About this file

This document is a Contract Data Requirements List (CDRL) for the Hydra-70 Rocket Weapon System program. It outlines thirty-four technical data items required to be delivered under the contract, including engineering and technical services reports, system safety documents, software documentation, test plans and reports, reliability predictions, and program management reports. Delivery of the data items is required at various intervals throughout contract performance, with first deliverables due within the first few months and subsequent updates delivered on a recurring basis. The data will be provided electronically through the program's Integrated Data Environment and mutually agreed digital media. The Government will review and approve deliverables within 30 days and requests revisions be submitted within 30 days of review comments.

Exhibit A Contract Data Requirements List

View the file

Other files

File Type Posted
Final_Vendor_Question_65_25_Apr_18.pdf PDF
Hydra-70_Final_Questions_and_Answers.pdf PDF
Hydra-70_Draft_RFP_and_Industry_Day_Questions_and_Answers_5_April_2018.pdf PDF
W31P4Q-17-R-0046_Hydra-70_Draft_RFP_as_of_26Mar2018.pdf PDF
Attach0006-_FFP_Hydra_Pricing_Tables.xlsm XLSM spreadsheet
Attach0010_MK2_Accept.pdf PDF
Attach0027__Delivery_Scenario.xls XLS spreadsheet
Attach0023_PMP.pdf PDF
Attach0017_SysRiskMgmtPlan.pdf PDF
Attach0002__IPT_Charter.pdf PDF
Attach0006-_FFP_Tables.xlsm XLSM spreadsheet
Attach0019_QASP.pdf PDF
Attach0016_Grain_TDPL.pdf PDF
Attach0007_ES_Pricing.xlsx XLSX spreadsheet
ExA_CDRL.pdf PDF
Attach0001_DSL.pdf PDF
Attach0025_Price_Template.xlsm XLSM spreadsheet
Attach0005_HazClass.pdf PDF
Attach0021__Refurb_Accept.pdf PDF
Attach0012_Changes.pdf PDF
Attach0011__OPSEC_DD254.pdf PDF
Attach0020_-_MK706_Accept.pdf PDF
Attach0022_M643_Accept.pdf PDF
Attach_0003_SOW.pdf PDF
Attach0009_HazMtl.pdf PDF
Attach0004_TDPList.pdf PDF
Attach0008-GFP.pdf PDF
Attach0024__Skill_Crosswalk.xlsx XLSX spreadsheet
Attach0013_WBS.pdf PDF
Attach0026_Preaward_Survey.pdf PDF
https://einvitations.afit.edu/inv/anim.cfm?i=374163&k=016646087D54 —
W31P4Q-17-R-0046_DRAFT_for_Hydra-70_FY19-23_Production_and_Engineering_Services.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W31P4Q-19-X-XXXX

Exhibit B

31 January 2018

Contract Data Requirements List

19 August 2016

Joint Attack Munition Systems Project Office SFAE-MSL-JA, Redstone Arsenal, AL 35898-5610

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B001 Engineering and Technical Services

Accomplishment Report

Program Management Control

Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80061A SOW C-10.6.1.1 SFAE-MSL-JAE

INSERT

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION IN

LT

SEE 16 SEE 16

b. COPIES

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A

N/A SEE 16

Reg

Repro

16. REMARKS:

BLK 8. Government approval/disapproval within 5 calendar days of receipt.

If disapproved, the contractor shall resubmit within 10 calendar days of receipt of Government comments.

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 12, 13. First Report due on the 30th of the month following the first full accounting month subsequent to contract award. Subsequent reports are due on the 30th of each month.

BLK 14. Delivery shall be in electronic format via the Integrated Data

Environment (IDE) in Statement of Work Section 14. The final delivery shall be delivered on mutually agreeable digital media at the end of the contract.

SEE 16

0 1 0

15. TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Andrea Thompson 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

DD Form 1423-1, Feb 2001

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B002 System Safety Hazard Analysis (SSHA)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80101C SOW C-10.7.2.1 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

BLK 9. For Distribution Statement and Export Control Act Statement see last page of

Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 12, 13. Initial submission shall be a minimum of 60 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first. Submit 30 calendar days prior to a PDR and update 30 calendar days prior to a CDR. Submission of hazard explosive data to support Interim Hazard

Classification requests shall be provided a minimum of 30 calendar days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification. This data shall be submitted as an appendix to the Safety Assessment Report (DI-SAFT-80102C)

BLK 14. Delivery shall be in electronic format via the Integrated Data Environment

(IDE) in Statement of Work Section 14. The final delivery shall be delivered on mutually agreeable digital media at the end of the contract.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Satonya Hobson-Williams 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B003 Safety Assessment Report (SAR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-80102C SOW C-10.7.2.1 SFAE-MSL-JAE

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

last page of Exhibit B Contract Date Requirements List (CDRL).

BLK 10, 12, 13. Initial submission shall be a minimum of 60 calendar days prior to first contractor test or 60 calendar days prior to first Government test, whichever occurs first. Submit 30 calendar days prior to a PDR and updates if required 30 calendar days prior to a CDR. Submission of hazard explosive data to support Interim Hazard Classification requests shall be provided a minimum of 30 working days prior to proposed shipment. Data shall be updated whenever a change in configuration occurs that impacts existing explosive hazard classification. Report shall include a separate section that addresses the System Safety Hazard Analysis (DI-SAFT-

80101C)

Environment (IDE) in Statement of Work Section 14. The final delivery shall be delivered on mutually agreeable digital media at the end of the contract.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B004 Failure Summary and Analysis Report QE & Reliability Analysis

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-80255A SOW C-10.7.1.2, C-10.10.1.2,

C-10.10.1.3, C-10.10.1.4, C-

10.13.2

SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 11, 12, 13. Report (email when acceptable) provided to JAMS

Product Assurance 30 calendar days prior to implementation of ES design or configuration changes.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Kevin Jackson 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B005 Test Plans/Test Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81704 SOW 10.12.2 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

ASREQ SEE 16

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt.

If disapproved the contractor shall resubmit within 25 calendar days of receipt of Government comments.

page of Exhibit B Contract Date Requirements List (CDRL).

BLK 10, 12, 13. Submit NLT 60 calendar days prior to test, except as agreed to by the IPT.

/S/ Ezio R. Wheeler 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MCCR

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

B006 Computer Software Product End Items Software and Firmware Code

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ACVS-80700 SOW C-10.8.2 SFAE-MSL-JAS

7. DD 250 REQ 9.DIST

STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SEMIA SEE 16

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 9: For Distribution Statement and Export Control Act Statement see last

BLK 10, 12, 13: Delivery

- Every software update

- 90 calendar days prior to system CDR

- end of contract

BLK 14: Delivery shall be in electronic format via the Integrated Data

/S/ Ashley Mathis 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER NDTI

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B007 Test/Inspection Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80809B SOW 10.12.2 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12, 13. Submit NLT 60 calendar days after completion of test.

Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit within 30 calendar days of receipt of

Government comments.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER FNCL

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B008 Performance and Cost Report (PCR) N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-FNCL-80912 SOW C-10.6.1.5 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

B

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft page of Exhibit B Contract Data Requirements List (CDRL.).

BLK 10, 12, 13. First Report due on the 15th of the month following the first due on the 15th of each month.

/S/ Andrea Thompson 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER ADMN

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B009 Revisions to Existing Government Documents Publications

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-80925 SOW C-10.11.2.1 SFAE-MSL-JAL

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval requirements will be stipulated in the technical direction letter.

BLK 10 and 11. Start of work meetings, in-process reviews, and verification/validation meetings shall be conducted by a joint

Government/contractor team. Date and locations will be determined by the

Government.

BLK 12 and 13. Delivery schedule will be within 45 calendar days of ECP approval.

Environment (IDE) in Statement of Work Section 14. The final delivery shall be delivered on mutually agreeable digital media at the end of the contract.

SFAE-MSLS-JAMS-LOG-S

SFAE-MSLS-JAMS-LOG-S

15. TOTAL 1 2 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ David Kegel 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B010 Product Drawings/Models and Associated Lists N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81000E SOW C-10.9.3.3.1.2 SFAE-MSL-JAP

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8. Government approval/disapproval within 30 calendar days of receipt. If

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Date Requirements List (CDRL).

BLK 10, 12, 13. Submittal due 14 calendar days after receipt of Engineering

Services Memorandum (ESM) Approval. Submittal due 7 calendar days prior to

Design Review II. Submittal due concurrent to submittal of ERR.

See B023 Enclosure 2 (TDP Option Selection Worksheet).

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Anthony Howard 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

TDP OPTION SELECTION WORKSHEET

SYSTEM: Hydra-70 2.75 Rocket System DATE PREPARED: 03 Mar 2014

A. CONTRACT NO.

W31P4Q-14-C-0116

B. EXHIBIT/ATTACHMENT NO.

Enclosure 2 for Sequence B023

C. CLIN

D. CDRL DATA ITEM NO.

B023

1. TDP Level (X and complete as applicable.)

A. CONCEPTUAL LEVEL

DEVELOPMENTAL

LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable)

A.

TYPE 2D: 2D DRAWINGS

TYPE 3D: 3D MODEL ONLY

TYPE 3D: 3D MODELS WITH

ASSOCIATED 2D DRAWINGS

B.

NATIVE CAD (SPECIFY TYPE) _______TBD_______________________

ISO 10303 STEP FORMAT (Specify STEP PROTOCOL AP203, AP 214 etc.)_____________

ISO32000 PORTABLE DOCUMENT FORMAT:

OTHER ELECTRONIC FORMAT (SPECIFY TYPE)

_______Specifications and 2D Drawings to be submitted in PDF format____________

HARDCOPY: ___________________________________________

REMARKS: 3D models are required on new designs. 3D models required on legacy product only if already available.

3. CAGE Code AND DOCUMENT

NUMBERS

A. CONTRACTOR CAGE AND DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B & 3C OR 3D)

D. To Be Assigned By:

JAMS CM

B. USE CAGE CODE: 18876 and

30003 (Indian Head)

C. USE DOCUMENT NUMBERS: Assigned by JAMS CM

4. DRAWING FORMATS (X one and complete as applicable)

CONTRACTOR FORMAT.

GOVERNMENT FORMAT.

REMARKS: _________________________________________________________________________________________

5. TDP ELEMENTS REQUIRED (X all that apply)

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR-OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL DRAWINGS/MODELS AND ASSOCIATED LISTS

DEVELOPMENTAL DESIGN DRAWINGS/MODELS AND ASSOCIATED LISTS

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LIST

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LIST

QUALITY ASSURANCE PROVISIONS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWINGS/MODELS AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) DRAWINGS/MODELS AND ASSOCIATED LIST

6. ASSOCIATED LISTS (X and complete as applicable)

A. PARTS LIST (X ONE) (1) INTEGRAL (2) SEPARATE

B. DATA LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

C. INDEX LIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

D. WIRINGLIST (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

E. INDENTURE DATA LIST (X

ONE)

(1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

F. APPLICATION LISTS (X ONE) (1) NOT REQUIRED (2) REQUIRED (SPECIFY LEVELS OF ASSEMBLY)

7. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING

DRAWING PRACTICES

WITH APPENDICES

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35 REVISION OF ENGINEERING DRAWINGS

AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCES

OTHER STANDARDS APPLY AS

DESCRIBED:

COMPANY STANDARDS

PERMITTED: YES NO

8. OTHER TAILORING

ASME Y14.100 tailoring Enclosure 3- Table A1 Tailoring Checklist

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER PACK

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B011 Performance Oriented Packaging (POP)

Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-PACK-81059A SOW C-10.11.1.1 AMSAM-MMC-MM-DP

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

1TIME SEE 16

SECT. B

8. APP CODE

D

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

N/A N/A

BLK 8. Government approval/disapproval within 45 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

Other requests for this document shall be referred to:

U.S. Army Aviation and Missile Command

ATTN: AMSAM-MMC-MM-DP

Redstone Arsenal, AL 35898-5000

BLK 12. Submission shall be within 45 calendar days following completion of each test.

15.TOTAL 0 1 0

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ David Kegel 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SAFT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B012 Explosive Hazard Classification Data N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SAFT-81299C SOW -10.7.2.1 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8: Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit the report (corrected) within 30 calendar days of receipt of Government comments.

of Exhibit B Contract Date Requirements List (CDRL.).

BLK 10, 12, 13. Submit NLT 30 calendar days prior to shipment need date.

Update whenever a change in configuration occurs that impacts existing explosive hazard classification (IHC).

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B013 Failure Analysis And Corrective Action Report Preliminary Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81315B SOW C-10.12.2 SFAE-MSL-JAP/-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

N/A D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 10, 12. Preliminary Report submitted Not Later Than (NLT) 5 calendar days from identification of failure.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B014 Failure Analysis And Corrective Action

Final Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81315B SOW C-10.7.3 SFAE-MSL-JAE

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12, 13. Final Report with Corrective Actions submitted NLT 30 calendar days from identification of failure. Government approval/disapproval within 30 calendar days of receipt. If disapproved the contractor shall resubmit within 30 calendar days of receipt of Government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B015 Software Requirements Specification (SRS) Software/Firmware Requirements

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81433A SOW C-10.8.2

SFAE-MSL-JAS

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 12 and 13. Submit 60 calendar days prior to Software PDR and CDR.

Submit revisions as needed for computer resources changes. Government approval or disapproval within 30 calendar days of receipt. Submit revisions within 30 calendar days after receipt of Government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B016 Software Design Description (SDD) Software/Firmware Design

Description

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81435A SOW C-10.8.2

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 12 and 13. Submit 60 calendar days prior Software PDR and CDR.

Submit revisions as needed for computer resources design changes. Government approval or disapproval of revisions 30 calendar days after receipt. Submit revisions within 30 calendar days after receipt of comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B017 Software Test Plans (STP) Software/Firmware Test Plans

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81438A SOW C-10.8.3

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 12 and 13. Submit 60 calendar days prior Software PDR and CDR.

Submit revisions as needed for computer resources design changes. Government approval or disapproval of revisions 30 calendar days after receipt. Submit revisions within 30 calendar days after receipt of comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B018 Software Test Description (STD) Software/Firmware Test Desc.

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81439A SOW C-10.8.3

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 60 calendar days prior to start of formal computer resources test. Submit revisions as needed, but at least 15 calendar days prior to planned start of formal computer resources test. Government approval or disapproval 30 calendar days after receipt of initial submittal. Government approval or disapproval of revisions 15 calendar days after receipt.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B019 Software Test Report (STR) Software/Firmware Test Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81440A SOW C-10.8.3, C-10.8.4

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 30 calendar days after completion of each formal computer resources test. Government approval or disapproval 30 calendar days after receipt. Submit revisions within 15 calendar days after receipt of Government comments.

last page of Exhibit B Contract Data Requirements List (CDRL).

Environment (IDE) in Statement of Work Section 14. The final delivery shall be delivered on mutually agreeable digital media at the end of the contract.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B020 Software Product Specification (SPS) Software/Firmware Product

Specification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81441A SOW C-10.8.1

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 60 calendar days after completion of

Software Formal Qualification Test. Submit all sections concurrent with

Government acceptance of the final build of computer resources.

Government approval or disapproval 30 calendar days after receipt.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER IPSC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B021 Software Version Description (SVD) Software/Firmware Version Desc.

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81442A SOW C-10.8.2

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 10, 12 and 13. Submit 15 calendar days after release of each informal and formal computer resources build. Government approval or disapproval 15 calendar days after receipt. Submit revisions within 15 calendar days after receipt of Government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER SDMP

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon

System

W31P4Q-19-X-XXXX

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

B022 Program Unique Specification Documents Performance Based

Product/Process Specification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SDMP-81493A SOW C-10.9.3.3.1.1 SFAE-MSL-JAP

REQUIRED

10.

FREQUENCY

12. DATE OF FIRST SUBMISSION

AS

REQ

30 DAC

b. COPIES

SECT. B

8. APP CODE

D

11. AS OF

DATE

13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 8, 13. Government approval or disapproval of performance baseline specifications within 20 calendar days after receipt. Submit revisions and comment responses within 20 calendar days after receipt of government comments.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

/S/ Anthony Howard 31 Jul 2015 /S/ Anthony Howard 31 Jul 2015

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MISC

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B023 Scientific and Technical Reports Safety Technical Data

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80711A SOW C-10.7.1.5 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 10, 12, 13. Each submittal shall be no later than 30 calendar days following each Government request for technical data in support of safety requirements unless otherwise specified by the Government when the request for technical data is made. Submit updates as required.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

B TDP TM OTHER MGMT

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

Hydra-70 Rocket Weapon System W31P4Q-19-X-XXXX

B024 Briefing Material Safety Briefing Material

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81605 SOW C-10.7.1.5 SFAE-MSL-JAE

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

SECT. B

8. APP CODE

D

11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

BLK 9. For Distribution Statement and Export Control Act Statement see last page of Exhibit B Contract Data Requirements List (CDRL).

BLK 10, 12, 13. Each submittal shall be no later than 30 calendar days prior to each Safety Board or Safety Panel meeting unless otherwise specified by the

Government when the request is made. Submit updates as required.

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188).

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .