down and should not be recessed.

77. There does not appear to be a combo waste/paper towel dispenser in Men’s Restrooms 144 (see A-401). Please confirm if it should be included for 144.

A-E Response: Combo waste/paper towel dispenser to be included in Men’s restroom 144. Sheet A-401 to be revised in forthcoming Amendment.

78. Toilet partitions TPT-2 are called on sheet I-601 as ceiling mounted. There does not appear to be a detail showing the above ceiling supports for the ceiling mounted TPT-2. Please provide a detail showing the material and anchoring for above ceiling supports.

A-E Response: The toilet partitions are being replaced in kind. Please refer to manufacturer details for installation of toilet partitions.

79. The flooring material in stair 139 is identified on the finish schedule sheet I-601 as RST-1. There does not appear to be an RST-1 listed in the finish legend. Please identify this flooring material.

A-E Response: Existing stair tread to remain, no new finish to be applied. Sheet I-102 and I-601 to be revised in forthcoming Amendment.

80. Will the planes be moved out of the bays during construction of each phase?

81. Regarding any equipment which will remain in place during construction, how will the equipment be protected from damage?

A-E Response: Contractor is responsible to protect from damage.

82. Sheet I-602 shows a transition between the 5-coat resinous and the 3 coat resinous flooring systems. This detail indicates to the contractor to sawcut and chip the concrete slab to feather the 5-coat system into the 3-coat system. It appears the only locations the two flooring systems abut is in doorways. Is it acceptable to use a transition strip or is it required to sawcut, chip and feather the slab?

A-E Response: Refer to detail on sheet I-602 and manufacturer’s recommended transition installation.

83. There were discussions at the site visit about some window work on the second floor. There does not appear to be any reference in the plans for window demo or replacement on the second floor.

Please clearly identify this work.

A-E Response: Windows are shown on sheet A-102 and are interior windows facing towards the hangar bay. These windows are to be infilled in accordance with structure's typical CMU wall infill detail.

84. Sheet A-102 appears to show CMU infill at the second floor windows looking down on the hanger bays. This note A19 says to see structural drawings, but there does not appear to be any work on the second floor shown on the structural drawings. Please clarify.

A-E Response: Refer to structure’s typical CMU wall infill detail.

85. Sheet A-102 appears to show CMU infill at the second floor windows looking down on the hanger bays. Are these existing windows to be removed?

86. Sheet A-102 appears to show CMU infill at the second floor windows looking down on the hanger bays. What size are these openings?

A-E Response: 4’-0”x4’-0”

87. Sheet A-102 appears to show CMU infill at the second floor windows looking down on the hanger bays. Is new framing and drywall needed inside the second floor corridor at this CMU infill or is the CMU exposed inside the corridor?

A-E Response: Corridor is assumed to be furred out with metal studs and drywall. Window infills are to include metal stud and drywall infill, painted to match existing.

88. Sheet A-102 appears to show CMU infill at the second-floor windows looking down on the hanger bays. Does the entire corridor wall getting CMU infill need to be repainted?

A-E Response: No, paint to match existing at infills only.

89. Sheet IG102 shows a B2 sign at the elevator in corridor 131. There is not a B2 sign shown on the signage schedule sheet IG-601. Please clarify what sign is used at this location.

A-E Response: See sheet IG601 Signage Schedule second line. See sheet IG602 Detail E9.

90. The total quantity of signs shown on the signage schedule sheet IG601 (99 ea) does not match the total quantity taken off on the signage plans IG101-104 (98). Please confirm which is correct.

A-E Response: Sheets IG101-104 and Signage Legend on sheet IG601 both reflect the same total quantity, 99.

91. None of the signs shown on sheet IG602 match those used on IG601 signage schedule. Please confirm which is correct.

A-E Response: See sheet IG601 – Signage Schedule – Sign Type column and Sheet IG602. Sign details on IG602 are to show details and characteristics of each sign type, not exact verbiage to be used. For exact verbiage refer to Signage Schedule on sheet IG601.

92. General note #7 on all demo sheets AD101A-101D state that all painted surfaces are assumed to be lead paint. However, the Hazardous Materials Report provided in the specs states in the Findings section that of all 98 samples collected from various areas around the building, only 1 sample on one door contained lead. To treat all painted surfaces as lead will greatly increase the demolition costs. With this information in mind, should the contractors still treat all painted surfaces as lead contaminated paint?

A-E Response: Use the Hazardous materials report.

93. General note #7 on all demo sheets AD101A-101D state that all painted surfaces are assumed to be lead paint. Does this apply to the existing floor coatings as well?

A-E Response: See response to #92

94. If all painted surfaces are to be assumed as lead contaminated, should all painted surfaces that are to remain such as CMU an precast concrete walls, doors and frames, exposed ceilings, etc, get fully abated or can it be left in place and encapsulated?

A-E Response: Use the Hazardous Materials Report to determine which painted materials are positive and the Specifications to guide required contractor actions.

95. If painted surfaces of items to remain are to be fully abated what product is to be used;

mechanical or chemical abatement?

A-E Response: Refer to Specification 02 83 00.

96. The demo drawings AD101A-101D only show restroom tile flooring to be removed. Please identify the type of existing flooring for demolition in ALL areas of the building. This should include any floor coatings which will need to be ground or shot-blasted to prepare for new finished flooring.

A-E Response: The restrooms are the only areas designated for flooring to be demolished.

Follow manufacturer instructions, specifications and notes on finish plans and schedules for preparation of floors prior to installation of new flooring.

97. Does any of the new steel need to be fireproofed?

A-E Response: New steel does not need to be fireproofed unless surrounding framing is fireproofed

98. Notes 14, 15, 16 on PD110B appear to call for all under slab plumbing associated with removal of certain plumbing fixtures back to the mains. Is the intent here to sawcut and demo existing concrete, remove the under slab piping and patch back the concrete?

A-E Response: The modified space for the area where note 14 is present is an office, and there is no need for a floor drain. There are incomplete existing sanitary drawings for this space, so the intent is to sawcut and demo the existing floor drain below slab and cap it. For notes 15 and 16, those fixtures are being completely removed, so demo and cap as shown on the plumbing plan.

99. If the intent of Notes 14, 15, 16 on PD110B is to remove and patch concrete, please identify the slab thickness.

A-E Response: See response to Question #27

100. Detail E4&A1/P-501 shows new emergency eye wash fixtures. The details are used on the new plumbing drawings P-110A-110D. These fixtures have underground sanitary drains. Will new underground sanitary lines be required under slab, or do they use existing drains?

A-E Response: Per UFC and International Plumbing code, drain are not required for emergency fixtures. Where floor drains are not shown on plan, floor drains will not be provided.

101. Sheet P-110A calls out 2” dia. sanitary lines. Are these new sanitary lines which need to be installed under the existing concrete slab, or are they existing?

A-E Response: These 2” diameter sanitary lines are connected from a pump and routed above the ceiling per note 6. The 2” line is to be routed to the nearest plumbing stack in the ceiling through the addition of a hub drain. Please refer to the updated Drawing P-110B in a forthcoming Amendment.

102. Note #5 on sheet P110A says to cleanout sanitary piping from this space to confirm no clogs. Cap all sanitary in this space. Is this under slab existing sanitary?

A-E Response: Correct. This is an existing line, and there is a floor drain in that space. The existing floor drain has no use in the modified building. As it currently exists, staff made it known that the line has a clog and tends to provide a foul odor in that space. The existing record drawings for sanitary were incomplete, so the routing beyond the floor drain is unknown.

103. Note #6 sheet P110A says to connect 2” sanitary to discharge line from DP-1. Is this sanitary under slab and requires concrete removal and patching?

A-E Response: These 2” diameter sanitary lines are connected from a pump and routed above the ceiling per note 8. The 2” line is to be routed to the nearest plumbing stack in the ceiling through the addition of a hub drain. Please refer to the updated Drawing P-110B in a forthcoming Amendment.

104. Just so we can clearly answer the question, is there any new or existing plumbing that requires the existing concrete slab to be removed and patched back? Please identify these locations.

A-E Response: Mechanical drawings show existing plumbing that requires slab removal/patching on PD110X series and new plumbing lines shown on P-110X series

105. HVAC demo sheets MD110A-110D show existing HVAC louvers in the exterior precast walls that get removed. When compared with the new HVAC drawings MH110A-110D many of these louver penetrations do not get reused. There does not appear to be any indication in the plan how to infill these HVAC penetrations. Please provide details.

A-E Response: Note A43 on sheet A-201 describes how these openings are to be in-filled. Refer to HVAC demo plans for quantities of louvers to be demolished and in-filled.

106. At locations where the exterior stucco wall is patched, will the patches get painted to match existing as close as possible or will the entire exterior wall need to be painted around the patches?

A-E Response: It is not project intention to paint the whole bldg exterior

107. There appear to be many new penetrations in the exterior precast walls for ductwork to new DOAS units. These penetrations are not denoted as new penetrations on the structural sheets. Do these unidentified penetrations get framed with structural steel as all other penetrations shown on the structural sheets?

A-E Response: Revised drawings in forthcoming Amendment have been updated to include additional penetrations.

108. Mechanical piping demo sheets MD120A-D shows piping removed that will leave penetration in the existing precast walls. How do these pipe penetrations get infilled?

A-E Response: See response to Q&A set 04, #29

109. At locations where the existing piping is removed at the precast walls, will the stucco need to be patched?

A-E Response: Yes. Where existing pipes are demolished through precast, the openings should be patched with stucco and painted to match existing.

110. At locations where the existing piping is removed at the precast walls and the exterior stucco wall is patched, will the patches get painted to match existing as close as possible or will the entire exterior wall need to be painted around the patches?

A-E Response: See Response to Q#106

111. Will GPR scanning be required prior to cutting or drilling into the existing precast concrete wall panels?

A-E Response: Scanning not required

112. Will GPR scanning be required prior to cutting or drilling into the existing concrete slab?

A-E Response: Scanning not required

113. Question #12 in Set 02 of RFI’s included in the second addendum asks whether the contractor is to furnish any of the appliances. The responses state the language in the CLIN is standard language.

Can you clarify whether or not the contractor is responsible for furnishing and/or installing any of the appliances?

Gov Response: Follow Specs for any requirements contained in there.

114. The finish schedule on sheet I-601 calls for walk-off mats WALK-OFF MAT, LOOSE LAY: C-S

GROUP, DESIGNSTEP ENTRANCE CARPET, CARPET MATS, POWER POINT PWPT,

WROUGHT IRON 905. Please confirm if this is a rug which sits on top of the finished flooring or is it a recessed mat with metal frame which requires concrete slab to be removed and poured back to accommodate the recess?

A-E Response: Per Finish Legend on sheet I-601 WM-1 is a loose lay mat.

115. It was said at the site visit that the new jets will arrive March 2025. The project will not be finished by that date. Should bidders assume the new jets will be parked outside the hangers on the flight line rather than in the hangers so as not to impact construction schedule.

A-E Response: See response to Q#80

116. Does the painted exposed roof framing structure in the hangar bays need to have lead paint abatement?

A-E Response: Painting of the hangar bay roof structure is not in the scope of work.

117. Does the painted exposed roof framing structure in the hangar bays need to be repainted or left as is?

A-E Response: See response to Q#116

118. What is to be done with the existing foam fire suppression tanks, piping, etc., in the hangar bays?

A-E Response: The hangar foam systems are not included in this scope of work.

119. Do the hangars get all new bird netting or is the existing to be removed and reinstalled as needed?

A-E Response: Refer to keynote D38 on demo RCP’s: Temporarily remove existing bird netting for installation of new fan.

120. Spec sections 09 67 23.15 & 09 67 23.16 call for the installer to have SSPC QP 8 and QS 1 certifications. These certifications are typical with painting contractors but not with floor coating contractors. Can this certification be excluded in lieu of the industry standard certifications held by flooring coating contractors?

A-E Response: Refer to prior RFI response Set 02 Q#9 & 10

121. Does the existing 750 KVA transformer denoted for demolition have PCB’s or other hazardous materials requiring special disposal?

A-E Response: See Response to Q#122

122. Do any of the existing transformers denoted for demolition have PCB’s or other hazardous materials requiring special disposal?

A-E Response: Contractor to field determine existence of PCB’s at transformers to be demolished and dispose of transformers at contractor’s expense.

123. Sheet E-007 riser calls for one new conduit and wire to be added from each new 1500 KVA transformer to each of the existing main switchboards. Is the existing feeder for the switchboards under slab?

A-E Response: The existing feeders are located under the slab.

124. If new feeders are required from the new transformers to the existing switchboards, will they need to be installed under the existing slab? Or can the new feeders penetrate the building at the exterior wall and be ran above ceiling to the switchboard?

A-E Response: See change in scope per forthcoming amendment drawings.

125. Sheet E-012 in room Avionics 159 shows three symbols, a box with lines at the corners and a communications outlet on the right side of the box. This symbol cannot be located on the legends and cannot be identified. What is this symbol representing?

A-E Response: Symbol shown is a “flush floor outlet box with type outlet indicated”. It appears in column 2 of E-002). In the example included in bidder question the floor box has one duplex receptacle and a duplex cat 6 data outlet.

126. There does not appear to be a drawing showing the new transformer. The pads are called out on the site drawings, but no transformer. Please show the transformer on the plans.

A-E Response: See one-line diagrams E-007, specifications and CS plans for transformer requirements. New service transformers will not be shown on the electrical plans.

127. Detail J/E-032 shows a detail for a cast iron monument cover encased in concrete housing a grounding rod. This detail does not appear to be used on the plans. If it is used, please show ALL locations on the project.

A-E Response: Detail is for ground rod test well. Item is not currently used.

128. Please clarify exactly what is included in the CLIN 0002. Is it only furnish and install (excluding conduit, raceways and other rough-in) of all Division 27 devices, panels, cabling, etc for tv distribution, communications systems and public address? (note Clin 0002 is communications) Gov Response: Correct

129. Please clarify exactly what is included in the CLIN 0003. Is it only furnish and install (excluding conduit, raceways and other rough-in) of all Division 28 devices, panels, cabling, etc for electronic security systems? (note Clin 0003 is Advantor) Gov Response: Correct

130. Does CLIN 0003 include physical access for door systems?

Gov Response: NO

131. Does CLIN 0003 include fire alarm?

Gov Response: NO

132. Who is the certifying Fire Alarm company?

Gov Response: See Sec 00100, item 11, List Brand name and Sole Source item

133. Who is the preferred camera company?

Gov Response: See Sec 00100, item 11, List Brand name and Sole Source item

134. Who is the preferred voice Data?

Gov Response: See Sec 00100, item 11, List Brand name and Sole Source item