Addendum 01_Q-A_W50S6Y24B0002 Hanger.pdf

PDF 163 KB Posted

Attached to
Repair Maintenance (MTX) Hangar Building 1001 (B1001)
Solicitation number
W50S6Y24B0002
Issued by

About this file

This document contains a solicitation for repair and renovation work on a maintenance hangar building at the 125th Fighter Wing in Jacksonville, Florida. The solicitation requests bids for project number LSGA212001 to fully renovate the ground floor of Hangar Building B1001 to enable the F-35 fighter mission. Renovations include demolition, new interior construction and finishes, HVAC, plumbing, electrical, lighting, grounding, fire protection, telecommunications and access control/security systems. The estimated period of performance is 540 calendar days from notice to proceed. Bids are due by small businesses only under NAICS code 236220 with a size standard of $45M. The project magnitude is between $10M to $20M. Award will be made based on price to the responsible bidder. Funds are not presently available but are expected to be appropriated prior to award.

View the file

Other files

File Type Posted
Repair Hanger Abstract OF_1419-4.25.24-KO.pdf PDF
Bid Submission Day Sign-In Sheet-25APR24.pdf PDF
W50S6Y24B0002_00004 Repair MTX_19Apr24.pdf PDF
Rev 3 Attach-2 Adend 3- Electrical E-ED.pdf PDF
Set 06_Q-A_W50S6Y24B0002 Hanger.pdf PDF
QA Set 05 W50S6Y24B0002 Hanger.docx DOCX document
Rev 2 Attach-2 U. P-110B Adend 2.pdf PDF
Rev 2 Attach-2 E-M. STRC Adend 2.pdf PDF
Rev 2 Attach-2 C. CS402 ADEND2 signed.pdf PDF
Set 05_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Rev 2 Attach-2 A. CD100 Adend 2 signed.pdf PDF
Rev 2 Attach-2 B. CU100 Adend 2 signed.pdf PDF
Rev 2 Attach-2 N-T. ARCH & Interiors Adend 2.pdf PDF
Rev 2 Attach-1_22 00 00 Specs.pdf PDF
Rev 2 Attach-2 D. CS403 Adend 2 signed.pdf PDF
W50S6Y24B0002_00003 Repair MTX_3Apr24.pdf PDF
Rev 2 Attach-2 II. TY-101 ADEND #2.pdf PDF
Notifier Panel Pics.pdf PDF
Set 04_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Rev 2 Attach-2 V-HH. ELEC Adend 2.pdf PDF
Set 03_Q-A_W50S6Y24B0002 Hanger.pdf PDF
W50S6Y24B0002_00002 Repair MTX_28Mar24.pdf PDF
Site Visit Sign-In Sheet-20MAR24.pdf PDF
Hanger Pre-Proposal minutes.pdf PDF
MTX Pre-Bid slides B1001.pptx PPTX presentation
Set 02_Q-A_W50S6Y24B0002 Hanger.pdf PDF
Attach-7-125FW Form 2 Fillable (Aug 2023) - CAO 01MAR2024.pdf PDF
Rev 1 Attach-2-LSGA212001_B1001 Hangar Combined Drawings B-3_3.4.24.pdf PDF
Rev 1 Attach-1-LSGA212001_B1001 Hangar Combined Specifications B-3_3.4.24.pdf PDF
W50S6Y24B0002_00001 Repair MTX_5Mar24.pdf PDF
Attach-1-LSGA 212001_B1001 Hangar Combined Specifications B-3.pdf PDF
Attach-7-125FW Form 2 Installation Access Request dated Sep 2022.pdf PDF
Attach-4-JA-SS-LSGA212001-B-Advantor_Redacted.pdf PDF
Attach-2-LSGA 212001_B1001 Hangar Combined Drawings B-3.pdf PDF
Attach-3-JA-BN-LSGA212001-A-Best Locks_Cores-Redact.pdf PDF
W50S6Y24B0002 Repair MTX_29FEB24.pdf PDF
Attach-5-JA-BN-LSGA212001-C-Monaco-Redact.pdf PDF
Attach-6-JA-BN-LSGA212001-D-JCI Metasys-Redact.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W50S6Y-24-B-0002 Repair Hanger B1001 (MTX)

Addendum 01 Q&A

Bid Inquiry: 3/14/24

Ques�on 1:

Amendment #1 says new drawings were issued March 4, 2024, and the cover page of the drawings says March 4, 2024, but all of the drawings have a date of October 20, 2023. Are new drawings supposed to be included in this set?

Response: Current Mar 4, 2024 set of drawing are atached in SAM, NOT all drawing changed so you will need to look at legend, Ques�on 2:

Spec. Sec�on 01 14 00-1.2 iden�fies special scheduling requirements. Are you revising the date of 30 April 2024 since the project will not be awarded in �me to allow this work to be completed?

AE Response: This date was originally provided to the A-E during design as a deadline associated with the unit’s F-35 Mission conversion �meline to meet its IOC date.

Government Response: The user’s desire is for phasing to s�ll take place. The most specific desire is for Phase 2 to be complete by March 2025 , con�nue to bid the project using the phasing plans shown Sec�on 01 14 00, Para. 1.2 and on sheet G-103.

Ques�on 3:

Cadmium and Chromium Removal Plans are men�oned in sec�on 02 83 00 of the specifica�ons.

Appendix A includes a hazardous materials report for the hangar building 1001. Appendix A does not indicate we must abate cadmium or chromium. Please indicate where we should an�cipate encountering cadmium and/or chromium during performance of this contract.

AE Response: Sec�on 02 83 00 details requirements for lead, cadmium and chromium collec�vely. Lead was discovered, but cadmium and chromium were not found in the hazardous materials inves�ga�on (report included in the specifica�ons in Atachment A). If the contractor discovers unforeseen hazardous materials during construc�on, no�fy the Contrac�ng Officer immediately.

Ques�on 4:

Will we be integra�ng with any exis�ng equipment, or are we providing new IDS, ACS, and CCTV equipment? If there are any exis�ng devices, please list them and provide a marked floorplan.

AE Response: The contractor must provide IDS and ACS control panels to be installed on the first-floor hangar and provide a connec�on to second-floor government equipment. See T-201, T-205, T-206.

The contractor must provide IP cameras as shown in TY-101, TY-102, TY-104 and provide connec�on to second floor government equipment. See TY-201

Ques�on 5:

What is the Protec�on Level for this project? Please mark these areas/boundaries on the floorplan

A-E Response: The answer can be found on sheet T-102.

Ques�on 6:

What is the communica�on type for this building? (copper, fiber, or ethernet)

A-E Response: The answer can be found on Sheets T-201, T-202, T-203 and T-204.

Ques�on 7:

Will the ACS and CCTV systems be standalone, or controlled by BDOC?

A-E Response: Controlled by BDOC.

Ques�on 8:

Are we to provide any new network switches?

A-E Response: The government will provide the network switches. The project's scope ends in IT Rack and patch panels connec�on. Refer to Bid Note “FSRM Base Bid” note on sheets T-101, T-102, T-D-101, TN-101, TN-102, TN-103, TN-104, TY-101, TY-102, TY-103 and TY-104.

Ques�on 9:

What tes�ng requirements are there for this project?

A-E Response: Not enough context provided in the ques�on to answer beyond “read the specifica�ons”.

Ques�on 10:

Does the government have an actual or es�mated count of pcb containing ligh�ng ballasts which we must remove, package and dispose?

A-E Response: No. Quan��es can be es�mated by bidders during the bidders’ site visit.

Ques�on 11:

Please confirm that the North Hangar Bay and South Hangar Bay and Second Floor fire alarm zones are separate zones that may be isolated without disconnec�ng from the remainder of Building 1001.

A-E Response: Fire alarm contractor to verify the fire alarm zones. It is the A-E understanding that there are some no�fica�on circuits that may overlap with the first and second floors. All planned system impairments of the exis�ng fire alarm system must be coordina�on with the base fire department and COR as indicated on FA sheets.

Ques�on 12:

Please provide the no�fica�on zones referenced in Fire Alarm system note 14 on Drawing FA001.

Drawings FA101A, Fa101B, and FA101C are not divided according to the phasing plan on Drawing G-103.

A-E Response: Fire Alarm contractor to determine the zones for new fire alarm appliances, and to provide synchroniza�on of no�fica�on appliances within the same field of view, and each zone in accordance with NFPA 72.

Ques�on 13:

Please confirm that no fire sprinkler work is required on second floor and hangar bays, which includes all mezzanines.

A-E Response: Confirmed, No fire sprinkler work in the areas men�oned in the ques�on.

Ques�on 14:

Please confirm that the exis�ng fire sprinkler system is zoned and isolated so that we may isolate/impair phase 1, phase 2 and phase 3 independently without impac�ng another fire sprinkler zone.

A-E Response: Sprinkler contractor to verify the sprinkler zones. Most of the sprinkler protec�on is served by 1-2 risers located in HEF room. All planned system impairments of the system must be coordina�on with the base fire department and COR as indicated on FX sheets.