This is a pricing template (Attachment J) for the Regional Grounds Maintenance and Pavement Clearance contract (N40080-25-R-4580) issued by Naval Facilities Engineering Command (NAVFAC) for installations throughout the Washington Area of Responsibility. The template is organized into recurring and non-recurring work line items for a base period and four option periods, plus a six-month option period, with all pricing currently set at $0.00. Recurring work (Line Item 0001) includes grounds maintenance services across multiple installations such as Washington Navy Yard, Arlington Service Center, Naval Observatory, Naval Research Lab, NSWC Carderock, Marine Barracks Washington, Dahlgren, Indian Head, Quantico, and Bethesda facilities. Services are categorized by facility and include improved grounds maintenance (prestige, standard lawn, and standard field), operational areas, storm drain systems, debris removal, destructive weather response, and interior plant maintenance, each with 12-month performance periods.
Non-recurring work (Line Item 0002) comprises approximately 140 separate line items covering specialized grounds services including underbrushing, field mowing, special event services, tree and shrub removal and planting, soil analysis, grassing, mulching, landscape bed work, pavement sweeping, and extensive snow and ice removal operations at multiple severity levels for Washington Navy Yard, U.S. Naval Observatory, Vice President's Residence, NSWC Carderock, NSA Bethesda, and regional locations. Pavement clearance services (Line Item 0003) include pavement sweeping and snow/ice removal for specified facilities. The template allows contractors to submit unit prices and total prices for all line items across the base period and option periods, with quantities and units of measure pre-populated for each service type.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary- All Periods
| Attachment J-0200000-10 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40080-25-R-4580 |
| Regional Grounds and Pavement Clearance |
| ELIN SUMMARY TABLE |
| Summary - Recurring Work | |
| Period of Performance | Total Price |
| Base Period | $ - 0 |
| Option Period 1 | $ - 0 |
| Option Period 2 | $ - 0 |
| Option Period 3 | $ - 0 |
| Option Period 4 | $ - 0 |
| 6 Month Option | $ - 0 |
| Total: | $ - 0 |
| Summary - Non-recurring Work | |
| Period of Performance | Total Price |
| Base Period | $ - 0 |
| Option Period 1 | $ - 0 |
| Option Period 2 | $ - 0 |
| Option Period 3 | $ - 0 |
| Option Period 4 | $ - 0 |
| 6 Month Option | $ - 0 |
| Total: | $ - 0 |
| Summary - Recurring and Non-recurring Work | |
| Period of Performance | Total Price |
| Base Period | $ - 0 |
| Option Period 1 | $ - 0 |
| Option Period 2 | $ - 0 |
| Option Period 3 | $ - 0 |
| Option Period 4 | $ - 0 |
| 6 Month Option | $ - 0 |
| Total: | $ - 0 |
Base Recurring
| Attachment J-0200000-10 | ||||||||
| Exhibit Line Item Numbers | ||||||||
| Solicitation/Contract No.: N40080-25-R-4580 | ||||||||
| Regional Grounds and Pavement Clearance | ||||||||
| Line Item 0001 - Recurring Work - Base Period | ||||||||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | ||||||||
| ELIN/Sub-ELINs A100 through A700 | ||||||||
| ELIN/ | ||||||||
| Sub-ELIN | Annex/Sub-annex | |||||||
| Spec Item | Description | Quantity | Unit of Measure | Unit Price | Total Price | |||
| 1503050- Grounds Maintenance | ||||||||
| A100 | PWD Washingtion | |||||||
| A101 | 1503050 | Washington Navy Yard (WNY)(Region Funded)- Grounds Maintennace | ||||||
| A101 AA | 1503050 | 3.1 | WNY- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AB | 1503050 | 3.1 | WNY- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AC | 1503050 | 3.1 | WNY- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AD | 1503050 | 3.2 | WNY- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AE | 1503050 | 3.3 | WNY- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AF | 1503050 | 3.5 | WNY- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AG | 1503050 | 3.6 | WNY- Destructive Weather-Reserved | 12 | MO | $0.00 | $0.00 | |
| A101 AH | 1503050 | 3.7 | WNY- Interior Plant Maintenance-Reserved | 12 | MO | $0.00 | $0.00 | |
| Washington Navy Yard (WNY)(Regiona Funded) (A101) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A102 | 1503050 | Arlington Service Center (ASC)(Region Funded)- Grounds Maintenance | ||||||
| A102 AA | 1503050 | 3.1 | ASC- Improved Grounds (Prestige)- Reserved | |||||
| A102 AB | 1503050 | 3.1 | ASC- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A102 AC | 1503050 | 3.1 | ASC- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A102 AD | 1503050 | 3.2 | ASC- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A102 AE | 1503050 | 3.3 | ASC- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A102 AF | 1503050 | 3.5 | ASC- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A102 AG | 1503050 | 3.6 | ASC- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A102 AH | 1503050 | 3.7 | ASC- Interior Plant Maintenance-Reserved | 12 | MO | $0.00 | $0.00 | |
| Arlington (ASC)(Region Funded) (A102) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A103 | 1503050 | Naval Observatory (USNO) (Region Funded)- Grounds Maintenance | ||||||
| A103 AA | 1503050 | 3.1 | USNO- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AB | 1503050 | 3.1 | USNO- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AC | 1503050 | 3.1 | USNO- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AD | 1503050 | 3.2 | USNO- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AE | 1503050 | 3.3 | USNO- Storm Drain Systems-Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AF | 1503050 | 3.5 | USNO- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AG | 1503050 | 3.6 | USNO- Destructive Weather-Reserved | 12 | MO | $0.00 | $0.00 | |
| A103 AH | 1503050 | 3.7 | USNO- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| Naval Observatory (USNO) (Region Funded) (A103) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A104 | 1503050 | VPR (Quarters A) (Region Funded)- Grounds Maintenance | ||||||
| A104 AA | 1503050 | 3.1 | VPR (Quarters A)- Improved Grounds (Prestige) | 12 | MO | $0.00 | $0.00 | |
| A104 AB | 1503050 | 3.1 | VPR (Quarters A)- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A104 AC | 1503050 | 3.1 | VPR (Quarters A)- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A104 AD | 1503050 | 3.2 | VPR (Quarters A)- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A104 AE | 1503050 | 3.3 | VPR (Quarters A)- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A104 AF | 1503050 | 3.5 | VPR (Quarters A)- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A104 AG | 1503050 | 3.6 | VPR (Quarters A)- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A104 AH | 1503050 | 3.7 | VPR (Quarters A)- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| VPR (Quarters A) (Region Funded) (A104) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A105 | 1503050 | Naval Research Lab (NRL)- Grounds Maintenance | ||||||
| A105 AA | 1503050 | 3.1 | NRL- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AB | 1503050 | 3.1 | NRL- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AC | 1503050 | 3.1 | NRL- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AD | 1503050 | 3.2 | NRL- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AE | 1503050 | 3.3 | NRL- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AF | 1503050 | 3.5 | NRL- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AG | 1503050 | 3.6 | NRL- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A105 AH | 1503050 | 3.7 | NRL- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| Naval Research Lab (NRL) (A105) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A106 | 1503050 | NSWC Carderock- Grounds Maintenance | ||||||
| A106 AA | 1503050 | 3.1 | NSWC Carderock- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AB | 1503050 | 3.1 | NSWC Carderock- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AC | 1503050 | 3.1 | NSWC Carderock- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AD | 1503050 | 3.2 | NSWC Carderock- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AE | 1503050 | 3.3 | NSWC Carderock- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AF | 1503050 | 3.5 | NSWC Carderock- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AG | 1503050 | 3.6 | NSWC Carderock- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A106 AH | 1503050 | 3.7 | NSWC Carderock- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| NSWC Carderock (A106) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A107 | 1503050 | Marine Barracks Washington (MBW)- Grounds Maintenance | ||||||
| A107 AA | 1503050 | 3.1 | MBW- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AB | 1503050 | 3.1 | MBW- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AC | 1503050 | 3.1 | MBW- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AD | 1503050 | 3.2 | MBW- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AE | 1503050 | 3.3 | MBW- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AF | 1503050 | 3.5 | MBW- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AG | 1503050 | 3.6 | MBW- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A107 AH | 1503050 | 3.7 | MBW- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| Marine Barracks Washington (MBW) (A107) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A100 | 1503050 | PWD Washingtion Subtotal | 12 | MO | $0.00 | $0.00 | ||
| A200 | 1503050 | Dahlgren (DAHL) - Grounds Maintenance | ||||||
| A200 AA | 1503050 | 3.1 | DAHL- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AB | 1503050 | 3.1 | DAHL- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AC | 1503050 | 3.1 | DAHL- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AD | 1503050 | 3.2 | DAHL- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AE | 1503050 | 3.3 | DAHL- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AF | 1503050 | 3.5 | DAHL- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AG | 1503050 | 3.6 | DAHL- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A200 AH | 1503050 | 3.7 | DAHL- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| PWD Dahlgren (DAHL) (A200) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| B300 | 1503050 | Indian Head (NSF IH) - Grounds Maintenance | ||||||
| A300 AA | 1503050 | 3.1 | NSF IH- Improved Grounds (Prestige)-Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AB | 1503050 | 3.1 | NSF IH- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AC | 1503050 | 3.1 | NSF IH- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AD | 1503050 | 3.2 | NSF IH- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AE | 1503050 | 3.3 | NSF IH- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AF | 1503050 | 3.5 | NSF IH- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AG | 1503050 | 3.6 | NSF IH- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A300 AH | 1503050 | 3.7 | NSF IH- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| PWD Indian Head (NSF IH) (A300) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A400 | 1503050 | PWD Patuxent River (PAX)- Reserved | ||||||
| A500 | 1503050 | PWD Annapolis- Reserved | ||||||
| A600 | PWD Quantico | |||||||
| A601 | 1503050 | MCSC- Grounds Maintenance | ||||||
| A601 AA | 1503050 | 3.1 | MCSC- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AB | 1503050 | 3.1 | MCSC- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AC | 1503050 | 3.1 | MCSC- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AD | 1503050 | 3.2 | MCSC- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AE | 1503050 | 3.3 | MCSC- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AF | 1503050 | 3.5 | MCSC- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AG | 1503050 | 3.6 | MCSC- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A601 AH | 1503050 | 3.7 | MCSC- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| MCSC (A601) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A602 | 1503050 | Manpower- Grounds Maintenance | ||||||
| A602 AA | 1503050 | 3.1 | Manpower- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A602 AB | 1503050 | 3.1 | Manpower- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A602 AC | 1503050 | 3.1 | Manpower- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A602 AD | 1503050 | 3.2 | Manpower- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A602 AE | 1503050 | 3.3 | Manpower- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A602 AF | 1503050 | 3.5 | Manpower- Other Recurring Services | 12 | MO | $0.00 | $0.00 | |
| A602 AG | 1503050 | 3.6 | Manpower- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A602 AH | 1503050 | 3.7 | Manpower- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| Manpower (A602) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A603 | 1503050 | MCCOG- Grounds Maintenance | ||||||
| A603 AA | 1503050 | 3.1 | MCCOG- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A603 AB | 1503050 | 3.1 | MCCOG- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A603 AC | 1503050 | 3.1 | MCCOG- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A603 AD | 1503050 | 3.2 | MCCOG- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A603 AE | 1503050 | 3.3 | MCCOG- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A603 AF | 1503050 | 3.5 | MCCOG- Other Recurring Services | 12 | MO | $0.00 | $0.00 | |
| A603 AG | 1503050 | 3.6 | MCCOG- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A603 AH | 1503050 | 3.7 | MCCOG- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| MCCOG (A603) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A604 | 1503050 | NMCL- Grounds Maintenance | ||||||
| A604 AA | 1503050 | 3.1 | NMCL- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A604 AB | 1503050 | 3.1 | NMCL- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A604 AC | 1503050 | 3.1 | NMCL- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A604 AD | 1503050 | 3.2 | NMCL- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A604 AE | 1503050 | 3.3 | NMCL- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A604 AF | 1503050 | 3.5 | NMCL- Other Recurring Services | 12 | MO | $0.00 | $0.00 | |
| A604 AG | 1503050 | 3.6 | NMCL- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A604 AH | 1503050 | 3.7 | NMCL- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| NMCL (A604) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A605 | 1503050 | VET (DHA)- Grounds Maintenance | ||||||
| A605 AA | 1503050 | 3.1 | VET (DHA)- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AB | 1503050 | 3.1 | VET (DHA)- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AC | 1503050 | 3.1 | VET (DHA)- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AD | 1503050 | 3.2 | VET (DHA)- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AE | 1503050 | 3.3 | VET (DHA)- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AF | 1503050 | 3.5 | VET (DHA)- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AG | 1503050 | 3.6 | VET (DHA)- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A605 AH | 1503050 | 3.7 | VET (DHA)- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| VET (DHA) (A605) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A606 | 1503050 | MCIA- Grounds Maintenance | ||||||
| A606 AA | 1503050 | 3.1 | MCIA- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AB | 1503050 | 3.1 | MCIA- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AC | 1503050 | 3.1 | MCIA- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AD | 1503050 | 3.2 | MCIA- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AE | 1503050 | 3.3 | MCIA- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AF | 1503050 | 3.5 | MCIA- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AG | 1503050 | 3.6 | MCIA- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A606 AH | 1503050 | 3.7 | MCIA- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| MCIA (A606) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A607 | 1503050 | MCCDC- Grounds Maintenance | ||||||
| A607 AA | 1503050 | 3.1 | MCCDC- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AB | 1503050 | 3.1 | MCCDC- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AC | 1503050 | 3.1 | MCCDC- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AD | 1503050 | 3.2 | MCCDC- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AE | 1503050 | 3.3 | MCCDC- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AF | 1503050 | 3.5 | MCCDC- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AG | 1503050 | 3.6 | MCCDC- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A607 AH | 1503050 | 3.7 | MCCDC- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| MCCDC (A607) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A608 | 1503050 | OCS - Grounds Maintenance | ||||||
| A608 AA | 1503050 | 3.1 | OCS- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AB | 1503050 | 3.1 | OCS- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AC | 1503050 | 3.1 | OCS- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AD | 1503050 | 3.2 | OCS- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AE | 1503050 | 3.3 | OCS- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AF | 1503050 | 3.5 | OCS- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AG | 1503050 | 3.6 | OCS- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A608 AH | 1503050 | 3.7 | OCS- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| OCS (A608) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A600 | 1503050 | PWD Quantico Subtotal | 12 | MO | $0.00 | $0.00 | ||
| A700 | PWD Bethesda | |||||||
| A701 | 1503050 | NSA Bethesda (NSAB)(Region Funded)- Grounds Maintenance | ||||||
| A701 AA | 1503050 | 3.1 | NSAB- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AB | 1503050 | 3.1 | NSAB- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AC | 1503050 | 3.1 | NSAB- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AD | 1503050 | 3.2 | NSAB- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AE | 1503050 | 3.3 | NSAB- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AF | 1503050 | 3.5 | NSAB- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AG | 1503050 | 3.6 | NSAB- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A701 AH | 1503050 | 3.7 | NSAB- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| NSA Bethesda (NSAB)(Region Funded) (A701) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A702 | 1503050 | WRNMCC- Grounds Maintenance | ||||||
| A702 AA | 1503050 | 3.1 | WRNMCC- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AB | 1503050 | 3.1 | WRNMCC- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AC | 1503050 | 3.1 | WRNMCC- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AD | 1503050 | 3.2 | WRNMCC- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AE | 1503050 | 3.3 | WRNMCC- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AF | 1503050 | 3.5 | WRNMCC- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AG | 1503050 | 3.6 | WRNMCC- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A702 AH | 1503050 | 3.7 | WRNMCC- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| WRNMCC (A702) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A703 | 1503050 | AFRI/USSHS)- Grounds Maintenance | ||||||
| A703 AA | 1503050 | 3.1 | AFRI/USSHS- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AB | 1503050 | 3.1 | AFRI/USSHS- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AC | 1503050 | 3.1 | AFRI/USSHS- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AD | 1503050 | 3.2 | AFRI/USSHS- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AE | 1503050 | 3.3 | AFRI/USSHS- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AF | 1503050 | 3.5 | AFRI/USSHS- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AG | 1503050 | 3.6 | AFRI/USSHS- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A703 AH | 1503050 | 3.7 | AFRI/USSHS- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| AFRI/USSHS) (A703) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A704 | 1503050 | Dalecarlia (20% Regon /80% WRNMMC Funded)- Grounds Maintenance | ||||||
| A704 AA | 1503050 | 3.1 | Dalecarlia- Improved Grounds (Prestige)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AB | 1503050 | 3.1 | Dalecarlia- Improved Grounds (Standard Lawn)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AC | 1503050 | 3.1 | Dalecarlia- Improved Grounds (Standard Field)- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AD | 1503050 | 3.2 | Dalecarlia- Operational Areas- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AE | 1503050 | 3.3 | Dalecarlia- Storm Drain Systems- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AF | 1503050 | 3.5 | Dalecarlia- Debris Removal- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AG | 1503050 | 3.6 | Dalecarlia- Destructive Weather- Reserved | 12 | MO | $0.00 | $0.00 | |
| A704 AH | 1503050 | 3.7 | Dalecarlia- Interior Plant Maintenance- Reserved | 12 | MO | $0.00 | $0.00 | |
| Dalecarlia (20% Regon /80% WRNMMC Funded) (A704) Subtotal | 12 | MO | $0.00 | $0.00 | ||||
| A700 | 1503050 | PWD Bethesda Subtotal | 12 | MO | $0.00 | $0.00 | ||
| 1503050- Grounds Maintenance Total | 12 | MO | $0.00 | $0.00 |
| 1503060- Pavemetn Clearance | |||||||
| A100 | PWD Washingtion | ||||||
| A110 | 1503060 | Washington Navy Yard (WNY)- Pavement Clearance | |||||
| A110 AA | 1503060 | 3.1 | WNY- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A110 AB | 1503060 | 3.2 | WNY- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| Washington Navy Yard (WNY) (A110) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A111 | 1503060 | Arlington Service Center (ASC)- Pavement Clearance | |||||
| A111 AA | 1503060 | 3.1 | ASC- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A111 AB | 1503060 | 3.2 | ASC- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| Arlington (ASC) (A111) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A112 | 1503060 | Naval Observatory (USNO) (Region Funded)- Pavement Clearance | |||||
| A112 AA | 1503060 | 3.1 | USNO- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A112 AB | 1503060 | 3.2 | USNO- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| Naval Observatory (USNO) (Region Funded) (A112) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A113 | 1503060 | VPR (Quarters A) (Region Funded)- Pavement Clearance | |||||
| A113 AA | 1503060 | 3.1 | VPR (Quarters A)- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A113 AB | 1503060 | 3.2 | VPR (Quarters A)- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| VPR (Quarters A) (Region Funded) (A113) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A114 | 1503060 | Naval Research Lab (NRL)- Pavement Clearance -Reserved | |||||
| A115 | 1503060 | NSWC Carderock- Pavement Clearance | |||||
| A115 AA | 1503060 | 3.1 | NSWC Carderock- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A115 AB | 1503060 | 3.2 | NSWC Carderock- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| NSWC Carderock (A115) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A116 | 1503060 | NSF Carderock (Region Funded)- Pavement Clearance | |||||
| A116 AA | 1503060 | 3.1 | NSF Carderock (Region Funded)- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A116 AB | 1503060 | 3.2 | NSF Carderock (Region Funded)- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| NSF Carderock (Region Funded) (A116) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A117 | 1503060 | Marine Barracks Washington (MBW)- Pavement Clearance- Reserved | |||||
| A100 | 1503060 | PWD Washingtion-Pavement Clearance Subtotal | 12 | MO | $0.00 | $0.00 | |
| A200 | 1503060 | PWD Dahlgren- Reserved | |||||
| A300 | 1503060 | PWD Indian Head- Reserved | |||||
| A400 | 1503060 | PWD Patuxent River (PAX)- Reserved | |||||
| A500 | 1503060 | PWD Annapolis- Reserved | |||||
| A600 | 1503060 | PWD Quantico- Reserved | |||||
| A700 | 1503060 | PWD Bethesda | |||||
| A710 | 1503060 | NSA Bethesda (NSAB)(Region Funded)- Pavement Clearance | |||||
| A710 AA | 1503060 | 3.1 | NSAB- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A710 AB | 1503060 | 3.2 | NSAB- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| NSA Bethesda (NSAB)(Region Funded) (A710) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A711 | 1503060 | WRNMCC- Pavement Clearance | |||||
| A711 AA | 1503060 | 3.1 | WRNMCC- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A711 AB | 1503060 | 3.2 | WRNMCC- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| WRNMCC (A711) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A712 | 1503060 | AFRI/USSHS)- Pavement Clearance | |||||
| A712 AA | 1503060 | 3.1 | AFRI/USSHS- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A712 AB | 1503060 | 3.2 | AFRI/USSHS- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| AFRI/USSHS) (A712) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A713 | 1503060 | Dalecarlia (20% Regon /80% WRNMMC Funded)- Pavement Clearance | |||||
| A713 AA | 1503060 | 3.1 | Dalecarlia- Pavement Sweeping Services | 12 | MO | $0.00 | $0.00 |
| A713 AB | 1503060 | 3.2 | Dalecarlia- Snow and Ice Removal Services | 12 | MO | $0.00 | $0.00 |
| Dalecarlia (20% Regon /80% WRNMMC Funded) (A713) Subtotal | 12 | MO | $0.00 | $0.00 | |||
| A700 | 1503060 | PWD Bethesda- Pavement Clearance Subtotal | 12 | MO | $0.00 | $0.00 | |
| 1503060- Pavement Clearance Total | 12 | MO | $0.00 | $0.00 | |||
| Total Annex 1503050 &1503060 | 12 | MO | $0.00 | $0.00 |
Base Non-Recurring
| Attachment J-0200000-10 | |
| Exhibit Line Item Numbers | |
| Solicitation/Contract No.: N40080-25-R-4580 | |
| Regional Grounds and Pavement Clearance | |
| Line Item 0002 - Non-Recurring Work - Base Period | |
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 4 | |
| ELIN A900 through A1026 |
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Total Price | |
| A900 | Underbrushing | All brush, weeds, and small trees (3 inches and below in diameter at ground level) shall be cut back to within 1 inch of ground level. Work shall be completed within 10 calendar days. | 10000 | SY | $0.00 | $0.00 | |
| A901 | Field Mowing | Vegetation shall be mowed in accordance with J-1503050-04. All debris shall be removed upon completion of mowing. Work shall be completed within 20 calendar days. | 500 | AC | $0.00 | $0.00 | |
| A902 | Special Event Grass Cutting | Grass shall be mowed and trimmed to a uniform height. Clippings and debris shall be removed. Complete all work within 3 calendar days. | 1000 | AC | $0.00 | $0.00 | |
| A903 | Special Event Edging | Edging to provide a uniform edged cut. All clippings shall be removed. Complete all work within 3 calendar days. | 50000 | LF | $0.00 | $0.00 | |
| A904 | Special Event Raking | Rake and remove leaves, pine straw and pinecones, limbs, and other debris from the specified area. All debris shall be removed the same day as raked. Work to be completed in 5 calendar days. | 200000 | SY | $0.00 | $0.00 | |
| A905 | Large Tree and Stump Removal | Remove trees above 18 inches in diameter measured at 4.5 feet above ground level. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Work shall be completed within 10 calendar days. | 100 | EA | $0.00 | $0.00 | |
| A906 | Medium Tree and Stump Removal | Remove trees 6 to 18 inches in diameter measured at 4.5 feet above ground level. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Work shall be completed within 7 calendar days. | 100 | EA | $0.00 | $0.00 | |
| A907 | Small Tree and Stump Removal | Remove trees 6 to 18 inches in diameter measured at 4.5 feet above ground level. Remove stumps to 12 inches below ground level and remove roots to 4 inches below level ground extending to six feet from tree. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Work shall be completed within 7 calendar days. | 100 | EA | $0.00 | $0.00 | |
| A908 | Large Shrub and Stump Removal | Remove shrubs above 15-gallon and/or above 48 inches high. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. | 100 | EA | $0.00 | $0.00 | |
| A909 | Medium Shrub and Stump Removal | Remove shrubs between 5 and 15-gallon and/or between 18 and 48 inches high. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on the standard growing plant container capacity and plant height above ground level. Work shall be | 200 | EA | $0.00 | $0.00 | |
| A910 | Small Shrub and Stump Removal | Remove shrubs up to 5-gallon and/or up to 18 inches high. Remove stumps to 6 inches below ground level and remove all exposed roots. Treat to prevent regrowth. Backfill all excavated holes and replant with the same type of vegetation as surrounding area. Shrubs are sized based on the standard growing plant container capacity and plant height above ground level. Work shall be completed within 3 calendar days. | 200 | EA | $0.00 | $0.00 | |
| A911 | Large Tree Pruning | Prune trees above 15 feet high according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 1 calendar day. | 25 | EA | $0.00 | $0.00 | |
| A912 | Small Tree Pruning | Prune trees less than 15 feet high according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 1 calendar day. | 25 | EA | $0.00 | $0.00 | |
| A913 | Soil Analysis | Perform soil analysis and provide a written report and recommendations of the results within 5 calendar days. Seven to ten soil samples from various locations, blended or combined for each analysis, are required. The Contractor shall repair any damages to grounds caused by analysis operations. | 10 | EA | $0.00 | $0.00 | |
| A914 | Grassing | Areas shall be filled with topsoil to a minimum depth of 2 inches, raked, uniformly fertilized, seeded, and watered to establish a healthy grassed covering. If existing topsoil is sufficient in depth, scarify prior to application of fertilizer and seed. Newly seeded areas shall be covered with straw mulch, then watered. Matting or other suitable erosion control material shall be placed in steep terrain areas and along natural and man-made drainage ways. Establishment shall include watering and providing other continuing care as necessary to firmly establish new grass growth and ensure proper development. Grassed areas that die or fail to develop noticeable growth for a period of one year after seeding shall be re-grassed by the Contractor at no additional cost to the Government. Seed species shall be identified in the task order. Work shall be completed within 10 calendar days. | 50 | AC | $0.00 | $0.00 | |
| A915 | Tree Planting | This line item is for time and labor to plant a tree. Plant materials shall be ordered on a separate task order. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 50 | EA | $0.00 | $0.00 | |
| A916 | Small Shrub Planting | This line item is for time and labor to plant a tree. Plant materials shall be ordered on a separate task order. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Trees shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Trees shall be guyed and staked in at least three directions. Tree species shall be specified in the task order. All plants that die or fail to develop noticeable growth within one year of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 60 | EA | $0.00 | $0.00 | |
| A917 | Large Shrub Planting | This line item is for time and labor to plant a large shrub. Plant materials will be ordered on a separate task order. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Shrubs established shall be of the 5-gallon size. Shrubs shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Shrub species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 15 | EA | $0.00 | $0.00 | |
| A918 | Bedding / Ornamental Plants | All plants shall be nursery grown and bear certification indicating species, common name, and grade. Plants shall be 4 inch pot size, healthy, living specimens considered number one grade stock. Planting procedures shall be in accordance with accepted nursery standards. The Contractor shall water and provide continuing care to ensure new plants develop properly. Annuals/perennials shall be planted in accordance with accepted horticultural standards, including fertilization, mulching, and watering. Annuals / perennials species shall be specified in the task order. All plants that die or fail to develop noticeable growth within 90 days of planting shall be replaced by the Contractor with plants of like size and type, at no additional cost to the Government. Work shall be completed within 5 calendar days. | 5000 | EA | $0.00 | $0.00 | |
| A919 | Sodding | Sod shall be of species specified on task order. It shall be dense, uniform, weed free, and have good sod strength and minimum thatch. Sod shall be laid on properly prepared topsoil. Sod joints shall be staggered and butted together. On slopes, the sod blocks shall be installed in a manner that prevents slippage. Completed installation shall be smooth and uniform in appearance. The Contractor shall water and provide continuing care for sodded areas as necessary to firmly establish new grass growth and development. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sodding at no additional cost to the Government. Work shall be completed within 20 calendar days. | 1000 | SY | $0.00 | $0.00 | |
| A920 | Sprigging | Sprigs shall be fresh, healthy, living stems (stolons or rhizomes with 50 percent or more of the stems being rhizomes) and attached roots. Sprig root species shall be specified in the task order. Sprigs shall be obtained from approved sources and shall be free of material that might be detrimental to the development of the turf. Distribution shall be sufficiently uniform to ensure the appropriate spacing of sprigs, but not to exceed 12 inches. The Contactor shall replace all grass that dies or fails to develop noticeable growth within 90 days of sprigging at no additional cost to the Government. Work shall be completed within 20 calendar days. | 850 | SY | $0.00 | $0.00 | |
| A921 | Fertilize Lawns and Grassed Areas | Vegetation shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 25 | AC | $0.00 | $0.00 | |
| A922 | Fertilize Trees | Trees shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 50 | EA | $0.00 | $0.00 | |
| A923 | Fertilize Planting Beds | Planting beds shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 5000 | SY | $0.00 | $0.00 | |
| A924 | Fertilize Shrubs | Planting beds shall be fertilized in a manner that promotes health, growth, color, and appearance. Fertilizer shall be applied in accordance with the manufacturer's printed instructions. Organic fertilizer shall be used as the standard. The Contractor shall comply with the Integrated Pest Management Plan (IPMP). Work shall be completed within 10 calendar days. | 100 | EA | $0.00 | $0.00 | |
| A925 | Dethatch and Aerate | Services shall be performed to ensure the health, growth, and appearance of lawns. Dethatched areas shall be overseeded to provide a healthy appearance. Work shall be completed within 14 calendar days. | 50 | AC | $0.00 | $0.00 | |
| A926 | Aerate | Grass shall be aerated to promote health and growth. Work shall be completed within 10 calendar days. | 50 | AC | $0.00 | $0.00 | |
| A927 | Shrub Pruning | The Contractor shall prune stand-alone shrubs and hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 3 calendar days. | 100 | EA | $0.00 | $0.00 | |
| A928 | Hedge Pruning | The Contractor shall prune continuous hedges according to their natural growth characteristics leaving them well shaped and balanced, and to promote proper health and growth. Retain typical growth habit of individual plant with as much height and spread as is practical. Pruning shall be accomplished by or under the guidance of a certified Arborist. Work shall be completed within 3 calendar days. | 1000 | LF | $0.00 | $0.00 | |
| A929 | Erosion Control | Soil erosion damage shall be repaired by filling in washed out/bare areas with soil matching the surrounding area and ground elevation (after compacting). The area shall be raked, fertilized, seeded, covered with straw, matting, or other material suitable to correct the effects of erosion. Areas shall be cared for until vegetation is firmly established. Erosion Control shall be completed within 10 calendar days. | 100 | CY | $0.00 | $0.00 | |
| A930 | Control Undesired Vegetation | Remove weeds and other undesirable vegetation using manual methods.. Work shall be completed within 10 calendar days. | 3000 | SY | $0.00 | $0.00 | |
| A931 | Debris Removal | Remove and properly dispose of natural debris (tree limbs, leaves, dry brush, rodent habitats, dead animals, etc.), and stray man-made trash/debris. Work shall be completed within 10 calendar days. | 125 | CY | $0.00 | $0.00 | |
| A932 | Mulching | Remove the existing mulch, removing weeds, dead shrubbery and other debris from the area to be mulched. The Contractor shall install a breathable mesh fabric over the entire area to be mulched. Low areas that retain water throughout the flowerbed shall be leveled and graded, using screened topsoil. The Contractor shall provide shredded hardwood mulch to a minimum depth of three inches (3”), ensuring the underside of all plantings and shrubs have a protective barrier against frost and diseases and to stimulate plant growth. Work shall be completed within 10 calendar days. | 8500 | SY | $0.00 | $0.00 | |
| A933 | Cutting of Grass Covered Magazines | Vegetation shall be mowed to a height of 6". All debris shall be removed prior to mowing and disposed off the installation upon completion of mowing. Only walk-behind mowers and hand-held equipment shall be used. All equipment shall be non-sparking. Work shall be completed within 20 calendar days. | 50 | AC | $0.00 | $0.00 | |
| A934 | Emergency and Special Event Services | Upon notification the contractor shall perform emergency or special event grounds maintenance and landscape services as required. These services may be required to be performed outside of normal duty hours. Upon notification of an emergency, the contract manager shall respond within one (1) hour to meet with government quality assurance personnel to receive emergency service requirements. Upon receiving notification, the contractor shall begin emergency work within two hours. Special event services may consist of the same items as the basic Firm Fixed Price (FFP) services within the contract. The contractor will be notified as soon as a special event requirement is known. This consists of, but is not limited to, unannounced visits, distinguished visitors, VIPs and other events that will cause numerous schedule changes and alterations for performances on the ceremonial areas. | 200 | HR | $0.00 | $0.00 | |
| A935 | Cut / Bush Hog FIFTEEN (15) foot Utility Line Right of Ways | All trees, shrubs, brush, undergrowth, vines, and other vegetation shall be bush hogged or cleared by other means a minimum of seven and one half (7.5) feet each side and all the way up, from ground to sky, (growing within right of way) of centerline of utility poles except as specified otherwise by the Contracting Officer. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 10000 | LF | $0.00 | $0.00 | |
| A936 | Cut / Bush Hog Thirty (30) foot Utility Line Right of Way | All trees, shrubs, brush, undergrowth, vines, and other vegetation shall be bush hogged or cleared by other means a minimum of fifteen (15) feet each side and all the way up, from ground to sky, (growing within right of way) of centerline of utility poles except as specified otherwise by the Contracting Officer. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 10000 | LF | $0.00 | $0.00 | |
| A937 | Cut / Bush Hog Fifteen (15) foot Road Shoulder Right of Way | All trees, shrubs, brush, undergrowth, vines, and other vegetation shall be bush hogged or cleared by other means a minimum of fifteen (15) feet each side and all the way up, from ground to sky, (growing within right of way) of centerline of utility poles except as specified otherwise by the Contracting Officer. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 4000 | LF | $0.00 | $0.00 | |
| A938 | Cut / Bush Hog Eight (8) foot Road Shoulder Right of Way | All trees, shrubs, brush, undergrowth, vines, and other vegetation shall be bush hogged or cleared by other means a minimum of eight (8) feet one side of the road shoulder, but no farther than the original wood line, from the ground to twenty (20) feet in height. Trees which originate beyond the eight (8) feet area and yet have branches that extend into the cut zone shall not be so drastically cut that the tree will not survive. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 10000 | LF | $0.00 | $0.00 | |
| A939 | Utility Power Line Tree Topping (Cutting) | All trees, as specified, shall have branches and trunks topped (cut) a minimum of ten (10) feet below power lines, except as specified otherwise by the Contracting Officer. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 5000 | LF | $0.00 | $0.00 | |
| A940 | Trim Trees Near Power Lines | All trees that touch or come within five (5) feet of touching power lines shall be trimmed back a minimum of ten (10) feet from power lines, all the way up, ground to sky, except as specified otherwise by the Contracting Officer. Trimming of trees shall include the removal of dead and diseased foliage, branches, and limbs. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 5000 | LF | $0.00 | $0.00 | |
| A941 | Removal of Hazardous Trees | Any tree twelve (12) inches or greater in diameter, hanging twenty-four (24) inches or more over buildings, power lines, or other structures shall be considered a hazardous tree, and shall be cut at ground level. Subsurface roots need not be removed. Tree diameter will be measured four (4) feet above the ground. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 10 | EA | $0.00 | $0.00 | |
| A942 | Clear Overhanging Branches that Encroach into Rights of Way | The Contractor shall be responsible for removal of all tree branches, limbs, or vines that encroach from outside the right of ways into the right of way area. The Contractor shall cut and remove the encroaching limb, branch, or vine to a point, which is outside the right of way. The Line Item shall be ordered by the area length at ground level on the outside parameter of the right of way. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 5000 | LF | $0.00 | $0.00 | |
| A943 | Grind Tree Stumps | Stumps shall be ground smooth and resulting depressions shall be filled with fill dirt and topsoil and appropriately seeded. Subsurface roots need not be removed. | 50 | EA | $0.00 | $0.00 | |
| A944 | Remove Tree Limbs | The Contractor shall remove limbs as specified. The length will be determined by the length of the main supporting limb actually cut to remove the limb. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 100 | EA | $0.00 | $0.00 | |
| A945 | Land Clearing | The Contractor shall be responsible for land clearing and grubbing to a depth of eight (8) inches below the ground surface of trees, stumps, roots, and brush. The Contractor shall grade, level, and fill all resulting irregularities of surface contour. The result of the Contractor's work shall be an area cleared to a depth of eight (8) inches below the soil surface, free of foreign debris, including rocks with a diameter greater than twelve (12) inches. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 10000 | SF | $0.00 | $0.00 | |
| A946 | Emergency Response Service Call | The Contractor shall be prepared to answer emergency service calls when contacted by a Government Representative to remove fallen trees or trees that are considered a potential danger to property or life. Emergency response service calls can be initiated at any time and the Contractor shall respond within four (4) hours. The Contractor is responsible for all expenses incurred from collection and disposal of debris and shall dispose of all debris off Government property. | 10 | EA | $0.00 | $0.00 | |
| A947 | Remove Debris from Stormwater Ponds | The Contractor shall be responsible for the removal and disposal of all debris from stormwater ponds. This line item may not be used for ponds which have a depth that exceeds four (4) feet of standing water at its deepest point during a dry spell. The Contractor is responsible for all expenses incurred from raking, collection, and disposal of debris and shall dispose of all debris off Government property. | 2000 | SF | $0.00 | $0.00 | |
| A948 | Destructive Weather - Washington Navy Yard | The Contractor shall provide all tools material and labor to respond to pending threat of destructive weather. The Contractor shall supply the labor to place prefilled sand bags and fill replacement bags for one that become unserviceable. Fill, transport and place bags as needed in a manor to limit water intrusion to low lying facilities. | 9 | CREW HRS | $0.00 | $0.00 | |
| A949 | Destructive Weather Restoration - Washington Navy Yard | The Contractor shall provide all tools material and labor to respond to restoration efforts after a destructive weather event. Efforts shall include but not limited to damaged tree limb removal, collection of twigs, leaves, and various debris within the perimeter of the Washington Naval Yard. | 9 | CREW HRS | $0.00 | $0.00 | |
| A950 | Maintain LID – Bioretention/rain garden | The Contractor shall perform maintenance and inspections of bioretention cells and rain gardens; which includes: removal of debris, unclogging of inlets, remove weeds, re-mulch cells, replace dead plants with like species and comparable size (to meet the planting plan). Contractor shall perform work within 15 days of request. | 25000 | SF | $0.00 | $0.00 | |
| A951 | Maintain LID – swale | The Contractor shall perform maintenance and inspection of dry, wet, and bio-swales. This includes: Checking and removing sediment accumulation, debris removal and disposal, mowing of dry swales, inspection of structures for spalling and deterioration, and replacement of planting and rip rap (as necessary). The Contractor shall perform the work within 15 days of request. | 25000 | SF | $0.00 | $0.00 | |
| A952 | Maintain LID – green roof | The Contractor shall perform maintenance and inspection of green roofs. This includes periodic irrigation, weeding, replanting, and removal of debris from outlets. Contractor shall perform the work within 15 days of request. | 200000 | SF | $0.00 | $0.00 | |
| A953 | Maintain LID- permeable pavement | The Contractor shall sweep and vacuum permeable pavement system to reduce sediment accumulation. Inlets and drains must be cleared of debris. Replace chips and stones from openings as necessary. The Contractor shall perform this work within 20 days of request. | 800000 | SF | $0.00 | $0.00 | |
| A954 | Maintain LID – surface sand filter | The Contractor shall perform maintenance and inspection of surface sand filters. This includes; replacement of plants as necessary, mowing, debris and trash removal, and inspection of structural components. The Contractor shall perform this work within 15 days of request. | 20000 | SF | $0.00 | $0.00 | |
| A955 | Remove Bird Droppings | The Contractor shall remove bird droppings from sidewalks, steps, and handicapped ramps. The Contractor shall perform this work within 15 days of request. | 10000 | SF | $0.00 | $0.00 | |
| A956 | Turf and Ornamental Bed Weed Control | Provide labor and materials to control weeds in turf areas and in ornamental plant beds. Work shall conform to Pest Group Sheet 02. Respond within 5 working days and achieve control within 21 calendar days. | 500 | 1,000 SF | $0.00 | $0.00 | |
| A957 | Turf and Ornamental Pest Control | Provide labor and materials to control arthropod pests in turf and on ornamental plantings. Work shall conform to Pest Group Sheet 03. Respond within 5 working days and achieve control within 7 calendar days. | 100 | 1,000 SF | $0.00 | $0.00 | |
| A958 | Bare Grounds Weed Control | Provide labor and materials to provide bare ground weed control in cracks in sidewalks and paved surfaces, at fenceline locations, in transformer vaults, around fire hydrants, and similar locations. Work shall conform to Pest Group Sheet 01. Respond within 5 working days and achieve control within 14 calendar days. | 100 | 1,000 SF | $0.00 | $0.00 | |
| A959 | Pavement Sweeping Services | The Contractor shall sweep paved surfaces indicated. Work shall be completed within 5 calendar days of order. | 10000 | 1,000 SF | $0.00 | $0.00 | |
| A960 | Pre-Treatment / | ||||||
| Post Treatment -WNY | The Contractor shall provide pre-treatment and post-treatment. Pretreatment of an event is the act of applying anti-icing agent to site, and post treatment is patrolling and treating existing ice buildup. Anti-Icing/pre-treating before an event may occur the day of the storm or a day before the storm. Post-treatment shall consist of performing a surveillance of the entire site and applying the approved ice melt to sidewalks, steps roadways, garages and parking lot areas after a storm has stopped. Once site is treated for existing ice buildup, the “post storm treatment” portion is completed. Note: If temps do not drop below freezing or there is mixed rain/snow, pretreatment and post treatment may not be effective. Contractor shall respond within 2 hours of notification. Work shall be completed within 1 calendar day of order.Snow and Ice removal, Light event, 1"-4" deep. The Contractor shall remove ice/snow from runways, taxiways, parking areas, sidewalks, and roads required for operations, safety, fire protection access, and vehicular and pedestrian traffic. Contractor shall respond within 2 hours of notification. Work shall be completed within 1 calendar day of order. | 4 | EA | $0.00 | $0.00 | ||
| A961 | De-Icing Operations / | ||||||
| Re-freeze - WNY | The Contractor shall be provide, store, and spread approved deicing materials. The Contractor shall provide sand, salt, or other Environmental approved deicing material for streets, roads, and parking lots identified. Deicing material (i.e. Calcium Chloride, Magnesium Chloride) will be utilized in place of salt/sand mixture for all concrete surfaces. Contractor shall respond within 2 hours of notification. Work shall be completed within 1 calendar day of order. | 4 | EA | $0.00 | $0.00 | ||
| A962 | Ice / Snow Removal |