VA263-17-R-1144-026.pdf
PDF 22 MB Posted
- Solicitation number
- VA26317R1144
About this file
VA263-17-R-1144 Attachment 24 of 25_I Drawings Combined (13 Pages).pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
30 x 42
G E
N
R A
L
O
T
S
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i n c f t
-q u a rt r in re s
-h lf i n d n
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED ARCHITECT UNDER
THE LAWS OF THE STATE OF MINNESOTA
C U rs \s tr m k \D ts
\3
B
D
H
F
.r v
/9
/2
:2
:0
M
1322 - I-602
TW DRE
EXPAND OUTPATIENT MENTAL HEALTH
ROOM FINISH SCHEDULE
INTERIORS
05-05-2017 DWG. 54 OF 94
NUMBER NAME FLOOR FINISH
WALL FINISH CEIING
COMMENTS NUMBER
NORTH WALL SOUTH WALL WEST WALL EAST WALL
MATERIAL FINISH
MATERIA
L FINISH BASE MATERIAL FINISH BASE MATERIAL FINISH BASE MATERIAL FINISH BASE
1P-334 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-334
1P-335 OFFICE REF I-110 ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-335
1P-336 OFFICE REF I-110 ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-336
1P-340 BULLPEN REF I-110 G P-3 VB-1 G, ETR P-3 VB-1 ETR P-3 VB-1 G P-6 VB-1 ACT-1 --- 1 1P-340
1P-341 OFFICE REF I-110 ETR P-3 VB-1 ETR P-3 VB-1 G P-3 VB-1 ETR P-7 VB-1 ACT-1 --- 1 1P-341
1P-342 OFFICE REF I-110 ETR P-3 VB-1 G, ETR P-4 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-342
1P-343 OFFICE REF I-110 ETR P-3 VB-1 ETR P-6 VB-1 G, ETR P-3 VB-1 ETR P-3 ETR ETR ETR 1,A1,A2 1P-343
1P-344 OFFICE REF I-110 G, ETR P-3 VB-1 ETR P-6 VB-1 ETR P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-344
1P-345 OFFICE REF I-110 ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-345
1P-346 OFFICE REF I-110 ETR P-3 VB-1 ETR P-3 VB-1 ETR P-4 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-346
1P-347 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-347
1P-348 OFFICE REF I-110 ETR P-6 VB-1 G P-3 VB-1 G P-7 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-348
1P-349 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR P-7 ETR ETR ETR 1,A1,A2 1P-349
1P-351 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-4 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-351
1P-353 LAB/OFFICE ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 3 1P-353
1P-355 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR P-6 ETR ETR ETR 1,A1,A2 1P-355
1P-360 OFFICE REF I-110 ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2,A3,A4 1P-360
1P-361 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-361
1P-362 OFFICE REF I-110 ETR P-3 ETR ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-362
1P-363 OFFICE REF I-110 ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-363
1P-364 OFFICE REF I-110 ETR P-3 ETR ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-364
1P-365 OFFICE REF I-110 ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-365
1P-366 OFFICE REF I-110 ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-366
1P-367 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-367
1P-368 OFFICE REF I-110 ETR P-3 ETR ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-368
1P-369 OFFICE REF I-110 ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-369
1P-370 OFFICE REF I-110 ETR P-3 ETR ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-370
1P-371 OFFICE REF I-110 ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-371
1P-372 OFFICE REF I-110 ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-372
1P-373 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-373
1P-374 OFFICE REF I-110 ETR P-3 VB-1 G, ETR P-3 VB-1 ETR P-3 VB-1 DM, ETR P-6 VB-1 ACT-1 --- 1 1P-374
1P-374A OFFICE REF I-110 ETR P-3 VB-1 DM, ETR P-7 VB-1 DM P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-374A
1P-374B OFFICE REF I-110 DM, ETR P-4 VB-1 ETR P-3 VB-1 DM P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-374B
1P-375 ELECTRICAL ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-375
1P-376 COMMS ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-376
C1P-86 CORRIDOR REF I-110 ETR FWC-2 VB-1 --- --- --- ETR FWC-2 VB-1 ETR FWC-2 VB-1 ETR ETR 1,A3 C1P-86
C1P-86A CORRIDOR REF I-110 ETR FWC-2 VB-1 ETR FWC-2 VB-1 ETR FWC-2 VB-1 ETR FWC-2 VB-1 ACT-1 --- 1,A3 C1P-86A
C1P-88 CORRIDOR REF I-110 --- --- --- --- --- --- G, ETR FWC-2 VB-1 G, ETR FWC-2 VB-1 ACT-1 --- 1,A3 C1P-88
C1P-90 CORRIDOR REF I-110 --- --- --- --- --- --- G, ETR FWC-2 VB-1 ETR FWC-2 VB-1 ETR ETR 1,A3 C1P-90
C1P-91 CORRIDOR REF I-110 G,ETR FWC-2 VB-1 ETR FWC-2 VB-1 --- --- --- ETR FWC-2 VB-1 ACT-1 --- 1,A3 C1P-91
C1P-92 CORRIDOR REF I-110 --- --- --- --- --- --- G, ETR FWC-2 VB-1 G, ETR FWC-2 VB-1 ETR ETR 1,A3 C1P-92
C1P-93 CORRIDOR REF I-110 G FWC-2 VB-1 G, ETR FWC-2 VB-1 --- --- --- --- --- --- ACT-1 --- 1,A3 C1P-93
C1P-94 CORRIDOR REF I-110 --- --- VB-1 G --- VB-1 --- FWC-2 --- G, ETR FWC-2 VB-1 ETR ETR 1 C1P-94
C1P-95 CORRIDOR REF I-110 G,ETR FWC-5,
RWP-2
VB-1 G, ETR FWC-5,
VB-1 --- --- --- G --- VB-1 ETR ETR 1,A3,8 C1P-95
C1P-96 CORRIDOR REF I-110 --- --- --- --- --- --- ETR FWC-2 VB-1 G, ETR FWC-2 VB-1 ETR ETR 1,A3 C1P-96
C1P-97 CORRIDOR REF I-110 G FWC-2 VB-1 G FWC-2 VB-1 G --- VB-1 G --- VB-1 ACT-1 --- C1P-97
C1P-98 CORRIDOR REF I-110 G, ETR --- VB-1 G, ETR FWC-2 VB-1 --- FWC-2 --- G FWC-2 VB-1 ETR ETR 1,A3 C1P-98
C1P-98A CORRIDOR REF I-110 ETR FWC-2 VB-1 --- --- --- ETR FWC-2 VB-1 ETR FWC-2 VB-1 ETR ETR 1,A3 C1P-98A
C1P-99 CORRIDOR REF I-110 G,ETR FWC-2 VB-1 ETR FWC-2 VB-1 G --- VB-1 G, ETR FWC-2 VB-1 ACT-1 --- 1,A3 C1P-99
C1P-100 CORRIDOR REF I-110 --- --- --- --- --- --- G, ETR FWC-2 VB-1 ETR FWC-2 VB-1 ACT-1 --- 1,A3 C1P-100
C1P-101 CORRIDOR REF I-110 G,ETR FWC-5,
VB-1 G, ETR FWC-5,
VB-1 G --- VB-1 G FWC-5 VB-1 ACT-1 --- 1,8 C1P-101
C1P-102 CORRIDOR REF I-110 --- --- --- --- --- --- G, ETR FWC-2 VB-1 G, ETR FWC-2 VB-1 ACT-1 --- C1P-102
C1P-103 CORRIDOR REF I-110 G FWC-2 VB-1 G FWC-2 VB-1 --- --- --- G --- VB-1 ACT-1 --- 1,A3 C1P-103
C1P-103A CORRIDOR REF I-110 G FWC-2 VB-1 G FWC-2 VB-1 G --- VB-1 --- --- --- ACT-1 --- C1P-103A
C1P-104 CORRIDOR REF I-110 --- --- --- --- --- --- G, ETR FWC-2 VB-1 G FWC-2 VB-1 ACT-1 --- 1 C1P-104
C1P-104A CORRIDOR REF I-110 --- --- --- G FWC-2 VB-1 G FWC-2 VB-1 G FWC-2 VB-1 ACT-1 --- C1P-104A
C1P-105 CORRIDOR REF I-110 G FWC-2 VB-1 G FWC-2 VB-1 --- FWC-2 --- G FWC-2 VB-1 ACT-1 --- C1P-105
C1P-106 CORRIDOR REF I-110 --- --- --- --- --- --- G, GL FWC-1 VB-1 G, GL FWC-1 VB-1 ACT-2 --- C1P-106
C1P-107 CORRIDOR REF I-110 G FWC-1 VB-1 G FWC-1 VB-1 G FWC-1 VB-1 G FWC-1 VB-1 ACT-2 --- C1P-107
C1P-108 CORRIDOR REF I-110 G --- --- ETR --- --- G, C FWC-3,
SM-2,
PT-3
VB-1,
SB-1
ETR --- --- ACT-2 --- 1,A5 C1P-108
C1P-109 CORRIDOR REF I-110 G FWC-3 VB-1 ETR --- --- G, ETR --- --- --- --- --- ACT-2 --- 1,A5 C1P-109
NORTH WALL SOUTH WALL WEST WALL EAST WALL
MATERIAL FINISH
MATERIA
L FINISH BASE MATERIAL FINISH BASE MATERIAL FINISH BASE MATERIAL FINISH BASE
1P-96 MECHANICAL ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-96
1P-97 OFFICE 1P-97
1P-98 OFFICE 1P-98
1P-99 SAMPLE COLLECTION ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 3 1P-99
1P-100 WAITING REF I-110 G P-6,
WV-1
SB-1,
VB-1
G, GM FWC-1,
SM-1
VB-1 G, ETR P-6 VB-1 G P-6,
FWC-1
VB-1 ACT-2,
AWP-1
--- 1, 10 1P-100
1P-100a SELF CHECK-IN REF I-110 G, ETR P-6, FWC-6
VB-1 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 ACT-2 --- 1 1P-100a
1P-101 RECEPTION DESK REF I-110 G, DG-1 P-7 VB-1 G P-3,
WV-1
VB-1, MB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-2,
--- 1 1P-101
1P-102 RESTROOM REF I-110 G, GM P-3,
PWT-1
ISB-1 G, GM P-3,
ISB-1 G P-3 4 1P-102
1P-103 CLOSET HOUSEKEEPING REF I-110 G, GM P-3,
PWT-2
VB-1 G, GM P-3,
VB-1 G P-3 4 1P-103
1P-104 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G, GL P-3 VB-1 G P-6 VB-1 ACT-2 --- --- 1P-104
1P-105 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 G, GL P-3 VB-1 ACT-2 --- --- 1P-105
1P-106 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G, GL P-3 VB-1 G P-6 VB-1 ACT-2 --- --- 1P-106
1P-107 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 G, GL P-3 VB-1 ACT-2 --- --- 1P-107
1P-108 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G, GL P-3 VB-1 G P-6 VB-1 ACT-2 --- --- 1P-108
1P-109 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 G, GL P-3 VB-1 ACT-2 --- --- 1P-109
1P-110 GROUP ROOM REF I-110 G P-3 VB-1 G P-3 VB-1 G, GL P-3 VB-1 G P-6 VB-1 ACT-2 --- --- 1P-110
1P-111 GROUP ROOM REF I-110 G, GL P-3 VB-1 G P-6 VB-1 G P-3 VB-1 G P-3 VB-1 ACT-2 --- --- 1P-111
1P-112 CLOSET REF I-110 ETR P-3,
VB-1 G P-3,
VB-1 ETR ETR 1 1P-112
1P-200 OFFICE REF I-110 G P-4 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-200
1P-201 EXAM ROOM REF I-110 G P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-3 VB-1 G P-7 VB-1 ACT-1 --- 1 1P-201
1P-202 OFFICE REF I-110 G P-3 VB-1 G P-6 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-202
1P-203 EXAM ROOM REF I-110 ETR P-3 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-203
1P-204 OFFICE REF I-110 ETR P-7 VB-1 G P-3 VB-1 G P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-204
1P-205 RESTROOM REF I-110 ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 1, 6 1P-205
1P-206 ADMIN BULLPEN REF I-110 G P-4 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-206
1P-207 RESTROOM REF I-110 ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-207
1P-208 OFFICE REF I-110 ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-208
1P-209 OFFICE REF I-110 G P-3 VB-1 G P-6 VB-1 G, ETR P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-209
1P-210 OFFICE REF I-110 ETR P-3 ETR ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-210
1P-211 OFFICE REF I-110 G P-4 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-211
1P-212 OFFICE REF I-110 ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-212
1P-213 OFFICE REF I-110 G, ETR P-3 VB-1 G P-7 VB-1 ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-213
1P-214 LOCKER ROOM ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-214
1P-215 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2, A3, A4 1P-215
1P-216 OFFICE REF I-110 G, ETR P-3 VB-1 G P-3 VB-1 G P-6 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-216
1P-217 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR ETR 1,A1,A2,A3,A4 1P-217
1P-218 OFFICE REF I-110 ETR P-3 VB-1 G P-3 VB-1 G P-4 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-218
1P-219 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR P-6 ETR ETR ETR 1,A1,A2,A3,A4 1P-219
1P-220 OFFICE REF I-110 ETR P-3 VB-1 G P-3 VB-1 G, ETR P-7 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-220
1P-221 OFFICE REF I-110 G P-3 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ETR P-4 VB-1 ACT-1 --- 1 1P-221
1P-223 OFFICE REF I-110 G P-3 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 G P-6 VB-1 ACT-1 --- 1 1P-223
1P-225 OFFICE REF I-110 G P-3 VB-1 ETR P-3 VB-1 G, ETR P-3 VB-1 G P-7 VB-1 ACT-1 --- 1 1P-225
1P-240 EXAM ROOM REF I-110 G P-3 VB-1 G P-6 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-240
1P-241 OFFICE REF I-110 G P-3 VB-1 ETR P-3 VB-1 G P-3 VB-1 ETR P-7 VB-1 ACT-1 --- 1 1P-241
1P-242 LPN BULLPEN REF I-110 G, ETR P-3 VB-1 G P-3 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-242
1P-242a DRUG LOCKER REF I-110 G P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-242a
1P-243 OFFICE REF I-110 ETR P-3 VB-1 ETR P-3 VB-1 ETR P-3 VB-1 G, ETR P-4 VB-1 ETR ETR 1,A1,A2 1P-243
1P-244 TESTING REF I-110 G P-3 VB-1 G P-7 VB-1 G P-3 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-244
1P-245 OFFICE REF I-110 G P-3 ETR ETR P-3 ETR ETR P-3 ETR G, ETR P-4 ETR ETR ETR 1,A1,A2 1P-245
1P-246 OFFICE REF I-110 G P-3 VB-1 ETR P-3 VB-1 ETR P-6 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-246
1P-247 OFFICE REF I-110 ETR P-3 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-6 VB-1 ACT-1 --- 1 1P-247
1P-248 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-248
1P-249 OFFICE REF I-110 ETR P-3 VB-1 G P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-7 VB-1 ACT-1 --- 1 1P-249
1P-250 OFFICE REF I-110 ETR P-3 VB-1 G P-3 VB-1 G, ETR P-4 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-250
1P-251 OFFICE REF I-110 ETR P-3 VB-1 G P-3 VB-1 ETR P-3 VB-1 G, ETR P-6 VB-1 ACT-1 --- 1 1P-251
1P-252 OFFICE REF I-110 G P-3 VB-1 ETR P-3 VB-1 G P-6 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-252
1P-253 OFFICE REF I-110 G P-3 VB-1 ETR P-3 VB-1 G P-4 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-253
1P-254 OFFICE REF I-110 G P-3 VB-1 ETR P-3 VB-1 G, ETR P-7 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-254
1P-260 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-7 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-260
1P-261 OFFICE REF I-110 G P-6 VB-1 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-261
1P-262 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-262
1P-263 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-4 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-263
1P-264 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 G P-7 VB-1 ACT-1 --- --- 1P-264
1P-265 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 ACT-1 --- --- 1P-265
1P-266 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-4 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-266
1P-267 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-7 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-267
1P-268 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 ACT-1 --- --- 1P-268
1P-269 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-4 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-269
1P-270 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-7 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-270
1P-271 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-271
1P-272 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 G P-4 VB-1 ACT-1 --- --- 1P-272
1P-273 OFFICE REF I-110 G P-4 VB-1 G P-3 VB-1 G P-3 VB-1 G P-4 VB-1 ACT-1 --- --- 1P-273
1P-274 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-6 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-274
1P-275 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-7 VB-1 G P-3 VB-1 ACT-1 --- --- 1P-275
1P-276 OFFICE REF I-110 G P-3 VB-1 G P-3 VB-1 G P-3 VB-1 G P-7 VB-1 ACT-1 --- --- 1P-276
1P-300 BULLPEN REF I-110 G, ETR P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-3 VB-1 G, ETR P-7 VB-1 ACT-1 --- 1 1P-300
1P-303 OFFICE REF I-110 ETR P-3 ETR ETR P-4 ETR ETR P-4 ETR ETR P-3 ETR ETR ETR 1,A1,A2,A3,A4 1P-303
1P-305 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR P-6 ETR ETR ETR 1,A1,A2,A3,A4 1P-305
1P-307 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-7 ETR ETR P-3 ETR ETR ETR 1,A1,A2,A3,A4 1P-307
1P-308 OFFICE REF I-110 ETR P-4 VB-1 G P-3 VB-1 ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-308
1P-309 OFFICE REF I-110 ETR P-3 ETR ETR P-3 ETR ETR P-6 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-309
1P-310 RESTROOM ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-310
1P-311 OFFICE REF I-110 ETR P-3 VB-1 ETR P-4 VB-1 G, ETR P-3 VB-1 G P-3 VB-1 ACT-1 --- 1 1P-311
1P-312 RESTROOM ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-312
1P-313 BREAKROOM REF I-110 ETR P-3 VB-1 ETR P-4 VB-1 ETR P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-313
1P-314 CONFERENCE ROOM REF I-110 G P-3 VB-1 G, ETR P-3 VB-1 ETR P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-314
1P-320 OFFICE REF I-110 ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-320
1P-321 RESTROOM ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-321
1P-322 RESTROOM ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-322
1P-323 CLOSET HOUSEKEEPING ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR ETR 2 1P-323
1P-324 OFFICE REF I-110 ETR P-3 ETR ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-324
1P-325 OFFICE REF I-110 ETR P-7 VB-1 G P-3 VB-1 ETR P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-325
1P-326 OFFICE REF I-110 ETR P-3 ETR ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-326
1P-327 OFFICE REF I-110 G P-3 VB-1 G P-4 VB-1 G, ETR P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-327
1P-328 OFFICE REF I-110 ETR P-7 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-328
1P-329 OFFICE REF I-110 G P-6 VB-1 G P-3 VB-1 ETR P-3 VB-1 G, ETR P-3 VB-1 ACT-1 --- 1 1P-329
1P-330 OFFICE REF I-110 ETR P-3 ETR ETR P-4 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-330
1P-331 OFFICE REF I-110 G P-3 VB-1 ETR P-7 VB-1 ETR P-3 VB-1 ETR P-3 VB-1 ACT-1 --- 1 1P-331
1P-332 OFFICE REF I-110 ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-332
1P-333 OFFICE REF I-110 ETR P-3 ETR ETR P-6 ETR ETR P-3 ETR ETR P-3 ETR ETR ETR 1,A1,A2 1P-333
NORTH
SOUTH
WEST EAST
MATERIALS LEGEND
ACT ACCOUSTICAL CIELING TILE
AWP ACCOUSICAL WOOD PANEL
C CEMENT BACKER BOARD
DG DECORATIVE GLASS
DM DEMOUNTABLE PARTITION
ETR EXISTING TO REMAIN
FWC FABRIC WALL COVERING
G GYPSUM BOARD
GL GLASS
GM GLASS-MAT BACKER
PT PAINT
VB VINYL BASE
SCHEDULE NOTES KEY
1 PATCH AND REPAIR EXISTING MATERIALS TO LIKE-NEW CONDITION AND PREP FOR NEW FINISHES. PATCH AND REPAIR ANY EXISTING TO REMAIN FINISHES TO LIKE-NEW CONDIDTION.
2 NO INTERIORS WORK IN THIS ROOM.
3 THIS ROOM NOT INCLUDED IN PROJECT SCOPE.
4 TILE AND GLASS-MAT BACKER TO 48" AFF.
5 PROVIDE FRP TO 8'-0" AFF. EXTEND OUT 4'-0" FROM CORNER AT MOP SINK.
6 MINIMIZE DSTURBANCE TO EXISTING FINISHES. PATCH TO MATCH EXISTING.
7 DEMOUNTABLE PARTITION SUPPLIER TO SUPPLY PANELS WITH FINISHES TO MATCH THOSE SCHEDULED
8 REFERENCE DETAIL 5/I-601 FOR RWP-2 WAINSCOTING CONDITION.
9 NOT USED.
10 STAINLESS STEEL BASE ON RECEPTION DESK.
A1 **BID ALTERNATE** REPLACE CEILING IN ITS ENTIRETY.
A2 **BID ALTERNATE** REPLACE FLOORING AND BASE IN THEIR ENTIRETY.
A3 **BID ALTERNATE** REPLACE WALL EXPANSION JOIINTS.
A4 **BID ALTERNATE** REPLACE FLOOR EXPANSION JOINTS.
A5 **BID ALTERNATE** USE CERAMIC TILE FLOORING IN LIEU OF TERAZZO FLOORING.
DESCRIPTION DATE
N N
2 2
2 2 2 2 2 2
3 3 3 3 3 3 2
2 2 2
3 3
HH GG FF EE DD CC BB AA Z Y X
5 5
1P-139 1P-140 1P-142 1P-144 1P-145 1P-148 1P-149 1P-159 1P-160 1P-163 1P-164 1P-165 1P-165A 1P-165B 1P-182
1P-181
1P-184
1P-180C1-103
1P-178 1P-179
1P-177
1P-176 1P-175
1P-166
1P-183 C1-101
1P-162c
1P-162b
C1-101AC1-100
C1-92
1P-138
1P-137 1E-170
1P-143
1P-146a 1P-146 1P-147 1P-158
1P-162
1P-161
C1-99
1P-157
1P-1321P-1331P-133A 1P-134a1P-134b
1P-136
1P-135
1P-134
1P-123
1P-124 1P-125
1P-131 1P-150
C1-98 1P-156a
1P-156b
1P-156
C1-96
1P-162a
1P-166A
1P-167A
1P-168A1P-168B1P-168C1P-168D
1P-1511P-130
1P-129
1P-127
1P-126 1P-122
1P-120
1P-121
1P-119
1P-117
1P-115
1P-118 1P-116
C1-94
1P-128 1P-154
1P-152
1P-153
C1-96C
C1-95C1-93
1P-105
1P-104B 1P-104C
C1-96A
C1-90
1P-106A
1P-106 1P-102 1P-101
1P-104
1P-100A
1P-100 1P-1031P-1071P-108
1P-112
1P-113
1P-114 1P-104A
C1-96B
1P-169B
C1-87
C1-104
1P-172
1P-174
1P-1731P-167
1P-1711P-168
1P-169 1P-170
C1-105
1P-170B
1P-170C1P-170D
C1-102
1P-169A
C1-108
C1-106
1P-99
1P-96
C1-91
1P-109
1P-95
1P-111
1P-110
C1-109 n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
:1
1/8" = 1'-0"
1322 - ID110
AREA K FIRST FLOOR FLOORING REMOVAL PLAN
05-05-2017 DWG. 43 OF 94
1 AREA K FIRST FLOOR FLOORING REMOVAL PLAN
DEMOLITION GENERAL NOTES
1 DEMOLITION SHOWN ON THIS SHEET IS NOT
INTENDED TO BE INCLUSIVE OF ALL TRADES.
2 CONTRACTOR SHALL COORDINATE DEMOLITION
WITH ALL TRADES AND PROVIDE ALL DEMOLITION
REQUIRED TO EXECUTE THE NEW WORK AS
INDICATED IN THE CONTRACT DOCUMENTS.
3 ALL EQUIPMENT SHOWN TO BE REMOVED IS TO BE
REMOVED BY CONTRACTOR UNLESS NOTED
OTHERWISE.
4 EXISTING EQUIPMENT SHOWN AS DEMOLISHED TO
BE TURNED OVER TO OWNER.
5 PREPARE ALL EXPOSED SUBSTRATES TO RECEIVE
NEW FINISHES.
6 COORDINATE DISPOSAL OF ALL REMOVED DOORS
AND FRAMES WITH OWNER.
7 CONTRACTOR TO TAKE REASONABLE STEPS TO
MAINTAIN FIRE RESISTANCE RATINGS DURING
CONSTRUCTION AND/OR ENSURE FIRE SAFETY
DURING CONSTRUCTION. REFER TO
SPECIFICATIONS.
8 OWNER RESERVES THE RIGHT OF FIRST REFUSAL
FOR ALL ITEMS REMOVED DURING DEMOLITION.
9 FINISHES NOT INDICATED TO BE REMOVED SHALL
BE PROTECTED FROM DAMAGE. REPAIR OF
DAMAGED FINISHES SHALL BE AT THE EXPENSE OF
THE CONTRACTOR.
10 TERMINATE EXSITING FINISHES TO REMAIN IN
CLEAN EDGE READY TO RECEIVE NEW FINISHES
11 FIRE PROTECTION, PLUMBING, MECHANICAL AND
ELECTRICAL SYSTEMS NOT SHOWN FOR CLARITY.
REFER TO RESPECTIVE DRAWINGS FOR
DEMOLITION OF THOSE SYSTEMS
12 REMOVAL OF EXISTING FURNISHINGS, STAFF
BELONGINGS AND OTHER SIMILAR ITEMS WILL BE
PERFORMED BY VA STAFF. COORDINATE WITH COR.
KEYED NOTES
1 REMOVE EXISTING TILE AND MUD BED. PREP SLAB
FOR NEW FINISHES.
2 REMOVE EXISTING CARPET AND ADHESIVE. PREP
SLAB FOR NEW FINISHES
3 EXISTING CARPET FLOORING TO REMAIN.
PROTECT FROM DAMAGE.
4 REMOVE EXISTING SLOPED LIGHTWEIGHT
CONCRETE PLANTER BOTTOM. DO NOT DAMAGE
FLOOR SLAB SYSTEM BELOW. LIGHTWEIGHT
CONCRETE IS APPROXIMATELY 4" THICK AT
DRAIN, SLOPING UP AT 1/4" PER 1'-0".
5 EXISTING TILE FLOOR TO REMAIN. PROTECT
FROM DAMAGE.
6 EXISTING EXPOSED CONCRETE SLAB.
7 HATCH INDICATES AREA IS PRIMARILY OUTSIDE
SCOPE. PROTECT AREA FROM DAMAGE AS
REQUIRED.
BID ALTERNATES
1. REPLACE EXISTING TO REMAIN CARPET WITH NEW CARPET
2. PROVIDE CERAMIC TILE MIN MAIN CORRIDOR IN LIEU OF
TERRAZZO FLOORING
PA PA
PA
1 1
1 1 1 1
AD4003
I-601
455555
5 1
4 4
6 5 n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - ID111
AREA K FIRST FLOOR CEILING REMOVAL PLAN
05-05-2017 DWG. 44 OF 94
1 AREA K FIRST FLOOR CEILING REMOVAL PLAN
1. REPLACE EXISTING TO REMAIN ACT CEILINGS WITH NEW TO
MATCH ADJACENT AREAS.
CONSTRUCTION AND/OR ENSURE FIRE SAFETY
1 REMOVE EXISTING LAY-IN CEILING SYSTEM.
2 REMOVE EXISTING GYP BOARD CEILING.
3 REMOVE EXISTING BULKHEAD.
4 EXISTING GYP BOARD CEILING TO REMAIN. PROTECT
5 EXISTING LAY-IN CEILING SYSTEM TO REMAIN.
NOT USED.
N N
2 2 2 2 2 2
3 3 3 3 3 3 2
2 2 2
3 3
1P-139 1P-140 1P-142 1P-144 1P-145 1P-148 1P-149 1P-159 1P-160 1P-163 1P-164 1P-165 1P-165A 1P-165B 1P-182
1P-181
1P-184
1P-180C1-103
1P-178 1P-179
1P-177
1P-176 1P-175
1P-166
1P-183 C1-101
1P-162c
1P-162b
C1-101AC1-100
C1-92
1P-138
1P-137 1E-170
1P-143
1P-146a 1P-146 1P-147 1P-158
1P-162
1P-161
C1-99
1P-157
1P-1321P-1331P-133A 1P-134a1P-134b
1P-136
1P-135
1P-134
1P-123
1P-124 1P-125
1P-131 1P-150
C1-98 1P-156a
1P-156b
1P-156
C1-96
1P-162a
1P-166A
1P-167A
1P-168A1P-168B1P-168C1P-168D
1P-1511P-130
1P-129
1P-127
1P-126 1P-122
1P-120
1P-121
1P-119
1P-117
1P-115
1P-118 1P-116
C1-94
1P-128 1P-154
1P-152
1P-153
C1-96C
C1-95C1-93
1P-105
1P-104B 1P-104C
C1-96A
C1-90
1P-106A
1P-106 1P-102 1P-101
1P-100A
1P-1031P-1071P-108
1P-113
1P-114 1P-104A
C1-96B
1P-169B
C1-87
C1-104
1P-172
1P-174
1P-1731P-167
1P-1711P-168
1P-169 1P-170
C1-105
1P-170B
1P-170C1P-170D
C1-102
1P-169A
C1-108
C1-106
C1-91
1P-109
1P-95
1P-111
1P-110
C1-109 n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - ID110
AREA K FIRST FLOOR FLOORING REMOVAL PLAN
05-05-2017 DWG. 43 OF 94
1 AREA K FIRST FLOOR FLOORING REMOVAL PLAN
CONSTRUCTION AND/OR ENSURE FIRE SAFETY
1 REMOVE EXISTING TILE AND MUD BED. PREP SLAB
FOR NEW FINISHES.
2 REMOVE EXISTING CARPET AND ADHESIVE. PREP
SLAB FOR NEW FINISHES
3 EXISTING CARPET FLOORING TO REMAIN.
4 REMOVE EXISTING SLOPED LIGHTWEIGHT
CONCRETE PLANTER BOTTOM. DO NOT DAMAGE
FLOOR SLAB SYSTEM BELOW. LIGHTWEIGHT
CONCRETE IS APPROXIMATELY 4" THICK AT
DRAIN, SLOPING UP AT 1/4" PER 1'-0".
5 EXISTING TILE FLOOR TO REMAIN. PROTECT
6 EXISTING EXPOSED CONCRETE SLAB.
Thomas JB Warner 05-05-17
22297
1 1 1 1
AD4003
455555
5 1
4 4
6 5 n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - ID111
AREA K FIRST FLOOR CEILING REMOVAL PLAN
05-05-2017 DWG. 44 OF 94
1 AREA K FIRST FLOOR CEILING REMOVAL PLAN
MATCH ADJACENT AREAS.
CONSTRUCTION AND/OR ENSURE FIRE SAFETY
1 REMOVE EXISTING LAY-IN CEILING SYSTEM.
2 REMOVE EXISTING GYP BOARD CEILING.
3 REMOVE EXISTING BULKHEAD.
4 EXISTING GYP BOARD CEILING TO REMAIN. PROTECT
5 EXISTING LAY-IN CEILING SYSTEM TO REMAIN.
NOT USED.
CPT-ETRCPT-ETR CPT-ETR CPT-ETR CPT-ETR CPT-ETR
LVT-1
CT-1
CPT-4CPT-4
CPT-4 CPT-4
CPT-1 CPT-1
CPT-1
CPT-1CPT-4
CPT-4
LVT-1CPT-4
CPT-4CPT-4CPT-4
CPT-4 CPT-4
CPT-4 CPT-4 CPT-4
CPT-4 CPT-4 CPT-4
CPT-4 CPT-4 CPT-4 CPT-4 CPT-4 CPT-4 CPT-4
CPT-4 CPT-4 CPT-4 CPT-4 CPT-4 CPT-4 CPT-4
CPT-1CPT-4
CPT-4 CPT-ETR
CPT-ETRCPT-4
CPT-2
CPT-ETR
CPT-ETR CPT-ETR
CPT-ETR CPT-ETR
CT-ETR
CT-ETR CT-ETR
CT-ETR CT-ETR
PCT-2
PCT-2CPT-4
CPT-1CPT-1
CT-1
CPT-2 CPT-2
LVT-1LVT-1
TZ-1
TZ-1
SM-1
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
:4
1322 - I-110
AREA K FLOOR FINISH PLAN
05-05-2017 DWG. 45 OF 94
1 FIRST FLOOR - FLOOR FINISH PLAN
GENERAL NOTES
1. REFER SHEET I-601 FOR FINISH LEGEND
2. PREPARE FLOOR SUBSTRATES TO BE LEVEL PRIOR TO
INSTALLATION OF NEW FINISHES
3. PREPARE FLOOR SUBSTRATES IN ACCORDACE WITH
SPECIFCATIONS AND MANUFACTUER REQUIREMENTS,
WHICHEVER IS MOR STRINGENT.
4. PROIDE TRANSITION STRIPS AT FLOOR FINISHES OF DIFFERENT
FINISHES
5. FLOOR FINISHES ARE NOT TO BE CONTINUOUS ACROSS
BUILDING EXPANSION JOINTS. PROVIDE EXPANSION JOINT
COVERS THAT CAN RECEIVE AN APPLIED FINISH TO MATCH
ADJACENT FINISHES.
6. FINISHES NOTED AS "ETR" SHALL BE PROTECTED FROM DAMAGE.
REPAIR OF DAMAGED FINISHES SHALL BE AT THE EXPENSE OF
7. AT CORRIDORS TO RECEIVE CARPET PROVIDE 1 PLANK WIDE
BORDER OF LVT-1.
8. ALL DOOR AND WINDOW FRAMES TO BE PAINTED PT-1.
TEAM A
FELLOW
24x48
24x60
BBFFF
COMBO
t A dj
24x72
36 36
FF
BBF
BC
36/4
Ht Adj x7 x6
BBF FF
60 TB24 TB
36 TB
36 TB36 TB
48 TB24 TB
48 TB
48 TB 24 TB
36 TB 36 TB
x4
48 B
24 TB
48B
FF BBF
FFBBF
VF
30/4 x
C24
B24x48
24x36 24x36 24x36 24x36 24x36
Stg Cab
36 TB 36 TB 36 TB 36 TB 36 TB
NEMSCHOFF
2750-10
-1
0 N
0N
24x36 lockers 24x72 bi z hu b biz hub
24x42
15x42
24x4824x42 x9
60 TB
4'-6"
X
TA
LE
x
SCALE
4'-6" x x x x
24x60 24x60
24x6024x60 x x x biz hub
24x60 24x48
24x7824x78
A T
R A
K x x x x x x x seated/ADA standing height
10 Lockers mailboxes mobile ob ile mobile obile
1P-360 1P-309 1P-307 1P-305 1P-303 1P-219 1P-217 1P-215 1P-214
C1P-99
C1P-98
1P-212
1P-210
C1P-97
C1P-86
1P-361
1P-362 1P-312
1P-310
1P-314
C1P-92
1P-363
1P-364
1P-365
1P-366
1P-333 1P-326 1P-320
C1P-95
C1P-96
1P-208
1P-3211P-328
1P-330
1P-334
1P-335
1P-367
1P-368
1P-369
1P-370
1P-336
C1P-90
1P-332 1P-324
1P-322
1P-323
C1P-93
C1P-94
1P-343
1P-342 1P-341
C1P-88
1P-345
1P-347 1P-346 1P-348
1P-344
1P-355 1P-3531P-3511P-349
1P-373
1P-372
1P-371
C1P-91
C1P-102
C1P-86A
1P-375 S-10
1P-313
1P-300
1P-308
1P-311
1P-220 1P-218 1P-216
1P-2211P-2231P-225
1P-325
1P-327
1P-329
1P-331
1P-340
1P-254
1P-251 1P-250
1P-253 1P-252 1P-245
1P-247 1P-249
1P-248
1P-246 1P-241
1P-243
1P-2631P-2651P-2671P-2691P-2711P-2731P-275
1P-276 1P-274 1P-272 1P-270 1P-268 1P-266 1P-264 1P-262 1P-260 1P-111
1P-261
1P-244
1P-242
1P-240
1P-213
1P-211
1P-209 1P-200
1P-202
1P-204
1P-203
1P-201
1P-103
1P-102
1P-105 1P-106
1P-1081P-107
1P-1101P-109
1P-205 1P-207
1P-101
1P-206
1P-100a
C1P-104C1P-100
C1P-105
C1P-104A
C1P-103A C1P-103
C1P-98A
C1P-101
C1P-106
C1P-107
1P-374
1P-376
1P-242a n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-112
AREA K FURNITURE PLAN
05-05-2017 DWG. 46 OF 94
1 AREA K FURNISHING PLAN
1. ALL FURNISHINGS PROVIDED BY VA, INSTALLED BY
CONTRACTOR
2. REFER TO VA DRAWINGS FOR TYPICAL ROOM FURNISHING
ITEMS.
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-113
AREA K FIRST FLOOR SIGNAGE PLAN
05-05-2017 DWG. 47 OF 94
SHEET NOTES
1. SIGNAGE DESIGN AND INFORMATION BY TAKEFORM.
2. SEE SHEETS I-502 THROUGH I-505 FOR ADDTIONAL
INFORMATION
3. SEE SHEET 1-501 FOR SIGNAGE SCHEDULE.
4. SEE SIGNAGE PLAN FOR SPECIALTY SIGNAGE LOCATIONS
5. SIGNAGE TO COMPLY WITH REQUIREMENTS OF ADAAG, ADA
ACCESSIBILITY AND AFAS, UNIFORM FEDERAL ACCESSIBILITY
STANDARDS.
6. REFER TO SIGNAGE SCHEDULE AND PLANS FOR SIGNAGE
LOCATIONS. VERIFY AND COORDINATE ALL SIGNAGE (TYPE,
TEXT, ROOM NAMES AND NUMBERS) WITH CONTRACTING
REP/GOVERNMENT.
7. REFER TO SPECIFICATION SECTION 10 14 00 FOR INTERIOR
SIGNAGE FOR FABRICATION, MATERIALS, TEXT AND GRAPHIC
8. PRESSURE SENSITIVE ADHESIVE MOUNTING FOR ALL SIGNS
ON SMOOTH, HARD SURFACES.
9. SCREW-ON MOUNTING PER SIGN SYSTEM MANUFACTURER'S
DIRECTIONS ON TEXTURED SURFACES.
10. FOR SIGNS THAT ARE TO BE MOUNTED ON GLASS, PROVIDE
LAMINATE BACK PANEL TO MATCH SG1.
11. VERIFY ALL SIGN LOCATIONS IN FIELD TO ENSURE
COORDINATION WITH OTHER EXISTING WALL-MOUNTED ITEMS.
VENDOR PROVIDED INFORMATION REMAINS
THE RESPONSIBILITY OF THE VENDOR
ACT-2
ETR
ETR ETR
GWB
ACT-1
GWB
ETR ETR ETR ETR ETR ETR ETR ETR ETR
ETRETRETR
ETR ETR ETR
ACT-1 ACT-1
ACT-1ACT-1
ACT-1 ACT-1 ACT-1
ACT-1ACT-1ACT-1
ACT-1 ACT-1 ACT-1 ACT-1 ACT-1
ACT-1ACT-1ACT-1ACT-1ACT-1ACT-1
ACT-1 ACT-1 ACT-1 ACT-1
ACT-1 ACT-1 ACT-1 ACT-1
ACT-1ACT-1ACT-1
AWP-1 AWP-1
ACT-1 ACT-2
ACT-2ACT-2
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-114
AREA K CEILING FINISH PLAN
05-05-2017 DWG. 48 OF 94
1 AREA K CEILING FINISH PLAN
1. REFER SHEET I-601 FOR FINISH LEGEND
2. REFER TO SHEET A-111 FOR CEILING HEIGHTS
3. FINISHES NOTED AS "ETR" SHALL BE PROTECTED FROM
DAMAGE. REPAIR OF DAMAGED FINISHES SHALL BE AT THE
EXPENSE OF THE CONTRACTOR.
MATCH ADJACENT AREAS
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-501
SIGNAGE SCHEDULE
05-05-2017 DWG. 49 OF 94
1. INFORMATION BY TAKEFORM SIGNAGE
2. ONLY TAKEFORM SIGNAGE ALLOWED; NOT SUBSTITUTIONS.
3. SIGNAGE TO COMPLY WITH REQUIREMENTS OF ADAAG, ADA
4. REFER TO SIGNAGE PLAN (SHEET I-113) FOR SIGNAGE
TEXT, ROOM NAMS AND NUMBERS) WITH CONTRACTING
5. ALL SIGNS THAT ARE WALL MOUNTED NEXT TO A DOOR SHALL
BE MOUNTED ON THE LATCH SIDE OF THE DOOR.
6. PRESSURE SENSITIVE ADHESIVE MOUNTING FOR ALL SIGNS ON
SMOOTH, HARD SURFACES.
7. SCREW-ON MOUNTING PER SIGN SYSTEM MANUFACTURER'S
8. FOR SIGNS THAT ARE TO BE MOUNTED ON GLASS, PROVIDE
LAMINATE BACK PANEL TO MATCH SG-1.
GENERAL NOTES:
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-502
SIGNAGE DETAILS
05-05-2017 DWG. 50 OF 94
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-503
05-05-2017 DWG. 51 OF 94
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-504
05-05-2017 DWG. 52 OF 94
PCT-3
PCT-4
12" X 12"
24" X 24"
12" X 24"
12" X 24"
24" X 36"
24" X 36"
PT-6
FWC-6
TRIM REF
DETAIL 4/I-601
1' - 6"
9" 1'
1' - 6"
CARPET TILE AS
SCHEDULED LVT AS SCHEDULED
PREMANUFACTURED TRANSITION STRIP PER
MANUFACTURERS RECOMMENDATION
PROVIDE FLUSH
TRANSITION FROM
LVT TO CARPET TILE
RED OAK CLEAR STAIN
3"
3/ 4"
2"
FWC-5
BUMPER RAIL
4'
3' n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
As indicated
1322 - I-601
INTERIOR FINISH LEGEND
05-05-2017 DWG. 53 OF 94
FLOOR TYPES
TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR NOTES
CPT-1 CARPET MANNINGTON SANCTUM GULLY FLOOR TRANSITIONS REF DETAIL
3/I-601
CPT-2 CARPET MANNINGTON HUSK KAMALA FLOOR TRANSITIONS REF DETAIL
CPT-3 NOT USED NOT USED NOT USED NOT USED
CPT-4 CARPET MANNINGTON LINNEN WEAVE STORM FLOOR TRANSITIONS REF DETAIL
LVT-1 LUXURY VINYL TILE MANNINGTON WOOD BLONDE OAK FLOOR TRANSITIONS REF DETAIL
PCT -1 PORCELAIN FLOOR TILE DALTILE DIAMANTE UNPOLISHED CORDA P033
PCT-2 PORCELAIN FLOOR TILE DALTILE KEYSTONES D175 ELEMENTAL TAN SPECKLE
D17522 SWATCH
PCT-3 PORCELAIN FLOOR TILE DALTILE LIGHT POLISHED SUPERIOR TAUPE DR08
PCT-4 PORCELAIN FLOOR TILE DALTILE LIGHT POLISHED NOTABLE BEIGE DR09
TZ-1 TERRAZO FLOORING GRAZZINI BROTHERS POLISH BROWN: GRAZZINI BROTHERS
FORMULA A2816
WALL FINISHES
TYPE DESCRIPTION MANUFACTURER PATTERN / FINISH COLOR COMMENTS
FWC-1 FABRIC WALL COVERING MDC --- MIF4052 IN DEMAND 4
FWC-2 FABRIC WALL COVERING MDC --- MIF4037 IN DEMAND 4
FWC-3 FABRIC WALL COVERING MDC --- MIF4006 IN DEMAND 4
FWC-4 NOT USED NOT USED NOT USED NOT USED
FWC-5 FABRIC WALL COVERING MDC --- MIF4051 IN DEMAND 4
FWC-6 FABRIC WALL COVERING MDC --- MIF4010
PT-1 PAINT SHERWIN WILLIAMS PRO MAR 200 ZERO VOC TONY TAUPE SW 7038
PT-2 NOT USED NOT USED NOT USED NOT USED
PT-3 PAINT SHERWIN WILLIAMS PRO MAR 200 ZERO VOC ACCESSIBLE BEIGE SW 7036
PT-4 PAINT SHERWIN WILLIAMS PRO MAR 200 ZERO VOC ELEPHANT EAR SW 9168
PT-5 NOT USED NOT USED NOT USED NOT USED
PT-6 PAINT SHERWIN WILLIAMS PRO MAR 200 ZERO VOC EARL GREY SW 7660
PT-7 PAINT SHERWIN WILLIAMS PRO MAR 200 ZERO VOC EVERGREEN FOG SW 9130
PWT-1 PORCELAIN WALL TILE DALTILE DIAMANTE POLISHED SABBIA P024
PWT-2 PORCELAIN WALL TILE DALTILE KEYSTONES D175 ELEMENT TAN D17522
SWATCH
RWP-1 RESIN WALL PANEL 3FORM SANDSTONE F01 WHISPER 1P-101
RWP-2 RESIN WALL PANEL LUMICOR SATIN PAPER LEAF + WHITE C1P-95, C1P-101
SM-1 STONE MASONRY REALSTONE SYSTEMS HONED PANEL WHITE BIRCH ROOM 1P-100
SM-2 STONE MASONRY NORSTONE 3-D ROUGH HEWN OCHRE WAINSCOTING C1P-108
WP-1 WOOD PANELING TBD CLEAR STAIN RED OAK
WV-1 WOOD VENEER TBD CLEAR STAIN RED OAK
WALL BASE TYPES
ISB-1 INTEGRAL SLANT BASE INNOVATIVE TILE
SYSTEMS
NATURAL INTEGRAL SLANT BASE
SB-1 STAINLESS STEEL BASE MX BASE MOLDING STAINLESS STEEL
VB-1 VINYL WALL BASE ARMSTRONG COLOR INTEGRATED 49 BEIGE
MISC. FINISH TYPES
GT-1 GROUT LATICRETE SPECTRALOCK PRO
GROUT
SMOKE GREY CLOSET
GT-2 GROUT LATICRETE SPECTRALOCK PRO
GROUT
ANTIQUE WHITE BATHROOM
PL-1 PLASTIC LAMINATE PIONITE FINE VELVET
TEXTURE
AG611 SUEDE
GRAVEYARD OF THE
ATLANTIC
COUNTERTOP ROOM 1P-101
PL-2 PLASTIC LAMINATE WILSONART FINE VELVET
TEXTURE
7971K-12 UPTOWN
WALNUT
BREAKROOM CUPBOARDS ROOM 1P-313
SSM-1 SOLID SURFACE MATERIAL DUPONT CORIAN MATTE WITCH HAZEL
CEILING TYPES
TYPE DESCRIPTION MANUFACTURER PATTEREN / FINISH COLOR COMMENTS
ACT-1 ACCOUSTICAL CIELING PANEL ARMSTRONG WHITE 24" X 48" FISSURED SQUARE LAY-IN #755
ACT-2 ACCOUSTICAL CIELING PANEL ARMSTRONG WHITE 24" X 24" ULTIMA BEVELED TEGULAR #1911
AWP ACCOUSTICAL WOOD PANEL SOUNDPLY RED OAK VENEER RF M51
GB-1 GYPSUM BOARD CIELING WHITE
3/4" = 1'-0"
1 TILE PATTERN
1/2" = 1'-0"
2 ACCENT WALL AT SELF CHECK-IN
6" = 1'-0"
3 FLOOR TRANSITION
6" = 1'-0"
4 TRIM PROFILE
1" = 1'-0"
5 WAINSCOTING DETAIL
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - I-602
05-05-2017 DWG. 54 OF 94
NORTH WALL SOUTH WALL WEST WALL EAST WAL
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.