This document outlines a federal contract opportunity for Hydra-70 rocket system production and engineering services from fiscal years 2019 through 2023. The Joint Attack Munition Systems Project Office is soliciting industry feedback on a draft RFP through an industry day on March 27, 2018. Interested parties must register by March 13 to receive technical data packages and secure access to the industry day event at KBRWyle facilities in Huntsville, Alabama. The opportunity includes production as well as engineering support for the 2.75-inch Hydra-70 rocket system. Industry questions and government responses will be posted to FEDBIZOPS within 15 business days of the industry engagement. Interested offerors are invited to provide written input on requirements and the draft RFP by March 13 to help shape the final solicitation.

Exhibit A Contract Data Requirements List

View the file

Other files

File Type Posted
Final_Vendor_Question_65_25_Apr_18.pdf PDF
Hydra-70_Final_Questions_and_Answers.pdf PDF
Hydra-70_Draft_RFP_and_Industry_Day_Questions_and_Answers_5_April_2018.pdf PDF
W31P4Q-17-R-0046_Hydra-70_Draft_RFP_as_of_26Mar2018.pdf PDF
Attach0006-_FFP_Hydra_Pricing_Tables.xlsm XLSM spreadsheet
Attach0010_MK2_Accept.pdf PDF
Attach0027__Delivery_Scenario.xls XLS spreadsheet
Attach0023_PMP.pdf PDF
Attach0017_SysRiskMgmtPlan.pdf PDF
Attach0002__IPT_Charter.pdf PDF
Attach0006-_FFP_Tables.xlsm XLSM spreadsheet
Attach0019_QASP.pdf PDF
ExB_CDRL.pdf PDF
Attach0016_Grain_TDPL.pdf PDF
Attach0007_ES_Pricing.xlsx XLSX spreadsheet
Attach0001_DSL.pdf PDF
Attach0025_Price_Template.xlsm XLSM spreadsheet
Attach0005_HazClass.pdf PDF
Attach0021__Refurb_Accept.pdf PDF
Attach0012_Changes.pdf PDF
Attach0011__OPSEC_DD254.pdf PDF
Attach0020_-_MK706_Accept.pdf PDF
Attach0022_M643_Accept.pdf PDF
Attach_0003_SOW.pdf PDF
Attach0009_HazMtl.pdf PDF
Attach0004_TDPList.pdf PDF
Attach0008-GFP.pdf PDF
Attach0024__Skill_Crosswalk.xlsx XLSX spreadsheet
Attach0013_WBS.pdf PDF
Attach0026_Preaward_Survey.pdf PDF
https://einvitations.afit.edu/inv/anim.cfm?i=374163&k=016646087D54 —
W31P4Q-17-R-0046_DRAFT_for_Hydra-70_FY19-23_Production_and_Engineering_Services.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31P4Q-19-X-XXXX

Exhibit A

31 January 2018

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Presentation Material Program Management Reviews

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ADMN-81373 SOW Section C-3.1, C-10.6.1.3

SFAE-MSL-JAP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT

QTRLY SEE 16

b. COPIES

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A

N/A SEE 16

Reg

Repro

16. REMARKS:

Blk 8, 13: Government approval or disapproval within 10 calendar days of receipt. If disapproved, submit revisions and comment responses within 10 calendar days after receipt of Government comments.

Blk 12: Submit presentation NLT 5 calendar days prior to scheduled Program Management Review.

Blk 9 - For distribution statement and export control act warning – See end page of CDRL package.

Blk 14: Delivery shall be in electronic media (Microsoft

Office Products). Electronic notification via email IAW clause C-6.6.

SEE 16

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Kevin Connelly 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER RELI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

A002 Failure Summary and Analysis Report Corrective Action Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80255A SOW section

C-5.1.1.1.2.1

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SEE 16 SEE 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8: Government approval or disapproval within 14 calendar days of receipt. If disapproved, submit revisions and comment responses within 14 calendar days after

Blk 10, 12, 13: The Corrective Action Plan shall be provided only after Failure Summary and Analysis Report

(FSAR) approval. Submit Corrective Action Plan no later than 30 calendar days after approval of the FSAR.

clause C-6.6.; CDE; collaborative data environment.

/S/ Kevin Jackson 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER RELI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

A003 Failure Summary and Analysis Report Failure Analysis Reporting

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80255A SOW C-5.1.1.1.2.1 SFAE-MSL-JAP

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ASREQ SEE 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8: Government approval or disapproval within 30 calendar days of failure incident. If disapproved, submit revisions and comment responses within 30 calendar days after receipt of Government comments.

Blk 10: Updates shall be made as LAT Failure Reports are created.

Blk 12, 13: Submit LAT Failure Report no later than 30 calendar days after failure incident.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket

System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 System Safety Hazard Analysis (SSHA)

Report

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80101C SOW Section C-8.3.2 SFAE-MSL-JAP

INSERT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION IN

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

Blk 10, 12, 13. Initial submission shall be a minimum of

90 calendar days prior to first contractor test or 75 calendar days prior to first Government test, whichever occurs first. Submission of hazard explosive data to support Interim Hazard Classification requests shall be provided a minimum of 60 calendar days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification. This data shall be submitted as an appendix to the Safety Assessment Report (CDRL A003).

Blk 14. Delivery shall be in electronic media (Microsoft

Office Products) via the Collaborative Data Environment

(CDE). Electronic notification shall be sent via email

IAW clause C-6.6.

/S/Satonya Hobson-Williams 04 May 15 /S/ Anthony Howard 04 May 15

DD Form 1423-1, 1 Jun 90

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MCCR

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket

System

W31P4Q-19-X-XXXX

A005 Computer Software Product End Items Risk Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-AVCS-80700 SOW Section C-8.1 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

N/A 60 DAC

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor

Blk 13. Submit revisions for changes to parts, material & processes.

(CDE). Electronic notification shall be sent via email

IAW clause C-6.6.

/S/Satonya Hobson-Williams 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006 Test Plan First Article Test (FAT), Tailored

First Article Test (TFAT) and

Requalification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80566A SOW section C-5.2.1

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions and comment responses within 30 calendar days after

Blk 10: As required in accordance with the SOW except as agreed to by the IPT.

Blk 12, 13: Submit 60 calendar days prior to test, except as agreed to by the Government.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket

System

W31P4Q-19-X-XXXX

A007 Engineering Release Record (ERR) N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80463D SOW C-6.2.1, C-10.9.3.5 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

XX

SECT. B

8. APP CODE

A

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8. The record will be approved/disapproved by the

Government in conjunction with the ECP, DI-SESS-

80639D.

Blk 10, 12, 13. The document shall be created and submitted with the formal ECP (see CDRL A010).

Blk 14. Any classified data shall be sent to JAMS

Security; SFAE-MSL-JAS. Referenced to: SFAE-MSL-

JAP. If the ECP is unclassified data, then the ERR electronic data shall be submitted as additional data using the “Supplemental Information” block of the Multi-user

ECP Automated Review System (MEARS).

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Anthony Howard 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

A008 Technical Report-Study/Services Single Point of Failure MGMT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B SOW section C-4.4 SFAE-MSL-JAP

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

N/A 120 DAC

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions

Blk 13: Annual delivery to include first tier suppliers.

/S/ Brad Schroer 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

A009 Test Procedure Lot Acceptance Test (LAT)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80603A SOW section C-5.1.1.1.2

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions

Blk 10: A plan procedure shall be submitted for Warheads, Motors (Including Static), All-Up Round (AUR), Grain, MK311, MK26, Igniters and Fuzes as required and for each revised plan.

Blk 12: Submit 60 days prior to LAT event.

Blk 13: Subsequent submissions are as required when revisions to the approved plan procedure are necessary.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket

System

W31P4Q-19-X-XXXX

A010 Engineering Change Proposal (ECP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80639D SOW Section C-6.2.1, C-6.4, C-10.9.3.2

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

SEE 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 10, 12. Generated as required to propose changes to existing technical baseline.

Blk 8, 13. The Government Configuration Control Board

(CCB) will approve or comment on and return the formal

ECP for rewrite as necessary. Dates for contractor resubmittal will be contained in the letter returning the formal ECP.

Blk 14. Any classified data shall be sent to JAMS Security;

SFAE-MSL-JAS. Referenced to: SFAE-MSL-JAP. If the

ECP is electronic: One copy shall be submitted using the

Multi-user ECP Automated Review System (MEARS) addressed to assigned CDM Analyst in JAMS and

USARMY Redstone Arsenal AMCOM Mailbox IMMC-

MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.

mailto:usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

A011 Request for Variance (RFV) N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80640D SOW C-6.2.1 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

SEE 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 10, 12. RFV shall be submitted if the contractor builds deficient hardware that is non-compliant or conflicts with the government approved TDP.

Blk 8, 13. The Government Configuration Control Board

(CCB) will approve or comment on and return the formal

RFV for rewrite as necessary. Dates for contractor resubmittal will be contained in the letter returning the formal RFV.

Blk 14. Any classified data shall be sent to JAMS Security;

SFAE-MSL-JAS. Referenced to: SFAE-MSL-JAP. If the

RFV is electronic: One copy shall be submitted using the

Multi-user ECP Automated Review System (MEARS) addressed to assigned CDM Analyst in JAMS and

USARMY Redstone Arsenal AMCOM Mailbox IMMC-

MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

A012 Notice of Revision (NOR) N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80642D SOW Section C-6.2.1, C-6.5, C-10.9.3.2

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

SEE 16

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8. The document will be approved/disapproved by the

Government and corrected in conjunction with the ECP, DI-SESS-80639D.

Blk 10, 12, 13. The document shall be created and submitted with each ECP, DI-SESS-80639D.

Blk 14. Any classified data shall be sent to Security; SFAE-

MSL-JAS. Referenced to: SFAE-MSL-JAP. If the ECP is electronic, the NOR copy shall be submitted using the

Multi-user ECP Automated Review System (MEARS) addressed to USARMY Redstone Arsenal AMCOM

Mailbox IMMC-MEARS Support usarmy.redstone.amcom.mbx.immc-mears-support@mail.mil.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

A013 Test / Inspection Report Lot Acceptance Test (LAT)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B SOW Section C-5.1.1.1.2 SFAE-MSL-JAP

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

16. REMA; 14RKS:

Blk 8; 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions and comment responses within 45 calendar days after

Blk 10, 12: Submit within 45 calendar days after completion of test.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

A014

Test/Inspection Report

First Article Test (FAT), Tailored First Article Test

(TFAT) and Requalification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B SOW Section C-5.2.1

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8; 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions

Blk 10: As required in accordance with the SOW except as agreed to by the IPT.

Blk 12: Submit within 45 calendar days after completion of test.

Blk 14: Delivery shall be in electronic media (Microsoft

Office Products). Electronic notification via email IAW

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

A015 Test / Inspection Report First Piece Inspection (FPI)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B SOW Section C-5.2.2 SFAE-MSL-JAP

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 9: Distribution Statement C: Distribution authorized to

U.S. Government agencies and their contractors, Administrative or Operational Use, 31 Aug 2012. Other requests for this document shall be referred to: Project

Manager Joint Attack Munition Systems Project Office

ATTN: SFAE-MSL-JAP Redstone Arsenal, AL 35898-

5000 Export Control Act Warning: Required, see end page of CDRL package.

Blk 10;13: As required in accordance with the SOW except as agreed to by the IPT.

Blk 12: Submit within 45 calendar days after completion of test And prior to submission of any system, subsystem, component, or material to the Government for inspection and acceptance.

SFAE-MSL-JAPP

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A016 INTEGRATED PROGRAM

MANAGEMENT REPORT (IPMR)

INTEGRATED MASTER

SCHEDULE (IMS)/INTEGRATED

MASTER PLAN (IMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81861A SOW SECTION C-3.4 SFAE-MSL-JAP

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SEE 16 90 DAC

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 4: Tailoring as set forth in the Document Summary

List.

Blk 8, 13: Government approval or disapproval within 45 calendar days of receipt. If disapproved, submit revisions

Blk 10:

Format 6: Quarterly

0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Allen Haiges 04 May 15 /S/ ANTHONY HOWARD 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A017 Contractor’s Configuration

Management Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80858C SOW Section C-6.1

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

N/A 30 DAC

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8; 13: Government approval or disapproval within 30 calendar days after receipt. Submit revisions and comment responses within 30 calendar days after receipt of

Government comments.

(CDE). Electronic notification shall be sent via email IAW

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A018 Critical Safety Item, Characteristic and

Critical Defect Reporting

Critical Item Failure Reporting

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80970A SOW Section C-5.1.1.4.1

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8; 13: Government approval or disapproval within 30 calendar days of receipt. If disapproved, submit revisions

Blk 10: As required for each critical item defect.

Blk 12: Contractor shall provide report within 3 calendar days after any occurrence of any critical defect.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER CMAN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A019 CONFIGURATION AUDIT

SUMMARY REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81022D SOW Section C-6.6 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A N/A

Blk 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 15 calendar

Blk 12. Submission shall be within 45 calendar days following completion of the audit..

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER PACK

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A020 Performance Oriented Packaging Test

Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-PACK-81059A SOW Section C-7.1.1

AMSAM-MMC-MM-DP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

1TIME SEE 16

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor

Blk 12. Submission shall be within 45 calendar days following completion of each test.

AMSAM-MMC-MM-

DP

/S/ David Kegel 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

A TDP TM OTHER CMAN

D. SYSTEM/ITEM

E. CONTRACT/PR NO.

F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A021 Configuration Status Accounting

Information

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81253C SOW Section C-6.3 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

QTRLY 90 DAC

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 14. Delivery shall be in electronic media via the

Collaborative Data Environment (CDE). Electronic notification shall be sent via email IAW clause C-6.6.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

A022

Explosive Hazard Classification Data

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-81299C SOW Section C-8.4 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8; 13: Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor

Blk 10, 12: Initial submission shall be a minimum of 90 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first.

Data shall be submitted in conjunction with submittal of the Safety Assessment Report (CDRL A003).

Submission of hazard explosives data to support Interim

Hazard Classification requests shall be a minimum of 14 calendar days prior to proposed shipment.

/S/ Satonya Hobson-Williams 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A023 Contract Work Breakdown Structure

(CWBS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81334D SOW Section, C-3.3.1 SFAE-MSL-JAB

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

E

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8. Government approval or disapproval within 30 calendar days after receipt. Submit revisions and comment responses within 15 calendar days after receipt of Government comments.

Blk 9 - For distribution statement and export control act warning –

See end page of CDRL package.

10 through 13. Prepare the CWBS in accordance with DI-MGMT-

81334D (most recently approved version), the CSDR Manual

(DoDM 5000.04-M-1), and the OSD Deputy Director, Cost

Assessment-approved contract CSDR Plan. The CSDR Plan is included as contract Attachment 013. The CSDR Manual is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil.

Blk 14. Delivery shall be in electronic media via the Collaborative

Data Environment (CDE) and to the DCARC. Electronic notification shall be sent via email IAW clause C-6.6.. Contractors shall be required to submit CCD reports at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. All CCD reports shall be submitted electronically using the CSDR Submit-

Review System. The required file format for each CCD report is specified in its Data Item Description (DID). The CWBS Index and

Dictionary must be submitted in Microsoft Word-compatible files.

Data submitters must register through the DCARC website and possess a DoD-issued CAC or DoD-approved ECA digital certificate to obtain a DCARC Portal account and be authorized to upload

CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC

Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. DCARC Portal users with a DoD-issued CAC shall be able to register their CAC with their

DCARC Portal account, enabling CAC login. All DCARC Portal accounts need to be renewed at least annually.

SFAE-MSL-JAB

DCARC

15. TOTAL 0 2 0

/S/ Duncan Tovar 04 May 15 /S/ Anthony Howard 04 May 15

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A024 Hazardous Material Management

Program (HMMP) Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-81397C SOW Section C-8.5.2 AMSAM-EN

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ANNLY 1 YAC

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A AS REQ

Blk 8, 10, and 13. Government approval/disapproval within 30 days of submissions. If disapproved the contractor shall resubmit the report (corrected) within 30

AMSAM-EN

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-Inch Rocket System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A025 Hazardous Material Management

Program (HMMP) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81398C SOW Section C-8.5.1 AMSAM-EN

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ANNLY 1 YAC

SECT. B

8. APP CODE

C

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A AS REQ

Blk 8, 13. Government approval/disapproval within 30 days of submissions. If disapproved the contractor shall resubmit the report (corrected) within 30 days of receipt of

AMSAM-EN

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER MFFP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

HYDRA-70 2.75-INCH

ROCKET SYSTEM

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

17. PRICE GROUP

A026 Corrosion Prevention and Control Plan CPDC Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MFFP-81403A SOW Section C-5.4.1

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SEE 16 120 DAC

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Blk 8: Government approval or disapproved within 30 calendar days of receipt. If disapproved, submit revisions

Blk 10, 13: Submit revisions for annual Government approval no later than 365 Calendar days after initial plan approval.

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA.