This topographic survey document supports Pinellas County, Florida's Design-Build procurement for the Cross Bayou Athletic Association Baseball Park reconstruction project located at 102nd Avenue and 98th Street North in Seminole, Florida (PID 004556B). The project encompasses demolition and reconstruction of seven athletic fields (four Little League fields ranging 200-220 feet, two 220-foot softball fields, and one 150-foot tee ball field), two prefabricated buildings (1,120-square-foot restroom/concession facility and 1,200-square-foot maintenance building), four batting cages, bleachers, dugouts, backstops, site lighting, irrigation systems, stormwater management infrastructure, utility connections, and a mid-block pedestrian crossing. The procurement is structured in two phases: Phase 1 requires completion of 100% construction documents from existing 60% design plans within 190 calendar days of Notice to Proceed, while Phase 2 encompasses complete construction and Certificate of Occupancy issuance within 455 calendar days. The mandatory site visit is scheduled for February 25, 2026 at 9:00 AM, written questions are due by March 3, 2026 at 3:00 PM Eastern Time, and all submittals must be uploaded to the OpenGov procurement platform by March 12, 2026 at 3:00 PM Eastern Time.
The estimated project budget is $10,000,000 for construction and design services, funded through the Penny for Pinellas capital improvement sales surtax approved for the Local Infrastructure Sales Surtax program. The Design-Build firm's fixed lump sum compensation for Phase 2 must include profit markup not exceeding 5%, with 5% of monthly payments retained by the County during construction. Pinellas County's Small Business Program identifies approximately 10 percent of project work as available for Small Business Enterprise (SBE) subcontracting, including survey, erosion control, clearing and grubbing, grading, sidewalk installation, fencing, sodding, irrigation, and landscaping. The Design-Build team must provide a bid bond of 5% of the Phase 2 base bid and Performance and Payment Bonds equal to 100% of the agreement amount. Comprehensive insurance requirements include Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Professional Liability ($2,000,000 per occurrence/$2,000,000 aggregate for Phase 1), and additional coverage for Phase 2, with all policies from companies rated A- VIII or better by A.M. Best and maintained for two years beyond final project acceptance.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| �� | � | ����� |
| ����� | ���������� | ����� |
File details come from the government source that posted it. Updated .