This document provides details regarding a draft solicitation for Hydra-70 rocket system production and engineering services from fiscal years 2019 through 2023. The Joint Attack Munition Systems Project Office is seeking industry feedback on the draft solicitation through an industry day on March 27, 2018 at KBRwyle in Huntsville, Alabama. Interested parties must register by March 13, 2018 through the provided eInvitations link. The industry day will include an open forum as well as scheduled one-on-one sessions on a first come, first served basis to discuss the draft solicitation and requirement. Questions and responses will be posted to FEDBIZOPS within 15 business days of the industry day. The technical data package will also be provided to registered recipients through the eInvitations system.

Attachment 0012 Changes and Verification 0046

View the file

Other files

File Type Posted
Final_Vendor_Question_65_25_Apr_18.pdf PDF
Hydra-70_Final_Questions_and_Answers.pdf PDF
Hydra-70_Draft_RFP_and_Industry_Day_Questions_and_Answers_5_April_2018.pdf PDF
W31P4Q-17-R-0046_Hydra-70_Draft_RFP_as_of_26Mar2018.pdf PDF
Attach0006-_FFP_Hydra_Pricing_Tables.xlsm XLSM spreadsheet
Attach0010_MK2_Accept.pdf PDF
Attach0027__Delivery_Scenario.xls XLS spreadsheet
Attach0023_PMP.pdf PDF
Attach0017_SysRiskMgmtPlan.pdf PDF
Attach0002__IPT_Charter.pdf PDF
Attach0006-_FFP_Tables.xlsm XLSM spreadsheet
Attach0019_QASP.pdf PDF
ExB_CDRL.pdf PDF
Attach0016_Grain_TDPL.pdf PDF
Attach0007_ES_Pricing.xlsx XLSX spreadsheet
ExA_CDRL.pdf PDF
Attach0001_DSL.pdf PDF
Attach0025_Price_Template.xlsm XLSM spreadsheet
Attach0005_HazClass.pdf PDF
Attach0021__Refurb_Accept.pdf PDF
Attach0011__OPSEC_DD254.pdf PDF
Attach0020_-_MK706_Accept.pdf PDF
Attach0022_M643_Accept.pdf PDF
Attach_0003_SOW.pdf PDF
Attach0009_HazMtl.pdf PDF
Attach0004_TDPList.pdf PDF
Attach0008-GFP.pdf PDF
Attach0024__Skill_Crosswalk.xlsx XLSX spreadsheet
Attach0013_WBS.pdf PDF
Attach0026_Preaward_Survey.pdf PDF
https://einvitations.afit.edu/inv/anim.cfm?i=374163&k=016646087D54 —
W31P4Q-17-R-0046_DRAFT_for_Hydra-70_FY19-23_Production_and_Engineering_Services.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment XX

CHANGES and VERIFICATION REQUIRED

Number Description of Changes

R e q u a li fi c a ti o n

(S O

W

.2 .1

F ir s t

A rt ic le

T e s t

(S O

W

.2 .1

T a il o re d

F A

T

S O

W

.2 .1

F ir s t

P ie c e I n s p e c ti o n

(S O

W

.2 .2

In te rn a l V a li d a ti o n

S

O W

.2

.3

100 Design Changes

101 Design changes X

102 Changes to physical features, raw materials or dimensions that may affect fit, form or function of hardware X X

Changes that affect items requiring outside agency involvement (i.e. Navy Weapon System

Explosive Safety Review Board (WSESRB), Army Fuze Board, etc.)

X X

200 Changes to Manufacturing Facility

Relocation of any equipment, tooling, or test/inspecion equipment, etc. used to manufacture deliverable hardware within same building, or relocation on same or other property.

X X X

202 Out of production for a period exceeding 12 months (See Note A Below) X X

Maintenance: Dismantling manufacturing equipment and/or acceptance test/inspection equipment that may affect fit, form or function of manufactured hardware.

X X

300 Changes to Manufacturing Processes

301 Change to manufacturing processes or Tooling that may affect fit, form, or function. X X

302 Changes to casting and press molds that do not impact form, fit or function. X

303 Preventive maintenance X

400 Changes to Material or Supply of Material

401 Change in suppliers or materials for manufacture, inspection/test and/or acceptance of hardware/software or materials X X

500 Changes Not Listed within Attachment 12 X X X X X

Notes:

A. If the supplier has not manufactured and delivered the item in question within the past 12 months, then that item will require a revalidation of manufacturing processes, etc. JAMS may waive the out of production revalidation requirement pending complexity and criticality of the item.

B. The level of validation identified will be agreed upon between the contractor and JAMS; in the event an agreement is not achieved, JAMS will determine the level of validation. JAMS may minimize the level of verification or may not require verification of some changes. Any undocumented changes that may affect fit, form or function not listed above shall be discussed with the applicable IPT and the level of validation will be determined by JAMS.

W31P4Q-19-X-XXXX

Attachment #0012

31 January 2018