VA263-17-R-1144-00002002.pdf

PDF 512 KB Posted

Attached to
618-16-111 - Expand Out Patient M/H - Construction 36C26318C0097
Solicitation number
VA26317R1144
Issued by

About this file

VA263-17-R-1144 00002 G-005 - AREA K - FIRST FLOOR PHASING PLAN.pdf

View the file

Other files

File Type Posted
36C26318C0097-000.docx DOCX document
VA263-17-R-1144-00007000.docx DOCX document
VA263-17-R-1144-00007001.pdf PDF
VA263-17-R-1144-00006001.pdf PDF
VA263-17-R-1144-00006000.docx DOCX document
VA263-17-R-1144-00005001.docx DOCX document
VA263-17-R-1144-00005000.docx DOCX document
VA263-17-R-1144-00004001.pdf PDF
VA263-17-R-1144-00004000.docx DOCX document
VA263-17-R-1144-00003001.pdf PDF
VA263-17-R-1144-00003000.docx DOCX document
VA263-17-R-1144-00002000.docx DOCX document
VA263-17-R-1144-00002001.pdf PDF
VA263-17-R-1144-00001000.docx DOCX document
VA263-17-R-1144-025.pdf PDF
VA263-17-R-1144-013.pdf PDF
VA263-17-R-1144-018.pdf PDF
VA263-17-R-1144-023.pdf PDF
VA263-17-R-1144-015.doc DOC document
VA263-17-R-1144-003.pdf PDF
VA263-17-R-1144-005.pdf PDF
VA263-17-R-1144-006.docx DOCX document
VA263-17-R-1144-027.pdf PDF
VA263-17-R-1144-016.pdf PDF
VA263-17-R-1144-026.pdf PDF
VA263-17-R-1144-009.pdf PDF
VA263-17-R-1144-008.pdf PDF
VA263-17-R-1144-002.docx DOCX document
VA263-17-R-1144-022.pdf PDF
VA263-17-R-1144-020.pdf PDF
VA263-17-R-1144-019.docx DOCX document
VA263-17-R-1144-021.pdf PDF
VA263-17-R-1144-011.pdf PDF
VA263-17-R-1144-004.xlsx XLSX spreadsheet
VA263-17-R-1144-012.pdf PDF
VA263-17-R-1144-007.docx DOCX document
VA263-17-R-1144-017.docx DOCX document
VA263-17-R-1144-024.pdf PDF
VA263-17-R-1144-014.pdf PDF
VA263-17-R-1144-010.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D W

HH GG FF EE DD CC BB AA Z Y X

TEMP LOBBY HERE

TEMP STAFF DESK

AND WORK AREA

HERE

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

NOTE: AREAS WHERE THE PHASING HATCH PATTES

OVERLAP INDICATE THAT WORK IN TATH AREA WILL OCCUR

OVER MULTIPLE PHASES. REFER TO PHASING NOTES FOR A

SUMMARY OF THE SCOPE FOR EACH PHASE.

PHASING HATCH LEGEND

NOTE: AREA FOR PHASE 6 IS NOT DEFINED BY HATCH. THIS AREA

WILL BE DETERMINED BY THE CONTRACTOR DURING THE

CREATION OF THE FINAL PHASING PLAN

30 x 42

G E

N E

R A

L

N O

T E

S

618-16-111

Project Title

V.A. MEDICAL CENTER

ONE VETERANS DRIVE

MINNEAPOLIS, MN 55417

REGISTRATION NUMBER:

Office of Facilities

Management Drawing Scale

Plot Scale

Drawing Title

Approved: Division Chief

Approved: Service Director

Building Number

Checked Drawn

Location

Date

Project No.

DRAWING NO.

o n e -e ig h th i n c h o n e f o o t o n e -q u a rt e r in c h o n e f o o t th re e -e ig h th s i n c h o n e f o o t o n e -h a lf i n c h o n e f o o t th re e -q u s rt e r in c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e

-h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

TRUE NORTH

PLAN NORTH

GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO

THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.

GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED

BY THE VARIOUS SUBCONTRACTORS.

I HEREBY CERTIFY THAT THIS PLAN,

SPECIFICATION OR REPORT WAS

PREPARED BY ME OR UNDER MY DIRECT

SUPERVISION AND THAT I AM A DULY

LICENSED ARCHITECT UNDER

THE LAWS OF THE STATE OF MINNESOTA

C U s e rs \e b e rl y d r\ D o c u m e n ts

\R e v it T e m p \3

B L

D G

A R

C H

C

F e b e rl y d r.

rv t

/9

/2

:5

:1

P

M

As indicated

1322 - G-005

TW DRE

EXPAND OUTPATIENT MENTAL HEALTH

AREA K - FIRST FLOOR PHASING PLAN

GENERAL

05-05-2017 DWG. 5 OF 94

1/8" = 1'-0"

1 AREA K FIRST FLOOR PHASING PLAN

PHASING GENERAL NOTES

1 PHASING PLAN IS TO GIVE THE GENERAL

CONTRACTOR THE INTENT OF THE SEQUENCE FOR

THE WORK.

2 GENERAL CONTRACTOR SHALL BE RESPONSIBLE

FOR PREPARING A DETAILED PHASING PLAN AND

ENSURING ALL WORK IS COMPLETED TO ALLOW FOR

TURN OF SPACES IN THE ORDER INDICATED BY THE

PHASING PLAN.

3 GENERAL CONTRACTOR SHALL COORDINATE THE

DETAILED PHASING PLAN WITH ALL TRADES.

4 ADDITIONAL COSTS INCURRED DUE TO IMPROPER

SEQUENCING OF THE WORK SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR ALONE.

5 PROTECT ALL ITEMS NOT SHOWN TO BE DEMOLISHED

FROM ANY DAMAGE. REPAIR ANY DAMAGE TO

LIKE-NEW CONDITION.

6 GENERAL CONTRACTOR IS RESPONSIBLE FOR

PROVIDING TEMPORARY PARTITIONS AS REQUIRED

TO ENSURE THE SAFETY AND SECURITY OF THE

FACILITY DURING CONSTRUCTION.

7 COORDINATE REMOVAL ALL EQUIPMENT WITH ALL

OTHER TRADES AND VA STAFF.

PHASING STAGES

PHASE 1

1.1 CONSTRUCT NEW STORAGE ROOM

1.2 DEMOLISH WORK TO CREATE TEMPORARY LOBBY

1.3 CREATE TEMPORARY STAFF DESK AND WORK AREA

1.4 INSTALL FINISHES FOR TEMPORARY FACILITIES

1.5 TURN OVER TEMPORARY FACILITIES

PHASE 2

2.1 INSTALL TEMPORARY PARTITIONS FOR ATRIUM

DEMO AND BUILD-OUT

2.2 DEMOLISH EXISTING PLANTERS

2.3 DEMOLISH EXISTING WORK IN PHASE 2 AREA

2.4 CONSTRUCT NEW STRUCTURAL FRAMING SYSTEM

AND FIREPROOF NEW STRUCTURAL WORK

2.5 CONSTRUCT CORRIDORS 1P-108 AND 1P-109; TURN

OVER FOR USE

2.6 BUILD-OUT OF NEW WORK IN PHASE 2 AREA

2.7 TURN OVER PHASE 2 AREA

PHASE 3

3.1 INSTALL TEMPORARY PARTITIONS FOR PHASE 3

DEMO AND BUILD-OUT

3.2 DEMOLISH EXISTING WORK IN PHASE 3 AREA

3.3 CONSTRUCT BUILD-OUT OF PHASE 3 AREA

3.4 TURN OVER PHASE 3 AREA

PHASE 4

4.1 INSTALL TEMPORARY PARTITIONS FOR PHASE 4

DEMO AND BUILD-OUT

4.2 DEMOLISH EXISTING WORK IN PHASE 4 AREA

4.3 CONSTRUCT BUILD-OUT OF PHASE 4 AREA

4.4 TURN OVER PHASE 4 AREA

PHASE 5

5.1 INSTALL TEMPORARY PARTITIONS FOR PHASE 5

DEMO AND BUILDOUT

5.2 DEMOLISH TEMPORARY LOBBY, STAFF DESK AND

STAFF WORK AREA.

5.3 CONSTRUCT BUILD-OUT OF PHASE 5 AREA

5.4 TURN OVER PHASE 5 AREA

PHASE 6

6.1 REMOVAL OF EXISTING CORRIDOR FINISHES AND

PREP FOR NEW FINISHES

6.2 INSTALLATION OF NEW CORRIDOR FINISHES

6.2 PROJECT SUBSTANTIAL COMPLETION AND

CLOSE-OUT

DESCRIPTION DATE