VA263-17-R-1144-023.pdf
PDF 5 MB Posted
- Solicitation number
- VA26317R1144
About this file
VA263-17-R-1144 Attachment 21 of 25_G Drawings Combined (7 Pages).pdf
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
FENCE
LINE
M
IN
N E H A H A
A V E S O U T H
(T .H .5
E S OF
A
E R I C
U N I
D
S TA T
VFO
P
S
F
NARETE
30 x 42
G
L
O
618-16-111
Project Title
V.A. MEDICAL CENTER
ONE VETERANS DRIVE
MINNEAPOLIS, MN 55417
REGISTRATION NUMBER:
Office of Facilities
Management Drawing Scale
Plot Scale
Drawing Title
Approved: Division Chief
Approved: Service Director
Building Number
Checked Drawn
Location
Date
Project No.
DRAWING NO.
o n e -e ig h th i n c f t
-q u a rt r in re s
-h lf i n d n
TRUE NORTH
PLAN NORTH
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
THE WORK WILL BE MADE WITHOUT THE PRIOR APPROVAL OF THE PROJECT ENGINEER.
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
BY THE VARIOUS SUBCONTRACTORS.
I HEREBY CERTIFY THAT THIS PLAN,
SPECIFICATION OR REPORT WAS
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
LICENSED ARCHITECT UNDER
THE LAWS OF THE STATE OF MINNESOTA
DEPARTMENT OF VETERANS AFFAIRS
MINNEAPOLIS, MN. MEDICAL CENTER
END USER:
1969 UNION:
3669 UNION:
APPROVED BY: DATE
LOCATION MAP: MPLS VAMC
ENGINEERING PROJECT CHIEF:
ENGINEERING DIRECTOR:
C rs \s tr m k \D ts
\3
B
.r v
/9
/2
:2
:4
1322 - G-001
TW DRE
EXPAND OUTPATIENT MENTAL HEALTH
COVER SHEET
GENERAL
05-05-2017
DWG. 1 OF 94
ISSUED FOR CONSTRUCTION
PROJECT LOCATION
BLDG 70
SHEET INDEX
1322- FX100 FIRE SUPPRESSION RENOVATION PLAN 58
PLUMBING
1322- P-001 SYMBOLS, ABBREVIATIONS, NOTES AND LEGENDS 59
1322- PD105 DEMO PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL AREA K 60
1322- PD110 DEMO PLUMBING PLAN - LEVEL 1 AREA K 61
1322- PD115 DEMO PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K 62
1322- P-105 PLUMBING PLAN - BASEMENT LEVEL INTERSTITIAL AREA K 63
1322- P-110 PLUMBING PLAN - LEVEL 1 AREA K 64
1322- P-115 PLUMBING PLAN - LEVEL 1 INTERSTITIAL AREA K 65
1322- P-401 ENLARGED PLUMBING PLANS AND RISERS 66
1322- P-501 STANDARD DETAILS AND SCHEDULES 67
MECHANICAL
1322- H-001 MECHANICAL ABBREVIATIONS AND LEGEND 68
1322- HD105 DEMOLITION HVAC PLAN - BASEMENT INTERSTITIAL 69
1322- HD110 DEMOLITION HVAC PLAN - LEVEL 1 AREA K 70
1322- HD115 DEMOLITION HVAC PLAN - LEVEL 1 INTERSTITIAL AREA K 71
1322- HD401 DEMOLITION ENLARGED PLAN & SECTION 72
1322- H-110 HVAC PLAN - LEVEL 1 AREA K 73
1322- H-115 HVAC PLAN - LEVEL 1 INTERSTITIAL AREA K 74
1322- H-401 ENLARGED PLANS - LEVEL 1 75
1322- H-501 DETAILS 76
1322- H-601 SCHEDULES 77
ELECTRICAL
1322- E-001 ELECTRICAL LEGEND AND ABBREVIATIONS 78
1322- ED110 LIGHTING DEMOLITION PLAN - LEVEL 1 AREA K 79
1322- ED210 POWER DEMOLITION PLAN - LEVEL 1 AREA K 80
1322- ED310 TELECOMMUNICATIONS DEMOLITION PLAN - LEVEL 1 AREA K 81
1322- E-110 LIGHTING PLAN - LEVEL 1 AREA K 82
1322- E-115 LIGHTING PLAN - LEVEL 1 INTERSTITIAL AREA K 83
1322- E-210 POWER PLAN - LEVEL 1 AREA K 84
1322- E-215 POWER PLAN - LEVEL 1 INTERSTITIAL AREA K 85
1322- E-310 TELECOMMUNICATIONS PLAN - LEVEL 1 AREA K 86
1322- E-315 TELECOMMUNICATIONS PLAN - LEVEL 1 INTERSTITIAL AREA K 87
1322- E-400 ENLARGED PLANS AND DETAILS 88
1322- E-401 ENLARGED PLANS AND DETAILS 89
1322- E-402 ELECTRICAL DETAILS 90
1322- E-500 INTERSTITIAL SECTIONS AND DETAILS 91
1322- E-601 PANELBOARD SCHEDULES 93
1322- E-600 LIGHT FIXTURE SCHEDULE 93
1322- E-602 PANELBOARD SCHEDULES 94
Grand total: 95
I-505 Unnamed
1322 - G-001 COVER SHEET 1
1322 - G-002 STANDARD ABBREVIATIONS AND SYMBOL LEGEND 2
1322 - G-003 GENERAL NOTES AND CODE ANALYSIS 3
1322 - G-004 AREA K FIRST FLOOR LIFE SAFTEY PLAN 4
1322 - G-005 AREA K - FIRST FLOOR PHASING PLAN 5
1322 - G-006 TYPICAL FIXTURE AND ACCESSORY MOUNTING HEIGHT LEGEND 6
STRUCTURAL
1322- S-010 GENERAL STRUCTURAL NOTES 7
1322- S-011 GENERAL STRUCTURAL NOTES 8
1322- S-012 SPECIAL INSPECTIONS AND TESTING REQUIREMENTS 9
1322- S-020 STRUCTURAL ABBREVIATIONS 10
1322- S-100 FOUNDATION PLAN - LEVEL 0 AREA K 11
1322- S-110 FLOOR FRAMING PLAN - LEVEL 1 AREA K 12
1322- S-115 INTERSTITIAL FLOOR FRAMING PLAN - LEVEL 1 AREA K 13
1322- S-120 FLOOR FRAMING PLAN - LEVEL 2 AREA K 14
1322- S-500 SECTIONS AND DETAILS 15
1322- S-501 SECTIONS AND DETAILS 16
ARCHITECTURAL
1322 - AD110 AREA K FIRST FLOOR DEMOLITION PLAN 17
1322 - AD115 AREA K FIRST FLOOR INTERSTITIAL DEMOLITION PLAN 18
1322 - AD120 AREA K SECOND FLOOR DEMOLITION PLAN 19
1322 - AD400 DEMOLITION ELEVATIONS 20
1322 - AD401 REFERENCE DETAILS 21
1322 - A-110 AREA K FIRST FLOOR PLAN 22
1322 - A-111 AREA K REFLECTED CEILING PLAN 23
1322 - A-115 AREA K FIRST FLOOR INTERSTITIAL FLOOR PLAN 24
1322 - A-120 AREA K SECOND FLOOR PLAN 25
1322 - A-400 AREA K FIRST FLOOR NW SECTOR FLOOR PLAN 26
1322 - A-401 AREA K FIRST FLOOR NE SECTOR FLOOR PLAN 27
1322 - A-402 AREA K FIRST FLOOR SW SECTOR FLOOR PLAN 28
1322 - A-403 AREA K FIRST FLOOR SE SECTOR FLOOR PLAN 29
1322 - A-404 ENLARGED FLOOR PLANS 30
1322 - A-405 AREA K FIRST FLOOR NW CEILING PLAN 31
1322 - A-406 AREA K FIRST FLOOR NE CEILING PLAN 32
1322 - A-407 AREA K FIRST FLOOR SW CEILING PLAN 33
1322 - A-408 AREA K FIRST FLOOR SE CEILING PLAN 34
1322 - A-410 ENLARGED SECTIONS 35
1322 - A-411 MILLWORK SECTIONS 36
1322 - A-500 DETAILS 37
1322 - A-501 INTERIOR ELEVATIONS 38
1322 - A-502 INTERIOR ELEVATIONS 39
1322 - A-590 TYPICAL PENETRATION DETAILS 40
1322 - A-602 DOOR TYPE DIAGRAMS 41
1322 - A-603 WALL TYPES 42
INTERIORS
1322 - ID110 AREA K FIRST FLOOR FLOORING REMOVAL PLAN 43
1322 - ID111 AREA K FIRST FLOOR CEILING REMOVAL PLAN 44
1322 - I-110 AREA K FLOOR FINISH PLAN 45
1322 - I-112 AREA K FURNITURE PLAN 46
1322 - I-113 AREA K FIRST FLOOR SIGNAGE PLAN 47
1322 - I-114 AREA K CEILING FINISH PLAN 48
1322 - I-501 SIGNAGE SCHEDULE 49
1322 - I-502 SIGNAGE DETAILS 50
1322 - I-503 SIGNAGE DETAILS 51
1322 - I-504 SIGNAGE DETAILS 52
1322 - I-601 INTERIOR FINISH LEGEND 53
1322 - I-602 ROOM FINISH SCHEDULE 54
FIRE ALARM
1322- FAD100 FIRE ALARM DEMOLITION PLAN 55
1322- FA100 FIRE ALARM RENOVATION PLAN 56
FIRE SUPPRESSION
1322- FXD100 FIRE SUPPRESSION DEMOLITION PLAN 57
DESCRIPTION DATE
1 2
10E
CORRIDOR
C2
DRAWING BLOCK TITLE
1 1/2" = 1'-0"
C4 1 1/2'1/2'0 1'
A-201
A4
0 16'8'4'
A2
A-202
BC
A-512
D2
CL
FEC
CG
NORTH
DETAIL NUMBER
SHEET WHERE REF.
SHEET WHERE DRAWN
A3.1 A4.3
1304-GXXX
SHEETDRAWING SET
SHEET NAMING CONVENTION
DISCIPLINE
FIRE RESISTIVE RATED LINE, 4 HOUR
DEMOLITION LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 4 HOUR
HIDDEN FEATURES LINE
NEW LINE
PROPERTY LINE
SMOKE BARRIER LINE
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
DOOR OPENING IDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
ARCHITECTURAL SYMBOLS
CENTER LINE
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
GRAPHIC SCALE, 1/8"=1'-0"
FIRE-RATED, SMOKE BARRIER LINE, 3
HOUR
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
WALL OR PARTITION
TYPE
FIRE EXTINGUISHER
CABINET
CORNER GUARD
NORTH ARROW
MATERIALS LEGEND
EXISTING
CONSTRUCTION TO
REMAIN
EXISTING
BE REMOVED
NEW
CONSTRUCTION
CONCRETE
EARTH
BASE
COURSE
RIGID
INSULATION
BATT
V V ITEM - VA SUPPLIED &
INSTALLED
VC ITEM - VA SUPPLIED &
CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR
SUPPLIED & INSTALLED
BUILDING SECTION INDICATOR
LEAD LINED WALL
NOTE:
1. THE LEGENDS ON THIS SHEET ARE COMPRISED OF STANDARD SYMBOLS AND ARE PERTINENT
TO THE CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE
2. ADDITIONAL LEGENDS AND/ OR ANOTHER LEGEND SHEET MAY APPEAR IN THIS SET OF
DRAWINGS TO INDICATE SPECIFIC CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
:5
12" = 1'-0"
1322 - G-002
STANDARD ABBREVIATIONS AND SYMBOL LEGEND
05-05-2017 DWG. 2 OF 94
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TC TOP OF CURB
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL
TEMPERATURE CONTROL PANEL; TRAFFIC
CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM+ THERMAL
THK THICK
THOLD THRESHOLD
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TO TOP OF
TO FDN+ TOP OF FOUNDATION
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF SLAB
TOSHP TOP OF STEEL HIGH POINT
TOSLP TOP OF STEEL LOW POINT
TOSMP TOP OF STEEL MIDPOINT
TOSTL TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED
CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
W WIDE OR WEST
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WL WIND LOAD
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WATER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD
(INSULATION
YD YARD
YR YEAR
RAD RADIATOR OR RADIUS
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REMOTE CONTROL
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REBAR REINFORCING BAR
REC RECESSED
RECD RECEIVED
RECPT RECEPTABLE
RECT RECTANGLE
REF REFER OR REFERENCE
REFR REFRIGERATION REFRACTORY OR
REFRACTORY REFRIGERATION
REG REGISTER
REINF REINFORCING
REINF REINFORCE
RELOC RELOCATED
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RFVC RECESSED FIRE VALVE CABINET
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
SA SUPPLY AIR
SAB SOUND ATTENUATION BLANKET
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR, OR
SOAP DISPENSER;
SDG SIDING
SECT SECTION
SED STANDARD EMBASSY DESIGN
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FEET
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SJI STEEL JOIST INSTITUTE
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SMS SHEET METAL SCREW
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
SNDU SANITARY NAPKIN DISPOSAL UNIT
SOG SLAB ON GRADE
SP STAND PIPE
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK OR
STAINLESS STEEL
ST STAIRS OR STREET
STA STATION
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PL STEEL PLATE
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STL TR STEEL TRUSS
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUC STRUCTURAL
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPENDED
SUSP CLG SUSPENDED CEILING
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMMETRICAL
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
T&B TOP AND BOTTOM
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF
ARCHITECTURAL METAL
MANUFACTURERS
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NEUT NEUTRAL
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRCA NATIONAL ROOFING CONTRACTORS
NRP NONREMOVABLE
NS NARROW STILE
NTE NOT TO EXCEED
NTS NOT TO SCALE
NUM NUMERAL
NWC NORMAL WEIGHT CONCRETE
O OXYGEN
O/O OUTSIDE TO OUTSIDE
OA OUTSIDE AIR OR OVERALL
OC ON CENTER, OVER HANG, OVER HEAD
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIMENSION OUTSIDE DIAMETER
OF/CI OWNER FURNISHED, CONTRACTOR
OF/OI OWNER FURNISHED, OWNER INSTALLED
OF/OI OWNER FURNISHED/OWNER INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OH OPPOSITE HAND
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINSTRATION
OTS OPEN TO STRUCTURE
OUT OUTLET
OVHD OVERHEAD
OZ OUNCE
PAR PARALLEL OR PARAPET
PARA PARAGRAPH
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PRECAST CONCRETE, PIECE,
POLYCARBONATE OR PORTLAND CEMENT
PC PIECE, POLYCARBONATE OR PORTLAND
CEMENT
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PD PLANTER DRAIN
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHAR PHARMACY
PHOTO PHOTOGRAPH
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLUMB PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
PNT PAINT
PO PURCHASE ORDER OR POST OFFICE
POL POLISHED
POLY POLYETHYLENE (PLASTIC)
POLYISO POLYISOCYANURATE
PORT CEM PORTLAND CEMENT
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, POINT, OR
PRESSURE TREATED
PTD PAINTED OR PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
HQ HEADQUARTERS
HR HOUR
HS HEAT-STRENGTHENED (GLASS) OR HIGH
STRENGTH
HSE HOUSE
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HTR HEATER
HVAC HEATING, VENTILATING, AND AIR
CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF
INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER, OR
INTERIOR DESIGN
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
IN INCH
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
JAN JANITOR
JT JOINT
K KIPS (1,000 LB)
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCK OUT
KPL KICK PLATE
KS KNEE SPACE
KSF KIPS PER SQUARE FOOT
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVITORY
LB POUND (WIEGHT)
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAL FOOT
LG LONG
LH LEFT HAND
LHR LEFT HAND REVERSE OR LATENT HEAT
RATIO
LIB LIBRARY
LIN LINEAR, LINEAL
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED, LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LOC LOCATION
LP LOW POINT
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHT WEIGHT CONCRETE
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MAS MASONRY
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
MDO MEDIUM DENSITY OVERLAY
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDIUM OR MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR
OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MSL MEAN SEA LEVEL
MTD MOUNTED
MTG MOUNTING
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXP BOLT EXPANSION BOLT
EXST GR EXISTING GRADE
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXT GR EXTERIOR GRADE
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FAC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FAS BD FASCIA BOARD
FAU FORCED AIR UNIT
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE, FINISH FLOOR
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIN WD FINISH WOOD
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLOUR FLOURESCENT
FLR FLOOR
FLR FIN FLOOR FINISH
FLR SK FLOOR SINK
FLUOR FLUORESCENT
FLUOR FIX FLUORESCENT FIXTURE
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FNDN FOUNDATION
FO FACE OF, FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR
FIBERGLASS REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS FIBER REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLOCK
GLU LAM GLUED LAMINATED WOOD
GND GROUND
GR GRADE
GR FL GROUND FLOOR
GRAN GRANITE
GRG GLASS REINFORCED GYPSUM
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HD HEAD
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER, HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HOR HORIZONTAL
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
CGSFU CERAMIC GLAZED STRUCTURAL FACING
UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CHK CHECK
CI CAST IRON
CIP CAST IN PLACE
CIR CIRCLE
CIRC CIRCULAR
CIRCLE CLASS A DOOR
CJ CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CM CONSTRUCTION MANAGEMENT
cm³ CUBIC CENTIMETER cm² SQUARE CENTIMETER
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CERTIFICATE OF
OCCUPANCY, CLEANOUT, OR COMPANY
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATIONS
COMP COMPONENT
CONC CONCRETE
CONC FLR CONCRETE FLOOR
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CO₂ CARBON DIOXIDE
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CRSI CONCRETE REINFORCING STEEL
INSTITUTE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSI CONSTRUCTION SPECIFICATIONS
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER CONTOUR
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CW CURTAIN WALL
CYL CYLINDER
CYL L CYLINDER LOCK
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DN DOWN
DOC DOCUMENT
DOUG FIR DOUGLAS FIR
DOZ DOZEN
DR DOOR, DRAIN, DRESSING ROOM, OR
DRIVE
DR CL DOOR CLOSER
DR FR DOOR FRAME
DR OPNG DOOR OPENING
DS DOWN SPOUT
DSGN DESIGN
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWGS DRAWINGS
DWLS DOWELS
DWTR DUMBWAITER
E EAST
E LABEL CLASS E DOOR
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRICAL
ELEC DR OP ELECTRIC DOOR OPENER
ELEV ELEVATOR
EMER EMERGENCY
EMER SHR EMERGENCY SHOWER
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
ESMT EASEMENT
ESP ESPECIALLY
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABC AGGREGATE BASE COURSE
ABO ADDITIVE BID OPTION
AC ASBESTOS CEMENT OR ASPHALTIC
ACC ACCESSORY
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADB AUTOMATIC DOOR BOTTOM
ADC AUTOMATIC DOOR CLOSER
ADD ADDENDUM
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FLOOR FINISH
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
ALT ALTERNATE
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZED
ANSI AMERICAN NATIONAL STANDARDS
ANT ANTENNA
APA AMERICAN PLYWOOD ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT, ARCHITECTURAL
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING AND
MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI. ARCHITECTURAL WOODWORKING
AWPA AMERICAN WOOD PRESERVERS'
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BB BOARD FEET (FOOT)
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BG BUMPER GUARD
BHMA BUILDER'S HARDWARE MANUFACTURER'S
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BL BUILDING LINE
BLD BUILD
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BU ROD BACK UP ROD
BUR BUILT-UP ROOF
C CELSIUS CHANNEL
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CONCRETE BACKER BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CUBIC FOOT, CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED CONTRACTOR
CF/OI CONTRACTOR FURNISHED/OWNER
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CENTER OF GRAVITY, CORNER GUARD
ARCHITECTURAL ABBREVIATIONS
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1322 - G-003
GENERAL NOTES AND CODE ANALYSIS
05-05-2017 DWG. 3 OF 94
1 THE CONTRACTING OFFICER SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL, DISPOSAL, OR EXPOSURE OF PEOPLE TO HAZARDOUS MATERIALS IN ANY
FORM, INCLUDING, BUT NOT LIMITED TO, ASBESTOS PRODUCTS, OR OTHER TOXIC SUBSTANCES.
2 THERE IS NO KNOWN ASBESTOS AND LEAD PAINT IN THE BUILDING. ASBESTOS AND LEAD PAINT
REMEDIATION IS NOT IN THE PROJECT SCOPE OF WORK.
1 MAINTAIN PROJECT IN ACCORDANCE WITH THE SAFETY STANDARDS REQUIRED BY LAW.
2 CONDUCT CLEANING AND DISPOSAL OPERATIONS TO COMPLY WITH LOCAL, STATE AND FEDERAL
REGULATIONS.
3 PROVIDE ON-SITE DUMP CONTAINERS FOR COLLECTION OF WASTE AND DAILY CLEAN UP REFUSE
AND RUBBISH. MAINTAIN SITE IN AN ORDERLY, CLEAN AND SAFE CONDITION AT ALL TIMES.
4 UPON COMPLETION OF WORK, REMOVE WASTE MATERIALS, RUBBISH, SURPLUS MATERIALS,
EQUIPMENT, MACHINERY, TEMPORARY FACILITIES AND CONTROLS. LEAVE ALL SURFACES IN
PERFECTLY CLEAN AND UNSOILED CONDITIONS.
5 CORDINATE WITH CONTRACTING OFFICER FOR AN INFECTON CONTROL RISK ASSESMENT (ICRA).
CONTRACTOR SHALL FOLLOW AND ENFORCE WITH ALL SUBTRADES THE REQUIREMENTS FOR
CLEANLINESS SET FORTH IN THE ICRA.
GENERAL NOTES
1 DEMOLITION AND REMOVAL WORK SHALL BE DONE WITH DUE CARE, INCLUDING BRACING, ETC.
PERFORM PATCHING AND RESTORATION AS REQUIRED TO REMEDY AND RESTORE SUCH
DAMAGED PARTS EQUAL TO ADJACENT AREA.
2 CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR ALL ITEMS SALVAGED
BUT NOT REUSED.
3 THE CONTRACTOR SHALL REMOVE ALL WORK AS INDICATED ON THE CONSTRUCTION DRAWING.
4 THE CONTRACTOR SHALL KEEP DUST TO A MINIMUM BEFORE AND DURING REMOVAL FROM THE
PREMISES, AS APPLICABLE.
5 EXISTING ELECTRIC AND TELECOMMUNICATIONS OUTLETS INTERFERING WITH NEW WORK SHALL
BE REMOVED OR RELOCATED AS NOTED BY THE CONTRACT DOCUMENTS. ITEMS NOT NOTED
SHALL BE REMOVED OR RELOCATED AS DIRECTED BY THE CONTRACTING OFFICER.
6 PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT AREAS BY DEMOLITION OPERATION AT NO
COST TO THE CONTRACTING OFFICER.
7 ANY DISCREPANCY FOUND ON DRAWINGS AND FIELD CONDITION SHALL BE BROUGHT TO THE
ATTENTION OF THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH THE WORK IN
QUESTION.
8 COORDINATE WITH THE CONTRACTING OFFICER ALL WORK WHICH WILL AFFECT THE TENANTS ON
ADJACENT FLOORS OR SPACES.
9 COORDINATE CEILING REMOVAL WITH ALL TRADES AS REQUIRED WITH CONSTRUCTION PLAN.
10 UNLESS NOTED OTHERWISE, ALL DEMOLITION MATERIAL IS TO BE LEGALLY DISPOSED OF IN
ACCORDANCE WITH THE SPECIFICATIONS. THE CONTRACTING OFFICER RESERVES THE RIGHT
AND SHALL BE GIVEN THE OPPORTUNITY TO CLAIM ITEMS WHETHER OR NOT THOSE ITEMS WERE
SPECIFICALLY NOTED FOR REMOVAL, RELOCATION, OR AS RETURNED TO CONTRACTING
OFFICER.
11 PROTECT FROM DEMOLITION AND RECONSTRUCTION DEBRIS, ALL "EXISTING TO REMAIN"
FIXTURES, FINISHES, EQUIPMENT, ETC. REQUIRED TO REMAIN IN PLACE DURING CONSTRUCTION.
12 CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEMOLITION REQUIRED FOR THE INSTALLATION
OF NEW CONSTRUCTION AND AS NECESSARY TO FULFILL THE PURPOSE AND INTENT OF THE
FINISH WORK, WHETHER OR NOT IT IS SPECIFICALLY SHOWN OR NOTED IN THESE DOCUMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ITEMS CALLED TO BE REMOVED THROUGH
OUT THE ENTIRE DOCUMENTS.
1 CONTRACTOR SHALL VERIFY AND COORDINATE ALL NEW AND EXISTING CONDITIONS AND
DIMENSIONS AT JOB SITE FOR COMPARISON WITH THE DRAWINGS PRIOR TO THE START OF AND
DURING CONSTRUCTION. IF ANY DISCREPANCIES OR OMISSIONS ARE FOUND, THE OWNERS
REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING FOR CLARIFICATION PRIOR TO PROCEEDING
WITH WORK.
2 DO NOT SCALE DRAWINGS. CONTRACTOR SHALL RELY ON WRITTEN DIMENSIONS AS GIVEN. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER FOR CLARIFICATIONS. ALL DIMENSIONS SHALL BE FIELD VERIFIED BY CONTRACTOR AND COORDINATED WITH ALL OF THE WORK OF ALL
TRADES. IF DISCREPANCIES ARE FOUND, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IN WRITING FOR CLARIFICATIONBEFORE THE COMMENCEMENT OR RESUMPTION OF
WORK.
3 ABBREVIATIONS THROUGHOUT THE PLANS ARE THOSE IN COMMON USE. COORDINATE WITH
ABBREVIATION LEGEND
4 INSTALL ALL WORK PLUMB, LEVEL, TRUE, SQUARE, STRAIGHT AND IN PROPER ALIGNMENT WITH
NO DISTORTIONS, PROVIDE SHIMS AS REQUIRED.
5 COORDINATE INSTALLATION WITH THE WORK OF OTHER TRADES TO ENSURE EXACT FIT AND
PERFECT ALIGNMENT. VERIFY DIMENSIONS BEFORE PROCEEDING AND OBTAIN MEASUREMENTS
AT JOB SITE FOR WORK REQUIRED TO BE ACCURATELY FITTED TO OTHER CONSTRUCTION.
6 ALL WORK AND MATERIALS SHALL BE GUARANTEED AGAINST DEFECTS UNTIL AFTER ACCEPTANCE OF INSTALLATION IS MADE BY THE CONTRACTING OFFICER, AND AS IN ACCORDANCE WITH THE
SPECIFICATIONS.
7 THE CONTRACTOR SHALL PROTECT EXISTING ACTIVE SERVICES AND UTILITY LINES
ENCOUNTERED. DO NOT INTERRUPT SERVICES TO OTHER PARTS OF THE BUILDING. TEMPORARY
SHUT DOWN OF SERVICES, IF REQUIRED, SHALL BE DONE ONLY WITH PRIOR APPROVAL OF THE
CONTRACTING OFFICER, AND IN ACCORDANCE WITH THE SPECIFICATIONS.
8 CONTRACTOR SHALL STOP WORK AND NOTIFY THE CONTRACTING OFFICER IMMEDIATELY IF ANY
SERVICE OR UTILITY IS ACCIDENTALLY TAKEN OFFLINE OR DAMAGED DUE TO CONSTRUCTION
ACTIVITIES. CONSTRUCTION SHALL REMAIN STOPPED UNTIL THE CONTRACTOR IS EXPRESSLY
NOTIFIED TO CONTINUE WORK FROM THE CONTRACTING OFFICER.
9 EXCEPT AS MODIFIED BY GOVERNING CODES, COMPLY WITH THE APPLICABLE PROVISIONS AND
RECOMMENDATIONS OF ANSI A10 "SAFETY CODE FOR BUILDING CONSTRUCTION".
10 THE CONTRACTOR SHALL DO ALL CLEANING NECESSARY TO KEEP THE TRAFFIC ROUTES AND
ADJACENT AREAS WITHIN THE PREMISES FREE FROM DUST AND DEBRIS AT ALL TIMES.
11 THE CONTRACTOR SHALL NOT LOAD ANY PART OF THE BUILDING AND ITS FACILITIES WITH
MATERIALS, EQUIPMENT AND DEBRIS THAT COULD COMPROMISE THE BUILDINGS STRUCTURAL
INTEGRITY.
12 UPON COMPLETION OF THE WORK, TAKE ALL EQUIPMENT, DEBRIS AND SALVAGED ITEMS FROM THE BUILDING. LEAVE ALL WORK AREAS CLEAN. TAKE SPECIAL CARE TO CLEAN ALL TRACES OF
DUST AND GRIT ADJACENT TO WORK AREAS.
13 DIMENSIONS SHOWN ON FLOOR PLANS, SECTIONS, ELEVATIONS AND DETAILS ARE TO FINISH FACE
OF GYPSUM BOARD, MASONRY, CONCRETE OR COLUMN GRID CENTERLINES, UNLESS NOTED
OTHERWISE.
14 IN THE CASE OF A CONFLICT BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, THE
SPECIFICATIONS SHALL GOVERN. THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER
OF SUCH CONFLICTS PRIOR TO PROCEEDING WITH THE WORK.
15 THE CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE ARCHITECTURAL DRAWINGS
BEFORE THE INSTALLATION OF ANY OF CONSULTANTS WORK AND TO INFORM THE CONTRACTING
OFFICER OF ANY DISCREPANCIES OR CONFLICTS. IMPROPERLY INSTALLED WORK SHALL BE
CORRECTED BY THE CONTRACTOR AT HIS EXPENSES AND AT NO EXPENSE TO THE CONTRACTING
OFFICER.
16 PROTECT FROM DEMOLITION AND PRE-CONSTRUCTION DEBRIS, ALL "EXISTING TO REMAIN" AND/ OR "SALVAGED FOR REUSE" FIXTURES, FINISHES, EQUIPMENT, ETC. REQUIRED TO REMAIN IN
PLACE DURING CONSTRUCTION.
17 DEMOLISH MEANS TO REMOVE, TRANSPORT AND LEGALLY DISPOSE OF DEMOLISHED MATERIAL IN
ACCORDANCE WITH THE SPECIFICATIONS.
18 REMOVE AND SALVAGE OR REMOVED AND REINSTALLED MEANS TO CAREFULLY DETACH FROM
EXISTING CONSTRUCTION, CLEAN AND REPAIR TO CONDITION ADEQUATE FOR INTENDED REUSE.
19 ALL PENETRATIONS IN RATED ASSEMBLIES, WHETHER NEW OR EXISTING, SHALL BE SEALED WITH
UL/FM APPROVED MATERIALS AND PROCEDURES. NOTIFY THE CONTRACTING OFFICER OF
QUESTIONABLE CONDITIONS.
20 CONTRACTOR SHALL REFER TO ADDITIONAL GENERAL NOTES ELSEWHERE IN THE CONTRACT
DOCUMENTS.
21 BASIS-OF-DESIGN PRODUCT DEFINITION: A PRODUCT IN WHICH A SPECIFIC MANUFACTURER'S PRODUCT IS NAMED AND ACCOMPANIED BY THE WORDS "BASIS-OF-DESIGN," INCLUDING MAKE OR MODEL NUMBER OR OTHER DESIGNATION, TO ESTABLISH THE SIGNIFICANT QUALITIES RELATED
TO TYPE, FUNCTION, DIMENSION, IN-SERVICE PERFORMANCE, PHYSICAL PROPERTIES,
APPEARANCE, AND OTHER CHARACTERISTICS FOR PURPOSES OF EVALUATING COMPARABLE
PRODUCTS OF ADDITIONAL MANUFACTURERS WHICH MEET SPECIFICATION REQUIREMENTS.
22 ALL WOOD BLOCKING SHALL BE FIRE TREATED.
1 ALL CUTTING AND PATCHING REQUIRED FOR THE INSTALLATION OF NEW CONSTRUCTION,
EQUIPMENT AND FINISHES.
2 ALTERATIONS REQUIRED BY THE DRAWINGS AND AS REQUIRED BY THE CONDITIONS
ENCOUNTERED DURING PROGRESS OF THE WORK.
3 ALTERATIONS NEITHER INDICATED ON THE CONSTRUCTION DRAWINGS, NOR SPECIFIED HEREIN, BUT NECESSARY TO RESTORE EXISTING WORK DISTURBED UNDER THIS CONTRACT TO FINISH
CONDITION SATISFACTORY TO THE CONTRACTING OFFICER.
4 TEMPORARY WORK REQUIRED BY THE DRAWINGS AND/OR HEREIN SPECIFIED, INCLUDING THE
PROTECTION OF EXISTING CONSTRUCTION, FIXTURES AND FINISHES. TEMPORARY ENCLOSURES
AND OTHER PRECAUTIONS AS MAY BE REQUIRED TO PREVENT DAMAGES.
5 PREPARATION OF EXISTING SURFACES AND WORK AS REQUIRED FOR PROPER INSTALLATION OF
NEW CONSTRUCTION AND FINISHES.
6 OVERHEAD CONSTRUCTION, DUCTWORK, PIPES, ETC. INTERFERING WITH REQUIRED CEILING
HEIGHTS AND LIGHTING FIXTURES SHALL BE NOTED. GENERAL CONTRACTOR SHALL REPORT
EXTENT OF INTERFERENCE (IF ANY) TO THE CONTRACTING OFFICER WITHOUT DELAY.
7 ALL GYPSUM BOARD CONSTRUCTION IS TO BE DONE AS RECOMMENDED BY THE MANUFACTURER
IN STRICT ACCORDANCE WITH THEIR SPECIFICATIONS. ALL INSIDE AND OUTSIDE CORNERS, CUT EDGES OF WALL BOARD, ETC. TO RECEIVE APPROPRIATE CORNER BEAD, REINFORCEMENT TAPE, EDGE TRIM, ETC. EDGE TRIM TO BE USED AT REVEALS AND WHEREVER DRYWALL ABUTS A
DIFFERENT MATERIAL.
8 ALL EXISTING FLOOR SUBSTRATE SHALL BE LEVELED, FILLED AND PATCHED BY THE
CONTRACTOR WITH APPROPRIATE COMPOUND AS RECOMMENDED AND APPROVED BY THE FINISH
FLOORING MANUFACTURER. THE CONTRACTOR SHALL FILL DENTS, CRACKS, HOLLOW PLACES,
OPEN JOINTS AND OTHER IRREGULARITIES, IN ALL EXISTING WALLS, WITH SUITABLE FILLER.
9 THE CONTRACTOR SHALL PROVIDE SUFFICIENT FRAMING AND FIRE RETARDANT TREATED WOOD
BLOCKING FOR ALL WALL OPENINGS FOR DUCTWORK, RETURN AIR OPENINGS AND GRILLE
OPENINGS ABOVE AND BELOW SUSPENDED CEILINGS AND SHALL COORDINATED WITH HVAC
DRAWINGS AND THE MECHANICAL SHOP DRAWINGS. ALL OPENINGS SHALL BE PROPERLY SEALED
FOR SOUNDPROOFING, VIBRATION AND FIRE-RATED, IF REQUIRED.
10 ALL INFILL AREAS OF EXISTING WALLS, COLUMN ENCLOSURE, CHASE WALLS, ETC. THAT HAVE
BEEN CUT OPEN PRIOR TO CONSTRUCTION, FOR EXPLORATORY OPERATIONS, OR DURING
CONSTRUCTION OPERATIONS. USE SIMILAR MATERIALS ADJACENT TO EXISTING CONSTRUCTION, PREPARE SURFACE READY TO RECEIVE NEW FINISHES.
11 CONTRACTOR SHALL COORDINATE WITH MILL WORKER FOR INSTALLATION OF FIRE RETARDANT
WOOD BLOCKING IN DRYWALL (INCLUDING SHELVES, CABINETS, DOOR FRAMES, COUNTERTOPS,
ARTWORK, AND LIGHT FIXTURES, ETC.).
12 ALL NEW INTERIOR DOOR OPENINGS SHALL BE CONSTRUCTED 4" FROM THE FINISHED FACE OF
THE ADJACENT WALL, UNLESS NOTED OTHERWISE.
13 LUMBER IN CONTACT WITH WEATHER, MASONRY OR CONCRETE SHALL BE TREATED WITH WOOD
PRESERVATIVE AND BE FIRE RETARDANT.
14 FASTEN SECURELY ARCHITECTURAL WOODWORK ITEMS TO BLOCKING WITH CONCEALED
FASTENERS ONLY. WHERE SURFACE NAILING IS REQUIRED, COUNTERSINK AND FILL FLUSH SO
THAT FINISHED HEADS ARE UNDETECTABLE.
15 DO ALL CUTTING AND PATCHING REQUIRED TO MAKE OTHER PARTS OF THE WORK COME
TOGETHER PROPERLY AND TO FIX WORK TO RECEIVE OR BE RECEIVED BY OTHER TRADES AS
INDICATED ON CONTRACT DOCUMENTS.
16 REFER TO FINISH PLANS AND FINISH LEGEND SPECIFICATION FOR ALL FINISH INFORMATION AND
COORDINATION.
17 DIMENSION PARTITIONS FROM FACE TO FACE OF GYPSUM BOARD UNLESS OTHERWISE NOTED.
LAYOUT PARTITIONS ON SITE AND CONFIRM DIMENSION WITH THE CONTRACTING OFFICER PRIOR
TO SECURING PARTITION TRACKS.
18 PROVIDE WOOD BLOCKING, FRAMING, ANCHORS, CLIPS, SUPPORTING AND ATTACHING DEVICES
REQUIRED FOR COMPLETE INSTALLATION OF CASEWORK, PARTITIONS, FIXTURES, DOORS,
WINDOWS AND ETCETERA.
19 ALL GYPSUM BOARD SURFACES TO BE PATCHED AND REPAIRED TO LIKE NEW CONDITION READY
TO RECEIVE NEW PAINT FINISH - TYPICAL FOR INTERIOR WALL SURFACES UNLESS NOTED
OTHERWISE.
20 PROVIDE AND INSTALL UL APPROVED PENETRATIONS AT ALL PIPE, DUCT, ELECTRICAL, ETC., PENETRATIONS THROUGH CONCRETE FLOOR SLABS AND AT FIRE AND SMOKE WALLS.
21 ALL DUCT PENETRATION THROUGH PARTITIONS AND CEILING SHALL BE PROVIDED WITH
NECESSARY FRAMES AND BRACING AROUND THE OPENING AND SHALL BE PROVIDED WITH
AUTOMATIC FIRE DAMPERS AS REQUIRED BY THE FIRE RATED PENETRATIONS, WHERE OCCURS.
22 ACCESS PANELS SHALL BE PROVIDED AND INSTALLED WHEREVER REQUIRED BY BUILDING CODE
OR FOR THE PROPER OPERATION OR MAINTENANCE OF MECHANICAL OR ELECTRICAL
EQUIPMENT, WHETHER OR NOT INDICATED ON THE DRAWINGS. ACCESS PANEL LOCATION, SIZE
AND CONFIGURATION SHALL BE AS REQUIRED BY EQUIPMENT TO BE ACCESSED.
23 PROVIDE BRACING FOR ALL NEW FIXTURES, EQUIPMENT AND ETCETERA AS REQUIRED TO
COMPLY WITH LOCAL CODES WHETHER NOTED OR NOT IN THE CONTRACT DOCUMENTS.
GENERAL NOTES NEW WORK GENERAL NOTES
ASBESTOS AND LEAD PAINT GENERAL NOTES
CLEANING GENERAL NOTES DEMOLITION GENERAL NOTES
PROJECT SCOPE
RENOVATE AND EXPAND OUTPATIENT MENTAL HEALTH CLINC. EXTEND SECOND FLOOR AND FIRST FLOOR INTERSTITIAL SLABS EXTENDED ACROSS EXISTING ATRIUM SPACE. ATRIUM REMAINS A PREVOUSLY APPROVED ATRIUM FROM THE ORIGINAL CONSTRUCTION. CLINC EXPANDS INTO FORMER FIRST FLOOR ATIUM SPACE. APPROXIMATLY 60% OF THE EXISTING CLINIC SPACE IS RENOVATED.
APPLICABLE CODES AND STANDARDS
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 - LIFE SAFETY CODE, 2015 EDITION
NFPA 70 - NATIONAL ELECTRICAL CODE, 2014 EDITION.
NFPA 10 - STANDARD FOR PORTABLE FIRE EXTINGUISHERS
OTHER REFERENCES
INTERNATIONAL CODE COUNCIL, INTERNATIONAL BUILDING CODE (IBC), 2015 EDITION (AS AMENDED BY UFC 1-200-01)
FED-STD-795 UNIFORM FEDERAL ACCESSIBILITY ACT
ARCHITECTURAL BARRIERS ACT (ABA) ACCESSIBILITY STANDARD FOR DEPARTMENT OF DEFENSE FACILITIES, 31 OCT. 2008.
ADAABAAG AMERICANS WITH DISABILITIES ACT AND ARCHITECTURAL BARRIERS ACT ACCESSIBILITY GUIDELINES
EXISTING BUILDING INFORMATION
CONSTRUCTION DATE: 1984
CONSTRUCTION TYPE: I (332)
BUILDING HEIGHT: 4 STORIES, 1 BASEMENT, 5 INTERSTITIAL LEVELS
FIRE PROTECTION:FULLY SPRINKLERED
ORIGINAL DESIGN CODES: NFPA 101-1981
OCCUPANCY CLASSIFICATION (POST-RENOVATIONS)
OCCUPANCY OF THE FACILTY DOES NOT CHANGE AFTER THE PROJECT (HEALTHCARE)
MAXIMUM ALLOWABLE HEIGHT AND AREA
OCCUPANCY OF THE FACILITY DOES NOT CHANGE AFTER THE PROJECT. BUILDING AREA AND HEIGHT ARE NOT ALTERED.
FIRE RESISTANCE REQUIREMENTS OF BUILDING (TABLE A.8.2.1.2
STRUCTURAL FRAME (INCLUDING COLUMNS, GIRDERS, AND TRUSSES) 2 HOUR (UL X528)
BEARING WALLS
FLOOR CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS) 2 HOUR (UL D913)
FIRE SPRINKLER AND FIRE ALARM
EXISTING BUILDING IS FULLY SPRINKLERED. RENOVATED AREA WILL REMAIN FULLY SPRINKLERED.
FIRE RESISTANCE REQUIREMENTS OF BUILDING (CONTINUED)
EXIT STAIRS SERVING 3 STORIES OR LESS 1 HOUR NFPA 101 § 7.1.3.2
EXIT STAIRS SERVING 4 STORIES OR MORE 2 HOUR NFPA 101 § 7.1.3.2
EXIT PASSAGEWAYS 2 HOUR
SMOKE CONTROL ZONES 1 HOUR (SMOKE PARTITION*) NFPA 101 § 8.7.1.1
*PER NFPA 101 SECTION 8.4.3.3 DOORS IN SMOKE PARTITIONS SHALL BE SELF-CLOSING OR AUTOMATIC-CLOSING
INTERIOR FINISHES:
INTERIOR WALL AND CEILING FINIISHES CLASS A NFPA 101 § 18.3.3.2
INTERIOR WALL AND CEILING FINISH IN CORRIDORS NOT CLASS A OR B NFPA 101 § 18.3.3.2.2
EXCEEDING 48" IN HEIGHT
INTERIOR WALL AND CEILING FINISH IN ROOMS <4 OCCUPANTS CLASS A OR B NFPA 101 § 18.3.3.2.1
INTERIOR WALL AND CEILING FINISH IN ALL OTHER AREAS CLASS A NFPA 101 § 10.2.2
-ASSEMBLY AREAS WITH OCCUPANT LOAD <= 300 PERSONS CLASS A, B, OR C NFPA 101 § 12.3.3.3 INTERIOR WALL AND CEIING FINISHES MAY BE LOWERED BY ONE NFPA 101 § A18.3.3.2; 10.2.2
CLASS FOR BUILDINGS FULLY SPRINKLERED.
INTERIOR FLOOR FINISH IN EXITS AND EXIT ACCESS CORRIDORS CLASS I NFPA 101 § 18.4.4.6.3; 10.2.2
INTERIOR FLOOR FINISH MAY BE REDUCE BY 1 CLASS FOR NFPA 101 § 10.2.2
BUILDINGS FULLY SPRINKLERD
MEANS OF EGRESS REQUIREMENTS
EGRESS CAPACITY FACTOR:
LEVEL COMPONENTS: 0.20 INCH / PERSON NFPA 101 TABLE 7.3.3.1
MINIMUM NUMBER OF EXITS REQUIRED:
OCCUPANT LOAD 1-500: NOT LESS THAN 2 EXITS REQUIRED NFPA 101 § 7.4.1.1
OCCUPANT LOAD 501-1,000: NOT LESS THAN 3 EXITS REQUIRED NFPA 101 § 7.4.1.1
TRAVEL DISTANCES:
TRAVEL DISTANCE TO AN EXIT LIMIT:
HEALTHCARE OCCUPANCY: 200 FEET NFPA 101 § 18.2.6.2.1
COMMON PATH LIMIT:
HEALTHCARE OCCUPANCY: 100 FEET NFPA 101 § 18.2.5.3
DEAD-END LIMITS:
HEALTHCARE OCCUPANCY: 30 FEET NFPA 101 § 18.2.5.2
*EXIT TRAVEL DISTANCE FROM MECHANICAL ROOM IS IN ACCORDANCE WITH TRAVEL DISTANCE REQUIREMENTS FOR BUILDING'S
OCCUPANCY TYPE.
CAPACITY OF MEANS OF EGRESS:
MINIMUM CORRIDOR WIDTH
HEALTHCARE: 8'-0", PROJECTIONS ALLOWED NFPA 101 § 18.2.3.4
PSYCHIATRIC CARE AREAS: 6'-0" NFPA 101 § 18.2.3.5
MINIMUM DOOR WIDTH: 32 INCHES NFPA 101 § 7.2.1.2.3
DOOR MUST SWING IN DIRECTION OF EGRESS TRAVEL FOR DOORS SERVING AN OCCUPANCY LOAD GREATER THAN 49 PERSONS.
NFPA 101 § 7.2.1.4.2(1)
S S S S
S S S S SS
S S S S SS S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S
S S
2HR RATED WALL
SEPARATES EXIT
PASSAGE WAY
1 HR SMOKE BARRIER
SEPARATES SMOKE
COMPARTMENTS
NON SEPARATED
HH GG FF EE DD CC BB AA Z Y X
EXISTING 1HR WALL TO REMAIN
EXIT
EXIT EXIT
ID
X
IS
W
LL
EXISTING 2HR WALL
TO REMAIN
EXISTING 2HR WALL
TO REMAIN
SEPARATES EXIT
PASSAGEWAY
STORAGE ROOM
SERRATED BY 2 HR
WALLS
SCZ 27
22,159 SF
SCZ 28
10,902 SF
CORRIDORS IN PSYCHIATRIC
AREAS TO BE NOT LESS THAN 6'
(NFPA-101 18.2.3.5)
CROSS-CORRIDOR DOOR OPENINGS MIN 64"
CLEAR, MIN 32"/LEAF (NFPA-101 18.2.2.5.5)
DOORS IN SMOKE BARRIERS NEED NOT
LATCH (NFPA-101 18.3.7.8)
STORAGE ROOM
SERRATED BY 2 HR
SMOKE BARRIER
TE
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
1/8" = 1'-0"
1322 - G-004
AREA K FIRST FLOOR LIFE SAFTEY PLAN
05-05-2017 DWG. 4 OF 94
1 AREA K FIRST FLOOR LIFE SAFETY PLAN
LIFE SAFETY GENERAL NOTES
1 VA FACILITIES ARE PART OF A FEDERAL AGENCY.
CODES SHOWN ON THIS PLAN ARE THE APPLICABLE
CODES AND SUPERCEDE THE STATE AND LOCAL
CODES.
2 PLAN INDICATES PRIMARY PROJECT LIMITS ONLY.
SOME MEP WORK MAY BE REQUIRED OUTSIDE OF THE
LIMITS SHOWN. REF MEP FOR ADDITIONAL
INFORMATION
3 CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE
INTEGRITY OF THE LIFE SAFETY SYSTEMS, INCLUDING,
BUT NOT LIMITED TO: FIRE RATED PARTITIONS, FIRE
SUPRESSION SYSTEMS, FIRE ALARM SYSTEMS,
EMERGENCY LIGHTING AND EMERGENCY POWER
SYSTEM.
APPLICABLE CODES AND STANDARDS:
• NFPA-101 LIFE SAFETY CODE 2015 EDITION
• INTERNATIONAL BUILDING CODE (IBC) 2015
EDITION
• INTERNATIONAL MECHANICAL CODE (IMC) 2015
EDITION
• INTERNATIONAL PLUMBING CODE (IPC) 2015
EDITION NATIONAL ELECTRIC CODE (NEC)
2014 EDITION
• ASHRAE 32.1 2004 EDITION
• VA SPECIFICATIONS
HH GG FF EE DD CC BB AA Z Y X
TEMP LOBBY HERE
TEMP STAFF DESK
AND WORK AREA
HERE
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
NOTE: AREAS WHERE THE PHASING HATCH PATTES
OVERLAP INDICATE THAT WORK IN TATH AREA WILL OCCUR
OVER MULTIPLE PHASES. REFER TO PHASING NOTES FOR A
SUMMARY OF THE SCOPE FOR EACH PHASE.
PHASING HATCH LEGEND
NOTE: AREA FOR PHASE 6 IS NOT DEFINED BY HATCH. THIS AREA
WILL BE DETERMINED BY THE CONTRACTOR DURING THE
CREATION OF THE FINAL PHASING PLAN
n i n n
GENERAL CONTRACTOR AND/OR ALL SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS SHOWN ON THESE PLANS AND SHALL BE RESPONSIBLE FOR VARIATIONS BETWEEN PLAN DIMENSIONS AND ACTUAL FIELD DIMENSIONS. WHERE VARIATIONS ARE FOUND TO OCCUR, THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN WRITING PRIOR TO PROCEEDING WITH CONSTRUCTION; NO ADJUSTMENT TO
GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR GENERAL DEMOLITION INCLUDING REMOVAL OF WALLS, PARTITIONS, DOORS & CEILING & FLOORS. ANY AND ALL CUTTING OF CONCRETE FLOORS, WALLS OR STRUCTURE SHALL BE THE GENERAL CONTRACTOR'S RESPONSIBILITY. CORE DRILLING THROUGH CONCRETE WALLS, FLOORS OR STRUCTURE FOR PIPING OR CONDUIT SHALL BE THE RESPONSIBILITY OF THE SUBCONTRACTOR BY TRADE; FIRESTOPPING OF THESE OPENING SHALL BE DONE BY THE RESPECTIVE SUBCONTRACTOR. REMOVAL OF DEBRIS RESULTING FROM DEMOLITION, CUTTING, AND/OR DRILLING IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. PATCHING AND REPAIR OF CONCRETE WALLS, FLOOR, OR STRUCTURE SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR; THIS WILL BE ACCOMPLISHED UPON COMPLETION OF THE INSTALLATION OF ANY AND ALL UTILITIES INSTALLED
PREPARED BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM A DULY
:0
As indicated
1322 - G-005
AREA K - FIRST FLOOR PHASING PLAN
05-05-2017 DWG. 5 OF 94
1 AREA K FIRST FLOOR PHASING PLAN
PHASING GENERAL NOTES
1 PHASING PLAN IS TO GIVE THE GENERAL
CONTRACTOR THE INTENT OF THE SEQUENCE FOR
THE WORK.
2 GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR PREPARING A DETAILED PHASING PLAN AND
ENSURING ALL WORK IS COMPLETED TO ALLOW FOR
TURN OF SPACES IN THE ORDER INDICATED BY THE
PHASING PLAN.
3 GENERAL CONTRACTOR SHALL COORDINATE THE
DETAILED PHASING PLAN WITH ALL TRADES.
4 ADDITIONAL COSTS INCURRED DUE TO IMPROPER
SEQUENCING OF THE WORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR ALONE.
5 PROTECT ALL ITEMS NOT SHOWN TO BE DEMOLISHED
FROM ANY DAMAGE. REPAIR ANY DAMAGE TO
LIKE-NEW CONDITION.
6 GENERAL CONTRACTOR IS RESPONSIBLE FOR
PROVIDING TEMPORARY PARTITIONS AS REQUIRED
TO ENSURE THE SAFETY AND SECURITY OF THE
FACILITY DURING CONSTRUCTION.
7 COORDINATE REMOVAL ALL EQUIPMENT WITH ALL
OTHER TRADES AND VA STAFF.
PHASING STAGES
PHASE 1
1.1 CONSTRUCT NEW STORAGE ROOM
1.2 DEMOLISH WORK TO CREATE TEMPORARY LOBBY
1.3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.