Minneapolis, Minnesota
Minneapolis VA Health Care System
Expand Outpatient Mental Health
618-16-111
Specifications
100% Issue for Construction
(Book 1 of 2)
May 5, 2017
Submitted by Benham
60 E. Plato Blvd, Suite 300 Saint Paul, MN 55107
Expand Outpatient Mental Health Specification 618-16-111 Section 00 01 10
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 09-11 00 01 20 Seals Pages
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 05-13 01 33 23 Shop Drawings, Product Data, and Samples 11-08 01 42 19 Reference Standards 09-11 01 45 29 Testing Laboratory Services 07-13 01 58 16 Temporary Interior Signage 08-11 01 74 19 Construction Waste Management 05-12 01 81 13 Sustainable Design Requirements 02-13 01 91 00 General Commissioning Requirements 06-13
DIVISION 02 – EXISTING CONDITIONS
02 41 19 Selective Demolition ---
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 10-01
DIVISION 04 – MASONRY
04 43 13.16 Adhered Stone Veneer 04-17
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-12 05 36 00 Composite Metal Decking 07-11
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 09-11 06 16 63 Cementitious Sheathing 05-12 06 20 00 Finish Carpentry 06-13
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 03-09 07 81 00 Applied Fireproofing 11-11 07 84 00 Firestopping 10-11 07 92 00 Joint Sealants 12-11 07 95 13 Expansion Joint Cover Assemblies 10-11
DIVISION 08 - OPENINGS
00 01 10-2
08 11 13 Hollow Metal Doors and Frames 01-13 08 14 00 Interior Wood Doors 10-12 08 31 13 Access Doors and Frames 10-11 08 71 00 Door Hardware 09-11 08 71 13.11 Low Energy Power Assist Door Operators 01-11 08 80 00 Glazing 10-12
DIVISION 09 – FINISHES
09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES 02-15
09 06 00 Schedule for Finishes 10-11 09 22 16 Non-Structural Metal Framing 07-13 09 29 00 Gypsum Board 02-13 09 30 13 Ceramic/Porcelain Tiling 05-12 09 51 00 Acoustical Ceilings 10-10 09 65 13 Resilient Base and Accessories 10-11 09 65 19 Resilient Tile Flooring 03-11 09 66 13 Portland Cement Terrazzo Flooring 10-11 09 68 00 Carpeting 10-11 09 72 16 Vinyl-Coated Fabric Wall Covering 11-11 09 91 00 Painting 07-13
DIVISION 10 – SPECIALTIES
10 14 00 Signage 11-11 10 26 00 Wall and Door Protection 01-11 10 44 13 Fire Extinguisher Cabinets 11-11
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 11-11 12 36 00 Countertops 06-13
DIVISION 13 - SPECIAL CONSTRUCTION
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 05-08
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 04-11 22 05 23 General-Duty Valves for Plumbing Piping 12-09 22 07 11 Plumbing Insulation 05-11 22 13 00 Facility Sanitary and Vent Piping 12-09 22 40 00 Plumbing Fixtures 03-11
00 01 10-3
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 11-10 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 11-10
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
11-10
23 05 93 Testing, Adjusting, and Balancing for HVAC 05-11 23 07 11 HVAC and Boiler Plant Insulation 05-11 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 09-12 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 11-09 23 36 00 Air Terminal Units 03-10 23 37 00 Air Outlets and Inlets 11-09 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 82 16 Air Coils 04-11
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 12-12 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-13 26 05 26 Grounding and Bonding for Electrical Systems 12-12 26 05 33 Raceway and Boxes for Electrical Systems 09-10 26 05 73 Overcurrent Protective Device Coordination Study 12-12 26 08 00 Commissioning of Electrical Systems 06-13 26 22 00 Low-Voltage Transformers 12-12 26 24 16 Panelboards 12-12 26 27 26 Wiring Devices 12-12 26 29 11 Motor Controllers 12-12 26 43 13 Surge Protector Device 12-12 26 51 00 Interior Lighting 12-12
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 11-09 27 05 26 Grounding and Bonding for Communications Systems 10-06 27 05 33 Raceways and Boxes for Communications Systems 12-05 27 05 36 Cable Tray for Telecommunication Systems 02-14 27 08 00 Commissioning of Communications Systems 06-13 27 10 00 Structured Cabling 12-05 27 12 00 Telecommunications Cabling Expansion 06-14 27 52 23 Nurse Call and Code Blue Systems 01-10
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 06-13 28 05 13 Conductors and Cables for Electronic Safety and
Security 09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 06-13
00 01 10-4
28 13 00 Physical Access Control Systems 10-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
DIVISION 48 – Electrical Power Generation
Section 00 01 15
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
SHEET INDEX
GENERAL
1322-G-001 COVER SHEET 1
1322-G-002 STANDARD ABBREVIATIONS AND SYMBOL LEGEND 2
1322-G-003 GENERAL NOTES AND CODE ANALYSIS 3
1322-G-004 AREA K FIRST FLOOR LIFE SAFTEY PLAN 4
1322-G-005 AREA K - FIRST FLOOR PHASING PLAN 5
1322-G-006 TYPICAL FIXTURE AND ACCESSORY MOUNTING HEIGHT LEGEND 6
STRUCTURAL
1322-S-010 GENERAL STRUCTURAL NOTES 7
1322-S-011 GENERAL STRUCTURAL NOTES 8
1322-S-020 STRUCTURAL ABBREVIATIONS 10
1322-S-012 SPECIAL INSPECTIONS AND TESTING REQUIREMENTS 10
1322-S-100 FOUNDATION PLAN - LEVEL 0 AREA K 11
1322-S-110 FLOOR FRAMING PLAN - LEVEL 1 AREA K 12
1322-S-115 INTERSTITIAL FLOOR FRAMING PLAN - LEVEL 1 AREA K 13
1322-S-120 FLOOR FRAMING PLAN - LEVEL 2 AREA K 14
1322-S-500 SECTIONS AND DETAILS 15
1322-S-501 SECTIONS AND DETAILS 16
ARCHITECTURAL
1322-AD110 AREA K FIRST FLOOR DEMOLITION PLAN 17
1322-AD115 AREA K FIRST FLOOR INTERSTIAL DEMOLITION PLAN 18
1322-AD120 AREA K SECOND FLOOR DEMOLITION PLAN 19
1322-AD400 DEMOLITION ELEVATIONS 20
1322-AD401 REFERENCE DETAILS 21
1322-A-110 AREA K FIRST FLOOR PLAN 22
1322-A-111 AREA K REFLECTED CEILING PLAN 23
1322-A-115 AREA K FIRST FLOOR INTERSTITIAL FLOOR PLAN 24
1322-A-120 AREA K SECOND FLOOR PLAN 25
1322-A-400 ENLARGED FLOOR PLAN 26
1322-A-401 ENLARGED PLANS 27
1322-A-402 ENLARGED FLOOR PLANS 28
1322-A-403 ENLARGED FLOOR PLANS 29
1322-A-404 ENLARGED FLOOR PLANS 30
1322-A-405 ENLARGED CEIING PLANS 31
1322-A-406 ENLARGED CEIING PLANS 32
00 01 15 - 2
1322-A-407 ENLARGED CEIING PLANS 33
1322-A-408 ENLARGED CEIING PLANS 34
1322-A-410 ENLARGED SECTIONS 35
1322-A-411 MILLWORK SECTIONS 36
1322-A-500 DETAILS 37
1322-A-501 INTERIOR ELEVATIONS 38
1322-A-502 INTERIOR ELEVATIONS 39
1322-A-590 TYPICAL PENETRATION DETAILS 40
1322-A-602 DOOR TYPE DIAGRAMS 41
1322-A-603 WALL TYPES 42
INTERIORS
1322-ID110 AREA K FLOORING REMOVAL PLAN 43
1322-ID111 AREA K CEILING REMOVAL PLAN 44
1322-I-110 AREA K FLOOR FINISH PLAN 45
1322-I-112 AREA K FURNITURE PLAN 46
1322-I-113 AREA K FIRST FLOOR SIGNGE PLAN 47
1322-I-114 AREA K CEILING FINISH PLAN 48
1322-I-501 SIGNAGE SCHEDULE 49
1322-I-502 SIGNAGE DETAILS 50
1322-I-503 SIGNAGE DETAILS 51
1322-I-504 SIGNAGE DETAILS 52
1322-I-601 INTERIOR FINISH LEGEND 53
1322-I-602 ROOM FINISH SCHEDULE 54
FIRE ALARM
1322-FAD100 FIRE ALARM DEMOLITION PLAN 50
1322-FA100 FIRE ALARM RENOVATION PLAN 51
FIRE SUPPRESSION
1322-FXD100 FIRE SUPPRESSION DEMOLITION PLAN 52
1322-FX100 FIRE SUPPRESSION RENOVATION PLAN 53
PLUMBING
1322-P-001 SYMBOLS, ABBREVIATIONS, NOTES AND LEGENDS 62
1322-PD105 DEMO PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL AREA K 63
1322-PD110 DEMO PLUMBING PLAN - LEVEL 1 AREA K 64
1322-P-110 PLUMBING PLAN - LEVEL 1 AREA K 65
1322-PD115 DEMO PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K 65
1322-P-105 PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL AREA K 66
1322-P-115 PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K 68
1322-P-401 ENLARGED PLUMBING PLANS AND RISERS 69
1322-P-501 STANDARD DETAILS AND SCHEDULES 70
MECHANICAL
1322-H-001 MECHANICAL ABBREVIATIONS AND LEGEND 71
00 01 15 - 3
1322-HD105 DEMOLITION HVAC PLAN - BASEMENT INTERSTITIAL 72
1322-HD110 DEMOLITION HVAC PLAN - LEVEL 1 AREA K 73
1322-HD115 DEMOLITION HVAC PLAN - LEVEL 1 INTERSTITIAL AREA K 74
1322-HD401 DEMOLITION ENLARGED PLAN & SECTION 75
1322-H-110 HVAC PLAN - LEVEL 1 AREA K 76
1322-H-115 HVAC PLAN - LEVEL 1 INTERSTITIAL AREA K 77
1322-H-401 ENLARGED PLANS - LEVEL 1 78
1322-H-501 DETAILS 79
1322-H-601 SCHEDULES 80
ELECTRICAL
1322-ED110 LIGHTING DEMOLITION PLAN - LEVEL 1 AREA K 80
1322-E-001 ELECTRICAL LEGEND AND ABBREVIATIONS 81
1322-ED210 POWER DEMOLITION PLAN - LEVEL 1 AREA K 81
1322-ED310 TELECOMMUNICATIONS DEMOLITION PLAN - LEVEL 1 AREA K 82
1322-E-110 LIGHTING PLAN - LEVEL 1 AREA K 83
1322-E-115 LIGHTING PLAN - LEVEL 1 INTERSTITIAL AREA K 84
1322-E-210 POWER PLAN - LEVEL 1 AREA K 85
1322-E-215 POWER PLAN - LEVEL 1 INTERSTITIAL AREA K 86
1322-E-310 TELECOMMUNICATIONS PLAN - LEVEL 1 AREA K 87
1322-E-315 TELECOMMUNICATIONS PLAN - LEVEL 1 INTERSTITIAL AREA K 88
1322-E-400 ENLARGED PLANS AND DETAILS 89
1322-E-401 ENLARGED PLANS AND DETAILS 90
1322-E-402 ELECTRICAL DETAILS 91
1322-E-500 INTERSTITIAL SECTIONS AND DETAILS 92
1322-E-600 LIGHT FIXTURE SCHEDULE 93
1322-E-601 PANELBOARD SCHEDULES 94
1322-E-602 PANELBOARD SCHEDULES 95
- - - E N D - - -
SPECIFICATION NO. 618-16-111
Section 00 01 30
SCOPE OF WORK
CONSTRUCT “EXPAND OUTPATIENT MENTAL HEALTH”
PROJECT #618-16-111
MINNEAPOLIS VA MEDICAL CENTER
A. PART I - GENERAL
A1. Scope of Contract
A. Base Bid: The Contractor shall provide all labor, materials and equipment to accomplish the “Expand Outpatient Mental Health” project per construction drawings and specifications. The project shall be accomplished per contract drawings numbered 618-16-111, specification number 618—16-111. This work includes, but is not limited to:
1. Demolition:
a. Removal of existing planters and quarry tile in the first floor atrium, including cabinet unit heaters and associated floor drains. Selective removal of West and North walls of atrium and second floor waiting are wall. Selective removal of offices, doors, ceilings, carpeting, and wall coverings.
Selective basement floor removal. Selective HVAC system removal including ductwork, diffusers, VAV boxes, and pneumatic controls. Removal 70-AH1SW-9 Supply Fan and Cooling
Coil. Selective removal of plumbing fixtures. Selective removal of Power and Low Voltage systems back to source including fixtures, devices, raceways, conduit, and cabling.
Selective removal of wet pipe automatic sprinkler system including heads and piping. Selective removal of Fire Alarm system including appliances.
b. Work must be performed in a careful manner protecting those items not to be removed from damage.
2. Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Owner retains right of first refusal on all times to be removed. Verify with owner prior to disposal.
3. New construction consists of, but is not limited to:
a. Installation of new rooms within Outpatient Mental Health including walls, doors, interior finishes, paint, and flooring.
b. Installation of new interstitial space including concrete and structural members.
c. Installation of new HVAC systems serving Outpatient Mental
Health. Installation of new 70-AH1SW-9 Supply Fan and Cooling
Coil. Balance of HVAC systems including Supply, Return and
Exhaust systems and associated equipment.
d. Installation of new Plumbing fixtures.
e. Installation of new Power and Low Voltage systems.
f. Installation of wet pipe automatic sprinkler system including heads.
g. Installation of Fire Alarm system including appliances.
4. Additional project specific notes:
a. Items not noted as to be demolished shall be protected from damage. Any damage not caused by the owner or deemed to be normal wear shall be corrected by the contractor with no additional time and/or money.
b. Temporary construction items such as dust walls, safety barriers, etc. shall be the responsibility of the contractor.
Obtain approval from VA staff prior to the installation of such temporary construction.
c. Coordinate with VA prior to performing shutdowns of electrical power systems, HVAC Equipment, chilled water systems, and fire suppression systems for modifications and tie-ins.
5. Phasing: Refer to drawing G-005 for phasing information.
6. Shutdowns:
a. Air Handling Unit 70-AH1SW-9, Return Fan 70-RF-8, and Exhaust
Fan 70-EF-20.
b. Chilled Water System.
c. Fire Suppression System.
d. Substation No.6
B. Bid Deduct Alternates:
a. Base Bid + Alternate 1
Terrazzo floor in corridor. Replacement of carpet in spaces not included in base bid
b. Base Bid + Alternate 1&2
Replacement of ceiling grid, new lighting fixtures, new HVAC grilles, new sprinklers and fire alarms in spaces not included in base bid.
c. Base Bid + Alternate 1,2&3
Conversion of VAV boxes from pneumatic control to DDC control at units not included in base bid. Conversion of radiant heating at perimeter zone finned tube from pneumatic control to DDC control in spaces not included in base bid.
A2. Tentative Schedule:
Contract award* D
Pre-construction conference D+7
Notice to Proceed D+12
Construction start D+22
Construction completion D+305
A. Schedule Objectives - The anticipated substantial completion of this project is 283 days after “Notice to Proceed” (NTP).
A3. Cost Range
The anticipated cost range for this project is between
Between $5,000,000 and $10,000,000.
Expand Outpatient Mental Health Spec ification 618-16-111
Section 01 00 00
01 00 00 - i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 GENERAL INTENTION
1.2 STATEMENT OF BID ITEM(S)
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.4 construction security requirements
1.5 FIRE SAFETY
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 INFECTION PREVENTION MEASURES
1.9 DISPOSAL AND RETENTION
1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS
1.11 RESTORATION
1.12 PHYSICAL DATA – Not used
1.13 PROFESSIONAL SURVEYING SERVICES – Not used
1.14 LAYOUT OF WORK – Not used
1.15 AS-BUILT DRAWINGS
1.16 USE OF ROADWAYS
1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.18 TEMPORARY USE OF EXISTING ELEVATORS
1.19 TEMPORARY USE OF NEW ELEVATORS – Not used
1.20 TEMPORARY TOILETS
1.21 AVAILABILITY AND USE OF UTILITY SERVICES
1.22 NEW TELEPHONE EQUIPMENT
1.23 TESTS
1.24 INSTRUCTIONS
1.25 GOVERNMENT-FURNISHED PROPERTY
1.26 RELOCATED EQUIPMENT
01 00 00 - ii
1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT – Not Used
1.28 CONSTRUCTION SIGN – NOt used
1.29 SAFETY SIGN – Not used
1.30 CONSTRUCTION DIGITAL IMAGES – Not used
1.31 FINAL ELEVATION Digital Images – Not used
1.32 HISTORIC PRESERVATION
1.33 COMPLETION TIME
1.34 SCHEDULES
1.35 CONTRACTOR’S COST BREAKDOWN (SCHEDULE OF VALUES)
1.36 SUBCONTRACTORS
1.37 MINIMUM HOURLY RATES OF WAGES
1.38 FIELD QUALITY CONTROL
1.39 KEYS AND BADGES
1.40 MSDS BOOK
1.41 LOCKOUT / TAGOUT
1.42 CONFINED SPACE ENTRY
1.43 PROHIBITION ON ASBESTOS-CONTAINING MATERIALS
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 GENERAL INTENTION
A. Contractor shall completely prepare site for buildi ng operations, including demolition and removal of existing struct ures or portions of structures, and furnish labor and materials and per form work as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by a ppointment with the
Contracting Officer.
C. All employees of general contractor and subcontract ors shall comply with VA security management program and obtain perm ission of the VA police, be identified by project and employer, and restricted from unauthorized access.
D. Prior to commencing work, general contractor shall provide proof that a
30 Hour OSHA certified “competent person” will main tain a presence at the work site whenever the general or subcontractor s are present.
E. Training:
1. All employees of general contractor or subcontracto rs shall have the 10-hour OSHA certified Construction Safety cour se and /or other relevant competency training, as determined b y VA CP with input from the ICRA team.
2. Submit training records of all such employees for a pproval before the start of work.
F. Confined Space Training:
1. The VA Medical Center Property has been surveyed fo r Permit
Required Confined Spaces. An inventory of the spac es including the hazards and entry procedures are available from the Safety
Manager. Entry may be required for the installatio n of electrical systems, controls, plumbing, pipe fittin g and insulation as part of the project scope.
2. Contractor shall be trained in confined space entry prior to entering confined space. Submit training records o f all such employees for approval before start of work.
1.2 STATEMENT OF BID ITEM(S)
A. SEE SOW
1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. AFTER AWARD OF CONTRACT, Specifications and drawing s will be furnished electronically on a compact disk. Drawing and speci fication will be in
Adobe PDF format.
B. Hard Copy drawings and specifications may be made b y the Contractor, at the Contractor’s expense, from electronic files fur nished by the
Issuing Contracting Officer.
1.4 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and adminis trative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for ensuring that all sub-contractors working on the project and their employ ees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without an appropriate badge. They may also be sub ject to inspection of their personal effects when entering or leaving the project site.
2. For working outside the “regular hours” as defined in the contract, the General Contractor shall give 3 days notice to the
Project Manager so that security/escort arrangement s can be provided for the employees. This notice is separat e from any notices required for utility shutdown described lat er in this section.
3. All employees of general contractor and subcontract ors shall comply with VA security management program and obta in permission of the VA police, be identified by project and empl oyer, and restricted from unauthorized access. Each contract or or subcontractor employee shall obtain a security clea rance from the
VA Medical Center. Obtaining a security clearance will require each contractor and/or subcontractor employee to re port to the
Facilities Engineering Project Section to complete paperwork and visit Human Resource Management for finger printing . When the employee has been cleared to work at the Medical Ce nter, the employee shall return to have a picture taken and w ill be issued a badge at that time. Employees must schedule appo intments with a Facilities Engineering Project Manager prior to a rriving on site to complete security clearance paperwork. This process could take up to thirty days.
4. No photography of VA premises is allowed without wr itten permission of the Contracting Officer.
5. VA reserves the right to close down or shut down th e project site and order General Contractor’s employees off the pr emises in the event of a national emergency. The General Contrac tor may return to the site only with the written approval of the C ontracting
Officer.
C. Guards: Not used
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Project Manager for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
E. Document Control:
1. Before starting any work, the General Contractor/Su bcontractors shall submit an electronic security memorandum desc ribing the approach to following goals and maintaining confide ntiality of
“sensitive information”.
2. The General Contractor is responsible for safekeepi ng of all drawings, project manual and other project informat ion. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensi tive
Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or tr ansmitted from the project site without the written approval of Co ntracting
Officer.
5. All paper waste or electronic media such as CD’s an d diskettes shall be shredded and destroyed in a manner accepta ble to the VA.
6. Notify Contracting Officer and Site Security Office r immediately when there is a loss or compromise of “sensitive in formation”.
7. All electronic information shall be stored in speci fied location following VA standards and procedures using an Engi neering
Document Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be perf ormed and tracked through the EDMS system.
b. ”Sensitive information” including drawings and othe r documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Contractor’s vehicles and workers vehicles are to b e parked in
Employee Parking lots. Coordinate with Project Man ager.
2. Shipping/Receiving dock parking; access shall be re stricted to picking up and dropping off materials and supplies.
1.5 FIRE SAFETY
A. Applicable Publications: Publications listed below form part of this
Article to extent referenced. Publications are ref erenced in text by basic designations only. The most recent versions o f each publication apply.
1. American Society for Testing and Materials (ASTM):
E84...............Surface Burning Characteristics of Building
Materials
2. National Fire Protection Association (NFPA):
10................Standard for Portable Fire Extin guishers
30................Flammable and Combustible Liquid s Code
51B...............Standard for Fire Prevention Dur ing Welding, Cutting and Other Hot Work
70................National Electrical Code
101...............Life Safety Code
241...............Standard for Safeguarding Constr uction, Alteration, and Demolition Operations
3. Occupational Safety and Health Administration (OSHA ):
29 CFR 1926.......Safety and Health Regulations fo r Construction
B. Fire Safety Plan: Establish and maintain a fire pr otection program in accordance with 29 CFR 1926. Prior to start of wor k, prepare a plan detailing project-specific fire safety measures, in cluding periodic status reports, and submit to the Project Manager f or review for compliance with contract requirements in accordance with Section 01 33
23, SHOP DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to any worker for the contractor or subcontractors beginning work, th ey shall undergo a safety briefing provided by the general contractor’ s competent person per OSHA requirements. This briefing shall include information on the construction limits, VAMC safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of V AMC equipment, etc.
Documentation shall be provided to the Project Mana ger that individuals have undergone contractor’s safety briefing.
C. Site and Building Access: Maintain free and unobst ructed access to facility emergency services and for fire, police an d other emergency response forces in accordance with NFPA 241.
D. Separate temporary facilities, such as trailers, st orage sheds, and dumpsters, from existing buildings and new construc tion by distances in accordance with NFPA 241. For small facilities wit h less than 6 m (20 feet) exposing overall length, separate by 3m (10 f eet).
E. Temporary Construction Partitions:
1. Install and maintain temporary construction partiti ons to provide smoke-tight separations between construction areas and adjoining areas. Construct partitions of gypsum board or tre ated plywood
(flame spread rating of 25 or less in accordance wi th ASTM E84) on both sides of fire retardant treated wood or met al steel studs. Extend the partitions through suspended cei lings to floor slab deck or roof. Seal joints and penetrations. At door openings, install Class C, ¾ hour fire/smoke rated doors with self-closing devices.
2. Install fire-rated temporary construction partition s as shown on drawings to maintain integrity of existing exit sta ir enclosures, exit passageways, fire-rated enclosures of hazardou s areas, horizontal exits, smoke barriers, vertical shafts a nd openings enclosures.
3. Close openings in smoke barriers and fire-rated con struction to maintain fire ratings. Seal penetrations with list ed through-penetration firestop materials in accordance with S ection 07 84
00, FIRESTOPPING.
F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with 29 CFR 1926, NFPA 241 and NFPA 70.
G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disr uptions and coordinate with the Project Manager.
H. Egress Routes for Construction Workers: Maintain f ree and unobstructed egress. Inspect daily. Report findings and correc tive actions weekly to the Project Manager.
I. Fire Extinguishers: Provide and maintain extinguis hers in construction areas and temporary storage areas in accordance wit h 29 CFR 1926, NFPA
241 and NFPA 10.
J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29 CFR 1926, NFPA 241 and NFPA 30.
K. Sprinklers: Install, test and activate new automat ic sprinklers prior to removing existing sprinklers.
L. Existing Fire Protection: Do not impair automatic sprinklers, smoke and heat detection, and fire alarm systems, except for portions immediately under construction, and temporarily for connections.
Provide fire watch for impairments more than 4 hour s in a 24-hour period. Request interruptions in accordance with p aragraph 1.6, OPERATIONS AND STORAGE AREAS, and coordinate with P roject Manager. All existing or temporary fire protection systems (fire alarms, sprinklers) located in construction areas shall be tested as co ordinated with the medical center. Parameters for the testing and res ults of any tests performed shall be recorded by the medical center a nd copies provided to the Project Manager.
M. Smoke Detectors: Prevent accidental operation. Re move temporary covers at end of work operations each day. Coordin ate with Project
Manager.
N. Hot Work: Perform and safeguard hot work operation s in accordance with
NFPA 241 and NFPA 51B. Coordinate with Project Man ager. Obtain permits from Project Manager the morning the work i s to be completed, provide 24 hr. notice when possible. Designate con tractor's responsible project-site fire prevention program ma nager to permit hot work.
O. Fire Hazard Prevention and Safety Inspections: Ins pect entire construction areas weekly. Coordinate with, and re port findings and corrective actions weekly to Project Manager.
P. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under const ruction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.
Q. Dispose of waste and debris in accordance with NFPA 241. Remove from buildings daily.
R. Perform other construction, alteration and demoliti on operations in accordance with 29 CFR 1926.
S. If required, submit documentation to the Project Ma nager that personnel have been trained in the fire safety aspects of wor king in areas with impaired structural or compartmentalization feature s.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (includ ing storage of materials) on Government premises to areas authoriz ed or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harml ess from liability of any nature occasioned by the Contractor's perfor mance.
B. Temporary buildings (e.g., storage sheds, shops, of fices) and utilities may be erected by the Contractor only with the appr oval of the
Contracting Officer and shall be built with labor a nd materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor a t its expense upon completion of the work. With the written consent o f the Contracting
Officer, the buildings and utilities may be abandon ed and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temp orary roadways constructed by the Contractor when and as authorize d by the Contracting
Officer. When materials are transported in prosecu ting the work, vehicles shall not be loaded beyond the loading cap acity recommended by the manufacturer of the vehicle or prescribed by an y Federal, State, or local law or regulation. When it is necessary to c ross curbs or sidewalks, the Contractor shall protect them from d amage. The
Contractor shall repair or pay for the repair of an y damaged curbs, sidewalks, or roads.
D. Working space and space available for storing mater ials shall be as determined by the Project Manager.
E. Workmen are subject to rules of Medical Center appl icable to their conduct.
F. Execute work so as to interfere as little as possib le with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any e xisting equipment, and with work being done by others. Use of equipmen t and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during co nstruction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by Project Manager where required by limi ted working space.
1. Do not store materials and equipment in other th an assigned areas.
All storage locations must be approved by project C OR.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not m ore than two work days. Provide unobstructed access to Medical Center areas required to remain in operation. There is currently minimal storage space available within the medical center. Contractors sh ould plan for alternate storage outside the medical center. Stora ge boxes will be allowed on VA Grounds or back parking lots with pri or approval.
3. Where access by Medical Center personnel to vaca ted portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and saf ety requirements.
4. All materials stored on VA Premises must be lab eled with contractor name, point of contact, telephone number , project title, date of storage, and project COR.
G. Phasing: To insure such executions, Contractor sha ll furnish the
Project Manager with a schedule of approximate phas ing dates on which the Contractor intends to accomplish work in each s pecific area of site, building or portion thereof. In addition, Co ntractor shall notify the Project Manager two weeks in advance of the proposed date of starting work in each specific area of site, buildi ng or portion thereof. Arrange such dates to insure accomplishme nt of this work in successive phases mutually agreeable to Project Man ager and Contractor.
H. Utilities Services: Maintain existing utility serv ices for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uni nterrupted services.
Where necessary to cut existing water, steam, gases , sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (incl uding telephone), they shall be cut and capped at suitable places whe re shown; or, in absence of such indication, where directed by Proje ct Manager.
1. No utility service such as water, gas, steam, sewer s or electricity, or fire protection systems and communi cations systems may be interrupted without prior approval o f Project
Manager. Electrical work shall be accomplished wit h all affected circuits or equipment de-energized. When an electr ical outage cannot be accomplished, work on any energized circu its or equipment shall not commence without an Energized C ircuit Permit issued by the Project Manager.
2. Contractor shall submit a request to interrupt any such services to Project Manager, in writing, 25 days in advance of proposed interruption. Request shall state reason, date, ex act time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruptio n will cause least inconvenience to operations of Medical Center .
Interruption time approved by Medical Center may oc cur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested , in writing, at least 25 calendar days prior to the desired time and shall be performed as directed by the Project Manager.
5. In case of a contract construction emergency, servi ce will be interrupted on approval of Project Manager. Such a pproval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be pa id to a public utility provider for new permanent service to the c onstruction project, for such items as water, sewer, electricit y, gas or steam, payment of such fee shall be the responsibil ity of the
Government and not the Contractor.
I. Abandoned Lines: All unused service lines shall be demoed to the source unless approved by the COR. All service li nes such as wires, cables, conduits, ducts, pipes and the like, and th eir hangers or supports, which are to be abandoned but are not req uired to be entirely removed, shall be sealed, capped or plugged. The l ines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfin ished areas, or within walls or partitions; so that they are comple tely behind the finished surfaces.
J. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to park ing and to occupied areas of buildings clear of construction m aterials, debris and standing construction equipment and vehi cles. Wherever excavation for new utility lines cross existing roa ds, at least one lane must be open to traffic at all times.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be appr oved by the
Project Manager.
K. Coordinate the work for this contract with other co nstruction operations as directed by Project Manager. This in cludes the scheduling of traffic and the use of roadways, as s pecified in paragraph 1.17, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of acc ess, Project
Manager, signed by both, to the Contracting Officer . This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to b e altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, veneti an blinds, shades, etc., required by drawings to be either reu sed or relocated, or both.
3. Shall note any discrepancies between drawings and e xisting conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where al terations occur and which have been agreed upon by Contractor and Project
Manager.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, o r in opinion of
Project Manager, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which w ill be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accor dingly.
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and Project Manager together s hall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient fl ooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protec tion measures;
and, will form basis for determining extent of repa ir work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective measu res:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of l eaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, ma terials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at al l times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protecti on shall be maintained intact until all work in the area is com pleted.
1.8 INFECTION PREVENTION MEASURES
A. Implement the requirements of VAMC’s Infection Cont rol Risk Assessment
(ICRA) team. ICRA Group may monitor dust in the vi cinity of the construction work and require the Contractor to tak e corrective action immediately if the safe levels are exceeded.
B. Establish and maintain a dust control program as pa rt of the contractor’s infection preventive measures in accor dance with the guidelines provided by ICRA Group. Prior to start of work, prepare a plan detailing project-specific dust protection mea sures, including periodic status reports, and submit to Project Mana ger for review for compliance with contract requirements in accordance with Section 01 33
23, SHOP DRAWINGS, PRODUCT DATA SAMPLES.
1. All personnel involved in the construction or renov ation activity shall be educated and trained in infection preventi on measures established by the medical center.
C. Medical center Infection Control personnel shall mo nitor for airborne disease (e.g. aspergillosis) as appropriate during construction. A baseline of conditions may be established by the me dical center prior to the start of work and periodically during the co nstruction stage to determine impact of construction activities on indo or air quality. In addition:
1. The COR and VAMC Infection Control personnel shall review pressure differential monitoring documentation to v erify that pressure differentials in the construction zone and in the patient-care rooms are appropriate for their settin gs. The requirement for negative air pressure in the constr uction zone shall depend on the location and type of activity. Upon notification, the contractor shall implement correc tive measures to restore proper pressure differentials as needed.
2. In case of any problem, the medical center, along w ith assistance from the contractor, shall conduct an environmental assessment to find and eliminate the source.
D. In general, following preventive measures shall be adopted during construction to keep down dust and prevent mold.
1. Dampen debris to keep down dust and provide tempora ry construction partitions in existing structures wher e directed by
Project Manager. Blank off ducts and diffusers to prevent circulation of dust into occupied areas during cons truction.
2. Do not perform dust producing tasks within occupied areas without the approval of the Project Manager. For construct ion in any areas that will remain jointly occupied by the medi cal Center and
Contractor’s workers, the Contractor shall:
a. Provide dust proof fire-rated temporary drywall con struction barriers to completely separate construction from t he operational areas of the hospital in order to conta in dirt debris and dust. Barriers shall be sealed and made presentable on hospital occupied side. Install a s elf-closing rated door in a metal frame, commensurate with the partition, to allow worker access. Maintain negative air at al l times. A fire retardant polystyrene, 6-mil thick or greater plastic barrier meeting local fire codes may be used where dust control is the only hazard, and an agreement is rea ched with the Project Manager and Medical Center.
b. HEPA filtration is required where the exhaust dust may reenter the breathing zone. Contractor shall verify that c onstruction exhaust to exterior is not reintroduced to the medi cal center through intake vents, or building openings. Instal l HEPA
(High Efficiency Particulate Accumulator) filter va cuum system rated at 95% capture of 0.3 microns including polle n, mold spores and dust particles. Insure continuous negat ive air pressures occurring within the work area. HEPA fil ters should have ASHRAE 85 or other prefilter to extend the use ful life of the HEPA. Provide both primary and secondary filtr ations units. Exhaust hoses shall be heavy duty, flexible steel reinforced and exhausted so that dust is not reintr oduced to the medical center.
c. Adhesive Walk-off/Carpet Walk-off Mats, minimum 600 mm x 900mm
(24” x 36”), shall be used at all interior transiti ons from the construction area to occupied medical center ar ea. These mats shall be changed as often as required to maint ain clean work areas directly outside construction area at al l times.
d. Vacuum and wet mop all transition areas from constr uction to the occupied medical center at the end of each work day.
Vacuum shall utilize HEPA filtration. Maintain surr ounding area frequently. Remove debris as they are created .
Transport these outside the construction area in co ntainers with tightly fitting lids.
e. The contractor shall not haul debris through patien t-care areas without prior approval of the Project Manager and the
Medical Center. When, approved, debris shall be ha uled in enclosed dust proof containers or wrapped in plasti c and sealed with duct tape. No sharp objects should be allowed to cut through the plastic. Wipe down the exterior of the containers with a damp rag to remove dust. All equ ipment, tools, material, etc. transported through occupied areas shall be made free from dust and moisture by vacuuming an d wipe down.
f. Using a HEPA vacuum, clean inside the barrier and v acuum ceiling tile prior to replacement. Any ceiling acc ess panels opened for investigation beyond sealed areas shall be sealed immediately when unattended.
g. There shall be no standing water during constructio n. This includes water in equipment drip pans and open cont ainers within the construction areas. All accidental spil ls must be cleaned up and dried within 12 hours. Remove and d ispose of porous materials that remain damp for more than 72 hours.
h. At completion, remove construction barriers and cei ling protection carefully, outside of normal work hours. Vacuum and clean all surfaces free of dust after the remov al.
E. Final Cleanup:
1. Upon completion of project, or as work progresses, remove all construction debris from above ceiling, vertical sh afts and utility chases that have been part of the construct ion.
2. Perform HEPA vacuum cleaning of all surfaces in the construction area. This includes walls, ceilings, cabinets, fur niture (built-in or free standing), partitions, flooring, etc.
1.9 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored.
Items that remain property of the Government shall be removed or dislodged from present locations in such a manner a s to prevent damage which would be detrimental to re-installatio n and reuse.
Store such items where directed by Project Manager.
2. Items not reserved shall become property of the Con tractor and be removed by Contractor .
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contr act shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs durin g the alteration period, such items which are NOT require d by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avo id interfering with Contractor's operation.
1.10 PCB TRANSFORMERS AND CAPACITORS: NOT APPLICABLE
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUI PMENT, UTILITIES,
AND IMPROVEMENTS
A. The Contractor shall preserve and protect all struc tures, equipment, and vegetation (such as trees, shrubs, and grass) o n or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contrac t. The Contractor shall only remove trees when specifically authorize d to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contra ct performance, or by the careless operation of equipment, or by workm en, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Con tracting Officer.
B. The Contractor shall protect from damage all existi ng improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any da mage to those facilities, including those that are the property o f a third party, resulting from failure to comply with the requireme nts of this contract or failure to exercise reasonable care in performin g the work. If the
Contractor fails or refuses to repair the damage pr omptly, the
Contracting Officer may have the necessary work per formed and charge the cost to the Contractor.
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, s oils and the environment. Refer to paragraphs 1.6 Operations an d Storage Areas, 1.7
Alterations, 1.11 Restoration for additional instru ctions concerning repair of damage to structures and site improvement s.
1.12 RESTORATION
A. Remove, cut, alter, replace, patch and repair exist ing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, an d do not disturb any ducts, plumbing, steam, gas, or electric work witho ut approval of the
Project Manager. Existing work to be altered or ex tended and that is found to be defective in any way, shall be reported to the Project
Manager before it is disturbed. Materials and work manship used in restoring work, shall conform in type and quality t o that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work , shall be patched, repaired, reinstalled, or replaced with new work, a nd refinished and left in as good condition as existed before commenc ing work.
C. At Contractor's own expense, Contractor shall immed iately restore to service and repair any damage caused by Contractor' s workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications sy stems (including telephone) which are indicated on drawings and whic h are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems no t shown on drawings or locations of which are unknown will be covered b y adjustment to contract time and price in accordance with the FAR.
1.13 PHYSICAL DATA – NOT USED
1.14 PROFESSIONAL SURVEYING SERVICES – NOT USED
1.15 LAYOUT OF WORK
A. The Contractor shall lay out the work from Governme nt established base lines and bench marks, indicated on the drawings, a nd shall be responsible for all measurements in connection with the layout. The
Contractor shall furnish, at Contractor's own expen se, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor sha ll be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contra ctor shall also be responsible for maintaining and preserving all stak es and other marks established by the Contracting Officer until author ized to remove them.
If such marks are destroyed by the Contractor or th rough Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the repl acement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each bu ilding and corner of column lines and/or addition to each existing build ing, and such other lines and grades that are reasonably necessary to p roperly assure that location,…