VA263-17-R-1144-027.pdf
PDF 2 MB Posted
- Solicitation number
- VA26317R1144
About this file
VA263-17-R-1144 Attachment 25 of 25_F Drawings Fire Protection 100_ IFC (4 Pages).pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D W
F
F A / V
F
F H
F H
F A / V
F A / V
F A / V
F A / V
F A / V
F A
F A
F A / V
F A / V
F A
F A
F A / V
F M
F A
A / V F
A / V F
A / V F
A / VF
A / VF
F
F A
F A
F A
F A
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V F
A / V
F A / V
F A / V F
A / V
F A / V
F A / V
F A / V
F M F
A / V
F
J
DH
J D
H
J
DH J
DH
J D
H
P
P
P
P P
P P
P
P P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P P
P
P
P
P
P
P
P P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P P
P
P
P
PP
P
P
P
P
P P
P
PPP
P
P P
P
P
P P P
P
P
P
P
P
P
P
P
P
P
P
P
J DH
P
P
P
P P
XYZAABBCCDDEEFFGGHH
STAIR
S-10
STAIR
4 4
LEGEND:
OUTSIDE OF SCOPE OF WORK AREA
EXISTING SPRINKLER ZONE AND SMOKE
CONTROL ZONE BOUNDARY
EXISTING SMOKE DETECTOR TO BE DEMOLISHED
EXISTING SMOKE DETECTOR TO REMAIN
EXISTING DOOR HOLDER AND FIRE ALARM
RELAY TO BE DEMOLISHED
EXISTING DOOR HOLDER AND FIRE ALARM
RELAY TO REMAIN
EXISTING MANUAL PULL STATION TO REMAIN
EXISTING WALL MOUNTED FIRE ALARM SPEAKER
STROBE TO BE DEMOLISHED
EXISTING FIRE ALARM NOTIFICATION APPLIANCE
TO BE DEMOLISHED
A = AUDIO FIRE ALARM SPEAKER
V = VISUAL FIRE ALARM STROBE
EXISTING FIRE ALARM NOTIFICATION APPLIANCE
TO REMAIN
A = AUDIO FIRE ALARM SPEAKER
V = VISUAL FIRE ALARM STROBE
EXISTING FLOW SWITCH AND TAMPER SWITCH
TO REMAIN
P
F A / V
DHJ
F M
DHJ
F A / V
NOTE: ALTHOUGH CERTAIN FIRE ALARM DEVICES AND APPLIANCES
MAY BE RE-USED, THE EQUIPMENT ADDRESS SHALL BE RE-
PROGRAMMED AS NECESSARY BASED ON THE NEW SMOKE
CONTROL ZONE BOUNDARIES.
ABBREVIATIONS:
SCZ - SMOKE CONTROL ZONE
P
F A / V
Room
C1-86
Room
Room
C1-85
Room Room
1P-98
RoomRoom
1P-97
Room
Room
1P-139
Room Room
1P-140
Room Room
1P-142
Room Room
1P-144
Room Room
1P-145
Room Room
1P-148
Room Room
1P-149
Room Room
1P-159
Room Room
1P-160
Room Room
1P-163
Room Room
1P-164
Room Room
1P-165
Room Room
1P-165A
Room Room
1P-165B
Room Room
1P-182
Room Room
1P-181
Room
Room
1P-184
Room
Room
1P-180
RoomRoom
C1-103
Room
Room
1P-178
Room Room
1P-179
Room
Room
1P-177
Room
Room
1P-176
Room Room
1P-175
RoomRoom
1P-166
Room
Room
1P-183
Room Room
C1-101
Room
Room
1P-162c
Room
Room
1P-162b
Room
Room
C1-101A
Room Room
C1-100
Room
Room
C1-92
Room
Room
1P-138
Room
Room
1P-137
Room Room
1E-170
Room Room
1P-143
Room Room
1P-146a
Room Room
1P-146
Room Room
1P-147
Room Room
1P-158
Room
Room
1P-162
Room
Room
1P-161
Room
Room
C1-99
Room
Room
1P-157
Room
Room
1P-132
Room
Room
1P-133
RoomRoom
1P-133A
RoomRoom
1P-134a
RoomRoom
1P-134b
Room
Room
1P-136
Room
Room
1P-135
Room
Room
1P-134
Room
Room
1P-123
Room
Room
1P-124
Room Room
1P-125
Room Room
1P-131
Room Room
1P-150
Room
Room
C1-98
Room Room
1P-156a
Room
Room
1P-156b
Room Room
1P-156
Room
Room
C1-96
Room
Room
1P-162a
Room
Room
1P-166A
Room
Room
1P-167A
Room
Room
1P-168A
RoomRoom
1P-168B
RoomRoom
1P-168C
RoomRoom
1P-168D
Room
Room
1P-151
RoomRoom
1P-130
Room
Room
1P-129
Room
Room
1P-127
Room
Room
1P-126
Room Room
1P-122
Room
Room
1P-120
Room
Room
1P-121
Room
Room
1P-119
Room
Room
1P-117
Room
Room
1P-115
Room
Room
1P-118
Room Room
1P-116
Room
Room
C1-94
Room
Room
1P-128
Room Room
1P-154
Room
Room
1P-152
Room
Room
1P-153
Room
Room
C1-96C
Room
Room
C1-95
RoomRoom
C1-93
Room
Room
1P-105
Room
Room
1P-104B
Room Room
1P-104C
Room Room
C1-96A
Room
Room
C1-90
RoomRoom
1P-106A
Room
Room
1P-106
Room Room
1P-102
Room Room
1P-101
Room
Room
1P-104
Room
Room
1P-100A
Room
Room
1P-100
Room Room
1P-103
RoomRoom
1P-107
RoomRoom
1P-108
Room
Room
1P-112
Room
Room
1P-113
Room
Room
1P-114
Room
Room
1P-104A
Room
Room
C1-96B
Room Room
1P-169B
Room
Room
C1-87
Room
Room
C1-104
Room
Room
1P-172
Room
Room
1P-174
Room
Room
1P-173
RoomRoom
1P-167
Room
Room
1P-171
Room
Room
1P-168
Room
Room
1P-169
Room Room
1P-170
Room
Room
C1-105
Room
Room
1P-170B
Room
Room
1P-170C
RoomRoom
1P-170D
Room
Room
C1-102
Room
Room
1P-169A
Room
Room
C1-108
Room
Room
C1-106
Room
Room
1P-99
Room
Room
1P-96
Room
Room
C1-91
Room
Room
1P-109
Room
Room
1P-95
Room
Room
1P-111
Room
Room
1P-110
Room
Room
C1-109
Room
EXISTING SMOKE
CONTROL ZONE 1-27
(SPRINKLER ZONE 40)
EXISTING SMOKE
CONTROL ZONE 1-28
(SPRINKLER ZONE 41)
EXISTING SMOKE
CONTROL ZONE 1-34
(NO SPRINKLER COVERAGE
AT TOP OF ATRIUM)
GENERAL NOTES:
1. THE ARCHITECTURAL SCOPE OF THIS PROJECT INCLUDES
MODIFICATIONS TO THE EXISTING MENTAL HEALTH CLINIC,
AND EXPANSION INTO THE ADJACENT ATRIUM SPACE. THE
ATRIUM SPACE ON THE 1ST FLOOR WILL RECEIVE A NEW
"LID" CEILING ABOVE ITS EXISTING SEATING AREA.
2. THE FIRE ALARM SCOPE OF WORK INCLUDES DESIGN,
INSTALLATION, AND MODIFICATIONS TO THE EXISTING FIRE
ALARM SYSTEM BASED ON THE ARCHITECTURAL
RENOVATIONS. THIS INCLUDES RE-PROGRAMMING OF
FIELD DEVICES AND APPLIANCES BASED ON THE REVISED
SMOKE CONTROL ZONE (SCZ) BOUNDARIES.
3. THE BUILDING IS CURRENTLY SERVED BY A GAMEWELL FCI
E3-SERIES PANEL. ALL NEW FIRE ALARM EQUIPMENT USED
IN THIS PROJECT SHALL BE COMPATIBLE WITH THIS
SYSTEM.
4. FIRE ALARM DESIGN AND INSTALLATION SHALL BE IN
COMPLIANCE WITH NFPA 72, NFPA 101, AND THE VA FIRE
PROTECTION DESIGN MANUAL.
5. ALL FIRE ALARM WORK SHALL PERFORMED IN
ACCORDANCE WITH THE PHASING DRAWING G-005.
6. NEW FIRE ALARM CIRCUITS IN RENOVATED AREAS MAY BE
ROUTED TO THE NEAREST EXISTING CIRCUIT PANEL.
7. CONTRACTOR MAY RE-USE EXISTING NOTIFICATION
APPLIANCES, INITIATING DEVICES, AND CIRCUIT WIRING
ONLY IF TESTED AND WARRANTED AS NEW. OTHERWISE,
PROVIDE NEW DEVICES IN LOCATION WHERE EXISTING
DEVICES ARE TO BE RELOCATED.
8. ALL NEW SYSTEM WIRING SHALL BE IN 3/4 INCH OR LARGER
ELECTRICAL METALLIC TUBING (EMT) CONDUIT.
9. ALL NEW FIRE ALARM INITIATING DEVICES SHALL BE
ADDRESSABLE.
10. ALL NEW VISUAL APPLIANCES SHALL BE SYNCHRONIZED
WITH OTHER VISIBLE APPLIANCES.
11. COORDINATE INSTALLATION WITH OTHER TRADES.
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ADD NEW
POWER SUPPLY PANELS AS NEEDED FOR THE NEW FIRE
ALARM EQUIPMENT.
13. THE INTENT OF THE NEW FIRE ALARM SPEAKER SPACING
IS TO PROVIDE AN INTELLIGIBLE VOICE MESSAGE. THE
INSTALLING CONTRACTOR SHALL VERIFY THEIR DESIGN
MEETS INTELLIGIBILITY REQUIREMENTS FROM NFPA 72
BASED ON THE CONTRACTOR'S SELECTED PRODUCTS.
14. NEW CEILING-MOUNTED FIRE ALARM EQUIPMENT SHALL
BE IN CENTER OF TILE.
15. EXISTING FIRE ALARM EQUIPMENT LOCATIONS SHOWN ON
THE PLANS ARE APPROXIMATE AND SHALL BE VERIFIED IN
THE FIELD.
16. COORDINATE ANY IMPAIRMENTS TO THE FIRE ALARM
SYSTEM WITH BUILDING MANAGEMENT AND FIRE
MARSHAL.
30 x 42
G E
N E
R A
L
N O
T E
S
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u s rt e r in c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e
-h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA
C U s e rs \c h e n q ix
\D o c u m e n ts
\R e v it L o c a l F ile s \3
B L
D G
F
IR
E
C F c h e n q ix
.r v t
/4
/2
:0
:5
P
M
1/8" = 1'-0"
1322- FAD100
RCR PQC
EXPAND OUTPATIENT MENTAL HEALTH
FIRE ALARM DEMOLITION PLAN
FIRE ALARM
05-05-2017 DWG. 55 OF 94
1/8" = 1'-0"
1 FIRE ALARM DEMOLITION PLAN
1. EXISTING SMOKE CONTROL ZONE (SCZ) 1-27. HOWEVER, THE
BOUNDARIES OF THIS ZONE SHALL BE MODIFIED AS SHOWN
ON SHEET FA100. RE-PROGRAM ALL FIRE ALARM EQUIPMENT
IN ACCORDANCE WITH NEW SCZ BOUNDARIES. COORDINATE
WITH MECHANICAL CONTROLS CONTRACTOR FOR PROPER
INITIATION OF THE SMOKE CONTROL SYSTEM.
2. EXISTING SMOKE CONTROL ZONE (SCZ) 1-28. HOWEVER, THE
BOUNDARIES OF THIS ZONE SHALL BE MODIFIED AS SHOWN
ON SHEET FA100. RE-PROGRAM ALL FIRE ALARM EQUIPMENT
IN ACCORDANCE WITH NEW SCZ BOUNDARIES. COORDINATE
WITH MECHANICAL CONTROLS CONTRACTOR FOR PROPER
INITIATION OF THE SMOKE CONTROL SYSTEM.
3. THERE IS NO EXISTING SPRINKLER COVERAGE IN ATRIUM (NO
SPRINKLER ZONE). SCZ 1-34 (ATRIUM) WILL NO LONGER SERVE
THIS LEVEL.
4. WALL MOUNTED EXISTING FIRE ALARM STROBES TO BE
DEMOLISHED. DEMOLISH WIRE AND CONDUIT ASSOCIATED
WITH THESE STROBES.
5. ACCESS TO THESE ROOMS WAS NOT AVAILABLE. THERE IS NO
FIRE ALARM SCOPE IN THESE ROOMS.
6. ACCESS TO THESE ROOMS WAS NOT AVAILABLE. ASSUME
DEMOLITION OF APPROXIMATELY FIVE DEVICES.
KEYED NOTES:
DESCRIPTION DATE
52414
ROBERT COOPER REYNOLDS
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V
F A
F A / V
F A / V
F A / V
F V
F V
F A / V
F A / V
F A / V
F A / V
F V
F V
F V
F A / V
75 75
30 30
F M
F A
F A / V
F A / V
F A / V
F A / V
15 15
F A
F A / V
F
A / V
F A / V
F A / V
F A / V
F A / V
F A / V
15 15
F A / V
F A / V
F M
F M
F M
F A
F A
F A / V
F A
F A
F A
F A
F A / V
F A
F A
F A
F A
F A
F A
F A / V
F A / V
F A
F A / V
F A
F A / V
F A
F A
F A
F A
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V
F A / V F
A / V
F A / V
F A / V F
A / V
F A / V
F A / V
F A / V
F M F
A / V
F
J
DH
J D
H
J
DH J
DH
J D
H
DH J
J DH
DH J
J DH
DH J
J DH
D H
J
J D
H
P
P
P
P P
P
P P
P
P
P
PP
P
P
P
P P
PP
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P P
P
P
P P
P
P
P
P
P P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
PPP
P
P
P
P P
P
P
P
P
P
P P
P P
P
P
P
P
P
P P P P P P P
P P P P
P
P
P
P
PP P P P P
P
P
P
P
P
P
PP
P
P
P
P
P
P
PPP
P P P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
PP
P
PP
P P P P
P
PPPP
P
P
P
P P P
P
P
P
PP
P
P
P
P
P
XYZAABBCCDDEEFFGGHH
OFFICE
1P-360
OFFICE
OFFICE
1P-309
OFFICE OFFICE
1P-307
OFFICE OFFICE
1P-305
OFFICE OFFICE
1P-303
OFFICE OFFICE
1P-219
OFFICE OFFICE
1P-217
OFFICE OFFICE
1P-215
OFFICE
LOCKER
ROOM
1P-214
LOCKER
ROOM
CORRIDOR
C1P-99
CORRIDOR
CORRIDOR
C1P-98
CORRIDOR
OFFICE
1P-212
OFFICE
OFFICE
1P-210
OFFICE
CORRIDOR
C1P-97
CORRIDOR
CORRIDOR
C1P-86
CORRIDOR
OFFICE
1P-361
OFFICE
OFFICE
1P-362
OFFICE
RESTROOM
1P-312
RESTROOM
RESTROOM
1P-310
RESTROOM
CONFERENCE
ROOM
1P-314
CONFERENCE
ROOM
CORRIDOR
C1P-92
CORRIDOR
OFFICE
1P-363
OFFICE
OFFICE
1P-364
OFFICE
OFFICE
1P-365
OFFICE
OFFICE
1P-366
OFFICE
OFFICE
1P-333
OFFICE
OFFICE
1P-326
OFFICE OFFICE
1P-320
OFFICE
CORRIDOR
C1P-95
CORRIDOR
CORRIDOR
C1P-96
CORRIDOR
OFFICE
1P-208
OFFICE
RESTROOM
1P-321
RESTROOM
OFFICE
1P-328
OFFICE
OFFICE
1P-330
OFFICE
OFFICE
1P-334
OFFICE
OFFICE
1P-335
OFFICE
OFFICE
1P-367
OFFICE
OFFICE
1P-368
OFFICE
OFFICE
1P-369
OFFICE
OFFICE
1P-370
OFFICE
OFFICE
1P-336
OFFICE
CORRIDOR
C1P-90
CORRIDOR
OFFICE
1P-332
OFFICE OFFICE
1P-324
OFFICE
RESTROOM
1P-322
RESTROOM
CLOSET
1P-323
CLOSET
CORRIDOR
C1P-93
CORRIDOR
CORRIDOR
C1P-94
CORRIDOR
OFFICE
1P-343
OFFICE
OFFICE
1P-342
OFFICE
OFFICE
1P-341
OFFICE
CORRIDOR
C1P-88
CORRIDOROFFICE
1P-345
OFFICE
OFFICE
1P-347
OFFICE OFFICE
1P-346
OFFICE
OFFICE
1P-348
OFFICE
OFFICE
1P-344
OFFICE
OFFICE
1P-355
OFFICE
LAB/OFFICE
1P-353
LAB/OFFICEOFFICE
1P-351
OFFICEOFFICE
1P-349
OFFICE
OFFICE
1P-373
OFFICE
OFFICE
1P-372
OFFICE
OFFICE
1P-371
OFFICE
CORRIDOR
C1P-91
CORRIDOR
CORRIDOR
C1P-102
CORRIDOR
SAMPLE
COLLECTION
1P-99
SAMPLE
COLLECTION
CORRIDOR
C1P-86A
CORRIDOR
MECHANICAL
1P-96
MECHANICAL
ELECTRICAL
1P-375
ELECTRICAL
STAIR
S-10
STAIR
BREAKROOM
1P-313
BREAKROOM
BULLPEN
1P-300
BULLPEN
OFFICE
1P-308
OFFICE
OFFICE
1P-311
OFFICE
OFFICE
1P-220
OFFICE
OFFICE
1P-218
OFFICE OFFICE
1P-216
OFFICE
OFFICE
1P-221
OFFICEOFFICE
1P-223
OFFICE
OFFICE
1P-225
OFFICE
OFFICE
1P-325
OFFICE
OFFICE
1P-327
OFFICE
OFFICE
1P-329
OFFICE
OFFICE
1P-331
OFFICE
BULLPEN
1P-340
BULLPEN
OFFICE
1P-254
OFFICE
OFFICE
1P-251
OFFICE
OFFICE
1P-250
OFFICE
OFFICE
1P-253
OFFICE
OFFICE
1P-252
OFFICE OFFICE
1P-245
OFFICE
OFFICE
1P-247
OFFICE
OFFICE
1P-249
OFFICE
OFFICE
1P-248
OFFICE
OFFICE
1P-246
OFFICE
OFFICE
1P-241
OFFICE
OFFICE
1P-243
OFFICE
OFFICE
1P-263
OFFICEOFFICE
1P-265
OFFICEOFFICE
1P-267
OFFICEOFFICE
1P-269
OFFICE
OFFICE
1P-271
OFFICE
OFFICE
1P-273
OFFICE
OFFICE
1P-275
OFFICE
OFFICE
1P-276
OFFICE OFFICE
1P-274
OFFICE OFFICE
1P-272
OFFICE OFFICE
1P-270
OFFICE OFFICE
1P-268
OFFICE OFFICE
1P-266
OFFICE OFFICE
1P-264
OFFICE OFFICE
1P-262
OFFICE OFFICE
1P-260
OFFICE
GROUP
ROOM
1P-111
GROUP
ROOM
OFFICE
1P-261
OFFICE
TESTING
1P-244
TESTING
LPN BULLPEN
1P-242
LPN BULLPEN
EXAM ROOM
1P-240
EXAM ROOM
OFFICE
1P-213
OFFICE
OFFICE
1P-211
OFFICE
OFFICE
1P-209
OFFICE OFFICE
1P-200
OFFICE
OFFICE
1P-202
OFFICE
OFFICE
1P-204
OFFICE
EXAM ROOM
1P-203
EXAM ROOM
EXAM ROOM
1P-201
EXAM ROOM
CLOSET
1P-103
CLOSET
RESTROOM
1P-102
RESTROOM
GROUP
ROOM
1P-104
GROUP
ROOM
GROUP
ROOM
1P-105
GROUP
ROOM GROUP
ROOM
1P-106
GROUP
ROOM
GROUP
ROOM
1P-108
GROUP
ROOM
GROUP
ROOM
1P-107
GROUP
ROOM
GROUP
ROOM
1P-110
GROUP
ROOM
GROUP
ROOM
1P-109
GROUP
ROOM
CLOSET
1P-112
CLOSET
RESTROOM
1P-205
RESTROOM
RECEPTION
DESK
1P-101
RECEPTION
DESK
ADMIN
BULLPEN
1P-206
ADMIN
BULLPEN
SELF
CHECK-IN
1P-100a
SELF
CHECK-IN
WAITING
1P-100
WAITING
CORRIDOR
C1P-104
CORRIDOR
CORRIDOR
C1P-100
CORRIDOR
CORRIDOR
C1P-105
CORRIDOR
CORRIDOR
C1P-104A
CORRIDOR
CORRIDOR
C1P-103A
CORRIDORCORRIDOR
C1P-103
CORRIDOR
CORRIDOR
C1P-98A
CORRIDOR
CORRIDOR
C1P-101
CORRIDOR
CORRIDOR
C1P-106
CORRIDOR
CORRIDOR
C1P-107
CORRIDOR
OFFICE
1P-374
OFFICE
COMMS
1P-376
COMMS
DRUG
LOCKER
1P-242a
DRUG
LOCKER
NEW SMOKE
CONTROL ZONE 1-27
(SPRINKLER ZONE 40)
NEW SMOKE
CONTROL ZONE 1-28
(SPRINKLER ZONE 41)
CORRIDOR
C1P-109
CORRIDORCORRIDOR
C1P-109
CORRIDOR
CORRIDOR
C1P-108
CORRIDOR
CORRIDOR
C1-85
CORRIDOR
CORRIDOR
C1-86
CORRIDOR
OFFICE
1P-374A
OFFICE
OFFICE
1P-374B
OFFICE
OFFICE
1P-97
OFFICE OFFICE
1P-98
OFFICE
CORRIDOR
C1P-97
CORRIDOR
LEGEND:
AREA OUTSIDE OF SCOPE OF WORK
NEW SPRINKLER ZONE AND SMOKE CONTROL
ZONE BOUNDARY
EXISTING SMOKE DETECTOR TO REMAIN
NEW PHOTOELECTRIC SMOKE DETECTOR
EXISTING DOOR HOLDER AND FIRE ALARM
RELAY TO REMAIN
NEW DOOR HOLDER AND FIRE ALARM RELAY
(DOOR HOLDER TO BE PROVIDED BY OTHERS.
FIRE ALARM CONTRACTOR SHALL PROVIDE
CONNECTION WITH FA SYSTEM)
EXISTING MANUAL PULL STATION TO REMAIN
NEW MANUAL PULL STATION
EXISTING FIRE ALARM NOTIFICATION
APPLIANCE TO REMAIN
A = AUDIO FIRE ALARM SPEAKER
V = VISUAL FIRE ALARM STROBE
NEW FIRE ALARM NOTIFICATION APPLIANCE
A = AUDIO FIRE ALARM SPEAKER
V = VISUAL FIRE ALARM STROBE
EXISTING FLOW SWITCH AND TAMPER SWITCH
TO REMAIN.
P
F A / V
DHJ
DHJ
F M
ABBREVIATIONS:
SCZ - SMOKE CONTROL ZONE
NOTE: ALTHOUGH CERTAIN FIRE ALARM DEVICES AND APPLIANCES
MAY BE RE-USED, THE EQUIPMENT ADDRESS SHALL BE RE-
PROGRAMMED AS NECESSARY BASED ON THE NEW SMOKE
CONTROL ZONE BOUNDARIES.
P
F M
F A / V
GENERAL NOTES:
1. THE ARCHITECTURAL SCOPE OF THIS PROJECT INCLUDES
MODIFICATIONS TO THE EXISTING MENTAL HEALTH CLINIC,
AND EXPANSION INTO THE ADJACENT ATRIUM SPACE. THE
ATRIUM SPACE ON THE 1ST FLOOR WILL RECEIVE A NEW
"LID" CEILING ABOVE ITS EXISTING SEATING AREA.
2. THE FIRE ALARM SCOPE OF WORK INCLUDES DESIGN,
INSTALLATION, AND MODIFICATIONS TO THE EXISTING FIRE
ALARM SYSTEM BASED ON THE ARCHITECTURAL
RENOVATIONS. THIS INCLUDES RE-PROGRAMMING OF
FIELD DEVICES AND APPLIANCES BASED ON THE REVISED
SMOKE CONTROL ZONE (SCZ) BOUNDARIES.
3. THE BUILDING IS CURRENTLY SERVED BY A GAMEWELL FCI
E3-SERIES PANEL. ALL NEW FIRE ALARM EQUIPMENT USED
IN THIS PROJECT SHALL BE COMPATIBLE WITH THIS
SYSTEM.
4. FIRE ALARM DESIGN AND INSTALLATION SHALL BE IN
COMPLIANCE WITH NFPA 72, NFPA 101, AND THE VA FIRE
PROTECTION DESIGN MANUAL.
5. ALL FIRE ALARM WORK SHALL PERFORMED IN
ACCORDANCE WITH THE PHASING DRAWING G-005.
6. NEW FIRE ALARM CIRCUITS IN RENOVATED AREAS MAY BE
ROUTED TO THE NEAREST EXISTING CIRCUIT PANEL.
7. CONTRACTOR MAY RE-USE EXISTING NOTIFICATION
APPLIANCES, INITIATING DEVICES, AND CIRCUIT WIRING
ONLY IF TESTED AND WARRANTED AS NEW. OTHERWISE,
PROVIDE NEW DEVICES IN LOCATION WHERE EXISTING
DEVICES ARE TO BE RELOCATED.
8. ALL NEW SYSTEM WIRING SHALL BE IN 3/4 INCH OR LARGER
ELECTRICAL METALLIC TUBING (EMT) CONDUIT.
9. ALL NEW FIRE ALARM INITIATING DEVICES SHALL BE
ADDRESSABLE.
10. ALL NEW VISUAL APPLIANCES SHALL BE SYNCHRONIZED
WITH OTHER VISIBLE APPLIANCES.
11. COORDINATE INSTALLATION WITH OTHER TRADES.
12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ADD NEW
POWER SUPPLY PANELS AS NEEDED FOR THE NEW FIRE
ALARM EQUIPMENT.
13. THE INTENT OF THE NEW FIRE ALARM SPEAKER SPACING
IS TO PROVIDE AN INTELLIGIBLE VOICE MESSAGE. THE
INSTALLING CONTRACTOR SHALL VERIFY THEIR DESIGN
MEETS INTELLIGIBILITY REQUIREMENTS FROM NFPA 72
BASED ON THE CONTRACTOR'S SELECTED PRODUCTS.
14. NEW CEILING-MOUNTED FIRE ALARM EQUIPMENT SHALL
BE IN CENTER OF TILE.
15. EXISTING FIRE ALARM EQUIPMENT LOCATIONS SHOWN ON
THE PLANS ARE APPROXIMATE AND SHALL BE VERIFIED IN
THE FIELD.
16. COORDINATE ANY IMPAIRMENTS TO THE FIRE ALARM
SYSTEM WITH BUILDING MANAGEMENT AND FIRE
MARSHAL.
30 x 42
G E
N E
R A
L
N O
T E
S
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u s rt e r in c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e
-h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA
C U s e rs \c h e n q ix
\D o c u m e n ts
\R e v it L o c a l F ile s \3
B L
D G
F
IR
E
C F c h e n q ix
.r v t
/4
/2
:0
:5
P
M
1/8" = 1'-0"
1322- FA100
RCR PQC
EXPAND OUTPATIENT MENTAL HEALTH
FIRE ALARM RENOVATION PLAN
FIRE ALARM
05-05-2017 DWG. 56 OF 94
1/8" = 1'-0"
1 FIRE ALARM RENOVATION PLAN
1. REVISE EXISTING FIRE ALARM SMOKE CONTROL ZONE
(SCZ) 1-27 BOUNDARY TO NEW AREA AS INDICATED ON
THIS DRAWING. ALL EXISTING AND NEW FIRE ALARM
DEVICES WITHIN ZONE BOUNDARY SHALL BE
PROGRAMMED TO BE INCORPORATED INTO SCZ 1-27.
2. REVISE EXISTING FIRE ALARM SCZ 1-28 TO NEW AREA AS
INDICATED ON THIS DRAWING. ALL EXISTING AND NEW
FIRE ALARM DEVICES WITHIN ZONE BOUNDARY SHALL BE
PROGRAMMED TO BE INCORPORATED INTO SCZ 1-28.
3. PER THE VA DESIGN MANUAL, VISUAL NOTIFICATION
SHOULD NOT BE PROVIDED WHERE THE STROBE COULD
INTERFERE WITH PATIENT CARE (SUCH AS PSYCHIATRIC
AREAS).
KEYED NOTES:
BID ALTERNATE:
1. REPLACE ALL EXISTING STROBE/SPEAKERS, SMOKE
DETECTORS, AND ANY OTHER FIRE ALARM DEVICES IN
ROOMS WHERE NO CEILING DEMOLITION WORK IS
SCHEDULED.
DESCRIPTION DATE
D W
XYZAABBCCDDEEFFGGHH
10 12
STAIR
S-10
STAIR
FXD100
LEGEND:
OUTSIDE OF SCOPE OF WORK AREA
EXISTING SPRINKLER ZONE AND SMOKE
CONTROL ZONE (SCZ) BOUNDARY
DEMOLITION START POINT
SPRINKLER MAIN TO BE DEMOLISHED
SPRINKLER SYSTEM MAIN
Room
C1-86
Room
Room
C1-85
Room Room
1P-98
RoomRoom
1P-97
Room
Room
1P-139
Room Room
1P-140
Room Room
1P-142
Room Room
1P-144
Room Room
1P-145
Room Room
1P-148
Room Room
1P-149
Room Room
1P-159
Room Room
1P-160
Room Room
1P-163
Room Room
1P-164
Room Room
1P-165
Room Room
1P-165A
Room Room
1P-165B
Room Room
1P-182
Room Room
1P-181
Room
Room
1P-184
Room
Room
1P-180
RoomRoom
C1-103
Room
Room
1P-178
Room Room
1P-179
Room
Room
1P-177
Room
Room
1P-176
Room Room
1P-175
Room
Room
1P-166
Room
Room
1P-183
Room Room
C1-101
Room
Room
1P-162c
Room
Room
1P-162b
Room
Room
C1-101A
RoomRoom
C1-100
Room
Room
C1-92
Room
Room
1P-138
Room
Room
1P-137
Room Room
1E-170
Room Room
1P-143
Room Room
1P-146a
Room Room
1P-146
Room Room
1P-147
Room Room
1P-158
Room
Room
1P-162
Room
Room
1P-161
Room
Room
C1-99
Room
Room
1P-157
Room
Room
1P-132
RoomRoom
1P-133
Room
Room
1P-133A
Room
Room
1P-134a
RoomRoom
1P-134b
Room
Room
1P-136
Room
Room
1P-135
Room
Room
1P-134
Room
Room
1P-123
Room
Room
1P-124
Room Room
1P-125
Room Room
1P-131
Room Room
1P-150
Room
Room
C1-98
Room Room
1P-156a
Room
Room
1P-156b
Room
Room
1P-156
Room
Room
C1-96
Room
Room
1P-162a
Room
Room
1P-166A
Room
Room
1P-167A
Room
Room
1P-168A
RoomRoom
1P-168B
RoomRoom
1P-168C
RoomRoom
1P-168D
Room
Room
1P-151
RoomRoom
1P-130
Room
Room
1P-129
Room
Room
1P-127
Room
Room
1P-126
Room Room
1P-122
Room
Room
1P-120
Room
Room
1P-121
Room
Room
1P-119
Room
Room
1P-117
Room
Room
1P-115
Room
Room
1P-118
Room Room
1P-116
Room
Room
C1-94
Room
Room
1P-128
Room Room
1P-154
Room
Room
1P-152
Room
Room
1P-153
Room
Room
C1-96C
Room
Room
C1-95
RoomRoom
C1-93
Room
Room
1P-105
Room
Room
1P-104B
Room Room
1P-104C
Room Room
C1-96A
Room
Room
C1-90
Room
Room
1P-106A
Room
Room
1P-106
Room Room
1P-102
Room Room
1P-101
Room
Room
1P-104
Room
Room
1P-100A
Room
Room
1P-100
Room Room
1P-103
RoomRoom
1P-107
RoomRoom
1P-108
Room
Room
1P-112
Room
Room
1P-113
Room
Room
1P-114
Room Room
1P-104A
Room
Room
C1-96B
Room
Room
1P-169B
Room
Room
C1-87
Room
Room
C1-104
Room
Room
1P-172
Room
Room
1P-174
Room
Room
1P-173
RoomRoom
1P-167
Room
Room
1P-171
RoomRoom
1P-168
Room
Room
1P-169
Room Room
1P-170
Room
Room
C1-105
Room
Room
1P-170B
Room
Room
1P-170C
RoomRoom
1P-170D
Room
Room
C1-102
Room
Room
1P-169A
Room
Room
C1-108
Room
Room
C1-106
Room
Room
1P-99
Room
Room
1P-96
Room
Room
C1-91
Room
Room
1P-109
Room
Room
1P-95
Room
Room
1P-111
Room
Room
1P-110
Room
Room
C1-109
Room
EXISTING
SPRINKLER ZONE 40
(SCZ 1-27)
EXISTING
SPRINKLER ZONE 41
(SCZ 1-28)
NO SPRINKLER COVERAGE
AT TOP OF ATRIUM
(SCZ 1-34)
HH
10 12
STAIR
S-10
STAIR
30 x 42
G E
N E
R A
L
N O
T E
S
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u s rt e r in c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e
-h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA
C U s e rs \c h e n q ix
\D o c u m e n ts
\R e v it L o c a l F ile s \3
B L
D G
F
IR
E
C F c h e n q ix
.r v t
/4
/2
:0
:0
P
M
As indicated
1322- FXD100
RCR PQC
EXPAND OUTPATIENT MENTAL HEALTH
FIRE SUPPRESSION DEMOLITION PLAN
FIRE SUPPRESSION
05-05-2017 DWG. 57 OF 94
1/8" = 1'-0"
1 FIRE SUPPRESSION DEMOLITION PLAN
1. EXISTING SPRINKLER ZONE 40 AND SMOKE CONTROL ZONE
(SCZ) 1-27 TO REMAIN. HOWEVER, ZONE BOUNDARIES SHALL
BE MODIFIED AS SHOWN ON SHEET FX100. DEMOLISH ALL
SPRINKLERS AND REMOVE OR RELOCATE SPRINKLER DROP
LOCATION AS REQUIRED FOR NEW ROOMS LAYOUT AND NEW
ZONE LAYOUT.
2. EXISTING SPRINKLER ZONE 41 AND SCZ 1-28 TO REMAIN.
HOWEVER, ZONE BOUNDARIES SHALL BE MODIFIED AS
SHOWN ON SHEET FX100. DEMOLISH ALL SPRINKLER SYSTEM
MAIN, BRANCH LINES, AND SPRINKLERS.
3. THERE IS NO EXISTING SPRINKLER COVERAGE IN THE ATRIUM,
EXCEPT AS NOTED IN KEY NOTE 15 OF THIS SHEET.
4. REMOVE AND/OR RELOCATE SPRINKLERS IN AREAS WHERE
THERE ARE ARCHITECTURAL WALL MODIFICATIONS. PROVIDE
PROPER SPRINKLER COVERAGE. (TYPICAL. APPLY TO ALL
AREAS WHERE WALL MODIFICATIONS OCCUR. REFER TO
ARCHITECTURAL DRAWINGS FOR RENOVATION AREAS).
5. EXISTING 2 1/2 INCH PIPE DOWN TO FIRE HOSE VALVE
STATION TO BE DEMOLISHED.
6. EXISTING STANDPIPE FEED MAIN SHALL BE DEMOLISHED BACK
TO STAIR OR NEAREST POINT OF CONNECTION.
7. EXISTING FIRE HOSE VALVE FEED MAIN TO BE DEMOLISHED.
8. EXISTING SPRINKLER SYSTEM FEED MAIN FEED TO ZONE 41
TO BE DEMOLISHED.
9. EXISTING STANDPIPE RISER IN STAIR 10 TO REMAIN.
10. EXISTING SPRINKLER ZONE 40 CONTROL SYSTEM TO REMAIN.
11. EXISTING SPRINKLER ZONE 41 CONTROL SYSTEM TO REMAIN.
12. 2 INCH COMMON DRAIN FOR SYSTEM 40 AND 41 TO REMAIN.
13. EXISTING SPRINKLER ZONE 40 FEED MAIN TO REMAIN.
14. EXISTING SPRINKLER ZONE 41 FEED MAIN TO REMAIN.
15. SPRINKLERS IN THE OVERHEAD CEILING FOR THIS WALKWAY
ARE FED FROM AN ADJACENT ZONE. DEMOLISH ALL
SPRINKLERS AND PIPING IN THIS AREA. CAP ANY PIPES
WHERE THEY PENETRATE THE SMOKE CONTROL ZONE
BOUNDARY.
KEYED NOTES:
GENERAL NOTES:
1. THE ARCHITECTURAL SCOPE OF THIS PROJECT INCLUDES
MODIFICATIONS TO THE EXISTING MENTAL HEALTH CLINIC,
AND EXPANSION INTO THE ADJACENT ATRIUM SPACE. THE
ATRIUM SPACE ON THE 1ST FLOOR WILL RECEIVE A NEW "LID"
CEILING ABOVE ITS EXISTING SEATING AREA.
2. THE FIRE SUPPRESSION SCOPE INCLUDES DESIGN,
INSTALLATION, AND MODIFICATIONS TO SPRINKLER SYSTEM IN
RENOVATED AREAS OF THE MENTAL HEALTH CLINIC.
ADDITIONALLY, THE SPRINKLER ZONE BOUNDARIES SHALL BE
MODIFIED (THIS INCLUDES DEMOLISHING LARGE PORTIONS OF
THE SPRINKLER SYSTEM BASED ON THE REVISED SPRINKLER
ZONE BOUNDARIES).
3. PROVIDE SPRINKLER SYSTEM DESIGN AND INSTALLATION IN
ACCORDANCE WITH NFPA 13 AND THE VA FIRE PROTECTION
DESIGN MANUAL.
4. ALL FIRE SUPPRESSION WORK SHALL PERFORMED IN
ACCORDANCE WITH THE PHASING DRAWING G-005.
5. SPRINKLER SYSTEM SHALL BE HYDRAULICALLY CALCULATED.
DENSITY AND REMOTE AREA SHALL BE IN ACCORDANCE WITH
NFPA 13 AND THE VA FIRE PROTECTION DESIGN MANUAL.
6. THE BUILDING IS SERVED BY AN AURORA FIRE PUMP RATED AT
500 GPM AT 65 PSI.
7. EXISTING SPRINKLERS IN RENOVATED AREAS MAY NOT BE RE-
USED. NEW SPRINKLERS IN RENOVATED AREAS SHALL BE
REPLACED WITH INSTITUTIONAL-TYPE SPRINKLERS.
8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE
ANY ADDITIONAL MODIFICATIONS TO THE FIRE SUPPRESSION
SYSTEM AND HYDRAULIC CALCULATIONS, AS REQUIRED FOR A
CODE COMPLIANT SYSTEM.
9. CONTRACTOR SHALL ENSURE THAT SPRINKLERS OUTSIDE OF
THE RENOVATED AREAS ARE NOT NEGATIVELY AFFECTED BY
ANY PIPE DEMOLITION.
10. NEW SPRINKLER LOCATIONS SHALL BE COORDINATED WITH
ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES AND CEILING
MOUNTED DEVICES AND SYSTEMS. NEW SPRINKLERS SHALL
BE IN CENTER OF TILE.
11. THE SPRINKLER MAINS SHOWN ON THIS DRAWING ARE
LOCATED IN THE INTERSTITIAL SPACE. THE LOCATIONS ARE
APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD. ALL
OTHER BRANCHLINES AND FEED MAINS ARE LOCATED BELOW
THE INTERSTITIAL LEVEL, AND ABOVE THE SUSPENDED
CEILING.
12. COORDINATE ANY IMPAIRMENTS TO THE SPRINKLER SYSTEM
WITH BUILDING MANAGEMENT AND FIRE MARSHAL.
1/4" = 1'-0"
2 ENLARGED EXISTING ZONE CONTROL SYSTEM
DESCRIPTION DATE
XYZAABBCCDDEEFFGGHH
STAIR
S-10
STAIR
COMMS
1P-376
COMMS ELECTRICAL
1P-375
ELECTRICAL
OFFICE
1P-360
OFFICE
OFFICE
1P-309
OFFICE OFFICE
1P-307
OFFICE OFFICE
1P-305
OFFICE OFFICE
1P-303
OFFICE OFFICE
1P-219
OFFICE OFFICE
1P-217
OFFICE OFFICE
1P-215
OFFICE
LOCKER
ROOM
1P-214
LOCKER
ROOM
CORRIDOR
C1P-99
CORRIDOR
CORRIDOR
C1P-98
CORRIDOR
OFFICE
1P-212
OFFICE
OFFICE
1P-210
OFFICE
CORRIDOR
C1P-97
CORRIDOR
CORRIDOR
C1P-86
CORRIDOR
OFFICE
1P-361
OFFICE
OFFICE
1P-362
OFFICE
RESTROOM
1P-312
RESTROOM
RESTROOM
1P-310
RESTROOM
CONFERENCE
ROOM
1P-314
CONFERENCE
ROOM
CORRIDOR
C1P-92
CORRIDOR
OFFICE
1P-363
OFFICE
OFFICE
1P-364
OFFICE
OFFICE
1P-365
OFFICE
OFFICE
1P-366
OFFICE
OFFICE
1P-333
OFFICE OFFICE
1P-326
OFFICE OFFICE
1P-320
OFFICE
CORRIDOR
C1P-95
CORRIDOR
CORRIDOR
C1P-96
CORRIDOR
OFFICE
1P-208
OFFICE
RESTROOM
1P-321
RESTROOMOFFICE
1P-328
OFFICE
OFFICE
1P-330
OFFICE
OFFICE
1P-334
OFFICE
OFFICE
1P-335
OFFICE
OFFICE
1P-367
OFFICE
OFFICE
1P-368
OFFICE
OFFICE
1P-369
OFFICE
OFFICE
1P-370
OFFICE
OFFICE
1P-336
OFFICE
CORRIDOR
C1P-90
CORRIDOR
OFFICE
1P-332
OFFICE OFFICE
1P-324
OFFICE
RESTROOM
1P-322
RESTROOM
CLOSET
1P-323
CLOSET
CORRIDOR
C1P-93
CORRIDOR
CORRIDOR
C1P-94
CORRIDOR
OFFICE
1P-343
OFFICE
OFFICE
1P-342
OFFICE
OFFICE
1P-341
OFFICE
CORRIDOR
C1P-88
CORRIDOR
OFFICE
1P-345
OFFICE
OFFICE
1P-347
OFFICE OFFICE
1P-346
OFFICE OFFICE
1P-348
OFFICE
OFFICE
1P-344
OFFICE
OFFICE
1P-355
OFFICE
LAB/OFFICE
1P-353
LAB/OFFICEOFFICE
1P-351
OFFICEOFFICE
1P-349
OFFICE
OFFICE
1P-373
OFFICE
OFFICE
1P-372
OFFICE
OFFICE
1P-371
OFFICE
CORRIDOR
C1P-91
CORRIDOR
CORRIDOR
C1P-102
CORRIDOR
SAMPLE
COLLECTION
1P-99
SAMPLE
COLLECTION
CORRIDOR
C1P-86A
CORRIDOR
MECHANICAL
1P-96
MECHANICAL
BREAKROOM
1P-313
BREAKROOM
BULLPEN
1P-300
BULLPEN
OFFICE
1P-308
OFFICE
OFFICE
1P-311
OFFICE
OFFICE
1P-220
OFFICE OFFICE
1P-218
OFFICE OFFICE
1P-216
OFFICE
OFFICE
1P-221
OFFICEOFFICE
1P-223
OFFICEOFFICE
1P-225
OFFICE
OFFICE
1P-325
OFFICE
OFFICE
1P-327
OFFICE
OFFICE
1P-329
OFFICE
OFFICE
1P-331
OFFICE
BULLPEN
1P-340
BULLPEN
OFFICE
1P-254
OFFICE
OFFICE
1P-251
OFFICE OFFICE
1P-250
OFFICE
OFFICE
1P-253
OFFICE OFFICE
1P-252
OFFICE OFFICE
1P-245
OFFICE
OFFICE
1P-247
OFFICE
OFFICE
1P-249
OFFICE
OFFICE
1P-248
OFFICE
OFFICE
1P-246
OFFICE OFFICE
1P-241
OFFICE
OFFICE
1P-243
OFFICE
OFFICE
1P-263
OFFICEOFFICE
1P-265
OFFICEOFFICE
1P-267
OFFICEOFFICE
1P-269
OFFICEOFFICE
1P-271
OFFICEOFFICE
1P-273
OFFICEOFFICE
1P-275
OFFICE
OFFICE
1P-276
OFFICE OFFICE
1P-274
OFFICE OFFICE
1P-272
OFFICE OFFICE
1P-270
OFFICE OFFICE
1P-268
OFFICE OFFICE
1P-266
OFFICE OFFICE
1P-264
OFFICE OFFICE
1P-262
OFFICE OFFICE
1P-260
OFFICE
GROUP
ROOM
1P-111
GROUP
ROOM
OFFICE
1P-261
OFFICE
TESTING
1P-244
TESTING
LPN BULLPEN
1P-242
LPN BULLPEN
EXAM ROOM
1P-240
EXAM ROOM
OFFICE
1P-213
OFFICE
OFFICE
1P-211
OFFICE
OFFICE
1P-209
OFFICE OFFICE
1P-200
OFFICE
OFFICE
1P-202
OFFICE
OFFICE
1P-204
OFFICE
EXAM ROOM
1P-203
EXAM ROOM
EXAM ROOM
1P-201
EXAM ROOM CLOSET
1P-103
CLOSET
RESTROOM
1P-102
RESTROOM
GROUP
ROOM
1P-104
GROUP
ROOM
GROUP
ROOM
1P-105
GROUP
ROOM
GROUP
ROOM
1P-106
GROUP
ROOM
GROUP
ROOM
1P-108
GROUP
ROOM
GROUP
ROOM
1P-107
GROUP
ROOM
GROUP
ROOM
1P-110
GROUP
ROOM
GROUP
ROOM
1P-109
GROUP
ROOM
CLOSET
1P-112
CLOSET
RESTROOM
1P-205
RESTROOM RESTROOM
1P-207
RESTROOM
RECEPTION
DESK
1P-101
RECEPTION
DESK
ADMIN
BULLPEN
1P-206
ADMIN
BULLPEN
SELF
CHECK-IN
1P-100a
SELF
CHECK-IN
WAITING
1P-100
WAITING
CORRIDOR
C1P-104
CORRIDOR
CORRIDOR
C1P-100
CORRIDOR
CORRIDOR
C1P-105
CORRIDOR
CORRIDOR
C1P-104A
CORRIDOR
CORRIDOR
C1P-103A
CORRIDOR
CORRIDOR
C1P-103
CORRIDOR
CORRIDOR
C1P-98A
CORRIDOR
CORRIDOR
C1P-101
CORRIDOR
CORRIDOR
C1P-106
CORRIDOR
CORRIDOR
C1P-107
CORRIDOR
OFFICE
1P-374
OFFICE
DRUG
LOCKER
1P-242a
DRUG
LOCKER
4 6
NEW SPRINKLER ZONE 40
(SCZ 1-27)
NEW SPRINKLER ZONE 41
(SCZ 1-28)
LEGEND:
OUTSIDE OF SCOPE OF WORK AREA
NEW SPRINKLER ZONE AND SMOKE
CONTROL ZONE (SCZ) BOUNDARY
NEW POINT OF CONNECTION FOR
NEW FEED MAIN.
SPRINKLER MAIN
30 x 42
G E
N E
R A
L
N O
T E
S
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u s rt e r in c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e
-h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA
C U s e rs \c h e n q ix
\D o c u m e n ts
\R e v it L o c a l F ile s \3
B L
D G
F
IR
E
C F c h e n q ix
.r v t
/4
/2
:0
:0
P
M
1/8" = 1'-0"
1322- FX100
RCR PQC
EXPAND OUTPATIENT MENTAL HEALTH
FIRE SUPPRESSION RENOVATION PLAN
FIRE SUPPRESSION
05-05-2017 DWG. 58 OF 94
1/8" = 1'-0"
1 FIRE SUPPRESSION RENOVATION PLAN
KEYED NOTES:
1. EXISTING SPRINKLER ZONE 40. THE BOUNDARIES OF THIS
ZONE SHALL BE EXPANDED AS INDICATED BY KEYNOTE 11 ON
THIS SHEET. REPLACE THE NECESSARY SPRINKLERS AND
BRANCH LINES IN THIS AREA TO ACCOMMODATE THE
ARCHITECTURAL CHANGES.
2. EXPAND EXISTING SPRINKLER ZONE 41 TO THE NEW ZONE
BOUNDARIES IDENTIFIED ON THIS DRAWING. PROVIDE NEW
SPRINKLER SYSTEM MAIN, BRANCH LINES, AND SPRINKLERS.
(NOTE: SCZ 1-34 WAS PREVIOUSLY PART OF THE ATRIUM, BUT
WILL NOW BE PART OF THE EXPANDED SCZ 1-28).
3. EXISTING STANDPIPE RISER IN STAIR 10.
4. EXISTING SPRINKLER SYSTEM ZONE 40 CONTROL ASSEMBLY.
5. EXISTING SPRINKLER SYSTEM ZONE 41 CONTROL ASSEMBLY.
6. 2 INCH EXISTING COMMON DRAIN.
7. EXISTING SPRINKLER SYSTEM ZONE 40 FEED MAIN.
8. NEW FEED MAIN FOR SPRINKLER SYSTEM ZONE 41. SIZE TO BE
DETERMINED BY A LICENSED FIRE SPRINKLER CONTRACTOR.
9. THIS AREA WAS PREVIOUSLY PART OF SPRINKLER ZONE 41.
DEMOLISH AND RECONFIGURE PIPING SUCH THAT THESE
SPRINKLERS ARE FED FROM ZONE 40.
10. SPRINKLERS IN THE OVERHEAD CEILING FOR THIS WALKWAY
WERE PREVIOUSLY FED FROM AN ADJACENT ZONE.
RECONFIGURE PIPING SUCH THAT THESE SPRINKLERS ARE
FED FROM ZONE 41.
GENERAL NOTES:
1. THE ARCHITECTURAL SCOPE OF THIS PROJECT INCLUDES
MODIFICATIONS TO THE EXISTING MENTAL HEALTH CLINIC,
AND EXPANSION INTO THE ADJACENT ATRIUM SPACE. THE
ATRIUM SPACE ON THE 1ST FLOOR WILL RECEIVE A NEW
"LID" CEILING ABOVE ITS EXISTING SEATING AREA.
2. THE FIRE SUPPRESSION SCOPE INCLUDES DESIGN,
INSTALLATION, AND MODIFICATIONS TO SPRINKLER SYSTEM
IN RENOVATED AREAS OF THE MENTAL HEALTH CLINIC.
ADDITIONALLY, THE SPRINKLER ZONE BOUNDARIES SHALL
BE MODIFIED (THIS INCLUDES DEMOLISHING LARGE
PORTIONS OF THE SPRINKLER SYSTEM BASED ON THE
REVISED SPRINKLER ZONE BOUNDARIES).
3. PROVIDE SPRINKLER SYSTEM DESIGN AND INSTALLATION IN
ACCORDANCE WITH NFPA 13 AND THE VA FIRE PROTECTION
DESIGN MANUAL.
4. ALL FIRE SUPPRESSION WORK SHALL PERFORMED IN
ACCORDANCE WITH THE PHASING DRAWING G-005.
5. SPRINKLER SYSTEM SHALL BE HYDRAULICALLY
CALCULATED. DENSITY AND REMOTE AREA SHALL BE IN
ACCORDANCE WITH NFPA 13 AND THE VA FIRE PROTECTION
DESIGN MANUAL.
6. THE BUILDING IS SERVED BY AN AURORA FIRE PUMP RATED
AT 500 GPM AT 65 PSI.
7. EXISTING SPRINKLERS IN RENOVATED AREAS MAY NOT BE
RE-USED. NEW SPRINKLERS IN RENOVATED AREAS SHALL
BE REPLACED WITH INSTITUTIONAL-TYPE SPRINKLERS.
8. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE
ANY ADDITIONAL MODIFICATIONS TO THE FIRE SUPPRESSION
SYSTEM AND HYDRAULIC CALCULATIONS, AS REQUIRED FOR
A CODE COMPLIANT SYSTEM.
9. CONTRACTOR SHALL ENSURE THAT SPRINKLERS OUTSIDE OF
THE RENOVATED AREAS ARE NOT NEGATIVELY AFFECTED
BY ANY PIPE DEMOLITION.
10. NEW SPRINKLER LOCATIONS SHALL BE COORDINATED WITH
ALL DIFFUSERS, SPEAKERS, LIGHTING FIXTURES AND
CEILING MOUNTED DEVICES AND SYSTEMS. NEW
SPRINKLERS SHALL BE IN CENTER OF TILE.
11. THE SPRINKLER MAINS SHOWN ON THIS DRAWING ARE
LOCATED IN THE INTERSTITIAL SPACE. THE LOCATIONS ARE
APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD. ALL
OTHER BRANCH LINES AND FEED MAINS ARE LOCATED
BELOW THE INTERSTITIAL LEVEL, AND ABOVE THE
SUSPENDED CEILING.
12. COORDINATE ANY IMPAIRMENTS TO THE SPRINKLER SYSTEM
WITH BUILDING MANAGEMENT AND FIRE MARSHAL.
BID ALTERNATE:
1. REPLACE ALL EXISTING SPRINKLER HEADS IN ROOMS
WHERE NO CEILING DEMOLITION WORK IS SCHEDULED.
DESCRIPTION DATE
File details come from the government source that posted it.