Rev 2 Attach-2 U. P-110B Adend 2.pdf

PDF 3 MB Posted

Attached to
Repair Maintenance (MTX) Hangar Building 1001 (B1001)
Solicitation number
W50S6Y24B0002
Issued by

About this file

This document is a partial first floor plumbing plan for the F-35 Repair Maintenance Hangar Building 1001 (B1001) project at the 125th Fighter Wing Jacksonville International Airport in Florida. The plan contains details on the proposed plumbing layout, including the locations of compressed air lines, water and sanitary lines, drinking fountains, sinks, and other fixtures. Key notes provide instructions for connecting new plumbing to existing systems and verifying the condition of the existing compressed air system. The plumbing plan is part of the construction documents for the larger solicitation to repair and renovate the ground floor spaces of the maintenance hangar to enable the F-35 fighter mission. The solicitation, W50S6Y-24-B-0002, is a small business set-aside with a NAICS code of 236220 and an estimated project magnitude between $10 million and $20 million. The period of performance is 540 calendar days after the notice to proceed.

View the file

Other files

File Type Posted
Repair Hanger Abstract OF_1419-4.25.24-KO.pdf PDF
Bid Submission Day Sign-In Sheet-25APR24.pdf PDF
W50S6Y24B0002_00004 Repair MTX_19Apr24.pdf PDF
Rev 3 Attach-2 Adend 3- Electrical E-ED.pdf PDF
Set 06_Q-A_W50S6Y24B0002 Hanger.pdf PDF
QA Set 05 W50S6Y24B0002 Hanger.docx DOCX document
Rev 2 Attach-2 E-M. STRC Adend 2.pdf PDF
Rev 2 Attach-2 C. CS402 ADEND2 signed.pdf PDF
Set 05_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Rev 2 Attach-2 A. CD100 Adend 2 signed.pdf PDF
Rev 2 Attach-2 B. CU100 Adend 2 signed.pdf PDF
Rev 2 Attach-2 N-T. ARCH & Interiors Adend 2.pdf PDF
Rev 2 Attach-1_22 00 00 Specs.pdf PDF
Rev 2 Attach-2 D. CS403 Adend 2 signed.pdf PDF
W50S6Y24B0002_00003 Repair MTX_3Apr24.pdf PDF
Rev 2 Attach-2 II. TY-101 ADEND #2.pdf PDF
Notifier Panel Pics.pdf PDF
Set 04_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Rev 2 Attach-2 V-HH. ELEC Adend 2.pdf PDF
Set 03_Q-A_W50S6Y24B0002 Hanger.pdf PDF
W50S6Y24B0002_00002 Repair MTX_28Mar24.pdf PDF
Site Visit Sign-In Sheet-20MAR24.pdf PDF
Hanger Pre-Proposal minutes.pdf PDF
MTX Pre-Bid slides B1001.pptx PPTX presentation
Set 02_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Addendum 01_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Attach-7-125FW Form 2 Fillable (Aug 2023) - CAO 01MAR2024.pdf PDF
Rev 1 Attach-2-LSGA212001_B1001 Hangar Combined Drawings B-3_3.4.24.pdf PDF
Rev 1 Attach-1-LSGA212001_B1001 Hangar Combined Specifications B-3_3.4.24.pdf PDF
W50S6Y24B0002_00001 Repair MTX_5Mar24.pdf PDF
Attach-1-LSGA 212001_B1001 Hangar Combined Specifications B-3.pdf PDF
Attach-7-125FW Form 2 Installation Access Request dated Sep 2022.pdf PDF
Attach-4-JA-SS-LSGA212001-B-Advantor_Redacted.pdf PDF
Attach-2-LSGA 212001_B1001 Hangar Combined Drawings B-3.pdf PDF
Attach-3-JA-BN-LSGA212001-A-Best Locks_Cores-Redact.pdf PDF
W50S6Y24B0002 Repair MTX_29FEB24.pdf PDF
Attach-5-JA-BN-LSGA212001-C-Monaco-Redact.pdf PDF
Attach-6-JA-BN-LSGA212001-D-JCI Metasys-Redact.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

C

D

F

G

H

J

K

L

20 19 18 17 16 13.214.1 11 10

MENS LOCKERS

VESTIBULE

131D

LOCKHEED

LOCKHEED

OFFICE

MECHANICAL

ELECTRICAL

WOMEN

RESTROOMS

ELEVATOR

ELECTRICAL

MULTIPURPOSE

ROOM

MEN RESTROOMS

OFFICE

CORRIDOR

VESTIBULE

143B

CORRIDOR

PILOT DEBRIEF

ELEC

139A

STAIRS

VESTIBULE

131C

MECH

127B

VESTIBULE

143A

WOMEN

LOCKERS

VESTIBULE

127A

READY ROOM

VESTIBULE

131B

VESTIBULE

131A

OFFICE

1"ø CW (E)

1"ø CW (E)

2 1/2"ø CW (E)

3"ø CW (E)

4"ø CW (E)

3"ø CW (E)

4"ø SAN (E)

1"ø CW (E)

1"ø CW (E)

1"ø CW (E)

S

E E

S H

E E

T A

P

-1 A

BREAK ROOM

KS

SH SH

SH SH

SH-HP

SH SH SH SH-HP SH SH

MS

WC-2

WC-1

WC-1

WC-1

WC-1

WC-1

WC-1

WC-1

WC-1

UR

UR

UR

UR

URLAV-1

LAV-1

LAV-1

LAV-1

LAV-1

WM

WM

WC-2

WC-1

WC-1

LAV-1

LAV-1

LAV-1

KS

IMB

EWH-1 AND EWH-2 SERVING

THESE RESTROOM ON LEVEL

ABOVE.

RADIO DISPATCH

126A

VESTIBULE

125A

TRAINING

OFFICE

IWH-6

IWH-5

NORTH HANGAR

BAY

SOUTH HANGAR

BAY

A5

P-501

TYPICAL

RELOCATED ICE MAKER

FD

IMB

IMB

8 9

1 1/2"ø CW

2"ø V

3"ø CW

3"ø CA

3"ø CA

2"ø CW

2"ø CW

113"ø CA

1 1/2"ø CA

3"ø SAN 3"ø SAN

3"ø SAN

2"ø SAN

1 1/2"ø CW

3"ø CA

3/4"ø CW (E)

3"ø CA

2"ø CW

LACTATION

ROOM

JANITOR

147B

SS

WC

PROVIDE 3" HUB DRAIN ABOVE

CEILING AT NEAREST WASTE

STACK. 2" PRESSURIZED

SANITARY LINE TO

DISCHARGE ABOVE CEILING

TO THE NEAREST WASTE

STACK.

A B C

KEY PLAN

D

N

SHEET ID

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

1 3 5 7 9

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10

F

D

B

F L O

R

ID

A A

IR

N

A T

IO

N

A L G

U A

R D

J A

C K

S O

N V

IL

L E

A N

G B

F

L O

R

ID

A

P a rk w a y L a n e S u it e

P e a c h tr e e C o rn e rs

G

A

L

IC

E N

S E

N U

M B

E R

S

A R

C H

IT

E

C T

U R

E

A A

E N

G

IN

E E

R

IN

G

C o A

N o .8

S o u th a ll

L a n e

S u it e

M a it la n d

F L

T e l:

-2

F L A

C O

A N o

E B

-0

B

IM

/1 F

L A

N G

F -3 c o n v e rs io n H a n g a r/

F

L A

N G

H A

N G

A R

P

L U

M B

IN

G v .r v t

/3

/2

:4

:5

A

M

P-110B

P L U

M B

IN

G

P

A R

T

IA

L F

IR

S

T F

L O

O R

P L A

N

A R

E A

B th

F

IG

H T

E R

W

IN

G J A

C K

S O

N V

IL

L E

F

L

A S

G L

J G

/2

/2

F -3

R

E P

A

IR

H A

N G

A R

B

L D

G

L S

G A

B -3

S U

B M

IT

T

A L

IS

S

U E

F O

R C

O N

S T

R U

C T

IO

N

A p p ro v e r

SCALE: 1/8" = 1'-0"A1

PLUMBING - PARTIAL FIRST FLOOR PLAN - AREA B

KEYNOTES

CONTRACTOR SHALL TEST COMPRESSED AIR SYSTEMS AND

VERIFY THAT COMPRESSED AIR PIPING HAS NO LEAKS.

VERIFY ALL EXISTING PIPE DIMENSIONS. CONFIRM ALL

PIPING, SAFETY RELIEF VALVE, PRESSURE REGULATOR, AND

VALVES ARE SUITABLE FOR NEW COMPRESSED AIR TIE-IN.

RECONNECT NEW FIXTURE TO EXISTING COLD WATER, HOT

WATER, AND SANITARY/VENT PIPING AS REQUIRED.

RECONNECT SANITARY LINE TO THE EXISTING FLOOR

CLEANOUT.

4 CONNECT NEW SHOWERS TO THE EXISTING SANITARY LINE.

5 4" EXSITING WATER LINE.

6 EXISTING 4" SANITARY LINE.

RECONNECT NEW DRINKING FOUNTAIN AND SERVICE SINK TO

EXISTING COLD WATER, HOT WATER, AND SANITARY/VENT

PIPING AS REQUIRED.

CONNECT NEW KITCHEN SINK TO EXISITNG SANITARY AND

VENT PIPING.

CONNECT 1/2" CW TO EXISTING CW LINE. PROVIDE 1/2" CW TO

THE INSTANTANEOUS WATER HEATER, THE WALL BOX FOR

THE COFFEE MAKER, THE WALL BOX FOR THE

REFRIGERATOR/FREEZER ICEMAKER, AND THE KITCHEN SINK.

CONNECT 1/2" HW LINE TO THE KITCHEN SINK. PROVIDE AN

INLINE FITLER FOR BOTH THE COFFEE MAKER AND THE WALL

BOX FOR THE REFRIGERATOR/FREEZER ICEMAKER.

AIR COMPRESSOR SIZED AND PURCHASED SEPERATELY BY

FANG TO ACCOMODATE THE DEMAND OF ALL SHOPS.

NEW 4" COMPRESSED AIR LINE. CONNECT TO AIR

COMPRESSOR.

CONNECT NEW 2" VENT LINE TO THE NEAREST VENT LINE

THAT IS 2" OR LARGER.

CONNECT NEW 3" SANITARY DISCHARGE LINE TO THE

NEAREST SANITARY LINE THAT IS 3" OR LARGER.

EXISTING COMPRESSED AIR HOSE REEL MOUNTED UP HIGH

IN HANGAR BAY TO REMAIN. PROVIDE EACH REEL WITH 1/2"

QUICK CONNECT FITTING, WATER SEPERATOR, REGULATOR

AND FILTER. REMOVE AND REATTACH BIRD NETTING TO

PROVIDE ACCESS TO INSTALL FIXTURES, OUTLETS, CORD

REELS, AND ALL OTHER APPURTENANCES.

PROVIDE NEW COMPRESSED AIR HOSE REEL. PROVIDE EACH

REEL WITH 1/2" QUICK CONNECT FITTING, WATER

SEPERATOR, REGULATOR AND FILTER. REMOVE AND

REATTACH BIRD NETTING TO PROVIDE ACCESS TO INSTALL

FIXTURES, OUTLETS, CORD REELS, AND ALL OTHER

APPURTENANCES.

16 EXISTING COMPRESSED AIR LINE TO REMAIN.

RECONNECT NEW SINK TO EXISTING COLD WATER, HOT

WATER, AND SANITARY/VENT PIPING AS REQUIRED.

RECONNECT NEW MOP SINK TO EXISTING COLD WATER, HOT

WATER, AND SANITARY/VENT PIPING AS REQUIRED.

GENERAL NOTES:

1. CONTRACTOR SHALL FIELD VERIFY LOCATIONS, DIMENSIONS, AND

CONFIGURATION OF ALL EXISTING EQUIPMENT, PIPING, HANGERS,

SUPPORTS, ANCHORS, CONTROLS, ETC.

2. COORDINATE LOCATIONS OF ALL PLUMBING PIPING AND EQUIPMENT

WITH ALL OTHER UTILITIES, EQUIPMENT, PIPING, ELECTRICAL DUCT

BANKS, DUCTWORK, CONDUIT, WIRING, LIGHTING, BUILDING

STRUCTURES, ETC.

3. FIELD VERIFY LOCATION OF EXISTING PIPING, CONNECT NEW PIPING

AND EXTEND AS SHOWN.

4. ROUTE SHOWN IS GENERAL. CONTRACTOR TO FIELD COORDINATE

ACTUAL PIPING ROUTE.

SCALE:

4' 8' 16'0

1/8" = 1'-0"

A

M E

N D

M E

N T

/0 /2

Sheets
P-110B - PLUMBING - PARTIAL FIRST FLOOR PLAN - AREA B

File details come from the government source that posted it. Updated .