ExA_CDRL.pdf
PDF 869 KB Posted
- Solicitation number
- W31P4Q-17-R-0046
About this file
This document outlines a federal contract opportunity for Hydra-70 rocket system production and engineering services from fiscal years 2019 through 2023. The Joint Attack Munition Systems Project Office is soliciting industry feedback on a draft RFP through an industry day on March 27, 2018. Interested parties must register by March 13 to receive technical data packages and secure access to the industry day event at KBRWyle facilities in Huntsville, Alabama. The opportunity includes production as well as engineering support for the 2.75-inch Hydra-70 rocket system. Industry questions and government responses will be posted to FEDBIZOPS within 15 business days of the industry engagement. Interested offerors are invited to provide written input on requirements and the draft RFP by March 13 to help shape the final solicitation.
Exhibit A Contract Data Requirements List
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W31P4Q-19-X-XXXX
Exhibit A
31 January 2018
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001 Presentation Material Program Management Reviews
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-81373 SOW Section C-3.1, C-10.6.1.3
SFAE-MSL-JAP
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT
QTRLY SEE 16
b. COPIES
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Final
A
N/A SEE 16
Reg
Repro
16. REMARKS:
Blk 8, 13: Government approval or disapproval within 10 calendar days of receipt. If disapproved, submit revisions and comment responses within 10 calendar days after receipt of Government comments.
Blk 12: Submit presentation NLT 5 calendar days prior to scheduled Program Management Review.
Blk 9 - For distribution statement and export control act warning – See end page of CDRL package.
Blk 14: Delivery shall be in electronic media (Microsoft
Office Products). Electronic notification via email IAW clause C-6.6.
SEE 16
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Kevin Connelly 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER RELI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A002 Failure Summary and Analysis Report Corrective Action Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80255A SOW section
C-5.1.1.1.2.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE 16 SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 14 calendar days of receipt. If disapproved, submit revisions and comment responses within 14 calendar days after
Blk 10, 12, 13: The Corrective Action Plan shall be provided only after Failure Summary and Analysis Report
(FSAR) approval. Submit Corrective Action Plan no later than 30 calendar days after approval of the FSAR.
clause C-6.6.; CDE; collaborative data environment.
/S/ Kevin Jackson 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER RELI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A003 Failure Summary and Analysis Report Failure Analysis Reporting
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80255A SOW C-5.1.1.1.2.1 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ASREQ SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of failure incident. If disapproved, submit revisions and comment responses within 30 calendar days after receipt of Government comments.
Blk 10: Updates shall be made as LAT Failure Reports are created.
Blk 12, 13: Submit LAT Failure Report no later than 30 calendar days after failure incident.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004 System Safety Hazard Analysis (SSHA)
Report
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-80101C SOW Section C-8.3.2 SFAE-MSL-JAP
INSERT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION IN
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.
Blk 10, 12, 13. Initial submission shall be a minimum of
90 calendar days prior to first contractor test or 75 calendar days prior to first Government test, whichever occurs first. Submission of hazard explosive data to support Interim Hazard Classification requests shall be provided a minimum of 60 calendar days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification. This data shall be submitted as an appendix to the Safety Assessment Report (CDRL A003).
Blk 14. Delivery shall be in electronic media (Microsoft
Office Products) via the Collaborative Data Environment
(CDE). Electronic notification shall be sent via email
IAW clause C-6.6.
/S/Satonya Hobson-Williams 04 May 15 /S/ Anthony Howard 04 May 15
DD Form 1423-1, 1 Jun 90
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MCCR
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
A005 Computer Software Product End Items Risk Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-AVCS-80700 SOW Section C-8.1 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
N/A 60 DAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor
Blk 13. Submit revisions for changes to parts, material & processes.
(CDE). Electronic notification shall be sent via email
IAW clause C-6.6.
/S/Satonya Hobson-Williams 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 Test Plan First Article Test (FAT), Tailored
First Article Test (TFAT) and
Requalification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80566A SOW section C-5.2.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions and comment responses within 30 calendar days after
Blk 10: As required in accordance with the SOW except as agreed to by the IPT.
Blk 12, 13: Submit 60 calendar days prior to test, except as agreed to by the Government.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
A007 Engineering Release Record (ERR) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80463D SOW C-6.2.1, C-10.9.3.5 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
XX
SECT. B
8. APP CODE
A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. The record will be approved/disapproved by the
Government in conjunction with the ECP, DI-SESS-
80639D.
Blk 10, 12, 13. The document shall be created and submitted with the formal ECP (see CDRL A010).
Blk 14. Any classified data shall be sent to JAMS
Security; SFAE-MSL-JAS. Referenced to: SFAE-MSL-
JAP. If the ECP is unclassified data, then the ERR electronic data shall be submitted as additional data using the “Supplemental Information” block of the Multi-user
ECP Automated Review System (MEARS).
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Anthony Howard 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A008 Technical Report-Study/Services Single Point of Failure MGMT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B SOW section C-4.4 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
N/A 120 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 13: Annual delivery to include first tier suppliers.
/S/ Brad Schroer 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A009 Test Procedure Lot Acceptance Test (LAT)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80603A SOW section C-5.1.1.1.2
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10: A plan procedure shall be submitted for Warheads, Motors (Including Static), All-Up Round (AUR), Grain, MK311, MK26, Igniters and Fuzes as required and for each revised plan.
Blk 12: Submit 60 days prior to LAT event.
Blk 13: Subsequent submissions are as required when revisions to the approved plan procedure are necessary.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket
System
W31P4Q-19-X-XXXX
A010 Engineering Change Proposal (ECP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80639D SOW Section C-6.2.1, C-6.4, C-10.9.3.2
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 10, 12. Generated as required to propose changes to existing technical baseline.
Blk 8, 13. The Government Configuration Control Board
(CCB) will approve or comment on and return the formal
ECP for rewrite as necessary. Dates for contractor resubmittal will be contained in the letter returning the formal ECP.
Blk 14. Any classified data shall be sent to JAMS Security;
SFAE-MSL-JAS. Referenced to: SFAE-MSL-JAP. If the
ECP is electronic: One copy shall be submitted using the
Multi-user ECP Automated Review System (MEARS) addressed to assigned CDM Analyst in JAMS and
USARMY Redstone Arsenal AMCOM Mailbox IMMC-
MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.
mailto:usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
A011 Request for Variance (RFV) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80640D SOW C-6.2.1 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 10, 12. RFV shall be submitted if the contractor builds deficient hardware that is non-compliant or conflicts with the government approved TDP.
Blk 8, 13. The Government Configuration Control Board
(CCB) will approve or comment on and return the formal
RFV for rewrite as necessary. Dates for contractor resubmittal will be contained in the letter returning the formal RFV.
Blk 14. Any classified data shall be sent to JAMS Security;
SFAE-MSL-JAS. Referenced to: SFAE-MSL-JAP. If the
RFV is electronic: One copy shall be submitted using the
Multi-user ECP Automated Review System (MEARS) addressed to assigned CDM Analyst in JAMS and
USARMY Redstone Arsenal AMCOM Mailbox IMMC-
MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
A012 Notice of Revision (NOR) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80642D SOW Section C-6.2.1, C-6.5, C-10.9.3.2
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
SEE 16
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. The document will be approved/disapproved by the
Government and corrected in conjunction with the ECP, DI-SESS-80639D.
Blk 10, 12, 13. The document shall be created and submitted with each ECP, DI-SESS-80639D.
Blk 14. Any classified data shall be sent to Security; SFAE-
MSL-JAS. Referenced to: SFAE-MSL-JAP. If the ECP is electronic, the NOR copy shall be submitted using the
Multi-user ECP Automated Review System (MEARS) addressed to USARMY Redstone Arsenal AMCOM
Mailbox IMMC-MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A013 Test / Inspection Report Lot Acceptance Test (LAT)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW Section C-5.1.1.1.2 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
16. REMA; 14RKS:
Blk 8; 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions and comment responses within 45 calendar days after
Blk 10, 12: Submit within 45 calendar days after completion of test.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
A014
Test/Inspection Report
First Article Test (FAT), Tailored First Article Test
(TFAT) and Requalification
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW Section C-5.2.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions
Blk 10: As required in accordance with the SOW except as agreed to by the IPT.
Blk 12: Submit within 45 calendar days after completion of test.
Blk 14: Delivery shall be in electronic media (Microsoft
Office Products). Electronic notification via email IAW
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
A015 Test / Inspection Report First Piece Inspection (FPI)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B SOW Section C-5.2.2 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 9: Distribution Statement C: Distribution authorized to
U.S. Government agencies and their contractors, Administrative or Operational Use, 31 Aug 2012. Other requests for this document shall be referred to: Project
Manager Joint Attack Munition Systems Project Office
ATTN: SFAE-MSL-JAP Redstone Arsenal, AL 35898-
5000 Export Control Act Warning: Required, see end page of CDRL package.
Blk 10;13: As required in accordance with the SOW except as agreed to by the IPT.
Blk 12: Submit within 45 calendar days after completion of test And prior to submission of any system, subsystem, component, or material to the Government for inspection and acceptance.
SFAE-MSL-JAPP
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A016 INTEGRATED PROGRAM
MANAGEMENT REPORT (IPMR)
INTEGRATED MASTER
SCHEDULE (IMS)/INTEGRATED
MASTER PLAN (IMP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81861A SOW SECTION C-3.4 SFAE-MSL-JAP
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE 16 90 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 4: Tailoring as set forth in the Document Summary
List.
Blk 8, 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions
Blk 10:
Format 6: Quarterly
0 1 0
15. TOTAL 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
/S/ Allen Haiges 04 May 15 /S/ ANTHONY HOWARD 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A017 Contractor’s Configuration
Management Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80858C SOW Section C-6.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
N/A 30 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval or disapproval within 30 calendar days after receipt. Submit revisions and comment responses within 30 calendar days after receipt of
Government comments.
(CDE). Electronic notification shall be sent via email IAW
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A018 Critical Safety Item, Characteristic and
Critical Defect Reporting
Critical Item Failure Reporting
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-80970A SOW Section C-5.1.1.4.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10: As required for each critical item defect.
Blk 12: Contractor shall provide report within 3 calendar days after any occurrence of any critical defect.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A019 CONFIGURATION AUDIT
SUMMARY REPORT
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81022D SOW Section C-6.6 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A N/A
Blk 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 15 calendar
Blk 12. Submission shall be within 45 calendar days following completion of the audit..
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER PACK
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A020 Performance Oriented Packaging Test
Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-PACK-81059A SOW Section C-7.1.1
AMSAM-MMC-MM-DP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
1TIME SEE 16
SECT. B
8. APP CODE
D
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor
Blk 12. Submission shall be within 45 calendar days following completion of each test.
AMSAM-MMC-MM-
DP
/S/ David Kegel 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A TDP TM OTHER CMAN
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A021 Configuration Status Accounting
Information
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81253C SOW Section C-6.3 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
QTRLY 90 DAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 14. Delivery shall be in electronic media via the
Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.6.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER SAFT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
A022
Explosive Hazard Classification Data
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SAFT-81299C SOW Section C-8.4 SFAE-MSL-JAP
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8; 13: Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor
Blk 10, 12: Initial submission shall be a minimum of 90 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first.
Data shall be submitted in conjunction with submittal of the Safety Assessment Report (CDRL A003).
Submission of hazard explosives data to support Interim
Hazard Classification requests shall be a minimum of 14 calendar days prior to proposed shipment.
/S/ Satonya Hobson-Williams 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A023 Contract Work Breakdown Structure
(CWBS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81334D SOW Section, C-3.3.1 SFAE-MSL-JAB
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SECT. B
8. APP CODE
E
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8. Government approval or disapproval within 30 calendar days after receipt. Submit revisions and comment responses within 15 calendar days after receipt of Government comments.
Blk 9 - For distribution statement and export control act warning –
See end page of CDRL package.
10 through 13. Prepare the CWBS in accordance with DI-MGMT-
81334D (most recently approved version), the CSDR Manual
(DoDM 5000.04-M-1), and the OSD Deputy Director, Cost
Assessment-approved contract CSDR Plan. The CSDR Plan is included as contract Attachment 013. The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil.
Blk 14. Delivery shall be in electronic media via the Collaborative
Data Environment (CDE) and to the DCARC. Electronic notification shall be sent via email IAW clause C-6.6.. Contractors shall be required to submit CCD reports at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. All CCD reports shall be submitted electronically using the CSDR Submit-
Review System. The required file format for each CCD report is specified in its Data Item Description (DID). The CWBS Index and
Dictionary must be submitted in Microsoft Word-compatible files.
Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload
CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC
Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. DCARC Portal users with a DoD-issued CAC shall be able to register their CAC with their
DCARC Portal account, enabling CAC login. All DCARC Portal accounts need to be renewed at least annually.
SFAE-MSL-JAB
DCARC
15. TOTAL 0 2 0
/S/ Duncan Tovar 04 May 15 /S/ Anthony Howard 04 May 15
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A024 Hazardous Material Management
Program (HMMP) Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-81397C SOW Section C-8.5.2 AMSAM-EN
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ANNLY 1 YAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A AS REQ
Blk 8, 10, and 13. Government approval/disapproval within 30 days of submissions. If disapproved the contractor shall resubmit the report (corrected) within 30
AMSAM-EN
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MISC
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-Inch Rocket System
W31P4Q-19-X-XXXX
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A025 Hazardous Material Management
Program (HMMP) Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81398C SOW Section C-8.5.1 AMSAM-EN
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ANNLY 1 YAC
SECT. B
8. APP CODE
C
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
N/A AS REQ
Blk 8, 13. Government approval/disapproval within 30 days of submissions. If disapproved the contractor shall resubmit the report (corrected) within 30 days of receipt of
AMSAM-EN
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER MFFP
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
HYDRA-70 2.75-INCH
ROCKET SYSTEM
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
17. PRICE GROUP
A026 Corrosion Prevention and Control Plan CPDC Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MFFP-81403A SOW Section C-5.4.1
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
SEE 16 120 DAC
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE Draft
Blk 8: Government approval or disapproved within 30 calendar days of receipt. If disapproved, submit revisions
Blk 10, 13: Submit revisions for annual Government approval no later than 365 Calendar days after initial plan approval.
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .