This document is Section F of a federal contract for Grounds Maintenance and Landscaping (Contract 1503050), detailing all required deliverables, submission timelines, distribution requirements, and frequencies.

The contractor must submit numerous plans and certifications within 15 calendar days prior to contract start, including Certification/Training/Licensing, Business Licensing, Planned Pesticide/Herbicide Use Sheets with Safety Data Sheets (SDS), Water Conservation Plan, Contractor Work Schedules, Soil Analysis results, Top Dressing and Over Seeding specifications, and maintenance schedules for irrigation systems, shrubs/hedges, undesirable vegetation control, dump tipple, gutters/roof drains, playgrounds, ball fields, CNO barge, debris removal, and interior plants. The Pest Management Operations Report must be submitted electronically by the 15th of the following month on a monthly basis, while the Green Waste/Yard Waste Tonnage Report is due by the 10th calendar day of each month waste is generated. Weight tickets accompany invoices as specified. All deliverables are distributed to the Contracting Officer (KO) and/or Contracting Officer's Representative (COR), with some materials also going to the Pest Management Coordinator (PPMC). Most initial plans and schedules require resubmission annually and five calendar days prior to implementing any changes. Certifications and licenses must be renewed and resubmitted annually as required by contract provisions, and permits must be submitted as needed within 15 calendar days prior to work commencement. All deliverables require two copies including the original, except pesticide/herbicide documentation which requires three copies.

View the file

Other files

File Type Posted
J-1503050-08 Quantico Revised.xlsx XLSX spreadsheet
J-1503050-08 Washington Revised.xlsx XLSX spreadsheet
Leumas CBA (Signed by the Union and Companies) 2023.pdf PDF
N4008025R4580 8A GROUNDS RFI Sheet w Answers.pdf PDF
N4008025R4580 8a Grounds Solicitation Synopsis Revised.pdf PDF
N4008025R4580 8A GROUNDS RFI Sheet w Answers.pdf PDF
J-1503050-8 Dahlgren Final Inventory KDC 20241101.xlsx XLSX spreadsheet
J-1503050-16(g1) Dahlgren_GroundMaint_Dec2024.pdf PDF
J-1503050-17(h1) Indian Head Map.pdf PDF
J-1503050-17(h2) Stump Neck Map.pdf PDF
J-1503050-17(h4) SN_SWPPP_2022.pdf PDF
J-1503050-08 Indian Head Final.xlsx XLSX spreadsheet
J-1503050-16(g3) PumpkinNeck_GroundMaint_Oct2024.pdf PDF
J-1503050-17(h3) IH_SWPPP_2022.pdf PDF
J-1503050-16(g2) Dahlgren_HerbicideApp_Oct2024.pdf PDF
New Attach J-2000000-10 Blank ELIN 8a Regional Grounds Rewrite.xlsx XLSX spreadsheet
Section J 1503060-10 Maps and Excel Sheet List.pdf PDF
J Attach 5.0 WD 15-4269 Rev 31.pdf PDF
Section J 1503050-14 Maps Attachment List.pdf PDF
Section J 1503060 All Maps.pdf PDF
J Attach 4.0 secnav5512.pdf PDF
J Attach 1.1 - 0200000 C Mngmt & Admin v2.10 20240701 KDC.pdf PDF
N4008025R4580 Exhibits A-E.pdf PDF
J-0200000-08(e) MBQ Spill Emergency Notification Response Proced.pdf PDF
J-1503050-08 Washington.xlsx XLSX spreadsheet
J Attach 5.1 WD 15-4281 Rev 35.pdf PDF
J-1503060-05 Washington.xlsx XLSX spreadsheet
Section J 1503050-15 Maps Consolidated.pdf PDF
J Attach 1.3 - 1503060 C Pvmt Clear v2.5 20240701 KDC.pdf PDF
J-1503050 13(a1 a4 a10 f1 f2) and excel sheets list.pdf PDF
N4008025R4580 8a Grounds Solicitation Synopsis.pdf PDF
J Attach 3.0 - 0200000 J Mngmt & Admin v2.7.pdf PDF
J-0200000-08(f) Bethesda (NSAB)- Spill Contingency Plan.pdf PDF
J-1503050-09(a) Irrigation System Inventory.xlsx XLSX spreadsheet
Updated Attchment J-2000000-10 Blank ELIN Regional Grounds Rewrite Revised KDC.xlsx XLSX spreadsheet
J-1503050-11(a) Washington SWD Systems Inventory.xlsx XLSX spreadsheet
J Attach 1.0 - 0100000 C General Info v2.4 rev 20200311 KDC 20240701.pdf PDF
J-1503060-05 Bethesda.xlsx XLSX spreadsheet
J-1503050-11(f) Bethesda SWD Systems Inventory.xlsx XLSX spreadsheet
J-0200000-05(i) Contractor Incident Report System (CIRS).pdf PDF
J Attach 3.1 - 1503050 J Grounds Maint & Landscaping v2.7.pdf PDF
J Attach 1.2 - 1503050 C Grounds Maint & Landscape v2.7 20240701 KDC.pdf PDF
J Attach 5.2 WD 15-4329 Rev 32.pdf PDF
J Attach 2.2 - 1503060 F Pvmt Clear v2.4 20240701 KDC.pdf PDF
J Attach 3.2 - 1503060 J Pvmt Clear v2.5.pdf PDF
J Attach 2.0 - 0200000 F Mngmt & Admin v2.9 20240701 (1).pdf PDF
J Attach 5.3 DSA CBA.pdf PDF
J Attach 6.0 Perform Assess Plan - v3.3 Regional Grnds Maint & Pvmt Clear Serv.pdf PDF
J-1503050-08 Bethesda.xlsx XLSX spreadsheet
J-1503050-08 Quantico.xlsx XLSX spreadsheet
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1503050 – Grounds Maintenance and Landscaping

SECTION F: DELIVERIES OR PERFORMANCE

Section F – 1503050

Grounds Maintenance and Landscaping

DELIVERABLES

Spec Item

Form

Attachment

Number

Deliverable

Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

2.2.1 N/A Certification, Training, and

Licensing

Within 15 calendar days prior to start of work.

Copies of renewed certifications shall also be submitted.

KO/COR 2 Annually and as required by

Section H –

Special Contract

Requirements, FAC 5252.237-

9301 Substitutions of Key Personnel

(JUN 1994)

2.3.1.1 N/A Business

Licensing

Within 15 calendar days prior to contract start.

Copies of renewed licenses shall also be submitted.

KO/COR 2 As required

2.3.1.4 N/A Planned

Pesticide/

Herbicide Use

Sheets including

Pesticide/

Herbicide

Labels and

Safety Data

Sheets (SDS)

Within 15 calendar days prior to contract start and at least 10 business days for any proposed changes.

KO,

COR,

PPMC

3 Annually for each pesticide/herbicide, as required.

2.3.1.5 N/A Pest

Management

Operations

Report

Electronically by the 15th of the following month

(Example:

July data must be submitted by August 15) on the format approved by

PMC.

KO,

COR,

PPMC

2 Monthly

2.3.2 N/A Permits Within 15

calendar days

KO/COR 2 As required

Form

Attachment

Number

Deliverable

Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original) prior to start of work.

2.3.9.1 N/A Water

Conservation

Plan

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule

3 N/A Weight

Tickets

With Invoice KO/COR 2 As Specified

3 N/A SDS sheets, catalog cut sheets, samples of all proposed fertilizers, and mulch

Prior to bringing on-board installation and prior to use

KO/COR 2 As Required

3 N/A Contractor

Work

Schedules

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing any changes to the schedule

3.1.1.3 N/A Soil Analysis Within 15

days after receipt of the test results by the Contractor

KO/COR 2 As Required

3.1.1.3 N/A Top Dressing

and Over

Seeding Seed

Type

Within 15 calendar days prior to contract start

KO/COR 2 Annually and five calendar days prior to implementing changes to the schedule

3.1.4 N/A Irrigation

System Repair

Plan and

Monthly

Maintenance

Schedule

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.1.5 N/A Shrub and

Hedge

Maintenance

Schedule

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.1.7 N/A Schedule for

Control of

Within 15 calendar days

KO/COR 2 Initially before contract start and

Form

Attachment

Number

Deliverable

Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

Undesirable

Vegetation prior to contract start five calendar days prior to implementing changes to the plan/schedule

3.5.2 N/A Schedule to

Maintain

Dump Tipple-

Carderock

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.5.3 N/A Schedule to

Clean Gutters and/or Roof

Drains-

NSWC

Caderock

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.5.5 N/A Schedule for

Playground

Maintenance

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.5.6 N/A Schedule for

Ball Field

Maintenance

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.5.7 N/A Schedule for

CNO Barge

Maintenance

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.5.8 N/A Schedule for

Debris

Removal-

WNY,

Carderock, NRL, ASC, Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

Form

Attachment

Number

Deliverable

Title

Date (s) of

Submission

Distribution

Frequency Original

Copies

(including original)

USNO, and

MBW

3.7 N/A Schedule for

Interior Plant

Maintenance

Within 15 calendar days prior to contract start

KO/COR 2 Initially before contract start and five calendar days prior to implementing changes to the plan/schedule

3.8 N/A Green

Waste/Yard

Waste

Tonnage

Report

10th Calendar

Day of each month waste is generated

KO/COR 2 Monthly during waste generation

File details come from the government source that posted it. Updated .