VA263-17-R-1144-025.pdf
PDF 7 MB Posted
- Solicitation number
- VA26317R1144
About this file
VA263-17-R-1144 Attachment 23 of 25_P Drawings Combined (10 Pages).pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
COMPRESSED AIR CONNECTION
WATER HAMMER ARRESTOR
ROOF DRAINRD
AREA DRAINAD
SOIL OR WASTE
SOIL OR WASTE VENT
ROOF DRAIN LINE
NATURAL GAS, LOW PRESS
OVERFLOW ROOF DRAIN
DOMESTIC COLD WATER
RISE OR DROP
TEE DOWN
TEE UP
TOP CONNECTION
BOTTOM CONNECTION
SIDE CONNECTION
GATE VALVE
CHECK VALVE
GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
PRESSURE REDUCING VALVE
RISER DOWN (ELBOW)
RISER UP (ELBOW)
HOSE BIBB
TEMPERATURE INDICATOR
PLUG COCK/GAS STOP
UNION
FLOW IN DIRECTION OF ARROW
PIPE SLOPE IN
ASME RELIEF VALVE
CAP OR BLIND FLANGE
BACKFLOW PREVENTION DEVICE
CLEANOUT, FLOOR
CLEANOUT PLUG
TEMP AND PRESS RELIEF
REDUCER, ECCENTRIC
REDUCER, CONCENTRIC
P L U M B I N G L E G E N D
DOMESTIC HOT WATER (120°F)
DOMESTIC HOT WATER RETURN
STRAINER, "Y" TYPE
BALANCING VALVE
WALL HYDRANT
SOLENOID VALVE
TRIPLE DUTY VALVE
IRRIGATION WATER
FD FLOOR DRAIN
ANGLE VALVE
STRAINER, "BUCKET" TYPE
YARD HYDRANT
STATION REF DETAIL
PRESSURE REDUCING
G
ORD
RD
IW
TRIPLE DUTY VALVE (ANGLE)
CONTROL VALVE, PNEUMATIC
CONTROL VALVE, PNEUMATIC, 3 WAY
CONTROL VALVE, ELECTRIC
DIRECTION OF ARROW
GAUGE COCK & SNUBBER
PRESSURE GAUGE WITH
THERMOMETER WELL
P L U M B I N G A B B R E V I A T I O N S
ABOVE
ADDENDUM
ADJUSTABLE
ABOVE FINISH FLOOR
ALUMINUM
ALTERNATE
APPROVED
APPROXIMATE
ARCHITECT, ARCHITECTURAL
ASSEMBLY
AUTOMATIC
ACID VENT
AVERAGE
ACID VENT THRU ROOF
ACID WASTE
BUILDING LINE
BRITISH THERMAL UNIT
BASEMENT
BLACK STEEL
BRACKET
BOTTOM
BOTTOM OF PIPE IF UNINSULATED
BILL OF MATERIALS
BELOW
BLIND FLANGE
BUILDING
BOTTLED GAS
BACK FLOW PREVENTER
CABINET
CENTER
CASING
CARBON STEEL
CYCLES PER SECOND
CYCLES PER MINUTE
CONTRACTOR
CONTINUE
CONSTRUCTION
CONNECTION
CONCRETE
COMPRESSOR
COLUMN
CLEANOUT
CEILING
CENTER LINE
CIRCLE,CIRCULAR
CAST IRON PIPE
CAST IRON
CENTER TO CENTER
CONDENSATE
CUBIC FOOT OR FEET
CUBIC INCH OR INCHES
CYCLE
DRIP ASSEMBLY
DEGREE
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGRAM
DIMENSION
DISCONNECT
DOWN
DOWNSPOUT, DISCONNECT SWITCH
DISHWASHER
DRAWING
EAST
EACH
ELEVATION
ELECTRIC, ELECTRICAL
ELBOW
EMERGENCY
ENCLOSURE
ENGINEER
EQUIPMENT
ESTIMATE
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
EXISTING
EXPANSION JOINT
EXTERIOR, EXTERNAL
FITTING
FACE TO FACE
FOOT, FEET
FROM
FEET PER SECOND
FEET PER MINUTE
FLANGE
FLOOR MOUNTED
FLOOR
FIXTURE
FINISH
FIGURE
FINISHED FLOOR
FOUNDATION
NATURAL GAS
GAUGE
GALVANIZED
GENERATOR, GENERAL
GALVANIZED IRON
GALLONS PER HOUR
GALLONS PER MINUTE
GRADE
GASKET
GALLON, GALLONS
HEAVY
HEATER
HOUR
HIGH POINT
HORSE POWER
HOSPITAL
HORIZONTAL
HEIGHT
HEAD
INSIDE DIAMETER
INVERT ELEVATION
INCH, INCHES
INSULATION, INSULATE
INTERIOR, INTERNAL
INVERT
IRON PIPE SIZE
JOINT
JUNCTION BOX, JOIST BEARING
JANITOR'S CLOSET
KILOWATT
KILOWATT HOUR
KICK PLATE
THOUSAND
LABORATORY
POUND, POUNDS
LANDING
LINEAR FEET
LONG
LEFT HAND
LEFT HAND REVERSE
LOCKER
LOW PRESSURE
LEAVING WATER TEMPERATURE
MINIMUM
MACHINE ROOM
MANHOLE
MANUFACTURER, MANUFACTURED
MEZZANINE
METAL
MEDIUM
MECHANICAL
MAXIMUM
MATERIAL
MACHINE
MISCELLANEOUS
MARK
MODEL, MODIFY
MOUNTED
NORTH
NORMALLY CLOSED
NIPPLE
NORMALLY OPEN
NUMBER
NOMINAL
NON SLIP
NOT TO SCALE
NON-CORROSIVE
OVERFLOW ROOD DRAIN
OUNCE
PARALLEL
PERFORATED
PHASE
PLATE
PALTFORM
PLUMBING
PNEUMATIC
POUNDS PER SQUARE INCH
POUNDS PER SQ INCH ABSOLUTE
POUNDS PER SQ INCH GAGE
PERCENT
PERPENDICULAR
RADIUS, RISER
ROOF DRAIN
RECIRCULATE, RECIRCULATOR
RECTANGULAR
REDUCER
REFERENCE, REFER
REGISTER, REGULATOR
REQUIRED
RETURN
REVICE, REVISION
ROOM
REVOLUTIONS PER MINUTE
REVOLUTIONS PER SECOND
RELIEF VALVE
ROUND, DIAMETER
SUPPLY
SUSPENDED CEILING
SELF CLOSING
STRUCTURAL
STANDARD
STATION
STAINLESS STEEL
SQUARE INCH OR INCHES
SQUARE FOOT OR FEET
SQUARE
SPECIFICATIONS
SPECIFIC GRAVITY
SIMILAR
SEWER
SERVICE
SECTION
SECOND
SCHEDULE, SCHEDULED
SEWER CAST IRON PIPE
TEMPERATURE CONTROL PANEL
TEMPERATURE, TEMPORARY
THREAD
THICK, THICKNESS
THROUGH
TOP OF DUCT
TOTAL DYNAMIC HEAD
TYPICAL
UNFINISHED
UNDERWRITER'S LABORATORIES
VENTILATE, VENTILATION
VENT THRU ROOF
VENT STACK
VENT PIPE
VOLUME
VARIABLE FREQUENCY INVERTER
VERTICAL
VACUUM
VOLT
WATT, WATER, WIDTH, WIRE, WEST
WITH
WINDOW
WIDE FLANGE (STEEL)
WATER HEATER, WALL HYDRANT
WROUGHT IRON
WATER METER
WITHOUT
WEIGHT
WATER COLUMN
FAHRENHEIT
FABRICATED
FLOOR DRAIN, FIRE DAMPER
OUTSIDE DIAMETER
OPPOSITE
OPENING
OFFICE
ON CENTER
YIELD STRENGTH
YIELD POINT
YARD
GAS PRESSURE REDUCING STATION
SENSIBLE
ABV
ADD
ADJ
AL
ALT
AFF
APPD
APPROX
ASSY
AUTO
AV
AVG
ARCH
AW
AVTR
A
BG
BFP
BL
BLDG
B
BLW
BOP
B/M
BRKT
BOT
BSMT
BS
BTU
BLD FLG
C
CAB
CI
C TO C
CD
CIR
CIP
CLG
COMPR
COL
CONN
CONC
CO
CONT
CPS
CPM
CONTR
CSG
CS
CTR
CONST
CW
CYC
CU FT or CF
CU IN
D
DEPT
DF
DIAG
DIM
DET
DEG or °
DIA or ø
DA
DISC
DN
DW
DWG
DS
E
EA
EL
ELL
ELEC
EMER
ENCL
ENGR
EQUIP
EST
EWC
EWT
EXT
EXIST
EXP JT
F
FD
FAB
FF
FDN
FIG
FIX
FLG
FLR
FPS
FPM
FT
FR
FL MTD
FTG
FTF
FIN
GAL
GA
GALV
GI
GEN
GPM
GPH
GR
GPRS
GSKT
HB
HT
HD
HPT
HP
HOSP
HORIZ
H
HVY
HTR
HR
ID
I
I.E.
INSUL
INT
INV
IPS
JB
J
JAN CLO
IN
JT
K
KW
KP
KWH
LAB
L
LF
LDG
LH
LG
LKR
LWT
LP
LHR
LB
M
MACH
MED
MECH
MAX
MATL
MACH RM
MIN
MH
MFR
MEZZ
MISC
MK
MOD
MTD
MTL
N
NC
NIP
NO
NCOR
NOM
NS
NTS
OD
O
O.C.
NO. or #
OPP
OPNG
OFF
PAR
P
OZ
PH
PL
PLAT
PERP
PLMB
PNEU
PRV
PSI
PERF
PSIG
R
RECIRC
RECT
RED
REF
REQD
RTN
REV
REG
PSIA
RM
RPM
RV
ø
RPS
S
SC
SIM
SCI
SP GR
SWR
SERV
SECT
SEC
SCH
SENS
SQ
S.S.
SUP
SUSP CLG
STRUCT
STD
STA
SQ IN
SQ FT or SF
SPEC
T
TCP
TEMP
TDH
UL
V
U
THK
THRU
TOD
TYP
UNFIN
VENT
VAC
THD
VFI
VP
W
VS
W/
W.C.
WF
WH
WI
VTR
VOL
VERT
WDW
WHA
WT
YD
Y
YP
YS
YH
W/O W.M.
SANITARYSAN
BALL, PIPE ROTATION -
PI
SRV SAFETY RELIEF VALVE
DIP DUCTILE IRON PIPE
AUTOMATIC BALANCING VALVE
SOUTHS
NONPOTABLE COLD WATERNPW
PRS
ORD OVERFLOW ROOF DRAIN
FLOOR SINKFS
TRAP PRIMERTP
ACCESS PANELAP
90° TURN WITH ELBOW
SUB-SURFACE DRAINAGESSD
OR BOTTOM OF INSULATION FOR
INSULATED PIPE
INCREASER
SS
BELOW FINISHED FLOORBFF
DOMESTIC HOT WATERHW
ORIGINALORIG
PRESSURE REDUCING STATIONPRS
WALL CLEANOUTWCO
FLOOR CLEANOUTFCO
RISER DESIGNATION
DOMESTIC HOT WATER RETURNHWR
PINTS PER DAYPTS
FINISHED FLOOR ELEVATIONF.F.E.
HERTZHZ
PRESSURIZED SOIL OR WASTEPSS
FLEX JOINT
WATER STORAGE TANKWST
GAS WATER HEATERGWH
THERMOSTATIC MIXING VALVETMV
EXPANSION TANKET
NOTE:
BOP=X'-X" IS ELEVATION OF BOTTOM OF
PIPE OF THE FLOOR SHOWN.
TI
X"X
PROVIDE WATER HAMMER ARRESTORS BEHIND
ACCESS PANELS.
HW
HWC
30 x 42
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i c e f o t
-q u a rt r in c e f o re s n c e f o
-h lf i n c e f o e f o e i n c e f o d i n c e f o n c h e e f o
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF MINNESOTA
rs
\z h n d rm
\D c m ts
\3 z e h n d
.r v
/4
/2
:2
:4
NONE
1322- P-001
GER MJZ
EXPAND OUTPATIENT MENTAL HEALTH
SYMBOLS, ABBREVIATIONS, NOTES AND LEGENDS
05-05-17 DWG. 59 OF 94DESCRIPTION DATE
XYZAABBCCDDEEFFGGHH
4"ø SS
2"ø SS
4"ø SS4"ø
3"ø SS
1 1/2"ø SS
4"ø STORM
2"ø SS 3"ø SS
CAP
SANITARY
PIPING
CAP STORM
3" SS TO
2" V UP
3" SS UP
2" SS UP
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1/8" = 1'-0"
1322- P-105
PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL AREA
05-05-17 DWG. 63 OF 94
1 PLUMBING PLAN - BASEMENT INTERSTITIAL AREA K
KEYED NOTES
1 3" SANITARY P-TRAP TO JANITOR'S SINK ABOVE.
A. REFER TO RISER DIAGRAMS ON P-601 FOR ADDITIONAL
INFORMATION.
GENERAL NOTES
DESCRIPTION DATE
RESTROOM
1P-102
1P-205
BREAKROOM
1P-313
CLOSET
1P-103
WC-1
WC-2
L-1
EWC-1SS-1
P-401
WAITING
1P-100
RECEPTION DESK
1P-101
CORRIDOR
C1P-102
KS-1
CONFERENCE
1P-314
1P-312
1P-310
C1P-95
C1P-94
EWC-2
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
:5
1322- P-110
PLUMBING PLAN - LEVEL 1 AREA K
05-05-17 DWG. 64 OF 94
1 PLUMBING PLAN - LEVEL 1 AREA K
1 PROVIDE NEW WALL HUNG WATER CLOSET
CONNECTED TO EXISTING CHAIR CARRIER IN
WET WALL BEHIND. CONNECT CW SERVICE
PIPING AT EXISTING SERVICE IN WET WALL
BEHIND.
2 PROVIDE NEW STAINLESS STEEL SINGLE BOWL
KITCHEN SINK WITH GOOSENECK FAUCET.
REFER TO PLUMBING FIXTURE SCHEDULE.
CONNECT SANITARY PIPING FROM SINK TO
SANITARY PIPING IN WET WALL BEHIND.
3 PROVIDE NEW WALL HUNG LAVATORY WITH
FAUCET. REFER TO PLUMBING FIXTURE
SCHEDULE.
4 PROVIDE NEW FLOOR MOUNTED REAR
DISCHARGE WATER CLOSET. REFER TO
PLUMBING FIXTURE SCHEDULE.
5 PROVIDE NEW SINGLE HEIGHT WALL HUNG
ELECTRIC WATER COOLER AT ADA HEIGHT.
REFER TO PLUMBING FIXTURE SCHEDULE.
6 PROVIDE NEW 24"x24" FLOOR MOUNT JANITOR'S
SINK WITH JANITOR'S FAUCET WITH VACUUM
BREAKER. REFER TO PLUMBING FIXTURE
7 PROVIDE NEW DUAL HEIGHT WALL HUNG
ELECTRIC WATER COOLER WITH BOTTLE
FILLER. REFER TO PLUMBING FIXTURE
SCHEDULE. CONNECT SANITARY PIPING AND
COLD WATER PIPING TO EXISTING IN WET WALL
A. REFER TO FIXTURE SCHEDULE ON P-501 FOR PLUMBING
FIXTURES AND TRIM
B. PLUMBING CONTRACTOR TO PROVIDE ALL NECESSARY VALVES
AND ACCESSORIES TO INSTALL WATER CLOSET IN RESTROOM
1P-205 TO WORKING CONDITION UTILIZING EXISTING CHAIR
CARRIER AND COLD WATER SUPPLY IN WET WALL BEHIND. FIELD
VERIFY WATER CLOSET CHAIR CARRIER AND COLD WATER
SUPPLY AND MODIFY AS REQUIRED.
C. PROVIDE MOLDED COVERING ON SUPPLY AND WASTE PIPING AT
LAVATORY IN RESTROOM 1P-102 PER SPECIFICATIONS.
D. PLUMBING CONTRACTOR TO PROVIDE ALL NECESSARY VALVES
AND ACCESSORIES TO INSTALL DUAL HEIGHT ELECTRIC WATER
COOLER IN CORRIDOR C1P-94 UTILIZING EXISTING SANITARY AND
COLD WATER SUPPLY IN WET WALL BEHIND. FIELD VERIFY
SANITARY AND COLD WATER SUPPLY AND MODIFY AS REQUIRED.
E. REFER TO RISER DIAGRAMS ON P-401 FOR ADDITIONAL
DOMESTIC
WATER AND
VENT PIPING
4"ø V
2"ø CW
3/4"ø HW
2"ø V
1"ø CW
1"ø HW
3/4"ø HWC
3"ø V
1 1/4"ø HW
1 1/2"ø HW
2 1/2"ø CW
1 1/2"ø V 3/4"ø CW
1 1/4"ø CW
CAP DOMESTIC
WATER PIPING
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
:0
1322- P-115
PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
05-05-17 DWG. 65 OF 94
1 PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
1 2" V AND 1/2" CW DOWN TO WC-2.
2 1 1/2" V, 1/2" CW AND 1/2" HW DOWN TO L-1.
3 2" V, 3/4" CW AND 3/4" HW DOWN TO SS-1.
4 1 1/2" V, 3/4" CW AND 3/4" HW DOWN TO KS-1.
5 1 1/2" V AND 1/2" CW DOWN TO EWC-1.
A. PROVIDE SHUT OFF VALVES AT ALL NEW DOMESTIC WATER
PIPING CONNECTIONS TO EXISTING.
B. REFER TO RISER DIAGRAMS ON P-601 FOR ADDITIONAL
Z
EWC-1
SS-1
EXISTING LAVATORY
LAVATORY
EXISTING WATER CLOSET
1P-207
3" SS DOWN AND 2" V UP
2" SS
1/2" CW AND HW UP
1 1/2" CW UP
1/2" CW UP
2" SS DOWN
AND 1 1/2" V UP
3/4" CW AND HW UP
C1P-99
1 1/2" V UP
WATER
EXISTING URINAL
C1P-86
3/4" HW UP
3/4" CW UP
EXIST WC
WC-1 EXIST LAV
EXIST LAV
1/2"ø CW
1/2"ø HW
1 1/2"ø CW
EXIST UR
4"ø V4"ø V
KS-1 3/4"ø HW c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1/4" = 1'-0"
1322- P-401
ENLARGED PLUMBING PLANS AND RISERS
05-05-17 DWG. 66 OF 94
1 ENLARGED TOILET ROOM PLAN
2 ENLARGED BREAKROOM PLAN
1P-205 TO WORKING CONDITION UTILIZING EXISTING CHAIR
CARRIER AND COLD WATER SUPPLY. FIELD VERIFY WATER
CLOSET CHAIR CARRIER AND COLD WATER SUPPLY AND MODIFY
AS REQUIRED.
WET WALL BEHIND. CONNECT CW SERVICE
REFER TO PLUMBING FIXTURE SCHEDULE.
3 RISER - TOILET ROOM WASTE AND VENT 4 RISER - TOILET ROOM DOMESTIC WATER 5 RISER - BREAKROOM WASTE AND VENT 6 RISER - BREAKROOM DOMESTIC WATER
PIPE
2"
3"
FLOOR SLAB
INSULATION
UNINSULATED INSULATED
CL
PIPE SLEEVE
DOW-CORNING
3-6548RTV
SEALANT
1/2" MIN ANNULAR
SPACE FILLED WITH
FIRE-STOP MATERIAL
1/4" DIA. X 5" LG. ANCHOR
ROD WELDED TO SLEEVE
(4) REQ'D PER SLEEVE.
ESCUTCHEON (WHERE EXPOSED)
FLUSH TO WALL AND OF SIZE TO
COVER OPENING COMPLETELY
METAL JACKET SHIELD
(BANDED IN PLACE)
RISER CLAMP
CONCEALED PIPING
WALL
INSULATED
UNINSULATED
PIPING EXPOSED TO VIEW
DOW CORNING 3-6548RTV
SEALANT, EA. SIDE
FLUSH TO WALL & OF SIZE TO
NOTE: SUPPORT PIPE INDEPENDENTLY
OF SLEEVE AND WALL. CENTER PIPE
AND INSULATION IN SLEEVE.
NOT TO SCALEP-501
2 TYPICAL PIPE THRU FLOOR
1 TYPICAL PIPE THRU WALL
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- P-501
STANDARD DETAILS AND SCHEDULES
05-05-17 DWG. 67 OF 94
Plumbing Fixture Schedule
Type Mark Description Mounting Type Manufacturer Model Trim Stops Trap Carrier Waste Pipe
(in) Vent Pipe
(in) CW (in) HW (in) Remarks
EWC-1 Single Height Electric Water Cooler With Bottle Filler
Wall Hung - ADA Elkay Manufacturing EZS8WSSK - Contractor Provided Valve
Contractor Provided 1 1/2" nominal
Fixture Support Carrier 1 1/2" 1 1/2" 1/2" - 8 GPH Chilling Capacity, Flexi-Guard Bubbler, Stainless Steel Cooler Panel Finish, 1.1 GPM Bottle Filler, 115V/60HZ
EWC-2 Bi-Level electric Water Cooler With Bottle Filler
Wall Hung Elkay Manufacturing EZSTL8WSSK - Contractor Provided
Fixture Support Carrier 1 1/2" 1 1/2" 1/2" - 8 GPH Chilling Capacity, Flexi-Guard Bubbler, Stainless Steel
KS-1 Kitchen Sink, Single Bowl Drop In Elkay Manufacturing LRAD312265 Faucet: Chicago Faucets 786-E29XKABCP, 2.2 GPM, Chrome Finish. Drain: Elkay LK99
NA 1 1/2" 1 1/2" 1/2" 1/2"
L-1 Lavatory Wall Hung - ADA AMERICAN STANDARD 0356.015 Faucet: Chicago Faucets 786-E29XKABCP. 2.2 GPM, Chrome Finish. Drain: Grid Strainer Drain
Fixture Support Carrier 1 1/2" 1 1/2" 1/2" 1/2" Wrist Blade Handles
SS-1 Janitor's Service Sink Floor Mounted Fiat Products MSB 2424 Faucet: Fiat 830-AA, Chrome Plated with Wall Brace, Vacuum Breaker and Pail Hook, 8 Inch Centers
Integral to Faucet Contractor Provided 3" nominal
NA 3" 2" 1/2" 1/2"
WC-1 Water Closet Wall Hung - ADA AMERICAN STANDARD 2856.016 Flush Valve; Sloan 111, 1.6 GPF, Chrome Plated Integral Angle Stop On Flush Valve
Integral Floor Supported Water Closet Fixture Carrier
3" 2" 1" - Seat; American Standard 5905.110, Extra Heavy Duty Open Front Less Cover
WC-2 Water Closet Floor Mount, Rear Discharge - ADA
AMERICAN STANDARD 3695.001 Flush Valve; Sloan 111, 1.6 GPF, Chrome Plated Integral Angle Stop On
Integral NA 3" 2" 1" - Seat; American Standard 5905.110, Extra Heavy Duty Open
DEMOLISH STORM
DRAIN PIPING
DEMOLISH SANITARY
SEWER PIPING
4"ø SS4"ø STORM
2"ø
1 1/2"ø
4"ø SS4"ø SS
3"ø3"ø
3"ø
4"ø
4"ø SS 4"ø SS
2 4 c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
:1
1322- PD105
DEMO PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL
AREA K
05-05-17 DWG. 60 OF 94
1 DEMO PLUMBING PLAN - BASEMENT INTERSTITIAL AREA K
1 DEMOLISH STORM DRAIN PIPING FROM FIRST
FLOOR.
2 DEMOLISH SANITARY SEWER PIPING FROM
FIRST FLOOR.
3 DEMOLISH SANITARY SEWER PIPING AND VENT
PIPING FROM FIRST FLOOR.
4 DEMOLISH SANITARY SEWER PIPING BACK TO
MAIN (NOT SHOWN) AND CAP - APPROXIMATELY
20'-0" OF PIPE.
A. PLUMBING CONTRACTOR TO COORDINATE INFILL OF HOLES IN
PRIMARY AND INTERSTITIAL FLOOR SLABS WITH GENERAL
CONTRACTOR. REFER TO ARCHITECTURAL DETAILS.
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- PD110
DEMO PLUMBING PLAN - LEVEL 1 AREA K
05-05-17 DWG. 61 OF 94
1 DEMO PLUMBING PLAN - LEVEL 1 AREA K
1 DEMOLISH AREA DRAIN. REFER TO DRAWING
PD105 FOR STORM DRAIN DEMOLITION.
2 DEMOLISH PLUMBING FIXTURE. DEMOLISH
ASSOCIATED CW AND HW SERVICE PIPING UP
TO FIRST FLOOR INTERSTITIAL SPACE.
DEMOLISH VENT PIPING UP TO FIRST FLOOR
INTERSTITIAL SPACE. DEMOLISH SANITARY
PIPING DOWN TO BASEMENT INTERSTITIAL
SPACE. REFER TO DRAWINGS PD105 AND
PD115 FOR ADDITIONAL DEMOLITION
3 DEMOLISH HOSE BIBB FIXTURE. DEMOLISH
ASSOCIATED CW SERVICE PIPING UP TO FIRST
FLOOR INTERSTITIAL SPACE. REFER TO
DRAWING PD115 FOR ADDITIONAL DEMOLITION
4 DEMOLISH CW AND VENT PIPING UP TO FIRST
FLOOR INTERSTITIAL SPACE. REFER TO
INFORMATION
5 DEMOLISH CW, HW AND VENT PIPING UP TO
FIRST FLOOR INTERSTITIAL SPACE. REFER TO
DRAWINGS PD115 FOR ADDITIONAL
DEMOLITION INFORMATION
6 FIELD VERIFY ABANDONED PIPING IN WALL AT
THIS LOCATION. DEMOLISH SANITARY SEWER
PIPING DOWN TO BASEMENT INTERSTITIAL
SPACE, VENT PIPING AND DOMESTIC WATER
PIPING UP TO FIRST FLOOR INTERSTITIAL
SPACE. REFER TO DRAWINGS PD105 AND
7 DEMOLISH PLUMBING FIXTURE. RETAIN
SANITARY SEWER, VENT PIPING AND DOMESTIC
WATER PIPING FOR CONNECTION TO NEW
FIXTURE IN SAME LOCATION. REFER TO
DRAWING P-110 AND PLUMBING FIXTURE
SCHEDULE FOR ADDITIONAL INFORMATION.
DEMOLISH
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- PD115
DEMO PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
05-05-17 DWG. 62 OF 94
1 DEMO PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
B. PLUMBING CONTRACTOR TO ENSURE THAT ALL DEMOLISHED
DOMESTIC WATER PIPING IS CAPPED AT FITTING OFF MAIN WITH
NO DEAD LEG REMAINING.
COMPRESSED AIR CONNECTION
ROOF DRAINRD
SOIL OR WASTE
SOIL OR WASTE VENT
ROOF DRAIN LINE
NATURAL GAS, LOW PRESS
OVERFLOW ROOF DRAIN
RISE OR DROP
TEE DOWN
TEE UP
TOP CONNECTION
BOTTOM CONNECTION
SIDE CONNECTION
GATE VALVE
CHECK VALVE
GLOBE VALVE
BALL VALVE
BUTTERFLY VALVE
RISER DOWN (ELBOW)
RISER UP (ELBOW)
TEMPERATURE INDICATOR
PLUG COCK/GAS STOP
UNION
FLOW IN DIRECTION OF ARROW
PIPE SLOPE IN
ASME RELIEF VALVE
CAP OR BLIND FLANGE
BACKFLOW PREVENTION DEVICE
CLEANOUT, FLOOR
CLEANOUT PLUG
TEMP AND PRESS RELIEF
REDUCER, ECCENTRIC
REDUCER, CONCENTRIC
P L U M B I N G L E G E N D
DOMESTIC HOT WATER (120°F)
DOMESTIC HOT WATER RETURN
STRAINER, "Y" TYPE
BALANCING VALVE
WALL HYDRANT
SOLENOID VALVE
TRIPLE DUTY VALVE
IRRIGATION WATER
FD FLOOR DRAIN
ANGLE VALVE
STRAINER, "BUCKET" TYPE
STATION REF DETAIL
PRESSURE REDUCING
IW
TRIPLE DUTY VALVE (ANGLE)
CONTROL VALVE, PNEUMATIC
CONTROL VALVE, PNEUMATIC, 3 WAY
DIRECTION OF ARROW
GAUGE COCK & SNUBBER
PRESSURE GAUGE WITH
THERMOMETER WELL
P L U M B I N G A B B R E V I A T I O N S
ABOVE
ADDENDUM
ADJUSTABLE
ABOVE FINISH FLOOR
ALUMINUM
ALTERNATE
APPROVED
APPROXIMATE
ARCHITECT, ARCHITECTURAL
ASSEMBLY
AUTOMATIC
ACID VENT
AVERAGE
ACID VENT THRU ROOF
ACID WASTE
BUILDING LINE
BRITISH THERMAL UNIT
BASEMENT
BLACK STEEL
BRACKET
BOTTOM
BOTTOM OF PIPE IF UNINSULATED
BILL OF MATERIALS
BELOW
BLIND FLANGE
BUILDING
BOTTLED GAS
BACK FLOW PREVENTER
CABINET
CENTER
CASING
CARBON STEEL
CYCLES PER SECOND
CYCLES PER MINUTE
CONTRACTOR
CONTINUE
CONSTRUCTION
CONNECTION
CONCRETE
COMPRESSOR
COLUMN
CLEANOUT
CEILING
CENTER LINE
CIRCLE,CIRCULAR
CAST IRON PIPE
CAST IRON
CENTER TO CENTER
CONDENSATE
CUBIC FOOT OR FEET
CUBIC INCH OR INCHES
CYCLE
DRIP ASSEMBLY
DEGREE
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGRAM
DIMENSION
DISCONNECT
DOWN
DOWNSPOUT, DISCONNECT SWITCH
DISHWASHER
DRAWING
EAST
EACH
ELEVATION
ELECTRIC, ELECTRICAL
ELBOW
EMERGENCY
ENCLOSURE
ENGINEER
EQUIPMENT
ESTIMATE
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
EXPANSION JOINT
EXTERIOR, EXTERNAL
FITTING
FACE TO FACE
FOOT, FEET
FROM
FEET PER SECOND
FEET PER MINUTE
FLANGE
FLOOR MOUNTED
FLOOR
FIXTURE
FINISH
FIGURE
FINISHED FLOOR
FOUNDATION
NATURAL GAS
GAUGE
GALVANIZED
GENERATOR, GENERAL
GALVANIZED IRON
GALLONS PER HOUR
GALLONS PER MINUTE
GRADE
GASKET
GALLON, GALLONS
HEAVY
HEATER
HOUR
HIGH POINT
HORSE POWER
HOSPITAL
HORIZONTAL
HEIGHT
HEAD
INSIDE DIAMETER
INVERT ELEVATION
INCH, INCHES
INSULATION, INSULATE
INTERIOR, INTERNAL
INVERT
IRON PIPE SIZE
JOINT
JUNCTION BOX, JOIST BEARING
JANITOR'S CLOSET
KILOWATT
KILOWATT HOUR
KICK PLATE
THOUSAND
LABORATORY
POUND, POUNDS
LANDING
LINEAR FEET
LONG
LEFT HAND
LEFT HAND REVERSE
LOCKER
LOW PRESSURE
LEAVING WATER TEMPERATURE
MINIMUM
MACHINE ROOM
MANHOLE
MANUFACTURER, MANUFACTURED
MEZZANINE
METAL
MEDIUM
MECHANICAL
MAXIMUM
MATERIAL
MACHINE
MISCELLANEOUS
MARK
MODEL, MODIFY
MOUNTED
NORTH
NORMALLY CLOSED
NIPPLE
NORMALLY OPEN
NUMBER
NOMINAL
NON SLIP
NON-CORROSIVE
OVERFLOW ROOD DRAIN
OUNCE
PARALLEL
PERFORATED
PHASE
PLATE
PALTFORM
PNEUMATIC
POUNDS PER SQUARE INCH
POUNDS PER SQ INCH ABSOLUTE
POUNDS PER SQ INCH GAGE
PERCENT
PERPENDICULAR
RADIUS, RISER
ROOF DRAIN
RECIRCULATE, RECIRCULATOR
RECTANGULAR
REDUCER
REFERENCE, REFER
REGISTER, REGULATOR
REQUIRED
RETURN
REVICE, REVISION
REVOLUTIONS PER MINUTE
REVOLUTIONS PER SECOND
RELIEF VALVE
ROUND, DIAMETER
SUPPLY
SUSPENDED CEILING
SELF CLOSING
STRUCTURAL
STANDARD
STATION
STAINLESS STEEL
SQUARE INCH OR INCHES
SQUARE FOOT OR FEET
SQUARE
SPECIFICATIONS
SPECIFIC GRAVITY
SIMILAR
SEWER
SERVICE
SECTION
SECOND
SCHEDULE, SCHEDULED
SEWER CAST IRON PIPE
TEMPERATURE CONTROL PANEL
TEMPERATURE, TEMPORARY
THREAD
THICK, THICKNESS
THROUGH
TOP OF DUCT
TOTAL DYNAMIC HEAD
TYPICAL
UNFINISHED
UNDERWRITER'S LABORATORIES
VENTILATE, VENTILATION
VENT THRU ROOF
VENT STACK
VENT PIPE
VOLUME
VARIABLE FREQUENCY INVERTER
VERTICAL
VACUUM
VOLT
WATT, WATER, WIDTH, WIRE, WEST
WITH
WINDOW
WIDE FLANGE (STEEL)
WATER HEATER, WALL HYDRANT
WROUGHT IRON
WATER METER
WITHOUT
WEIGHT
WATER COLUMN
FAHRENHEIT
FABRICATED
FLOOR DRAIN, FIRE DAMPER
OUTSIDE DIAMETER
OPPOSITE
OPENING
OFFICE
ON CENTER
YIELD STRENGTH
YIELD POINT
YARD
GAS PRESSURE REDUCING STATION
SENSIBLE
ABV
ADD
ADJ
AL
ALT
AFF
APPD
APPROX
ASSY
AUTO
AV
AVG
ARCH
AW
AVTR
BG
BFP
BL
BLDG
BLW
BOP
B/M
BRKT
BOT
BSMT
BS
BTU
BLD FLG
CAB
CI
C TO C
CD
CIR
CIP
CLG
COMPR
COL
CONN
CONC
CONT
CPS
CPM
CONTR
CSG
CS
CTR
CONST
CYC
CU FT or CF
CU IN
DEPT
DF
DIAG
DIM
DET
DEG or °
DIA or ø
DA
DISC
DN
DW
DWG
DS
EA
EL
ELL
ELEC
EMER
ENCL
ENGR
EQUIP
EST
EWC
EWT
EXT
EXIST
EXP JT
FD
FAB
FDN
FIG
FIX
FLG
FLR
FPS
FPM
FT
FR
FL MTD
FTG
FTF
FIN
GAL
GA
GALV
GI
GEN
GPM
GPH
GR
GPRS
GSKT
HB
HT
HD
HPT
HP
HOSP
HORIZ
H
HVY
HTR
HR
ID
I
I.E.
INSUL
INT
INV
IPS
JB
J
JAN CLO
IN
JT
KW
KP
KWH
LAB
LF
LDG
LH
LG
LKR
LWT
LP
LHR
LB
MACH
MED
MECH
MAX
MATL
MACH RM
MIN
MH
MFR
MEZZ
MISC
MK
MOD
MTD
MTL
NC
NIP
NO
NCOR
NOM
NS
NTS
OD
O.C.
NO. or #
OPP
OPNG
OFF
PAR
OZ
PH
PL
PLAT
PERP
PLMB
PNEU
PRV
PSI
PERF
PSIG
RECIRC
RECT
RED
REF
REQD
RTN
REV
REG
PSIA
RM
RPM
RV
ø
RPS
SC
SIM
SCI
SP GR
SWR
SERV
SECT
SEC
SCH
SENS
SQ
S.S.
SUP
SUSP CLG
STRUCT
STD
STA
SQ IN
SQ FT or SF
SPEC
TCP
TEMP
TDH
UL
THK
THRU
TOD
TYP
UNFIN
VENT
VAC
THD
VFI
VP
VS
W/
W.C.
WF
WH
WI
VTR
VOL
VERT
WDW
WHA
WT
YD
Y
YP
YS
YH
W/O W.M.
SANITARYSAN
BALL, PIPE ROTATION -
PI
SRV SAFETY RELIEF VALVE
DIP DUCTILE IRON PIPE
AUTOMATIC BALANCING VALVE
SOUTHS
NONPOTABLE COLD WATERNPW
PRS
ORD OVERFLOW ROOF DRAIN
FLOOR SINKFS
TRAP PRIMERTP
ACCESS PANELAP
90° TURN WITH ELBOW
SUB-SURFACE DRAINAGESSD
OR BOTTOM OF INSULATION FOR
INSULATED PIPE
INCREASER
SS
BELOW FINISHED FLOORBFF
DOMESTIC HOT WATERHW
ORIGINALORIG
PRESSURE REDUCING STATIONPRS
WALL CLEANOUTWCO
FLOOR CLEANOUTFCO
RISER DESIGNATION
DOMESTIC HOT WATER RETURNHWR
PINTS PER DAYPTS
FINISHED FLOOR ELEVATIONF.F.E.
HERTZHZ
PRESSURIZED SOIL OR WASTEPSS
FLEX JOINT
WATER STORAGE TANKWST
GAS WATER HEATERGWH
THERMOSTATIC MIXING VALVETMV
EXPANSION TANKET
NOTE:
BOP=X'-X" IS ELEVATION OF BOTTOM OF
PIPE OF THE FLOOR SHOWN.
TI
X"X
PROVIDE WATER HAMMER ARRESTORS BEHIND
ACCESS PANELS.
HW
HWC
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
NONE
1322- P-001
SYMBOLS, ABBREVIATIONS, NOTES AND LEGENDS
05-05-17 DWG. 59 OF 94DESCRIPTION DATE
18264
05-05-17George E Rothenberger
4"ø SS4"ø STORM
1 1/2"ø
4"ø SS4"ø SS
3"ø3"ø
4"ø SS 4"ø SS
2 4 c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- PD105
DEMO PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL
AREA K
05-05-17 DWG. 60 OF 94
1 DEMO PLUMBING PLAN - BASEMENT INTERSTITIAL AREA K
1 DEMOLISH STORM DRAIN PIPING FROM FIRST
FLOOR.
2 DEMOLISH SANITARY SEWER PIPING FROM
FIRST FLOOR.
3 DEMOLISH SANITARY SEWER PIPING AND VENT
PIPING FROM FIRST FLOOR.
4 DEMOLISH SANITARY SEWER PIPING BACK TO
MAIN (NOT SHOWN) AND CAP - APPROXIMATELY
20'-0" OF PIPE.
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- PD110
DEMO PLUMBING PLAN - LEVEL 1 AREA K
05-05-17 DWG. 61 OF 94
1 DEMO PLUMBING PLAN - LEVEL 1 AREA K
1 DEMOLISH AREA DRAIN. REFER TO DRAWING
PD105 FOR STORM DRAIN DEMOLITION.
2 DEMOLISH PLUMBING FIXTURE. DEMOLISH
ASSOCIATED CW AND HW SERVICE PIPING UP
TO FIRST FLOOR INTERSTITIAL SPACE.
DEMOLISH VENT PIPING UP TO FIRST FLOOR
INTERSTITIAL SPACE. DEMOLISH SANITARY
PIPING DOWN TO BASEMENT INTERSTITIAL
SPACE. REFER TO DRAWINGS PD105 AND
3 DEMOLISH HOSE BIBB FIXTURE. DEMOLISH
ASSOCIATED CW SERVICE PIPING UP TO FIRST
FLOOR INTERSTITIAL SPACE. REFER TO
4 DEMOLISH CW AND VENT PIPING UP TO FIRST
FLOOR INTERSTITIAL SPACE. REFER TO
5 DEMOLISH CW, HW AND VENT PIPING UP TO
FIRST FLOOR INTERSTITIAL SPACE. REFER TO
DRAWINGS PD115 FOR ADDITIONAL
DEMOLITION INFORMATION
6 FIELD VERIFY ABANDONED PIPING IN WALL AT
THIS LOCATION. DEMOLISH SANITARY SEWER
PIPING DOWN TO BASEMENT INTERSTITIAL
SPACE, VENT PIPING AND DOMESTIC WATER
PIPING UP TO FIRST FLOOR INTERSTITIAL
SPACE. REFER TO DRAWINGS PD105 AND
7 DEMOLISH PLUMBING FIXTURE. RETAIN
SANITARY SEWER, VENT PIPING AND DOMESTIC
WATER PIPING FOR CONNECTION TO NEW
FIXTURE IN SAME LOCATION. REFER TO
DRAWING P-110 AND PLUMBING FIXTURE
SCHEDULE FOR ADDITIONAL INFORMATION.
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- PD115
DEMO PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
05-05-17 DWG. 62 OF 94
1 DEMO PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
B. PLUMBING CONTRACTOR TO ENSURE THAT ALL DEMOLISHED
DOMESTIC WATER PIPING IS CAPPED AT FITTING OFF MAIN WITH
NO DEAD LEG REMAINING.
4"ø SS4"ø
CAP STORM
3" SS TO
3" SS UP
2" SS UP
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- P-105
PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL AREA
05-05-17 DWG. 63 OF 94
1 PLUMBING PLAN - BASEMENT INTERSTITIAL AREA K
1 3" SANITARY P-TRAP TO JANITOR'S SINK ABOVE.
A. REFER TO RISER DIAGRAMS ON P-601 FOR ADDITIONAL
EWC-1SS-1
RECEPTION DESK
1P-101
C1P-102
C1P-94
EWC-2
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
:5
1322- P-110
PLUMBING PLAN - LEVEL 1 AREA K
05-05-17 DWG. 64 OF 94
1 PLUMBING PLAN - LEVEL 1 AREA K
WET WALL BEHIND. CONNECT CW SERVICE
REFER TO PLUMBING FIXTURE SCHEDULE.
3 PROVIDE NEW WALL HUNG LAVATORY WITH
FAUCET. REFER TO PLUMBING FIXTURE
4 PROVIDE NEW FLOOR MOUNTED REAR
DISCHARGE WATER CLOSET. REFER TO
PLUMBING FIXTURE SCHEDULE.
5 PROVIDE NEW SINGLE HEIGHT WALL HUNG
ELECTRIC WATER COOLER AT ADA HEIGHT.
REFER TO PLUMBING FIXTURE SCHEDULE.
6 PROVIDE NEW 24"x24" FLOOR MOUNT JANITOR'S
SINK WITH JANITOR'S FAUCET WITH VACUUM
BREAKER. REFER TO PLUMBING FIXTURE
7 PROVIDE NEW DUAL HEIGHT WALL HUNG
ELECTRIC WATER COOLER WITH BOTTLE
FILLER. REFER TO PLUMBING FIXTURE
SCHEDULE. CONNECT SANITARY PIPING AND
COLD WATER PIPING TO EXISTING IN WET WALL
1P-205 TO WORKING CONDITION UTILIZING EXISTING CHAIR
CARRIER AND COLD WATER SUPPLY IN WET WALL BEHIND. FIELD
VERIFY WATER CLOSET CHAIR CARRIER AND COLD WATER
SUPPLY AND MODIFY AS REQUIRED.
D. PLUMBING CONTRACTOR TO PROVIDE ALL NECESSARY VALVES
AND ACCESSORIES TO INSTALL DUAL HEIGHT ELECTRIC WATER
COOLER IN CORRIDOR C1P-94 UTILIZING EXISTING SANITARY AND
COLD WATER SUPPLY IN WET WALL BEHIND. FIELD VERIFY
SANITARY AND COLD WATER SUPPLY AND MODIFY AS REQUIRED.
E. REFER TO RISER DIAGRAMS ON P-401 FOR ADDITIONAL
CAP DOMESTIC
WATER PIPING
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- P-115
PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
05-05-17 DWG. 65 OF 94
1 PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K
1 2" V AND 1/2" CW DOWN TO WC-2.
2 1 1/2" V, 1/2" CW AND 1/2" HW DOWN TO L-1.
3 2" V, 3/4" CW AND 3/4" HW DOWN TO SS-1.
4 1 1/2" V, 3/4" CW AND 3/4" HW DOWN TO KS-1.
5 1 1/2" V AND 1/2" CW DOWN TO EWC-1.
A. PROVIDE SHUT OFF VALVES AT ALL NEW DOMESTIC WATER
PIPING CONNECTIONS TO EXISTING.
B. REFER TO RISER DIAGRAMS ON P-601 FOR ADDITIONAL
Z
EXISTING LAVATORY
1P-207
3" SS DOWN AND 2" V UP
1/2" CW AND HW UP
1 1/2" CW UP
1/2" CW UP
AND 1 1/2" V UP
3/4" CW AND HW UP
C1P-99
EXISTING URINAL
C1P-86
3/4" HW UP
3/4" CW UP
WC-1 EXIST LAV
1/2"ø HW
1 1/2"ø CW
4"ø V4"ø V
KS-1 3/4"ø HW c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- P-401
ENLARGED PLUMBING PLANS AND RISERS
05-05-17 DWG. 66 OF 94
1 ENLARGED TOILET ROOM PLAN
2 ENLARGED BREAKROOM PLAN
1P-205 TO WORKING CONDITION UTILIZING EXISTING CHAIR
CARRIER AND COLD WATER SUPPLY. FIELD VERIFY WATER
CLOSET CHAIR CARRIER AND COLD WATER SUPPLY AND MODIFY
AS REQUIRED.
WET WALL BEHIND. CONNECT CW SERVICE
REFER TO PLUMBING FIXTURE SCHEDULE.
3 RISER - TOILET ROOM WASTE AND VENT 4 RISER - TOILET ROOM DOMESTIC WATER 5 RISER - BREAKROOM WASTE AND VENT 6 RISER - BREAKROOM DOMESTIC WATER
2"
3"
FLOOR SLAB
UNINSULATED INSULATED
CL
DOW-CORNING
3-6548RTV
SEALANT
1/4" DIA. X 5" LG. ANCHOR
ROD WELDED TO SLEEVE
(4) REQ'D PER SLEEVE.
FLUSH TO WALL AND OF SIZE TO
RISER CLAMP
CONCEALED PIPING
WALL
INSULATED
UNINSULATED
PIPING EXPOSED TO VIEW
DOW CORNING 3-6548RTV
SEALANT, EA. SIDE
FLUSH TO WALL & OF SIZE TO
NOTE: SUPPORT PIPE INDEPENDENTLY
OF SLEEVE AND WALL. CENTER PIPE
AND INSULATION IN SLEEVE.
2 TYPICAL PIPE THRU FLOOR
1 TYPICAL PIPE THRU WALL
c e f o e f o n c e f o i n c e f o e f o e i n c e f o i n c e f o n c h e e f o
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
h n d c z e h n d
1322- P-501
STANDARD DETAILS AND SCHEDULES
05-05-17 DWG. 67 OF 94
Plumbing Fixture Schedule
Type Mark Description Mounting Type Manufacturer Model Trim Stops Trap Carrier Waste Pipe
(in) Vent Pipe
(in) CW (in) HW (in) Remarks
EWC-1 Single Height Electric Water Cooler With Bottle Filler
Wall Hung - ADA Elkay Manufacturing EZS8WSSK - Contractor Provided
Fixture Support Carrier 1 1/2" 1 1/2" 1/2" - 8 GPH Chilling Capacity, Flexi-Guard Bubbler, Stainless Steel
EWC-2 Bi-Level electric Water Cooler With Bottle Filler
Wall Hung Elkay Manufacturing EZSTL8WSSK - Contractor Provided
Fixture Support Carrier 1 1/2" 1 1/2" 1/2" - 8 GPH Chilling Capacity, Flexi-Guard Bubbler, Stainless Steel
KS-1 Kitchen Sink, Single Bowl Drop In Elkay Manufacturing LRAD312265 Faucet: Chicago Faucets 786-E29XKABCP, 2.2 GPM, Chrome Finish. Drain: Elkay LK99
NA 1 1/2" 1 1/2" 1/2" 1/2"
L-1 Lavatory Wall Hung - ADA AMERICAN STANDARD 0356.015 Faucet: Chicago Faucets 786-E29XKABCP. 2.2 GPM, Chrome Finish. Drain: Grid Strainer Drain
Fixture Support Carrier 1 1/2" 1 1/2" 1/2" 1/2" Wrist Blade Handles
SS-1 Janitor's Service Sink Floor Mounted Fiat Products MSB 2424 Faucet: Fiat 830-AA, Chrome Plated with Wall Brace, Vacuum Breaker and Pail Hook, 8 Inch Centers
Integral to Faucet…