J-1503050-17(h4) SN_SWPPP_2022.pdf

PDF 9 MB Posted

Attached to
Regional Grounds Maintenance and Landscaping Services
Solicitation number
N4008025R4580
Issued by

About this file

This is a Stormwater and Industrial Waste Water Map for Naval Support Activity South Potomac - NSF Indian Head, Stump Neck Annex, dated 13 December 2022. The map provides detailed hydrological and infrastructure data for the facility located in Maryland near the Potomac River and Mattawoman Creek.

The facility encompasses two primary areas: Stump Neck and Cornwallis Neck, divided into nine watersheds with varying levels of impervious surface. Stump Neck totals 1,113.3 acres with 45.03 acres of impervious surface (4.04% imperviousness), while individual watersheds range from 0.72% to 20.38% imperviousness. Cornwallis Neck watersheds range from 10.74% to 19.59% imperviousness. The map illustrates stormwater infrastructure including outfalls, structural best management practices (BMPs), storm sewer lines, open stormwater drainage, culverts, and industrial discharge points. Problem areas are identified as priority or non-priority repairs for stormwater management. The facility includes buildings, structures, paved and unpaved roads, wetlands, surface water bodies (perennial, intermittent, and ephemeral), and adjacent land uses including the Chicamuxen Wildlife Management Area and commercial forestry operations operated by Glatfelter Pulp and Paper Company. The map scale is 1:4,674 and is marked "For Official Use Only."

View the file

Other files

File Type Posted
J-1503050-08 Quantico Revised.xlsx XLSX spreadsheet
J-1503050-08 Washington Revised.xlsx XLSX spreadsheet
Leumas CBA (Signed by the Union and Companies) 2023.pdf PDF
N4008025R4580 8A GROUNDS RFI Sheet w Answers.pdf PDF
N4008025R4580 8a Grounds Solicitation Synopsis Revised.pdf PDF
N4008025R4580 8A GROUNDS RFI Sheet w Answers.pdf PDF
J-1503050-8 Dahlgren Final Inventory KDC 20241101.xlsx XLSX spreadsheet
J-1503050-16(g1) Dahlgren_GroundMaint_Dec2024.pdf PDF
J-1503050-17(h1) Indian Head Map.pdf PDF
J-1503050-17(h2) Stump Neck Map.pdf PDF
J-1503050-08 Indian Head Final.xlsx XLSX spreadsheet
J-1503050-16(g3) PumpkinNeck_GroundMaint_Oct2024.pdf PDF
J-1503050-17(h3) IH_SWPPP_2022.pdf PDF
J-1503050-16(g2) Dahlgren_HerbicideApp_Oct2024.pdf PDF
New Attach J-2000000-10 Blank ELIN 8a Regional Grounds Rewrite.xlsx XLSX spreadsheet
Section J 1503060-10 Maps and Excel Sheet List.pdf PDF
J Attach 5.0 WD 15-4269 Rev 31.pdf PDF
Section J 1503050-14 Maps Attachment List.pdf PDF
Section J 1503060 All Maps.pdf PDF
J Attach 4.0 secnav5512.pdf PDF
J Attach 1.1 - 0200000 C Mngmt & Admin v2.10 20240701 KDC.pdf PDF
N4008025R4580 Exhibits A-E.pdf PDF
J-0200000-08(e) MBQ Spill Emergency Notification Response Proced.pdf PDF
J-1503050-08 Washington.xlsx XLSX spreadsheet
J Attach 2.1 - 1503050 F Grounds Maint & Landscape v2.4 20240701 KDC.pdf PDF
J Attach 5.1 WD 15-4281 Rev 35.pdf PDF
J-1503060-05 Washington.xlsx XLSX spreadsheet
Section J 1503050-15 Maps Consolidated.pdf PDF
J Attach 1.3 - 1503060 C Pvmt Clear v2.5 20240701 KDC.pdf PDF
J-1503050 13(a1 a4 a10 f1 f2) and excel sheets list.pdf PDF
N4008025R4580 8a Grounds Solicitation Synopsis.pdf PDF
J Attach 3.0 - 0200000 J Mngmt & Admin v2.7.pdf PDF
J-0200000-08(f) Bethesda (NSAB)- Spill Contingency Plan.pdf PDF
J-1503050-09(a) Irrigation System Inventory.xlsx XLSX spreadsheet
Updated Attchment J-2000000-10 Blank ELIN Regional Grounds Rewrite Revised KDC.xlsx XLSX spreadsheet
J-1503050-11(a) Washington SWD Systems Inventory.xlsx XLSX spreadsheet
J Attach 1.0 - 0100000 C General Info v2.4 rev 20200311 KDC 20240701.pdf PDF
J-1503060-05 Bethesda.xlsx XLSX spreadsheet
J-1503050-11(f) Bethesda SWD Systems Inventory.xlsx XLSX spreadsheet
J-0200000-05(i) Contractor Incident Report System (CIRS).pdf PDF
J Attach 3.1 - 1503050 J Grounds Maint & Landscaping v2.7.pdf PDF
J Attach 1.2 - 1503050 C Grounds Maint & Landscape v2.7 20240701 KDC.pdf PDF
J Attach 5.2 WD 15-4329 Rev 32.pdf PDF
J Attach 2.2 - 1503060 F Pvmt Clear v2.4 20240701 KDC.pdf PDF
J Attach 3.2 - 1503060 J Pvmt Clear v2.5.pdf PDF
J Attach 2.0 - 0200000 F Mngmt & Admin v2.9 20240701 (1).pdf PDF
J Attach 5.3 DSA CBA.pdf PDF
J Attach 6.0 Perform Assess Plan - v3.3 Regional Grnds Maint & Pvmt Clear Serv.pdf PDF
J-1503050-08 Bethesda.xlsx XLSX spreadsheet
J-1503050-08 Quantico.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

$1

2220181514

4337363534

12 13

26 27 28 29 30 32

AN

TT

UU

VV

WW

XX

YY

ZZ

AB

AC

AD

AE

AF

AG

AH

AI

AJ

AK

AL

AM

QQ

RR

987654

40 42413938

16 17 19 21 23

25 3331

PP

321 1110 24

SS

GEN SMALLWOOD

STATE PARK

P O T

O M A

C R

I V E

R

Management Area

Glatfelter Pulp and Paper Company

Sweden Point

Marina

C H I C A M U X E N

C R E E K

M A T T A W O M A N C R E E K

Commercial Forestry

Chicamuxen Wildlife

Watchable Wildlife Area

Y

A

X

Z

W

AC

A4

AA

AB

MPL

A2A

A-2

SSTP

SS2-3

SS2-3

SS2-3

SS2-3

44 45

46 47 48 49

97 96 95

2 1

101 104

Archer Avenue

Rum Point Road

Ro ach

Ro ad

Strauss Avenue

Mars hal l R oad

Porter Avenue

Lewis Road

Parke r Road

Olsen Road

Inner Circle

Thermal Point Place

Eod Way

Eig ell

Ro ad

Sidewinder Way

Whitman Court

Outer Circle

Skeet Range Road

Jagerrd Road

W.

C aff ee

Ro ad

Outer Transfer Circle

Six Chimneys Court

Sopchick Court

Fine Grind Way

Howard Road

Arthur Road

Marshland Court

Inner Transfer Circle

NOS - TBN26 Road

Waters Place

NOS - TBN28 Road

Gu illo tin e P lac e

Deep Point Court Scrap Point Circle

Kaufmann Avenue

NOS - TBN24 Road

NOS - TBN11 Road

Incinerator Place

NOS - TBN27 Road

Outer Circle

W.

C aff ee

Ro ad

1864 3146

1SN

22SN

23SN

24A

2041 2039

26SN

25SN

24SN

27SN

28SN

T-93

15233046

TS02SN

13501349

TS10

TS24

T-996

TS5SN

TS04SN

TS2SNA

TS06SN

Stormwater and Industrial Waste Water Map

Totals for Stump Neck:

Total Impervious (acres) = 45.03 Total Watershed (acres) = 1113.3

Percent Impervious = 4.04%

Watershed 1 Total Impervious (acres) = 20.22 Total Subwatershed (acres) = 335.26 Percent Impervious = 6.03% Watershed 2 Total Impervious (acres) = 8.46 Total Subwatershed (acres) = 308.75 Percent Impervious = 2.74% Watershed 3 Total Impervious (acres) = 16.35 Total Subwatershed (acres) = 462.76 Percent Impervious = 3.53% Watershed 4 Total Impervious (acres) = 16.26 Total Subwatershed (acres) = 79.81 Percent Impervious = 20.38% Watershed 5 Total Impervious (acres) = 57.25 Total Subwatershed (acres) = 532.87 Percent Impervious = 10.74% µ For Official Use Only

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000500 Feet

Naval Support Activity South Potomac - NSF Indian Head, Stump Neck Annex 13 December 2022

Legend !. Stormwater Outfalls

$1 Stormwater Structural BMPs

Storm Sewer Line

Open Stormwater Drainage

Culverts

Stormwater Problem Points #* Priority Repair

") Not a Priority Repair

!( Good Housekeeping

Industrial Discharge Point Active

Inactive

Perennial

Intermittent

Ephemeral

Surface Water Bodies

Wetlands

Buildings

Structures

Roads & Parking Lots Paved

Unpaved

Sidewalk

Railroads

1' Contour Lines

Watersheds Stump Neck

Cornwallis Neck

Subwatershed Area

1:4,674

Watershed 6 Total Impervious (acres) = 71.67 Total Subwatershed (acres) = 365.87 Percent Impervious = 19.59% Watershed 7 Total Impervious (acres) = 63.12 Total Subwatershed (acres) = 351.66 Percent Impervious = 17.95% Watershed 8 Total Impervious (acres) = 119.55 Total Subwatershed (acres) = 640.35 Percent Impervious = 18.67% Watershed 9 Total Impervious (acres) = 0.33 Total Subwatershed (acres) = 46.08 Percent Impervious = 0.72%

File details come from the government source that posted it. Updated .