This document is the Contractor Incident Report System (CIRS) form and accompanying instructions, which contractors must use to document and report accident and incident investigations to contracting officers within specified timeframes.

The form requires contractors to complete separate reports for each injured person and all OSHA-recordable accidents and property damage cases. Initial reports of fatalities or high-visibility mishaps must be submitted within four hours, with follow-up or final reports due within five days. The form captures comprehensive incident data across six main sections: contract information and incident classification by type (assault, diving, electrical shock, fires, hazardous materials, explosions, vehicles, and various industrial activities); general incident information including date, time, detailed accident description, location, hazardous materials involvement, and personal protective equipment status; root cause analysis documenting direct and indirect causes plus corrective actions with begin and completion dates; contributing factors such as visibility, lighting, noise, and carbon monoxide levels; attached supporting documents; and injured party data including demographics, drug/alcohol involvement, ergonomic factors, injury severity classification, body parts affected, and training/certification status. For property damage incidents, the form collects information on involved persons, damaged property types, estimated costs, lost-use days, and operator licensing. The instructions emphasize that all applicable items must be checked or bolded, with non-applicable sections marked "N/A," and additional space may be used on separate sheets as needed.

View the file

Other files

File Type Posted
J-1503050-08 Washington Revised.xlsx XLSX spreadsheet
N4008025R4580 8A GROUNDS RFI Sheet w Answers.pdf PDF
N4008025R4580 8a Grounds Solicitation Synopsis Revised.pdf PDF
Leumas CBA (Signed by the Union and Companies) 2023.pdf PDF
J-1503050-08 Quantico Revised.xlsx XLSX spreadsheet
N4008025R4580 8A GROUNDS RFI Sheet w Answers.pdf PDF
J-1503050-17(h4) SN_SWPPP_2022.pdf PDF
J-1503050-17(h2) Stump Neck Map.pdf PDF
J-1503050-17(h1) Indian Head Map.pdf PDF
J-1503050-08 Indian Head Final.xlsx XLSX spreadsheet
J-1503050-17(h3) IH_SWPPP_2022.pdf PDF
J-1503050-16(g2) Dahlgren_HerbicideApp_Oct2024.pdf PDF
J-1503050-16(g1) Dahlgren_GroundMaint_Dec2024.pdf PDF
J-1503050-8 Dahlgren Final Inventory KDC 20241101.xlsx XLSX spreadsheet
J-1503050-16(g3) PumpkinNeck_GroundMaint_Oct2024.pdf PDF
New Attach J-2000000-10 Blank ELIN 8a Regional Grounds Rewrite.xlsx XLSX spreadsheet
N4008025R4580 Exhibits A-E.pdf PDF
J-1503060-05 Bethesda.xlsx XLSX spreadsheet
J Attach 3.2 - 1503060 J Pvmt Clear v2.5.pdf PDF
J-1503050 13(a1 a4 a10 f1 f2) and excel sheets list.pdf PDF
J-1503050-11(f) Bethesda SWD Systems Inventory.xlsx XLSX spreadsheet
J Attach 1.1 - 0200000 C Mngmt & Admin v2.10 20240701 KDC.pdf PDF
J Attach 1.0 - 0100000 C General Info v2.4 rev 20200311 KDC 20240701.pdf PDF
J Attach 5.2 WD 15-4329 Rev 32.pdf PDF
J Attach 5.0 WD 15-4269 Rev 31.pdf PDF
J Attach 4.0 secnav5512.pdf PDF
Section J 1503060 All Maps.pdf PDF
Section J 1503060-10 Maps and Excel Sheet List.pdf PDF
J-1503050-11(a) Washington SWD Systems Inventory.xlsx XLSX spreadsheet
J-1503050-09(a) Irrigation System Inventory.xlsx XLSX spreadsheet
J Attach 2.2 - 1503060 F Pvmt Clear v2.4 20240701 KDC.pdf PDF
J Attach 6.0 Perform Assess Plan - v3.3 Regional Grnds Maint & Pvmt Clear Serv.pdf PDF
J Attach 5.3 DSA CBA.pdf PDF
Section J 1503050-14 Maps Attachment List.pdf PDF
J-1503050-08 Quantico.xlsx XLSX spreadsheet
J-1503050-08 Bethesda.xlsx XLSX spreadsheet
J-0200000-08(e) MBQ Spill Emergency Notification Response Proced.pdf PDF
J Attach 2.0 - 0200000 F Mngmt & Admin v2.9 20240701 (1).pdf PDF
J Attach 5.1 WD 15-4281 Rev 35.pdf PDF
J-1503060-05 Washington.xlsx XLSX spreadsheet
Section J 1503050-15 Maps Consolidated.pdf PDF
J-1503050-08 Washington.xlsx XLSX spreadsheet
J Attach 3.1 - 1503050 J Grounds Maint & Landscaping v2.7.pdf PDF
J-0200000-08(f) Bethesda (NSAB)- Spill Contingency Plan.pdf PDF
Updated Attchment J-2000000-10 Blank ELIN Regional Grounds Rewrite Revised KDC.xlsx XLSX spreadsheet
J Attach 3.0 - 0200000 J Mngmt & Admin v2.7.pdf PDF
J Attach 2.1 - 1503050 F Grounds Maint & Landscape v2.4 20240701 KDC.pdf PDF
J Attach 1.3 - 1503060 C Pvmt Clear v2.5 20240701 KDC.pdf PDF
J Attach 1.2 - 1503050 C Grounds Maint & Landscape v2.7 20240701 KDC.pdf PDF
N4008025R4580 8a Grounds Solicitation Synopsis.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Incident Report System (CIRS) 1

Contractor Incident Report System (CIRS)

Initial Report

Follow-up Report

Final Report

Date / _/ _

1. Contract Information Incident Information Prime Contractor: Cage Code:

Contract Number: Installation of Incident:

Task Order #: Contracting Activity/ROICC Office:

Contractor Contact Information Name (Last, First): Phone #:

Email Address: Date Notified:

2. Incident Type (Please Check/Bold All That Apply)

Assault/Violent Act Extreme Environmental Exposure Man over the side (No water entry)

Diving Falls, slip, trip, or bodily exertion Man Overboard - Water Entry

Electrical Shock/Burns Fires - All Types Material Handling Equipment

Equipment Installation/Repair

Hazardous Material (any type)

Ordnance-Related (Explosive)

Explosion, Non-Ordnance Industrial (Select Additional Below)

Vehicle (Government or Private)

Industrial Incident Additional Information (Please Check/Bold All That Apply)

Confined Space Hand and Power Tools Work Platforms and Scaffolding

Demolition/Renovation Rigging Underground Construction, Shafts, and Caissons

Trenching/Entrapment Cranes and Hoisting Equipment Concrete, Masonry, Steel Erection and

Residential Construction

Contractor Incident Report System (CIRS) 2

Traffic Control

Floating Plant and Marine Activities

Tree Maintenance and Removal

Welding and Cutting

Pressurized Equipment and System

Airfield and Aircraft Operations

Control of Hazardous Energy

Fall Protection

Contractor Incident Report System (CIRS) 3

3. General Information Incident Information Date of Accident: Time of Accident:

Describe the accident in detail in your words: (Use the back of page if you need additional space)

Exact Location of Accident:

Were Hazardous Material(s) Involved Yes No If Yes, Explain What Hazardous Materials Were Involved and Why:

Who Provided Clean-up? Onsite Base Public

Activity of the injured person at the time of incident:

Personal Protective Equipment: (Check/Bold Response)

Available and used Available and not used Not Required

Not related to Mishap Wrong PPE for job

List PPE Used:

Contractor Incident Report System (CIRS) 4

4. Fully Explain What Allowed or Caused the Incident: Incident Information Direct Cause:

Indirect Cause:

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description)

Additional Action Taken: (Please Include a Begin Date and Est. End Date in Description) (Use the back of page if you need additional space)

5. Contributing Factors:

Was Visibility Restricted? Yes No Distance Visibility was restricted:

Unit of Measure (Check/Bold): Feet Yards Meters Miles Nautical Miles

Visibility Restricted By: (Check/Bold all that apply)

Fog Smoke Rain Sleet Snow

Mist

Dust

Sandstorm

Unknown Object

Other:

Lighting Conditions at Site of Mishap:

(Please Check)

Adequate Inadequate Unknown

Was Noise Level a Factor:

(Please Check)

Yes No Unknown

Was Carbon Monoxide (CO) a Factor:(Please Check)

Yes No

If Yes CO Alarm Manufacturer:

Contractor Incident Report System (CIRS) 5

5. Contributing Factors: Continued Incident Information

Other Contributing Factors:

6. Attached Documents Attached Documents/Files Name/Description:

Date Added:

Uploaded By:

Contractor Incident Report System (CIRS) 6

1. Injured Data (if applicable) Person # Age: Gender:

(Check/Bold) Male Female

Prime Contractor Company Name: Subcontractor Company Name:

2. General Information Drug or Alcohol Involved: (Check/Bold all that apply)

None Unknown Alcohol Drugs Alcohol and Drugs

Who Provided First Aid? Onsite Base Public

Was Ergonomics a Factor: (Check/Bold) Yes No

Type of Ergonomic Injury: (Check/Bold All That Apply)

Lifting Positioning Bending Equipment Placement Office

Equipment Placement Industrial Repetitive Motion Impact Strain

3. Injury Illness/Fatality Information Severity of Injury/Illness: (Check/Bold)

Fatality Lost Workday Case Involving Days Away From Work

Temporary Disability Recordable Workday Case Involving Restricted Duty

Permanent Total Disability Other Recordable Case Recordable First Aid Case

Permanent Partial Disability Non-Recordable Case No Injury

Where There Days Lost:

(Check/Bold)

Yes No

Where There Days Hospitalized:

(Check/Bold)

Yes No

Where There Days Restricted Duty:

(Check/Bold)

Yes No

Part of Body Affected:

Nature of Injury or Illness:

Event or Exposure:

Source of Injury or Illness:

General Location Description:

Injury Activity Code:

Contractor Incident Report System (CIRS) 7

4. License (if applicable) Person # Are Appropriate License and Certification/Medical Current: (Check/Bold) Yes No

Describe or Explain:

Attach Image of License or Certification

5. Training Was all the contract-required training provided to the employee: (Check/Bold) Yes No

Explain:

6. Attached Documents Attached Documents

Contractor Incident Report System (CIRS) 8

1. Involved Person Data (if applicable) Property Damage Age: Gender:

Male Female Contractor: Contractor:

2. Attached Documents Attached Documents

3. Property Damaged Was Anyone Injured: Yes No Was A Government Motor Vehicle Involved: Yes No

Property Type

Property ID #

Detailed Description

Property

Owned By

Estimated Cost USD

Lost Use Days

Contractor Incident Report System (CIRS) 9

4. License (if applicable) Property Damage Are Appropriate License and Certification/Medical Current: (Check/Bold)

Describe or Explain:

Yes No

Attach Image of License or Certification

5. Training Was all the contract-required training provided to the employee? (Check/Bold)

Explain:

Yes No

Contractor Incident Report System (CIRS) 1

CONTRACTOR INCIDENT REPORT SYSTEM (CIRS) INSTRUCTIONS

Complete Only Sections Appropriate to Incident (Rev. 03/11).

NOTE: THE ATTACHED CIRS FORM IS TO BE USED BY CONTRACTORS TO RECORD THE RESULTS OF THEIR ACCIDENT/INCIDENTS INVESTIGATIONS AND SHALL BE PROVIDED TO THE CONTRACTING OFFICER WITHIN

THE REQUIRED TIMEFRAMES.

GENERAL. Complete a separate report for each person who was injured in the accident pages 5-6. A report needs to be completed for all OSHA recordable accidents and property damage cases. Please type or print legibly. Appropriate items shall be Checkd/Bolded, non-applicable sections shall be marked “N/A”. If additional space is needed, provide the information on a separate sheet of paper and attach to the completed form.

Mark the report: (Check/Bold) Initial: If this form is being used as initial notification of a Fatality or High Visibility Mishap. The initial form is due within 4 hours of a serious accident. A form marked ‘Follow-up’ or ‘Final’ is required within 5 days.

Follow-Up: If you are providing additional information on a report previously submitted.

Final: If you are providing a completed report and expect no changes.

Incident Information Section 1 Contract Information – Incident Information Prime Contractor: Name as it appears on contract documents.

Cage Code: If known.

Contract Number: Number as it appears on the contract documents.

Installation: Name of installation where incident occurred.

Task Order #: Insert number if applicable.

Contracting Activity/ROICC Office: Enter the name and address of the Contracting Office administering the contract under which the mishap took place (e.g. ROICC MCBH, ROICC NORFOLK, PWC GUAM, etc.).

Contractor Contact Information: (Contractor point of contact information for the individual responsible for completing the form) Self Explanatory

Section 2 Incident Type: Check/Bold most applicable category, if you select Industrial you must Check/Bold at least one additional category from the Industrial Incident Additional Information Section.

Section 3 General Information Incident Information Date of Accident: Enter the month, day, and year of accident.

Time of Accident: Enter the local time of accident in military time. Example: 14:30 hrs (not 2:30 p.m.).

Describe the Accident in Detail in your words: Fully describe the accident in the space provided. If property damage involved, give estimated dollar amount of damage and/or repair costs involved. If additional space is needed continue on a separate sheet and attach to this report. Give the sequence of events that describe what happened leading up to and including the accident. Fully identify personnel and equipment involved and their role(s) in the accident. Ensure that relationships between personnel and equipment are clearly specified. Ensure questions below regarding direct cause(s), indirect cause(s), and actions taken are answered. NOTE! Review questions in Section 4 (Fully Explain What Allowed or Caused the Incident - Incident Information) below before completing.

Exact Location of Accident: Enter facts needed to locate the accident scene (e.g. installation/project name, building/room number, street, direction and distance from closest landmark, etc.).

Were Hazardous Material(s) Involved Yes No

Contractor Incident Report System (CIRS) 10

If Yes, Explain What Hazardous Materials Were Involved and Why: Check or Bold appropriate block and list name(s) and quantities of hazardous materials spilled/released during the mishap. List why the hazardous chemicals were being used.

Activity at the time of incident: What type of work/task was being performed by the injured when the injury took place or property damage occurred.

Personal Protective Equipment– Check/Bold appropriate items and list PPE which was being used by the injured person at the time of the accident (e.g. protective clothing, shoes, glasses, goggles, respirator, safety belt, harness, etc.)

Section 4 Fully Explain What Allowed or Caused the Incident - Incident Information Direct Cause(s): The direct cause is that single factor which most directly lead to the accident. See examples below.

Indirect Cause(s): Indirect cause are those factors, which contributed to, but did not directly initiate the occurrence of the accident.

Examples for Direct and Indirect Cause:

1. Employee was dismantling scaffold and fell 12 feet from unguarded opening.

Direct cause: Failure to provide fall protection at elevation Indirect causes: Failure to enforce safety requirements: improper training/motivation of employee (possibility that employee was not knowledgeable of fall protection requirements or was lax in his attitude toward safety); failure to ensure provision of positive fall protection whenever elevated; failure to address fall protection during scaffold dismantling in phase hazard analysis.

2. Private citizen had stopped his vehicle at intersection for red light when vehicle was struck in rear by contractor vehicle. (note contractor vehicles was in proper safe working condition.)

Direct cause: Failure of contractor driver to maintain control of and stop contractor vehicle within safe distance.

Indirect cause: Failure of employee to pay attention to driving (defensive driving).

Additional Action Taken: Fully describe all the actions taken, anticipated, and recommended to eliminate the cause(s) and prevent reoccurrence of similar accidents/illnesses. Continue in the additional box and or on additional sheets of paper if necessary to fully explain and attach to the completed report form.

Please Include a Begin Date and Estimated Completion Date in Description

(1) Begin: Enter the date when the corrective action(s) identified above will begin.

(2) Est. End Date - Enter the date when the corrective action(s) identified above will be completed.

Section 5 Contributing Factors Incident Information: Check/Bold appropriate items fill in information where required Other Contributing Factors: Describe in detail any additional contributing factors not listed in previous information provided.

Section 6 Attached Documents: Provide the appropriate information for each document/file attached or uploaded.

Injured Data Person # Complete Pages 5 and 6 for each injured person At the upper right hand corner of page 5 and 6 differentiate between each person by using a numerical value (e.g. Person #1, Person #, Person #3, etc.)

Section 1 Injured Data: Fill in all applicable information, Check/bold appropriate responses.

Section 2 General Information:

Check/bold appropriate responses

Section 3 Injury/Illness Fatality Information: Check/bold appropriate responses Part of Body Affected: Enter the most appropriate primary and when applicable, secondary, etc. body part(s) affected (e.g. arm: wrist: abdomen: single eye; jaw: both elbows: second finger: great toe: collar bone: kidney, etc.).

Contractor Incident Report System (CIRS) 11

Nature of Injury/Illness: Describes the manner in which the injury or illness was inflicted or produced. It attempts to answer the broad question of “how” work injuries and illnesses occurred. (e.g. Fall, Struck By, Caught By, Repetitive Motion, Rubbed or Abraded By, etc.)

Event or Exposure: Describes what was produced by the injury or illness was produced or inflicted. (e.g. Infectious Parasitic Diseases, Traumatic Injuries and Disorders, Open Wounds, Burns, Intracranial Injuries, etc.)

Source of Injury Illness: Identifies the object, substance, bodily motion, or exposure, which directly produced or inflicted the previously identified injury or illness. (e.g. Acids, Chemical Products, Furniture and Fixtures, Machinery, Structures and Surfaces, Tools Instruments and Equipment, etc.)

General Location Description: Describes where the injury occurred (e.g. Industrial Facilities, Operational Industrial Building Plant , Roadway, etc.)

Injury Activity Code: Describes what the injured person was doing when the injury occurred. (e.g. Operating Type of Equipment, Construction Activity Being Performed, Industrial Operation Being Conducted, etc.)

Section 4 License:

Are Appropriate License and Certification/Medical Current: Did the injured employee have the appropriate license/certification or medical evaluations completed to conduct the work/task being performed.

Describe/Explain: Describe the required (licensing/certification/medical evaluation) for job/task being performed, date when license was issued, and expiration date. (e.g. “Powdered Actuated Tools, Hilti DX-350, License issued 11/29/2011, expires 3-years from issue date.” “Respirator Semi Annual Medical Evaluation, conducted 12/30/2011, expires on 12/30/2013”, etc.)

Attach Image of License or Certification: Self-Explanatory

Section 5 Training:

Was all the contract-required training provided to the employee: Self-Explanatory

Explain: If no, to the previous questions explain why the employee was not trained.

Section 6 Attached Documents:

Self-Explanatory use this for photos, drawings, diagrams, or other relevant documents.

Property Damage Section 1 Involved Person Data: Fill in all applicable information, Check/bold appropriate responses.

Section 2 Attached Documents:

Self-Explanatory use this for photos, drawings, diagrams, or other relevant documents.

Section 3 Property Damaged:

Check/bold appropriate responses. Other Headings Self-Explanatory.

Section 4 License:

Are Appropriate License and Certification/Medical Current: Did the equipment operator have the appropriate license/certification or medical evaluations completed to conduct the work/task being performed.

Describe/Explain: Describe the required (licensing/certification/medical evaluation) for job/task being performed, date when license was issued, and expiration date. (e.g. “State Issued Driver, License issued 11/29/2011, expires on MM/DD/YYY)” “Scissor Lift, JLG Model 260MRT conducted 12/30/2011, does not expire.”)

Attach Image of License or Certification: Self-Explanatory

Section 5 Training:

Was all the contract-required training provided to the employee: Self-Explanatory

Contractor Incident Report System (CIRS)
CONTRACTOR INCIDENT REPORT SYSTEM (CIRS) INSTRUCTIONS
Mark the report: (Check/Bold)
Incident Information
Section 3 General Information Incident Information
Were Hazardous Material(s) Involved Yes No
Section 4 Fully Explain What Allowed or Caused the Incident - Incident Information
Please Include a Begin Date and Estimated Completion Date in Description
Injured Data Person #
Section 2 General Information:
Section 4 License:
Section 5 Training:
Section 6 Attached Documents:
Property Damage
Section 2 Attached Documents:
Section 3 Property Damaged:
Section 4 License:
Section 5 Training:

File details come from the government source that posted it. Updated .