The file's text, extracted by GovTribe without its formatting.
07-01-13 Expand Outpatient Mental Health Specification 618-16-111
Section 00 01 10
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
| DIVISION 00 ‑ SPECIAL SECTIONS |
| DATE |
| 00 01 15 |
| List of Drawing Sheets |
| 09-11 |
DIVISION 01 ‑ GENERAL REQUIREMENTS
| 01 00 00 |
| General Requirements |
| 05-13 |
| 01 33 23 |
| Shop Drawings, Product Data, and Samples |
| 11-08 |
| 01 42 19 |
| Reference Standards |
| 09-11 |
| 01 45 29 |
| Testing Laboratory Services |
| 07-13 |
| 01 58 16 |
| Temporary Interior Signage |
| 08-11 |
| 01 74 19 |
| Construction Waste Management |
| 05-12 |
| 01 81 13 |
| Sustainable Design Requirements |
| 02-13 |
| 01 91 00 |
| General Commissioning Requirements |
| 06-13 |
DIVISION 02 – EXISTING CONDITIONS
| 02 41 19 |
| Selective Demolition |
| --- |
DIVISION 03 – CONCRETE
| 03 30 00 |
| Cast-in-Place Concrete |
| 10-01 |
DIVISION 04 – MASONRY
| 04 43 13.16 |
| Adhered Stone Veneer |
| 04-17 |
DIVISION 05 – METALS
| 05 12 00 |
| Structural Steel Framing |
| 11-12 |
| 05 36 00 |
| Composite Metal Decking |
| 07-11 |
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
| 06 10 00 |
| Rough Carpentry |
| 09-11 |
| 06 16 63 |
| Cementitious Sheathing |
| 05-12 |
| 06 20 00 |
| Finish Carpentry |
| 06-13 |
DIVISION 07 ‑ THERMAL AND MOISTURE PROTECTION
| 07 21 13 |
| Thermal Insulation |
| 03-09 |
| 07 81 00 |
| Applied Fireproofing |
| 11-11 |
| 07 84 00 |
| Firestopping |
| 10-11 |
| 07 92 00 |
| Joint Sealants |
| 12-11 |
| 07 95 13 |
| Expansion Joint Cover Assemblies |
| 10-11 |
DIVISION 08 ‑ OPENINGS
| 08 11 13 |
| Hollow Metal Doors and Frames |
| 01-13 |
| 08 14 00 |
| Interior Wood Doors |
| 10-12 |
| 08 31 13 |
| Access Doors and Frames |
| 10-11 |
| 08 71 00 |
| Door Hardware |
| 09-11 |
| 08 71 13.11 |
| Low Energy Power Assist Door Operators |
| 01-11 |
DIVISION 09 – FINISHES
| 09 05 16 |
| SUBSURFACE PREPARATION FOR FLOOR FINISHES |
| 02-15 |
| 09 06 00 |
| Schedule for Finishes |
| 10-11 |
| 09 22 16 |
| Non-Structural Metal Framing |
| 07-13 |
| 09 29 00 |
| Gypsum Board |
| 02-13 |
| 09 30 13 |
| Ceramic/Porcelain Tiling |
| 05-12 |
| 09 51 00 |
| Acoustical Ceilings |
| 10-10 |
| 09 65 13 |
| Resilient Base and Accessories |
| 10-11 |
| 09 65 19 |
| Resilient Tile Flooring |
| 03-11 |
| 09 66 13 |
| Portland Cement Terrazzo Flooring |
| 10-11 |
| 09 72 16 |
| Vinyl-Coated Fabric Wall Covering |
| 11-11 |
| 09 72 16 |
| Vinyl-Coated Fabric Wall Covering |
| 11-11 |
DIVISION 10 – SPECIALTIES
| 10 26 00 |
| Wall and Door Protection |
| 01-11 |
| 10 44 13 |
| Fire Extinguisher Cabinets |
| 11-11 |
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
| 12 32 00 |
| Manufactured Wood Casework |
| 11-11 |
| 12 36 00 |
| Countertops |
| 06-13 |
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
| 21 13 13 |
| Wet-Pipe Sprinkler Systems |
| 05-08 |
DIVISION 22 – PLUMBING
| 22 05 11 |
| Common Work Results for Plumbing |
| 04-11 |
| 22 05 23 |
| General-Duty Valves for Plumbing Piping |
| 12-09 |
| 22 07 11 |
| Plumbing Insulation |
| 05-11 |
| 22 13 00 |
| Facility Sanitary and Vent Piping |
| 12-09 |
| 22 40 00 |
| Plumbing Fixtures |
| 03-11 |
DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
| 23 05 11 |
| Common Work Results for HVAC |
| 11-10 |
| 23 05 12 |
| General Motor Requirements for HVAC and Steam Generation Equipment |
| 11-10 |
| 23 05 41 |
| Noise and Vibration Control for HVAC Piping and Equipment |
| 11-10 |
| 23 05 93 |
| Testing, Adjusting, and Balancing for HVAC |
| 05-11 |
| 23 07 11 |
| HVAC and Boiler Plant Insulation |
| 05-11 |
| 23 09 23 |
| Direct-Digital Control System for HVAC |
| 09-11 |
| 23 21 13 |
| Hydronic Piping |
| 09-12 |
| 23 31 00 |
| HVAC Ducts and Casings |
| 03-13 |
| 23 36 00 |
| Air Terminal Units |
| 03-10 |
| 23 37 00 |
| Air Outlets and Inlets |
| 11-09 |
| 23 73 00 |
| Indoor Central-Station Air-Handling Units |
| 04-11 |
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
| 26 05 11 |
| Requirements for Electrical Installations |
| 12-12 |
| 26 05 19 |
| Low-Voltage Electrical Power Conductors and Cables |
| 07-13 |
| 26 05 26 |
| Grounding and Bonding for Electrical Systems |
| 12-12 |
| 26 05 33 |
| Raceway and Boxes for Electrical Systems |
| 09-10 |
| 26 05 73 |
| Overcurrent Protective Device Coordination Study |
| 12-12 |
| 26 08 00 |
| Commissioning of Electrical Systems |
| 06-13 |
| 26 22 00 |
| Low-Voltage Transformers |
| 12-12 |
| 26 24 16 |
| Panelboards |
| 12-12 |
| 26 27 26 |
| Wiring Devices |
| 12-12 |
| 26 29 11 |
| Motor Controllers |
| 12-12 |
| 26 43 13 |
| Surge Protector Device |
| 12-12 |
| 26 51 00 |
| Interior Lighting |
| 12-12 |
DIVISION 27 – COMMUNICATIONS
| 27 05 11 |
| Requirements for Communications Installations |
| 11-09 |
| 27 05 26 |
| Grounding and Bonding for Communications Systems |
| 10-06 |
| 27 05 33 |
| Raceways and Boxes for Communications Systems |
| 12-05 |
| 27 05 36 |
| Cable Tray for Telecommunication Systems |
| 02-14 |
| 27 08 00 |
| Commissioning of Communications Systems |
| 06-13 |
| 27 10 00 |
| Structured Cabling |
| 12-05 |
| 27 12 00 |
| Telecommunications Cabling Expansion |
| 06-14 |
| 27 52 23 |
| Nurse Call and Code Blue Systems |
| 01-10 |
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
| 28 05 00 |
| Common Work Results for Electronic Safety and Security |
| 06-13 |
| 28 05 13 |
| Conductors and Cables for Electronic Safety and Security |
| 09-11 |
| 28 05 28.33 |
| Conduits and Backboxes for Electronic Safety and Security |
| 09-11 |
| 28 08 00 |
| Commissioning of Electronic Safety and Security Systems |
| 06-13 |
| 28 13 00 |
| Physical Access Control Systems |
| 10-11 |
| 28 31 00 |
| Fire Detection and Alarm |
| 10-11 |
DIVISION 31 – EARTHWORK
DIVISION 48 – Electrical Power Generation
| 48 14 00 |
| Solar Energy Electrical Power Generation System |
| 01-13 |
| 48 15 00 |
| Wind Energy Electrical Power Generation System |
| 01-13 |
00 01 10-1