Exhibit_A_-_CDRLS.PDF

PDF 4 MB Posted

Attached to
Maintenance Support Device-Version 4 Light (MSD-V4L) System Federal contract opportunity
Solicitation number
W15QKN18R0037
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

Exhibit A - CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to Maintenance Support Device-Version 4 Light (MSD-V4L) System, newest first.
File Type Posted
W15QKN18R0037-0007.pdf PDF
W15QKN18R0037-0006.pdf PDF
W15QKN18R0037-0005.pdf PDF
W15QKN18R0037-0004.pdf PDF
Exhibit_A_-_CDRLS.pdf PDF
W15QKN18R0037-0003.pdf PDF
W15QKN18R0037-0002.pdf PDF
W15QKN18R0037-0001.pdf PDF
Attachment_0002-_Section_B_Matrix.xlsx XLSX spreadsheet
Attachment_0007_SOW_Labor_Categories.docx DOCX document
Attachment_0005_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0004-_MSD_Performance_Test_Plan.pdf PDF
Exhibit_A_-_CDRLS.PDF PDF
Attachment_0001_SOW_Appendix.docx DOCX document
Attachment_0002-_Section_B_Matrix.xlsx XLSX spreadsheet
Attachment_0003-MIS-DTL-58668.pdf PDF
W15QKN18R0037_RFP.pdf PDF
Attachment_0006_Standard_Form_LLL_Disclosure_of_Lobbying_Activities.pdf PDF
Attachment_0006-_Responses_to_Questions_Part_2.DOCX DOCX document
Attachment_0005-_Responses_to_Questions.docx DOCX document
Attachment_0001_-_APPENDIX_(SOW).docx DOCX document
Attachment_0003-_Scheduled_Government_Furnished_Property.pdf PDF
W15QKN18R0037-DRAFT_RFP.pdf PDF
Attachment_0004-_MSD-V4L_-__Detail_Spec.pdf PDF
Attachment_0002-_Section_B_Matrix.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

1_DATA_ITEM_NO: 002

2_TITLE_OF_DATA_ITEM: Request for Variance (RFV)

3_SUBTITLE: Configuration Control Document

4_AUTHORITY_Data_Acquisit: DI-SESS-80640D

5_CONTRACT_REFERENCE: SOW Para: 5.6

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: LT

8_APP_CODE: N/A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: N/A

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1: 0 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_repro: 0

16_REMARKS: Files shall be delivered in Microsoft Word 2010 or higher compatible format on a CD-ROM or DVD media, and as an attached file to electronic mail sent to ACC-RSA and PD TMDE. Specific electronic mail addresses will be provided at time of contract award.

Blocks 10, 12, and 13: A Request for Variance shall be submitted when a proposed departure (non-conformance) from the contractually specified configuration documentation for a specific number of units or for a specified period of time.

Government requires 30 days for review. Notification of Government disapproval of RFDs will be by letter or electronically. Approved RFDs will be incorporated into the contract by modification.

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 034

2_TITLE_OF_DATA_ITEM: Maintenance Allocation Chart (MAC)

3_SUBTITLE:

4_AUTHORITY_Data_Acquisit: DI-SESS-81759A

5_CONTRACT_REFERENCE: SOW Paras: 6.4.15, 6.4.16

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: DD

8_APP_CODE: A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: SEE BLK 16

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1: 1 reg1: 1 repro1: 2 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_repro: 2

16_REMARKS: Data shall be submitted electronically in format noted below and in Microsoft office or later. Documents shall be submitted to PD TMDE office and to the Army Contracting Command - Redstone Arsenal (ACC-RSA) Contracting office.

Block 8: Written approval from the Contracting Officer, or his or her designated representative, is required prior to publication and distribution of the final deliverable. On all submissions prior to receiving final Government approval, the Contractor shall clearly mark that the submission is draft or preliminary and has not been approved.

Blk 10, 11, 12, & 13:

Initial draft shall be submitted 180 days after contract award. Government will require 30 days review and will provide comments. Contractor shall incorporate comments and submit Final document 15 days after receipt of comments. Updates to Final shall be performed as changes occur to provisioning data and shall be submitted to Government for review and comments. Changes/updates shall be at no additional cost to Government. The MAC shall be in a top down pyramidal breakdown sequence of the end item by functional groups defined in DA PAM 738-751 that require maintenance. The MAC shall include all maintenance significant components, assemblies, subassemblies, and modules. For each repairable assembly or subassembly, the MAC shall identify the maintenance function to be performed, the level of responsibility for the function, the active repair time, and tools and test equipment necessary to perform the function. The MAC shall include all items unless deletion has been authorized by the Government. If a maintenance function is a replacement function only for a repair part, the item shall not be listed in the MAC, unless not listing the item would result in deletion of the group number, in this case, the item shall be listed in order to retain the functional group number. The contractor shall assign Functional Group Codes to the MAC. The Functional Group Code will be utilized as an indexing system and will be standard across the MSD-V4L databases. This paragraph only address the first two characters on the Technical Manual FGC.

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 003

2_TITLE_OF_DATA_ITEM: Notice of Revision (NOR)

3_SUBTITLE: Configuration Control Document

4_AUTHORITY_Data_Acquisit: DI-SESS-80642D

5_CONTRACT_REFERENCE: SOW Para: 5.6

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: LT

8_APP_CODE: N/A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: N/A

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1: 0 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_repro: 0

16_REMARKS: Files shall be delivered in Microsoft Word 2010 or higher compatible format on a CD-ROM or DVD media, and as an attached file to electronic mail sent to ACC-RSA and PD TMDE. Specific electronic mail addresses will be provided at time of contract award.

Blocks 10, 12, and 13: A Notice of Revision shall be submitted with an Engineering Change Proposal to describe a proposed change to a technical document.

Government requires 30 days for review. Notification of Government disapproval of NORs will be by letter or electronically. Approved NORs will be incorporated into the contract by modification.

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 035

2_TITLE_OF_DATA_ITEM: Functional Group Codes (FCG)

3_SUBTITLE:

4_AUTHORITY_Data_Acquisit: DI-ALSS-81530

5_CONTRACT_REFERENCE: SOW Paras: 6.4.15, 6.4.16

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: DD

8_APP_CODE: A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: SEE BLK 16

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1: 1 reg1: 1 repro1: 2 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_repro: 2

16_REMARKS: Data shall be submitted electronically in format noted below and in Microsoft office or later. Documents shall be submitted to PD TMDE office and to the Army Contracting Command - Redstone Arsenal (ACC-RSA) Contracting office.

Block 8: Written approval from the Contracting Officer, or his or her designated representative, is required prior to publication and distribution of the final deliverable. On all submissions prior to receiving final Government approval, the Contractor shall clearly mark that the submission is draft or preliminary and has not been approved.

Blk 10, 11, 12, & 13:

Initial draft shall be submitted 180 days after contract award. Government will require 30 days review and will provide comments. Contractor shall incorporate comments and submit Final document 15 days after receipt of comments. Updates to Final shall be performed as changes occur to provisioning data and shall be submitted to Government for review and comments. Changes/updates shall be at no additional cost to Government. The MAC shall be in a top down pyramidal breakdown sequence of the end item by functional groups defined in DA PAM 738-751 that require maintenance. The MAC shall include all maintenance significant components, assemblies, subassemblies, and modules. For each repairable assembly or subassembly, the MAC shall identify the maintenance function to be performed, the level of responsibility for the function, the active repair time, and tools and test equipment necessary to perform the function. The MAC shall include all items unless deletion has been authorized by the Government. If a maintenance function is a replacement function only for a repair part, the item shall not be listed in the MAC, unless not listing the item would result in deletion of the group number, in this case, the item shall be listed in order to retain the functional group number. The contractor shall assign Functional Group Codes to the MAC. The Functional Group Code will be utilized as an indexing system and will be standard across the MSD-V4L databases. This paragraph only address the first two characters on the Technical Manual FGC.

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 004

2_TITLE_OF_DATA_ITEM: Supplier's Configuration Management Plan

3_SUBTITLE:

4_AUTHORITY_Data_Acquisit: DI-CMAN-80858B

5_CONTRACT_REFERENCE:

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ:

8_APP_CODE: N/A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: SEE BLK 16

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1: 0 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_repro: 0

16_REMARKS: 1. Format of the CM plan shall be the supplier's format.

2. The CM plan shall identify the supplier's processes and procedures for:

a. Effective configuration identification

b. Change Control

c. Status Accounting

d. Audits of the total configuration, including hardware, software, and firmware.

EIA-649-1 and ISO 10007 are acceptable references.

Blocks 8, 10, 11, 12, 13:

A copy of the supplier's Configuration Management Plan is due no later than 30 days after the Start of Work Meeting. After receiving the submission, allow 30 days for the Government to review the Plan.

Block 9:

Distribution Statement D: Distribution authorized to U. S. Government agencies and their contractors only; administrative and operational use. This determination was made (contract effective date). Other requests for this document shall be referred to: PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN:

Redstone Arsenal, AL 35898-5000.

Export – Control Act Warning – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Block 14:

Files shall be delivered in Microsoft Word 2003 or higher.

Electronic submissions are preferred.

email to: TBD

Export – Control Act Warning – Not Required.

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: 036 title: Risk Management Framework Package Deliverables sub: RMF Package Deliverables auth: DI-MGMT-82001 ref: SOW Para: 9.11 req_ofc: SFAE-CSS-FP-TM-APA dd250: DD appcode: A dist: D freq: SEE BLK 16 asof: N/A firstsub: SEE BLK 16 subsub: SEE BLK 16 addressee1: SFAE-CSS-FP-TM-AP draft1: 2 reg1: 2 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 2 total_reg: 2 total_repro: 0 remarks: Data shall be delivered in Microsoft Word 2010 or higher compatible format on CD-ROM or DVD media, and as an attached file to electronic mail sent to Redstone Arsenal (ACC-RSA) and PD TMDE. Specific electronic mail addresses will be provided at time of contract award.

Block 8: Written approval from the Contracting Officer, or his or her designated representative, is required prior to publication and distribution of the final deliverable. On all submissions prior to receiving final Government approval, the Contractor shall clearly mark that the submission is draft or preliminary and has not been approved.

Block 9:

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

Blocks 12 and 13:

Contractor shall submit draft Draft Security Plan, Contingency Plan, System Security Design and Risk Assessment and Information Assurance Vulnerability Management (IAVM) Plan 60 Days after Contract Award (DACA). Government requires 30 calendar days for review and comment. Contractor submits final version 15 days after receipt of Government comments.

Contractor shall submit draft plan for managing the software code 60 Days after Contract Award (DACA). Government requires 30 calendar days for review and comment. Contractor submits final version 15 days after receipt of Government comments.

Contractor shall submit a draft RMF and Privacy Impact Assessment (PIA) 90 Days after Contract Award (DACA). Government requires 30 calendar days for review and comment. Contractor submits final version 15 days after receipt of Government comments.

Contractor shall submit a draft Plan of Action and Milestones (POA&M) 30 Days after initial Cybersecurity and software scans . Government requires 30 calendar days for review and comment. Contractor submits final version 15 days after receipt of Government comments.

group:

total_price:

prep_name:

line_item:

exhibit:

xtdp: Off xtm: Off othercat:

system: MSD-V4L System ctr_no:

contr: TBD remarksb:

Contractor shall provide the Government access to the software source code repositories for all MSD-V4L software (excluding closed source Commercial Off-The-Shelf (COTS) for Software Code Scans) after completion of First Article Test (FAT). Government requires 30 calendar days for review and comment. Contractor shall submit mitigation information 15 days after receipt of Government comments.

Contractor shall provide the Government the Assessement and Authorization (A&A) Project Plan 90 days after completion of First Article Test (FAT). Government requires 30 calendar days for review and comment. Contractor shall submit mitigation information 15 days after receipt of Government comments.

Contractor shall provide the Program Protection Implementation Plan (PPIP) 180 days after completion of First Article Test (FAT). Government requires 30 calendar days for review and comment. Contractor shall submit mitigation information 15 days after receipt of Government comments.

Contractor shall provide the Government installation software and instruction for Government installation of these applicable security patches to previously delivered MSD-V4L systems monthly.

Page2:

Reset:

prep_date:

app_by: MSD Team Lead app_date:

Page:

of_pages:

app: Adobe Professional 8.0

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 005

2_TITLE_OF_DATA_ITEM: Computer Operation Manual (COM)

3_SUBTITLE: Configuration Control Document

4_AUTHORITY_Data_Acquisit: DI-IPSC-81446A

5_CONTRACT_REFERENCE: SOW Para: 6.1.3

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: DD

8_APP_CODE: A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: N/A

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1: 1 reg1: 2 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 1 total_repro: 0

16_REMARKS: Files shall be delivered in paper/hard copies or as Microsoft Word 2010 or higher compatible format on a CD-ROM or DVD media, and as an attached file to electronic mail sent to ACC-RSA and PD TMDE. Specific electronic mail addresses will be provided at time of contract award.

Block 8: Written approval from the Contracting Officer, or his or her designated representative, is required prior to publication and distribution of the final deliverable. On all submissions prior to receiving final Government approval, the Contractor shall clearly mark that the submission is draft or preliminary and has not been approved.

Blocks 10: A new manual shall be delivered 15 days after the Government approval of MSD-V4L System hardware or software change(s) and the manual requires update(s).

Blocks 12 and 13: A MSD-V4L kit Manual shall be delivered NLT 30 days after the Governmental approval of the First Article Test Report (FATR). The Government requires 30 days for review and comment. Contractor submits final version 15 days after receipt of Government comments.

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 2

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 037

2_TITLE_OF_DATA_ITEM: Scientific and Technical Reports Summary

3_SUBTITLE: Technical Roadmap

4_AUTHORITY_Data_Acquisit: DI-MISC-80048

5_CONTRACT_REFERENCE: SOW Para. 9.17

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ:

8_APP_CODE: A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: SEE BLK 16

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1:

reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_repro: 0

16_REMARKS: 1. Format of the Technology Roadmap shall be the format of the contractor.

2. The Technology Roadmap shall outline the strategy:

a. to solve current problems from an operational need viewpoint (near term)

b. investigate new technology with a perspective of potential US Army applications (mid-term)

c. nurture technology to best understand the limits of the possibilities (far term).

3. Contents of the Technology Roadmap shall be exploratory in nature upon addressing items a-h listed in 10.3 (Contents) per the referenced data item description

Blocks 8, 10, 11, 12, 13:

A copy of the Technology Roadmap is due no later than 45 days after the Start of Work Meeting. After receiving the submission, allow 30 days for the Government to review the Technology Roadmap.

Block 9:

Distribution Statement D: Distribution authorized to U. S. Government agencies and their contractors only; administrative and operational use. This determination was made (contract effective date). Other requests for this document shall be referred to: PEO, Combat Support & Combat Service Support (CS&CSS), Product Director, Test, Measurement & Diagnostic Equipment (PD TMDE), ATTN:

Redstone Arsenal, AL 35898-5000.

Export – Control Act Warning – This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Block 14:

Files shall be delivered in Microsoft Word and PowerPoint 2003 or higher. MS PowerPoint will be used to depict the Technical Roadmap in a graphically format for quick visual use.

Electronic submissions are preferred.

E-mail addresses: TBD

Export – Control Act Warning – Not Required.

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY:

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 006

2_TITLE_OF_DATA_ITEM: Computer Software Product End Items

3_SUBTITLE: Calibration Software

4_AUTHORITY_Data_Acquisit: DI-MCCR-80700

5_CONTRACT_REFERENCE: SOW Paras: 6.7, 9.5, 9.6

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: SS

8_APP_CODE: N/A

DIST_STATEMENT: D

10_FREQUENCY: 0 TIME

11_AS_OF_DATE: N/A

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: N/A

addressee1: SFAE-CSS-FP-TM-APA draft1: 0 reg1: 1 repro1: 0 addressee2:

draft2:

reg2:

repro2:

addressee3:

draft3:

reg3:

repro3:

addressee4:

draft4:

reg4:

repro4:

addressee5:

draft5:

reg5:

repro5:

addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 0 total_repro: 0

16_REMARKS: Files shall be delivered on CD-ROM or DVD media, and as an attached file to electronic mail sent to ACC-RSA and PD TMDE. Specific electronic mail addresses will be provided at time of contract award.

Blocks 12: Calibration software shall be delivered 60 days after the Governmental approval of the First Article Test Report (FATR).

DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S. DoD contractors only for management and administrative purposes, 4 Dec 2015. Other requests shall be referred to Product Director Test, Measurement, and Diagnostic Equipment (PD TMDE) ATTN: SFAE-CSS-FP-TM-APA, Redstone Arsenal, AL 35898-5000

17_PRICE_GROUP:

ESTIMATED_TOTAL_PRICE:

G_PREPARED_BY:

H_DATE:

1_APPROVED_BY: MSD Team Lead

J_DATE:

Page: 1 reg38t: 1

A_CONTRACT_LINE_ITEM_NO:

B_EXHIBIT:

TDP:

TM:

OTHER:

DSYSTEMITEM: MSD-V4L System

E_CONTRACTPR_NO:

FCONTRACTOR:

of_pages: 1

Reset:

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the

1_DATA_ITEM_NO: 007

2_TITLE_OF_DATA_ITEM: Preparation of Digital Technical Information for Page-based Technical Manuals

3_SUBTITLE: MSD-V4L Page-based Technical Manual (TM)

4_AUTHORITY_Data_Acquisit: MIL-STD-40051-2C

5_CONTRACT_REFERENCE: SOW Paras: 6.1.1, 6.1.7

6_REQUIRING_OFFICE: SFAE-CSS-FP-TM-APA

7_DID_250_REQ: DD

8_APP_CODE: A

DIST_STATEMENT: D

10_FREQUENCY: SEE BLK 16

11_AS_OF_DATE: N/A

12_DATE_OF_FIRST_SUBMISSI: SEE BLK 16

13_DATE_OF_SUBSEQUENT_SUB: SEE BLK 16

addressee1: SFAE-CSS-FP-TM-APA draft1:

reg1:

repro1: 0 addressee2: 30% Draft draft2: 2 reg2: 0 repro2: 0 addressee3: 70% Draft draft3: 2 reg3: 0 repro3: 0 addressee4: PTM draft4: 2 reg4: 0 repro4: 0 addressee5: FRC draft5: 0 reg5: 1 repro5: 1 addressee6:

draft6:

reg6:

repro6:

addressee7:

draft7:

reg7:

repro7:

addressee8:

draft8:

reg8:

repro8:

addressee9:

draft9:

reg9:

repro9:

addressee10:

draft10:

reg10:

repro10:

addressee11:

draft11:

reg11:

repro11:

addressee12:

draft12:

reg12:

repro12:

addressee13:

draft13:

reg13:

repro13:

addressee14:

draft14:

reg14:

repro14:

addressee15:

draft15:

reg15:

repro15:

addressee16:

draft16:

reg16:

repro16:

addressee17:

draft17:

reg17:

repro17:

addressee18:

draft18:

reg18:

repro18:

addressee19:

draft19:

reg19:

repro19:

addressee20:

draft20:

reg20:

repro20:

addressee21:

draft21:

reg21:

repro21:

addressee22:

draft22:

reg22:

repro22:

addressee23:

draft23:

reg23:

repro23:

addressee24:

draft24:

reg24:

repro24:

addressee25:

draft25:

reg25:

repro25:

addressee26:

draft26:

reg26:

repro26:

addressee27:

draft27:

reg27:

repro27:

addressee28:

draft28:

reg28:

repro28:

addressee29:

draft29:

reg29:

repro29:

addressee30:

draft30:

reg30:

repro30:

addressee31:

draft31:

reg31:

repro31:

addressee32:

draft32:

reg32:

repro32:

addressee33:

draft33:

reg33:

repro33:

addressee34:

draft34:

reg34:

repro34:

addressee35:

draft35:

reg35:

repro35:

addressee36:

draft36:

reg36:

repro36:

addressee37:

draft37:

reg37:

repro37:

addressee38:

draft38:

reg38x:

repro38:

total_draft: 6 total_repro: 1

16_REMARKS: Block 14:

Draft, Reg, and Repro refers to Paper Copy Blocks 10,12, & 13:

30% draft due 45 days after Start of Work Meeting. Allow 30 days for Government review/comments.

70% draft due 90 days after Start of Work Meeting. Allow 30 days for Government review/comments.

Contractor shall notify Government 20 days before start of ETM validation.

Preliminary Technical Manual (PTM), validated by the contractor, due 30 days after final MAC approval (45 days before verification (VER)). Government will provide comments at or before VER. The Government will notify contractor of VER date.

Final Reproducible Copy (FRC) due 45 days after VER w/Wide Area Workflow Receiving Report.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.