This document contains questions and answers related to a draft request for proposal for the Hydra-70 rocket system production and engineering services requirement from fiscal year 2019 through fiscal year 2023. The Joint Attack Munition Systems Project Office is seeking feedback on the draft RFP through an industry day to be held on March 27, 2018 at KBRWyle in Huntsville, Alabama. Questions for the industry day are due by March 13, 2018. One-on-one sessions will also be available on a first-come first-served basis on March 27 and potentially March 28, 2018. Interested parties must register through the provided eInvitations link by March 13 in order to attend and obtain the technical data package. Questions and answers from the industry day will be posted to FEDBIZOPS within 15 business days. The requirement encompasses production and engineering services for the Hydra-70 rocket system from fiscal year 2019 through fiscal year 2023 for the Department of the Army Materiel Command Aviation and Missile Life Cycle Management Command.

Final Questions and Answers 23 April 2018

View the file

Other files

File Type Posted
Final_Vendor_Question_65_25_Apr_18.pdf PDF
Hydra-70_Draft_RFP_and_Industry_Day_Questions_and_Answers_5_April_2018.pdf PDF
W31P4Q-17-R-0046_Hydra-70_Draft_RFP_as_of_26Mar2018.pdf PDF
Attach0006-_FFP_Hydra_Pricing_Tables.xlsm XLSM spreadsheet
Attach0010_MK2_Accept.pdf PDF
Attach0027__Delivery_Scenario.xls XLS spreadsheet
Attach0023_PMP.pdf PDF
Attach0017_SysRiskMgmtPlan.pdf PDF
Attach0002__IPT_Charter.pdf PDF
Attach0006-_FFP_Tables.xlsm XLSM spreadsheet
Attach0019_QASP.pdf PDF
ExB_CDRL.pdf PDF
Attach0016_Grain_TDPL.pdf PDF
Attach0007_ES_Pricing.xlsx XLSX spreadsheet
ExA_CDRL.pdf PDF
Attach0001_DSL.pdf PDF
Attach0025_Price_Template.xlsm XLSM spreadsheet
Attach0005_HazClass.pdf PDF
Attach0021__Refurb_Accept.pdf PDF
Attach0012_Changes.pdf PDF
Attach0011__OPSEC_DD254.pdf PDF
Attach0020_-_MK706_Accept.pdf PDF
Attach0022_M643_Accept.pdf PDF
Attach_0003_SOW.pdf PDF
Attach0009_HazMtl.pdf PDF
Attach0004_TDPList.pdf PDF
Attach0008-GFP.pdf PDF
Attach0024__Skill_Crosswalk.xlsx XLSX spreadsheet
Attach0013_WBS.pdf PDF
Attach0026_Preaward_Survey.pdf PDF
https://einvitations.afit.edu/inv/anim.cfm?i=374163&k=016646087D54 —
W31P4Q-17-R-0046_DRAFT_for_Hydra-70_FY19-23_Production_and_Engineering_Services.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hydra-70 Draft RFP and Industry Day Questions and Answers Continued 23-Apr-18

TrackingNo Title Contractor Question Govt Draft Response

RFP0046-055 RFP Question For DSL Attachment 0001 and CDRL A002 of Exhibit A is the appropriate DID reference DI-RELI- 80254 rather than DI-SESS-80255A?

No because DI-RELI-80254 is cancelled with no replacement. Will tailor the DI-SESS-80255A for clarification purposes.

RFP0046-056 RFP Question

There is a discrepancy between the SOW and CDRL A015 in Exhibit A. The SOW states that the FPI report shall be approved by the Government, but the CDRL does not indicate an approval is required (block 8 says N/A). Which is correct? Additionally, the SOW paragraph references FAT and TFAT hardware. Is the intent to reference FPI hardware instead?

The CDRL is correct. The SOW paragraph will be updated to remove approval language and FAT/TFAT references.

RFP0046-057 RFP Question

There are discrepancies between the Attachment 0016 MK90 Grain TDPL and the Grain section of the Attachment 0004 TDPL. Please clarify which grain TDPL takes precedence and/or update the TDPLs to match.

The discrepancies that were found are addressed as follows:

AS2543-R06Y2014/R10Y5001R1 are not on Att 4, the will not be added as they are against industry specs that we do not list on Att 4. They are still applicable to grain inspection/requirements.

IHSP07-512-R08R4329 - Will be added to Att 4 as Hanging Paper

MIL-STD-1322/53 - Industry Spec and will not be added to Att 4

233AS171 - Not on Att 4 because it is for the grain cage and the cage is not used in the production of Motors, which is what is called out on Att 4. Still applicable for Grain inspection/requirements.

233AS418-MI-P4566R1C1 - Reference to the ECP will be removed from Att 16 as it was cancelled (C1)

12987995 - Att 16 will be updated to reflect Revision E which was released by MI-P1692R2A1

LD288346 - Document is for the pallet for grain cages, it is not used in the production of motors and will not be added to Att 4. Still applicable in inspection/requirements for grain.

RFP0046-058 RFP Question There is no data in the LAP price point tab. Should the information on this tab match the same information on the same titled tab of attachment 0025? Yes, this has information in the 180320 version.

RFP0046-059 RFP Question There is a discrepancy between the MIL-DTL-11195 specification and refurbishment criteria for paint color. We believe the correct color is 34079. Please verify Color should be 34079 Att 22 will be updated.

RFP0046-060 RFP Question For DSL Attachment 0001 and CDRL A005 of Exhibit A, is the appropriate DID reference DI-MGMT- 81808 rather than DI-AVCS-80700?

The DI-AVCS-80700 is not the correct DID. The CDRL A005, the SOW and the DSL will be updated accordingly.

RFP0046-061 RFP Question The same requirement for CDRL B033 has defined tailoring for Format 6 IMS/IMP, should those same tailoring instructions be included here for consistency? No, these are two different contract structures and therefore the tailoring will not be the same.

RFP0046-062 RFP Question P/N 13654277 is not the Container Assembly, Rocket. It should be 13654227 Correct. The RFP will need to be updated to reflect 13654227.

RFP0046-063 RFP Question

In the amendment to the DRFP a paragraph was added stating “The Government may waive the requirement for the first article approval test...FATs proposed for waiver shall be identified and presented to the government in the contract proposal. All costs associated with proposed waived FATs shall be disclosed to the Government and excluded from the contract price.”

Our understanding is the costs for the waived FATs should be excluded from the production unit prices, but the costs should be disclosed and included in the First Article Test CLINs (XXXXFA) only for evaluation purposes. Is that correct? Please clarify.

Correct, all FAT costs shall be excluded from the hardware unit price. However, costs of each of the First Article Test CLINs identified in Attachment 6 are to be disclosed and evaluated by the Government.

RFP0046-064 RFP Question

Why is a waiver of FAT required? Since the First Article CLINs (XXXXFA) are options, wouldn’t the exercise of the CLIN dictate the requirement for a first article approval test? If not exercised, then it is waived?

: FATs that normally would be required by contract (i.e., meet the criteria for FATs in Attach 12 of RFP) may be waived by the Gov, if the supplies are “identical or similar” to supplies that have been previously furnished and accepted by the Government. The Government may elect not to exercise the option.