This is a Subsurface Utility Excavation Vacuum Test Hole Report prepared for Pinellas County, Florida, documenting utility location investigations conducted at the Cross Bayou Athletic Association Complex site located at the corner of 102nd Avenue and 98th Street N in Seminole, Florida. The report documents nine test holes excavated on June 21 and June 24, 2024, under Project Identification Number GIA2203.01. Utilities identified at the site include multiple water lines owned by Pinellas County ranging from 1 inch to 8 inches in diameter constructed of PVC and polyethylene materials, as well as 18-inch ductile iron pipe (DIP) non-potable water lines. Two test holes yielded no utilities found (N.U.F.) after vacuum excavation to five feet below existing ground and air lance investigation to ten feet below existing ground. Two additional test holes contained utilities that could not be field verified (N.F.V.) due to adverse field conditions including water and cave-ins. All measurements are referenced to U.S. Survey Feet using the North American Datum of 1983 Adjustment of 2011 (NAD83/2011) and Florida State Plane Coordinate System West Zone projections with the North American Vertical Datum of 1988 (NAVD88) as the vertical reference.

The report provides specific geographic coordinates (northing and easting), utility cover depths, and top-of-utility elevations for each test hole location to support the design-build reconstruction project of the Cross Bayou Athletic Association Baseball Park. This utility investigation data is essential baseline information for the professional Design/Build teams selected to provide complete design and construction services for the park reconstruction, ensuring that project planning and execution account for existing subsurface infrastructure and associated constraints.

View the file

Other files

File Type Posted
25-0036-RFQ-DB_2-4-26.pdf PDF
APPENDIX_1_-_PERMITS_rev1_corrected.pdf PDF
Approved_RUP_24-00009.pdf PDF
Approved_RUP_24-00008.pdf PDF
Approved_RUP_24-00007.pdf PDF
Approved_RUP_24-00006.pdf PDF
Approved_STP_24-00002.pdf PDF
AREHNA_Geotech_Report_06-02-2023.pdf PDF
UTV_Summary_Report.pdf PDF
Topographic_Survey_Signed.pdf PDF
SWFWMD_Permit_43047961.0000_2025-02-24.pdf PDF
SWFWMD_Drainage_Report_Narrative_FD.pdf PDF
BDRS_Conditional_Approval_Letter.pdf PDF
Plans_Electrical.pdf PDF
Pinellas_County_-_Conveyance_Report.pdf PDF
Location_Map.pdf PDF
Flood_Plans.pdf PDF
Ecological_Assessment_Report.pdf PDF
Cross_Bayou_Ballfields.pdf PDF
Design_Criteria_Package_rev_01-20-2026_(2).pdf PDF
Sample_Agreement.pdf PDF
OKApproved-STP-24-00002.pdf PDF
Approved-RUP-24-00008.pdf PDF
Approved-RUP-24-00007.pdf PDF
Approved-RUP-24-00006.pdf PDF
Approved-RUP-24-00009.pdf PDF
Cross_Bayou_O&M_Manual.pdf PDF
OKCross_Bayou_Ball_Fields_GAI.pdf PDF
OKSWFWMD_Drainage_Report_04.18.25.pdf PDF
25-0036-REQ_Cross_Bayou_Topographic_Survey_Signed.pdf PDF
Cross_Bayou_SWFWMD_Financial_Capability_Certification.pdf PDF
PID_04556B_Cross_Bayou_Fixed_Price_Design-Build_RFP_12-09-2025.pdf PDF
OKR220415.01-Cross_Bayou_Little_League-EAR-20230818_FS.pdf PDF
Design_Criteria_Package_rev_01-20-2026.pdf PDF
OK004556B-FLOOD_Plans.pdf PDF
PID_04556B_DRAFT_Cross_Bayou_Fixed_Price_Design-Build_RFP_02-09-2024.docx DOCX document
TY2-23-15_Conditional_Apprvl_Ltr.pdf PDF
Email_re_Edits_to_DCP_for_04556B-Cross_Bayou_2026-1-16(Internal_Review_Only).pdf PDF
OKCross_Bayou_Conveyance_Report_09.27.2024.pdf PDF
OK43047961.000.pdf PDF
APPENDIX_1_PERMITS-rev1_corrected.pdf PDF
25-0036-REQ_AREHNA-Geotech_Report-06-02-2023.pdf PDF
25-0036-REQ_Plans-Electrical.pdf PDF
25-0036-REQ_Project_Location_Map.pdf PDF
OKCost_Estimate_60%.xlsx XLSX spreadsheet
25-0036-REQ_FY24_SeminoleRecreationFacilities_PFO.pdf PDF
25-0036-REQ_Request_for_ITB_CCNA_RFP-9-11-24.docx DOCX document
25-0036-REQ_SBE_Letter-from_EOR.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTILITY OWNER SIZE - MATERIAL - TYPE NORTHING EASTING

1 6/21/2024 PINELLAS COUNTY 8" PVC WATER 1284227.09 405896.32 9.73' 3.56' 6.17'

2 6/21/2024 UNKNOWN 4" PVC UNKNOWN 1284227.26 405899.86 9.79' 3.25' 6.54'

3 6/21/2024 PINELLAS COUNTY 1" PE WATER 1284226.92 405831.55 9.10' 4.31' 4.79'

4 6/21/2024 PINELLAS COUNTY 8" PVC WATER 1283953.11 405896.20 10.23' 3.86' 6.37'

5 6/21/2024 UNITI N.F.V. SIZE & MATERIAL (DUE TO WATER & CAVE-INS) FOC 1284227.38 405898.22 9.76' 7.70' 2.06'

6 6/24/2024 PINELLAS COUNTY 18" DIP NPW 1283727.09 405840.73 8.92' 4.92' 4.00'

7 6/24/2024 PINELLAS COUNTY 18" DIP NPW 1283445.00 405838.86 9.14' 4.87' 4.27'

8 6/24/2024 PINELLAS COUNTY 18" DIP NPW 1283342.74 405838.93 9.18' 4.70' 4.48'

9 6/24/2024 UNITI N.F.V. SIZE & MATERIAL (DUE TO WATER & CAVE-INS) FOC 1283953.07 405895.62 10.28' 9.12' 1.16'

ACP FOC PE

℆ FPID PVC

BE FM RCP

BT HDPE SS

CATV ITS STL

CIP N/A STM

CMP N.F.V. SL

CPP No./NO. TS

DB NPW UNK

DIP DUCTILE IRON PIPE N.U.F. VCP

ED ELECTRONIC DEPTH OD Vvh

POLYVINYL CHLORIDE PIPEBASELINE FINANCIAL PROJECT IDENTIFICATION NUMBER

FIBER OPTIC CABLE

SUBSURFACE UTILITY EXCAVATION

VACUUM TEST HOLE REPORT

Vvh No.

TEST

HOLE

DATE

JOB#GIA2203.01

CROSS BAYOU LITTLE LEAGUE

UTILITY LOCATION INFORMATION

HUB

ELEVATION

UTILITY

COVER

TOP OF

UTILITY

ELEVATION

UTILITY DESCRIPTION

(5) NO UTILITIES FOUND (N.U.F.): “N.U.F.” INDICATES THAT NO UTILITY WAS LOCATED BY GPR AND AN EXPLORATORY UTILITY INVESTIGATION WAS PERFORMED WITH VACUUM

EXCAVATION TO FIVE FEET BELOW EXISTING GROUND AND BY AIR LANCE TO TEN FEET BELOW EXISTING GROUND UNLESS OTHERWISE NOTED.

NOTES:

ABBREVIATIONS

POLYETHYLENE PIPE

VITRIFIED CLAY PIPE

VERIFIED VERTICAL & HORIZONTAL LOCATION

(6) NOT FIELD VERIFIED (N.F.V.): “N.F.V.” INDICATES THAT A UTILITY SIZE, MATERIAL, TYPE OR COMBINATION THEREOF, WAS UNABLE TO BE VISUALLY VERIFIED DUE TO FIELD

CONDITIONS EXISTING AT THE TIME OF THE UTILITY INVESTIGATION. SUCH FIELD CONDITIONS MAY INCLUDE, BUT NOT LIMITED TO: SOIL OR SURFACE MATERIAL WHICH REQUIRE

OTHER THAN NON-INVASIVE EXCAVATION TECHNIQUES, EXISTING GROUND WATER, CAVE-INS, MAINTENANCE OF TRAFFIC (M.O.T.) REQUIRED AREAS, OR OTHER HAZARDOUS CONDITIONS.

(7) UTILITY SIZE AND MATERIAL COMPOSITION WERE COLLECTED BY FIELD OBSERVATION UNDER ADVERSE CONDITIONS AND SHOULD BE CONSIDERED APPROXIMATE.

OUTSIDE DIAMETER

DIRECT BURIED NON-POTABLE WATER

NO UTILITY FOUND

CORRUGATED PLASTIC PIPE NUMBER

CORRUGATED METAL PIPE STREET LIGHT

TRAFFIC SIGNAL

NOT APPLICABLECAST IRON PIPE

STEEL

(1) UNITS: ALL MEASUREMENTS ARE IN THE U.S. SURVEY FOOT

(2) HORIZONTAL DATUM: NORTH AMERICAN DATUM OF 1983 ADJUSTMENT OF 2011. (NAD83/2011)

(3) PROJECTION: FLORIDA STATE PLANE COORDINATE SYSTEM WEST ZONE (FL83E)

(4) VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88)

UNKNOWN

STORM SEWER

NOT FIELD VERIFIED

FORCE MAIN - SANITARY

BURIED TELEPHONE HIGH DENSITY POLYETHYLENE

COMMUNITY ACCESS TELEVISION INTELLIGENT TRANSPORTATION SYSTEM

REINFORCED CONCRETE PIPE

SANITARY SEWER

BURIED ELECTRIC

ASBESTOS CEMENT PIPE