This Southwest Florida Water Management District drainage report, prepared by GAI Consultants for Pinellas County Public Works, details the stormwater management system design for the Cross Bayou Ball Fields project located at 10150 98th Street North in Seminole, Florida. The project encompasses approximately 13.86 acres within Section 27, Township 30 South, Range 15 East, and seeks Environmental Resource Permit (ERP) approval under Rule 62-330 F.A.C. The proposed improvements include reconstruction of baseball fields, a community park, surface parking, stormwater collection ponds, utilities, and landscaping. The stormwater management system is designed to treat runoff through two wet detention ponds with wet pond littoral shelves and a side bank filter (Bold and Gold media filter) on Pond 1 before discharge to Lake Seminole. The design addresses treatment volume requirements of one inch over the corresponding drainage basin, with the wet detention ponds required to recover half of the treatment volume within 24-36 hours through side bank filtration and orifice sizing. Peak attenuation modeling using AdICPR software demonstrates that post-development peak discharge rates of 37.30 cubic feet per second are reduced compared to pre-development rates of 39.68 cubic feet per second for the 25-year, 24-hour storm event.
The drainage report confirms that the proposed stormwater treatment system achieves nutrient loading reduction requirements established by Pinellas County and SWFWMD, with nitrogen reduction of 68 percent and phosphorus reduction of 80 percent compared to existing conditions, exceeding the requirement to reduce nitrogen by 55 percent and phosphorus by 80 percent. The existing site has elevations ranging from 7 to 9.5 feet NAVD88 with sandy soils classified in hydraulic group A/D and a seasonal high-water table estimated at 5.0 feet NAVD88. Floodplain compensation utilizes a "cup for cup" methodology with the base flood elevation of 6.84 NAVD88 established by the City of Seminole Watershed Management Plan, and all inhabited structures are designed to elevate one foot above the storm surge elevation of 11.10 NAVD88. The project site is located within FEMA Flood Zone AE, and the stormwater management system design incorporates existing swales and culverts while providing improved treatment and attenuation compared to the existing conditions where stormwater previously discharged without treatment through a 30-inch RCP culvert to Lake Seminole.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared by: GAI Consultants, Inc.
Orlando Office
618 East South Street, Suite 700 Orlando, Florida 32801
Prepared for: Pinellas County Public Works 14 S. Fort Harrison Ave.
Clearwater, FL 33756
Southwest Florida Water Management District Drainage Report
Cross Bayou Ball Fields Pinellas County, Florida
GAI Project Number: R220415.01
January 2024
Revised March 2025 gaiconsultants.com | transforming ideas into reality.®
G gai consultants
Drainage Report
Cross Bayou Ball Fields
GAI Project Number: R220415.01
September 2024
Prepared for:
Pinellas County Public Works – Engineering & Technical Support
14 S Fort Harrison Ave.
Clearwater, FL 33756
727-464-8900
Prepared by:
GAI Consultants, Inc.
Orlando Office
618 East South Street Orlando, Florida 32801
I hereby certify that to the best of my knowledge and belief, the design of the Stormwater Management System for the project known as: Cross Bayou Ball Fields Park, meets all the requirements and has been designed substantially in accordance with the Pinellas County and the SWFWMD Stormwater Management Criteria.
Frank C. DelValle Civil Technical Specialist
Aimee J. Shields, P.E.
Project Manager
Pinellas County Public Works Cross Bayou Ball Fields – Stormwater Permit
Table of Contents
1.0 Introduction
1.1 Purpose and Scope
2.0 Existing Conditions
2.1 Description
2.2 Existing Drainage Features
2.3 Geotechnical Analysis
3.0 Proposed Conditions
3.1 Description
3.2 Proposed Drainage Features
3.3 Tailwater Development
4.0 Stormwater Management System
4.1 Description
4.2 Treatment Volume Calculations
4.2.1 Wet Detention
4.2.2 Recovery
4.3 Stormwater Quantity / Attenuation Requirements
4.4 AdICPR Results Summary Table
4.5 BMP Trains Result Summary
4.6 Flood Compensation
Appendix A A-1: Location Map A-2: Aerial Photography A-3: USGS Quadrangle Map A-4: NRSCS Soils Map A-5: FEMA Map
Appendix B – Stormwater Management System Design B-1: Pre-Development Basin Map B-2: Post-Development Basin Map B-3: Curve Number Calculations B-4: Wet Detention Pond Calculations
Appendix C – Peak Attenuation Calculations C-1: AdICPR Input Report C-2: AdICPR Node Maximum Condition Report C-3: AdICPR Nodal Diagram C-4: Tailwater Development – Support Documentation C-5: BMP Analysis Report
Appendix D – Flood Compensation D-1: Pre Flood Compensation Exhibit D-2: Post Flood Compensation Exhibit
1.0 Introduction
1.1 Purpose and Scope
Pinellas County Public Works is seeking to obtain an Environmental Resource Permit (ERP) through the Southwest Florida Water Management District (SWFWMD) for the development of a parcel located within the Pinellas County. The Cross Bayou Ball Fields project site is bound by 102nd Avenue N to the North and 98th Street N to the East. This project site is located within Section 27, Township 30 South, and Range 15 East with a total project area of +/- 13.86 acres.
This submittal is for the approval of a SWFWMD ERP according to the rule 62-330 F.A.C. All elevation references contained within this report are based on the North American Vertical Datum of 1988
(NAVD88).
2.0 Existing Conditions
2.1 Description
The existing site is developed land and currently is comprised of multiple baseball fields, an access road and compacted parking areas. Site elevations range from 7-feet to 9.5-feet with the northeast section of the site sloping toward the southwest of the site. Existing soils are sandy and classified within hydraulic group A/D.
2.2 Existing Drainage Features
The existing Cross Bayou Ball Fields Park does not have an associated Environmental Resource Permit with the SWFWMD. There are existing swales that convey stormwater within the site at the East property line and South of the existing driveway. Swales are interconnected with stormwater culverts underneath the driveway entrance. Existing drainage basin flow into the existing swales that eventually discharge to Lake Seminole through the North existing 30” RCP culvert, without treatment and attenuation.
Refer to Appendix A-6 for the Pre-Development Basin Map.
Table 2.1. Pre-Development Basins
Basin Name Total
Area (ac)
Time of Concentration
(min) CN % Impervious
Pre Basin-1 5.64 10 85 25%
Pre Basin-2 4.94 10 89 71%
Pre-Bypass
Fields
3.30 10 83 15%
2.3 Geotechnical Analysis
The seasonal high ground water table was estimated based on Geotechnical data for the project site.
The estimated seasonal high-water table (SHWT) elevation is around 5.0’ (NAVD88) which is at depth of between 2.0 to 3.0 feet below the existing ground surface.
3.0 Proposed Conditions
3.1 Description
The proposed improvements include the construction of new baseball fields, a community park, surface parking, stormwater collection ponds, associated utilities, and landscaping.
3.2 Proposed Drainage Features
Stormwater runoff will be collected in wet detention ponds, catch basins and area drains is conveyed through a storm sewer system. Stormwater runoff will be treated and attenuated within two (2) wet detention ponds along the site boundary before discharging to the adjacent Lake Seminole.
Refer to Appendix A-7 for the Post-Development Basin Map.
Table 3.1. Post-Development Basins
Basin Name Total Area
(ac)
Time of
Concentration (min) CN % Impervious
Post Basin 1 8.11 10 88 33%
Post Basin 2 2.47 10 84 15%
Post Bypass
Fields
3.30 10 83 15%
3.3 Tailwater Development
Stormwater runoff from the existing and proposed project site discharges into the adjacent Lake Seminole system. Tailwater information for the existing and proposed project was obtained from permit no. 43041400.00 submitted to SWFWMD in application 685225. Tailwater support documents are included in Appendix C-5 of this report. The tailwater used for this analysis was
4.13’ NAVD88.
4.0 Stormwater Management System
4.1 Description
Two equalized wet detention ponds are proposed to meet SWFWMD and Pinellas County requirements.
They are sized to provide stormwater treatment and attenuation for the proposed development.
4.2 Treatment Volume Calculations
4.2.1 Wet Detention
Per SWFWMD, wet detention systems are required to treat 1” over the corresponding drainage basin. The design weir elevation for the proposed ponds were governed by the calculated treatment volume elevations. Refer to Appendix B-4 for treatment volume calculations, plan detail sheets and Post Development ICPR model provided with this report.
4.2.2 Recovery
The wet detention pond is required to recover half of the treatment volume in 24-36 hours. This is achieved through the side bank filtration and an orifice set at the top of the treatment required for the side bank filtration. See Appendix B-4 for the Side Bank Filtration calculations and Orifice sizing.
4.3 Stormwater Quantity / Attenuation Requirements
Pursuant to Rule 62-330.055. F.A.C., the peak discharge rates must demonstrate equal to or less than the pre-developed peak discharge rates. The pre-developed and post-developed conditions were modeled using AdICPR modeling software. This model was used to calculate the discharge rates for the 25-year, 24-hour storm event. The Florida Modified rainfall distribution was used along with the 256 Unit Hydrograph. Refer to Appendices C, and summary table provided in Section 4.6 of this report. Refer to Appendix C for AdICPR model input and results.
4.4 AdICPR Results Summary Table
Table 4.6
AdICPR Results Summary Table – Peak Discharge (Lake Seminole)
Outfall Location Pre Flow (cfs) Post Flow (cfs)
Lake Seminole - 25 Year / 24 Hour 39.68 37.30
4.5 BMP Trains Result Summary
The receiving waterbody for this project is Lake Seminole. A nutrient loading analysis was performed using BMP Trains to meet Lake Seminole Basin requirements.
To provide the required nutrient loading reduction, the volume is treated through a side bank filter (Bold and Gold media filter) that has been incorporated into the stormwater management system on Pond 1 and wet pond littoral shelves in both Ponds 1 and 2.
Per Pinellas County Stormwater Quality Permitting Requirements, the stormwater treatment system shall be designed to achieve the greater level of pollutant removal of the following performance standards:
1. Reduce the post-development annual average stormwater total nitrogen load by at least 55% and the annual average stormwater total phosphorus load by at least 80% more than the pre-development loads or
2. Reduce the post-development annual average stormwater total nitrogen and phosphorus loads by 10% or more of the undeveloped or current annual discharge loads.
Based on the provided BMP Trains analysis, the post-development nitrogen and phosphorus load does not exceed the existing conditions.
The existing conditions nutrient loading from Basins 1 and 2 is 16.81 kg/yr for Nitrogen and 0.804 kg/yr in Phosphorus. The existing condition is existing baseball fields with associated infrastructure (parking, sidewalks, etc).
The proposed conditions nutrient loading from Basins 1 and 2 is 6.97 kg/yr for Nitrogen and 0.201 kg/yr in Phosphorus, which is an 68% treatment efficiency in nitrogen reduction and 80% treatment efficiency in phosphorus reduction. The proposed condition is also baseball fields with similar associated infrastructure. Please refer to the support documentation in this report for a Complete Report of the BMP analysis.
Please refer to Appendix B-4 for the Bold & Gold Filter Water Quality Analysis and Appendix C-5 for the Site-Specific Pre/Post-Pollutant Loading Analysis for the drainage area to Pond 1 and 2.
4.6 Flood Compensation
The majority of the project site is located within FEMA Flood Zone AE. The base flood elevation (B.F.E.) for this zone is established at 9.00 NAVD88. The City of Semionle WMP establishes a B.F.E of
6.84 NAVD88 for this location. Floodplain impacts and subsequent compensation will utilize the B.F.E established by the City of Seminole WMP. The wetlands along the West of the project site are proposed for preservation. Any existing floodplain areas that are filled within the proposed development will be compensated for in accordance with FEMA, SWFWMD, and Pinellas County permit requirements. Stormwater management ponds will provide the majority of the compensating storage volume.
A ”cup for cup” methodology was used for compensation of the proposed project on the existing floodplain. The compensation site volume was calculated with AutoCAD Civil 3D software by comparing the proposed and existing surfaces between the seasonal high-water table (5.00 NAVD88) and the base flood elevation (6.84 NAVD88). The total compensation volume is the cut volume minus the fill volume between these two surfaces. See Appendix D for pre and post-flood compensation volume exhibits.
All inhabited structures proposed with this project will be constructed to an elevation one foot above the storm surge elevation established by the Pinellas County Storm Surge Analysis. The storm surge elevation for this site is established at 11.10 NAVD88.
APPENDIX A-1
Location Map
A-1
North
618 E. South Street Suite 700
Orlando, Florida 32801 Phone: 407.423.8398
NTS
SHEET NO.:
PROJECT NO.:
SCALE:
DATE:
R220415.01
DECEMBER 2023
PROJECT
LOCATION
LOCATION MAP
CROSS BAYOU LITTLE LEAGUE FIELDS
10150 98TH STREET NORTH
THE CITY OF SEMINOLE, FLORIDA
PuLake Seminole Resort P rated
LAKE PARK
Osceola Fundamental
VILLAC
ANTI
j.
HOLIDAY
SHORES
CATALINA
ESTATES
gai consultants
C) (D 3 O]
CD
O’
:N
STATES
ALT
APPENDIX A-2
Aerial Map
A-2
618 E. South Street Suite 700
Orlando, Florida 32801 Phone: 407.423.8398
NTS
SHEET NO.:
PROJECT NO.:
SCALE:
DATE:
R220415.01
DECEMBER 2023
PROJECT
LOCATION
AERIAL MAP
CROSS BAYOU LITTLE LEAGUE FIELDS
10150 98TH STREET NORTH
THE CITY OF SEMINOLE, FLORIDA
U5“*r -s a6 4 d|‘s.0 15- 129diet %e-- <-Er!
22P*seie 1 5 7Ars i wasa B -P-M04 chi atd 13. it. — weddh s Ee. sif F"Mudl
FHI
ohmhotm
A=—-
F teC e 8*si21‘ 1-a9tel.
18 tutis U —-,—rrnm-rmer -7,=***
2 4 ceo0 ---“n T fLD
Et,se.. 10Th Row)1 4lTala-". co ile ‘t s>
A feh 0ti=
U. —t s,7
14 . .
its Wj, 4p et j.
B tw).
cacA th teg“a t-s 42
8 4 a t, 84 L a st =0 MeMmi A gai consultants w ir Chug t w fto:
B
-w
- 4
0) d
140.43
.5 e,‘t
49 “A fris Yhi”
- jr ( cete wale “Ih
Pan
2— BC — ex wr ad
MMh.
9*msa-”:
(3 -
33.4 eredrst teu math
Sa ; e se -< Eat -iTI shmnte ar
Viest—Ped
5 "Fr. t) 5 .
a Lart
‘ S te “
C
22422247 ifm he ss ej
3 r.
227et
I
Bt
R 1 i da-lIte, V8
"le as ' hl #, w as esP
Bis e 35
. goeengeelT
! 1 J Lee
4 "7
| ’ .Jeme hte
IMfW ge
APPENDIX A-3
USGS Map
A-3
618 E. South Street Suite 700
Orlando, Florida 32801 Phone: 407.423.8398
NTS
SHEET NO.:
PROJECT NO.:
SCALE:
DATE:
R220415.01
DECEMBER 2023
PROJECT
LOCATION
USGS QUADRANGLE MAP
CROSS BAYOU LITTLE LEAGUE FIELDS
10150 98TH STREET NORTH
THE CITY OF SEMINOLE, FLORIDA
7 I I o Mami ad Fark"I" FSw
E e Anim Foma t f' Te ‘]* 1.t1 Sle T I in [ ur.— -iku * — ■ p —al----------ate .
...1f
Touh 1O LrLake- 3d .t I
—-- [IT ’ HI "g Mm".
L* air 2| J J lRewertoir
It1 I--- 2 J7 r
—AH'11! w‘L ■Jo——"5 o he n d
V : Utv s -mmn। a ! c 130 four jou■S.
U2at sae■ —m tT ts ...f s ■a ==mmmi
(J, PII..
.1711 ■ a J:2-7" 1 -■51 2 112 . ry21 4 1
2.U.a Fald : J4484H*
+ y t= intar --mmaxr?M LH RidTiX
—41/ ■ 2V\ V / 3Ri1 ?a. ■L■ w =—•.-- I t
J ..."M. - M,0...5 2 y AT£Gol i C.Coumet L3p 1 mny"wes
G gai consultants
ShMDm hum Pa* r
(hN—J
TU*
: - j
4 L
H
Ei
UM Seminals
J u
S’ h
I U- - A tE
7 o
2 s.
pl
1*P‘
I ssmmmmdw. — •------imi==ra t iei. Ol”
.))4
GI.I2"
Subi
(C
Athletic lin’d
Jnehiehel
470 IT
- 3 h: 1 —- 2 1PP in " aih “Gne I
2== H ie t m
AP r . 2 'j' w UM drLe e Q iof .
E y
APPENDIX A-4
NRCS Map
A-4a
618 E. South Street Suite 700
Orlando, Florida 32801 Phone: 407.423.8398
NTS
SHEET NO.:
PROJECT NO.:
SCALE:
DATE:
R220415.01
DECEMBER 2023
PROJECT
LOCATION
NRCS SOILS MAP
CROSS BAYOU LITTLE LEAGUE FIELDS
10150 98TH STREET NORTH
THE CITY OF SEMINOLE, FLORIDA
r
(trmn S0ss1■afIM!
WF Prsea Gl =o
Ay ema (o
IEes AeeS 694bodtrken ========== A’4 ma=qpay=======? I
ESEE
IM-
Pan? I
.: ■ g W.
e nrI - ■-tip II ACeaPu JBV A
0tpongitp Male 2. a1-2ig ad 17.
2t A
_ui w
-Mi a 41. ===== 7X E- E- RmL
M-dst‘tuwe
H f gr
22.15 3.12 taTAu Lldn i wiea — ’ eraeneos 3d FEone-
VAMASEUS
GWPEEE
nes (mtg --i li 5 Merene SDLl?
90) segs gai consultants
1 "
Awl3f z.) A erte J —erif .7 22.1 1e $3 .mursast. n ugas bid Lfsmth. LA
T
WE". "Va 100 Aaniai
A-4b 618 E. South Street
Suite 700 Orlando, Florida 32801 Phone: 407.423.8398
NTS
SHEET NO.:
PROJECT NO.:
SCALE:
DATE:
R220415.01
DECEMBER 2023
NRCS SOILS MAP
CROSS BAYOU LITTLE LEAGUE FIELDS
10150 98TH STREET NORTH
THE CITY OF SEMINOLE, FLORIDA
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI
2 10.4
Anclote fine sand, depressional3 91.0
4 43.3
13.16
10 EauGallie soils and Urban land 43.2
11 Felda soils and Urban land 33.6
12 88.0
13 86.5
15 63.3
16 35.0
17 Myakka soils and Urban land 765.4
22 Pineda soils and Urban land 31.2
23 Pinellas soils and Urban land 14.0
25 3.7
Seffner soils and Urban land28 8.7
29 11.4
31 Wabasso soils and Urban land 17.8
99 Water 333.7
Totals for Area of Interest 1,693.3 gai consultants
Adamsville soils and Urban land, 0 to 5 percent slopes
Matlacha and St. Augustine soils and Urban land
Placid fine sand, frequently ponded, 0 to 1 percent slopes
Felda fine sand, frequently ponded, 0 to 1 percent slopes
Tavares fine sand-Urban land complex, 0 to 5 percent slopes
Basinger fine sand-Urban land complex, 0 to 2 percent slopes
Manatee loamy fine sand, frequently ponded, 0 to 1 percent slopes
Astatula soils and Urban land, 0 to 5 percent slopes
Immokalee soils and Urban land
APPENDIX A-5
FEMA Map
A-5
618 E. South Street Suite 700
Orlando, Florida 32801 Phone: 407.423.8398
NTS
SHEET NO.:
PROJECT NO.:
SCALE:
DATE:
R220415.01
DECEMBER 2023
PROJECT
LOCATION
FEMA FLOOD MAP
CROSS BAYOU LITTLE LEAGUE FIELDS
10150 98TH STREET NORTH
THE CITY OF SEMINOLE, FLORIDA
s MYARDDR °
ZONEAE %
: '(EL 11) 99 . City of Pinellas2 10THPLN 1202515 33 -9 --9THIERRN. u.
BRYAN DAIRY RD-
O tmmit.FE | "A 1.5- 15
109THIAVEN’a IN rated107THAVEN, 125139
T5 srC
■ jPele.
ge"LDowsoowS‘» ?1
I ■8. ‘06THAV54(1 “Or,X 3 100TH 3 IHIS PANELZONEAF L(EL9)’, SIOCATEORANGEJ 0 BIRCH DF 0“h
AKEISEMINOLEDRW SN tee SEMINOL 92c (2.
A MAlostoneCICHERF MPinellas County104THAVEIN
8 , HOPMAN CT’
125139ts- I, EE JENNIFER WAY
-ONGWOOD DR XAstetelCYPRESS TRL102NDAVE N '
102NDAVEN
LSABETHN6, 4e .4-.44 1 fmte 8 h ( il‘ eebstgves”? 101STCTNPel 1JUud (EL 9) ir e s
/ 3 Ps -% 8-- I00THAE"THA’" 24 o 2; It. TA. . 3 i f m.
98THAVENIs I 4 1 STN.- prem “e “I AVOCUIpE I N/C
INNWOOD RD
“CAMSHIREILN—+J zel Lst ( 25 ■ AYRSHIRE LN’wl JRENTWOODRDS-—B \B BRENTWOOD RDBERKSHIRE LNI
: SARDMOOR BLDCL).,"ANTIGUA DRe!2175 ANDLEWOOD RD
) ESPLANADE E-
95lei TERRIN
88THWAYN-
!“a , —e*94TH AVE— 44 AVE N
I 23 eta i— «.■ P bisI $ITHAVE.NI, s 93RD AVE'N 24, s ;t 3 es ddirenI 92ND TERF92NDAVE sZONEAE 1ST TERR NPT--ERND 29- as$ ‘s.eeN e . ROSE TERR N. i
4ROSE TERRN2 90THAVEI
90THAVEV PORTUIACAAVEIN •s--- - sakDr
,15, LARChw.2I
CssSUSA6 •VCCity of Seminole IMAGNOLIADR.1202577 2 HOPEWELL,rr 75 13
182 327OFPANEL
Panel Contains:
COMMUNITY SUFFIXNUMBER PANEL
H H H
G gai consultants a Lass Sock
I
91STTEF
ENS
125139 120251 120257
L nincorpo rated reas
ZONE AE 1
(EL 9) (
ZONEAE
(EL 10)
MAPNRE
N TOWNS
JOWN Or
30SOUTE
PINELLAS COUNTY
PINELLAS PARK, CITY OF
SEMINOLE, CITY OF
ZONE
1 (El.9 e ej
* sSPREY INU rc’ i
ZONEAE
(EL 11)
CYPRES
DAVEIN
> CHAPMAN ci
3 f e dett".1 eeul so
> SsoSnsbes,,kd% i sa Min. 4.944— ifA 8.1*21135/5RRRXAHEss
CORDOVA"* ■
GREENS—A
"ANTANAAE—Mnzzi d s w4"se “lvi;
F.92NDITERRN Lfe tsmesssi fa/n. TERRN ge4 ayM cP’OPP’AVE neslla
95THAVE N
8 00, -SPLANADEW
ISTHITERRNC
Pas’ stonl— • =PPsslbad
-Pinellas County IL nin corporatedreas ihaas ‘T
. .. dery H 106TH‘AVEIN a"set-Ceee s A88THTERRN E=
-de
■ ZONEAE
IXuchesAY’) mefatsl ga
Trent* "4FPs Ie
89id
W 2‘ r
/ y /S
BRIDLEWOODYfMM A elen SL fcht olmime, -- -1-1109THAVE
2-m .M md
1INORT — ? LAKEDF
,—/ i J06THAVEN
2" "“AchEr
--5.
sjh
ANDLEWOOD RD, bs . ASRPSTEEB
APPENDIX B-1
Pre-Developed Basin Map
Feet 160800 40
ST-14
CATCH BASIN
TOP OF GRATE EL = 24.25'
N (15" RCP) IE = 19.35'
E (24" RCP) IE = 19.32'
ST-8
ST-9
ST-13
CATCH BASIN
TOP OF GRATE EL = 14.74'
N (15" RCP) IE = 10.11'
E (24" RCP) IE = 9.35'
W (24" RCP) IE = 9.35'
ST-15
CATCH BASIN
TOP OF GRATE EL = 14.73'
S (15" RCP) IE = 10.25'
ST-12
CATCH BASIN
TOP OF GRATE EL = 11.86'
N (15" RCP) IE = 7.08'
E (24" RCP) IE = 6.37'
W (24" RCP) IE = 6.42'
ST-16
CATCH BASIN
TOP OF GRATE EL = 11.74'
S (15" RCP) IE = 7.99'
ST-3
CURB INLET WITH MANHOLE
N RIM EL = 11.63'
THROAT EL = 11.03'
E (30" RCP) IE = 4.51'
W (24" RCP) IE = 4.89'
ST-4
MANHOLE
N RIM EL = 10.94'
E (8" PVC) = 7.77'
BOTTOM OF STRUCTURE EL = 7.82'
ST-11
CURB INLET WITH MANHOLE
N RIM EL = 11.07'
THROAT EL = 10.10'
W (30" RCP) IE = 3.62'
S (30" RCP) IE = 3.34'
ST-18
CATCH BASIN
(NO GRATE)
E (2" PIPE) IE = 6.20'
W (24" RCP) IE = 6.88'
BOTTOM OF BOX EL = 6.35'
ST-6
CURB INLET WITH MANHOLE
N RIM EL = 9.81'
THROAT EL = 8.85'
E (15" RCP) IE = 4.45'
ST-7
CURB INLET WITH MANHOLE
N RIM EL = 9.81'
THROAT EL = 9.04'
E (15" RCP) IE = 4.35'
W (15" RCP) IE = 4.35'
ST-19
CATCH BASIN
TOP OF GRATE EL = 9.04'
W (15" RCP) IE = 5.87'
ST-8
CATCH BASIN
TOP OF GRATE EL = 7.72'
W (14"X23" ERCP) IE = 6.13'
SE (14"X23" ERCP) IE = 5.96'
ST-9
CATCH BASIN
TOP OF GRATE EL = 7.55'
E (14"X23" ERCP) IE = 1.32'
METAL WOODWOOD
WOOD
WOODATMS
CONC.
WOOD
W O O D
WOOD
W O O D
CO
N C.
W O O D
H O R
SE
S N O P
A R K
IN
G A
N
YT
IM
E
W O O D
N O P
A R K
IN
G A
N
YT
IM
E
W O O D
R
IP
R
A P
A
SP
H A
LT
CONC.
CONCRETE
ELECTRIC
CONCRETE
ELECTRIC
WOOD
WOOD
WOOD
WOOD
WOOD
CONC.
CONC.
CHANNEL
C O N C
W O O D
C O N C R
ET
E W
O O D
C O N C R
ET
E
C O N C R
ET
E
W O O D
WOOD
WOOD
CONC.
SP
EE
D L
IM
IT
A D O
PT
A M
IL
E
SC
H O O L
A H
EA
D
C O N C R
ET
E
WOOD
WOOD
CONCRETE
CONCRETE
CONC.
WOOD
WOOD
WOOD
WOOD
WOOD
ST-1
MANHOLE
N RIM EL = 9.71'
W (30" RCP) IE = 5.28'
SE (30" RCP) IE = 5.28'
ST-10
N RIM EL = 8.14'
E (30" RCP) IE = 4.46'
SW (30" RCP) IE = 4.44'
WOOD
WOOD
WOOD
2 STORY
MASONRY BUILDING
1 STORY
MASONRY
BUILDING
COVERED
CONCRETE
STAIRS
COVERED
DUGOUT
COVERED
DUGOUTBLEACHERS
CONCRETE
CONCRETE
BLEACHERS
ASPHALT PAVEMENT
ASPHALT
PAVEMENT
BRICK
B
LE
A C H
ER
S
C O N C R
ET
E C O V
ER
ED
D U G O U T
C O V
ER
ED
D U G O U T
B
LE
A C H
ER
S
C O N C R
ET
E
COVEREDDUGOUT
7' CHAINLINK FENCECOVERED
DUGOUT
C O V
ER
ED
D U G O U T
C O V
ER
ED
D U G O U T
C O V
ER
ED
D U G O U T
BLEACHERS
C O N C R
ET
E
B
LE
A C H
ER
S
C O N C R
ET
E
COVERED
DUGOUT
BLEACHERS
CONCRETE
BATTING CAGES
BATTING CAGES
CLAY
CLAY
CLAY
CLAY
GRASS
GRASSGRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
GRASS
GRASS
GRASS
GRASS
CLAY
CLAY
CLAY
CLAY
GRASS
GRASS
CLAY
CLAY
CLAY
CLAY
GRASS
GRASS
CLAY
CLAY
CLAYCLAY
CLAY
CLAY
CLAY
CLAY
B
LE
A C H
ER
S C O V
ER
ED
D U G O U T
GRASS
GRASS
CLAYCLAY
CLAY
CLAY
GATE
6' CHAINLINK
FENCE
H A N D
IC
A P
PA
R K
IN
G
2" M
ET
A L
PO
ST
S 2"
M
ET
A L
PO
ST
S
22"
17"
GATE
6' CHAINLINK FENCE
GATE
GATE
ASPHALT PAVEMENT
ASPH
ALT P
AVEM
ENT
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
GATE
G A
TE
GATE
GATE
GATE
GATE
GATE
GATE
GATEGATE
GATE
GATE
DIRT
DIRT
DIRT
DIRT
GRASS
GRASS
GRASS
GRASS
GRASS GRASS
GRASS
GRASS
GRASS
DIRT
FINISH FLOOR EL = 9.68'
FINISH FLOOR EL = 9.01'
GATE
GATE 6' CHAINLINK FENCE
6' C
H A
IN
LI
N K F
EN
C E
6' C
H A
IN
LI
N K F
EN
C E
6' C
H A
IN
LI
N K F
EN
C E
6' CHAINLINK FENCE
6' C
H A
IN
LI
N K F
EN
C E
6' C
H A
IN
LI
N K F
EN
C E
C H A
IN
LI
N K F
EN
C E
6' C
H A
IN
LI
N K F
EN
C E
6' CHAINLINK FENCE
6' C
H A
IN
LI
N K F
EN
C E
ASPHALT
PAVEMENT
C H A
IN
LI
N K F
EN
C E
C H A
IN
LI
N K F
EN
C E
23' CHAINLINK FENCE
8' CHAINLINK FENCE
20' CHAINLINK FENCE
20' CHAINLINK FENCE
C H A
IN
LI
N K F
EN
C E
C H A
IN
LI
N K F
EN
C E
6' CHAINLINK FENCE
12' CHAINLINK FENCE
C H A
IN
LI
N K F
EN
C E
BEGIN
12' CHAINLINK FENCE
C H A
IN
LI
N K F
EN
C E
20' CHAINLINK FENCE
C H A
IN
LI
N K F
EN
C E
CH
AI
N
LI
N K
FE
N
CE
' C
HA
INL
INK
FE
NC
E
C H A
IN
LI
N K
FE
N C E
20' CHAINLINK FENCE 20' CHAINLINK FENCE
20' CHAINLINK FENCE
8' CHAINLINK FENCE
12' CHAINLINK FENCE
12' CHAINLINK FENCE
4' P
VC
F
EN
CE
6' C
H
AI
N
LI
N K
FE
N
CE
WOOD
COVERED
DUGOUT
WOOD
WOOD
SCOREBOARD
SCOREBOARD
SCOREBOARD
BLEACHERS
20' CHAINLINK FENCE
6' CHAINLINK FENCE
6' C
H A
IN
LI
N K F
EN
C E
6' CHAINLINK FENCE
14"
20' CHAINLINK
FENCE
BEGIN
8' CHAINLINK
FENCE
8' CHAINLINK FENCE
BEGIN
8' CHAINLINK
FENCE
BEGIN
8' CHAINLINK
FENCE
METAL POST (2)
METAL POST (2)
BEGIN
8' CHAINLINK FENCE
20' CHAINLINK
FENCE
6' CHAINLINK
FENCE
6' CHAINLINK FENCE
20' CHAINLINK FENCE
END 6' CHAINLINK FENCE
6' CHAINLINK FENCE
20' CHAINLINK
FENCE
6' CHAINLINK FENCE
8' CHAINLINK FENCE
B
EG
IN
7' C
H A
IN
LI
N K F
EN
C E
EXISTING PINELLAS COUNTY R/W PER
PINELLAS COUNTY RIGHT OF WAY MAP
FOR CAPITAL IMPROVEMENT FUND
NO. 401 007 001/001
EXISTING PINELLAS COUNTY R/W PER
PINELLAS COUNTY RIGHT OF WAY MAP
FOR CAPITAL IMPROVEMENT FUND
NO. 401 007 001/001
EXISTING PINELLAS COUNTY R/W PER
PINELLAS COUNTY RIGHT OF WAY MAP
FOR CAPITAL IMPROVEMENT FUND
NO. 401 007 001/001
EX
IS
TI
N G P
IN
EL
LA
S
C O U N
TY
R /W
P
ER
PI
N
EL
LA
S
C O U N
TY
R
IG
H T
O F
W A Y
M A P
FO
R C
A
PI
TA
L
IM
PR
O V
EM
EN
T
FU
N D
N O
1/
CONC. WALL
1. PROJECT COORDINATES ARE BASED ON THE FLORIDA STATE PLANE
COORDINATE SYSTEM, WEST ZONE, OF THE NORTH AMERICAN DATUM
OF 1983, 2011 ADJUSTMENT (NAD83/2011).
2. ELEVATIONS ARE BASED ON THE NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88).
3. THIS FILE IS MEANT TO BE DISPLAYED AT A SCALE OF 1" = 40'.
D
IR
EC
TI
O N O
N
LY
DI
RE
CT
IO
N
ON
LY
TT
5 T
2o ve-
— 4 SWALE 1
[ 9 o
I lilt— A e
LZc--- — W
— Wwi
I I! P
I! FM.
|III
III
I'1 1I
I' o& UH I 8I
, I1 I
OU
I
SWALE 2
i
BASIN DELINEATION LINE (TYP.)
Ein
%O1
— OO
o oo Qo8 o ©o On ®® 0*o on te oo l s DATE:DESCRIPTION: APPROVED BY:PROJECT:FB 01/02/2024DESIGNED
Pinellas PROJECT NO.IMDRAWN PRE WATERSHED PLANCROSS BAYOU LITTLE LEAGUECounty 004556B
RP DATE SHEET:CHECKED PUBLIC WORKSREV. BYREV. NO. DATE WS-01DESCRIPTION
AIMEE SHIELDS, P.E.
FLA. LIC. NO 6801 1
QU
ou m O
LO)
LO
OU
(U D ou O Ou
PRE
BYPASS
FIELDS
r
PRE
BASIN 1
PRE
BASIN 2
J
COMPACTED
PARKING AREA
O) d
O
••—A
O)3
O) C = S
A
C O
O o 0 w I O
O ill f
APPENDIX B-2
Post-Developed Basin Map
ST���
CATCH BASIN
TOP OF GRATE EL = 24.25'
N (15" RCP) IE = 19.35'
E (24" RCP) IE = 19.32'
ST-13
CATCH BASIN
TOP OF GRATE EL = 14.74'
N (15" RCP) IE = 10.11'
E (24" RCP) IE = 9.35'
W (24" RCP) IE = 9.35'
ST-15
CATCH BASIN
TOP OF GRATE EL = 14.73'
S (15" RCP) IE = 10.25'
ST-12
CATCH BASIN
TOP OF GRATE EL = 11.86'
N (15" RCP) IE = 7.08'
E (24" RCP) IE = 6.37'
W (24" RCP) IE = 6.42'
ST-16
CATCH BASIN
TOP OF GRATE EL = 11.74'
S (15" RCP) IE = 7.99'
ST-3
CURB INLET WITH MANHOLE
N RIM EL = 11.63'
THROAT EL = 11.03'
E (30" RCP) IE = 4.51'
W (24" RCP) IE = 4.89'
ST-4
MANHOLE
N RIM EL = 10.94'
E (8" PVC) = 7.77'
BOTTOM OF STRUCTURE EL = 7.82'
ST-11
CURB INLET WITH MANHOLE
N RIM EL = 11.07'
THROAT EL = 10.10'
W (30" RCP) IE = 3.62'
S (30" RCP) IE = 3.34'
ST-18
CATCH BASIN
(NO GRATE)
E (2" PIPE) IE = 6.20'
W (24" RCP) IE = 6.88'
BOTTOM OF BOX EL = 6.35'
ST-6
CURB INLET WITH MANHOLE
N RIM EL = 9.81'
THROAT EL = 8.85'
E (15" RCP) IE = 4.45'
ST-7
CURB INLET WITH MANHOLE
N RIM EL = 9.81'
THROAT EL = 9.04'
E (15" RCP) IE = 4.35'
W (15" RCP) IE = 4.35'
ST-19
CATCH BASIN
TOP OF GRATE EL = 9.04'
W (15" RCP) IE = 5.87'
ST-8
CATCH BASIN
TOP OF GRATE EL = 7.72'
W (14"X23" ERCP) IE = 6.13'
SE (14"X23" ERCP) IE = 5.96'
ST-9
CATCH BASIN
TOP OF GRATE EL = 7.55'
E (14"X23" ERCP) IE = 1.32'
METAL WOODWOOD
WOOD
WOODATMS
CONC.
ST-1
MANHOLE
N RIM EL = 9.71'
W (30" RCP) IE = 5.28'
SE (30" RCP) IE = 5.28'
ST-10
N RIM EL = 8.14'
E (30" RCP) IE = 4.46'
SW (30" RCP) IE = 4.44'
WOOD
Feet 80400 20
TT
3.75” ORIFICE @ 5.504L .-.-WEIR @ 6.02 (3.50 W X 1.49 H) - 1 COUNT
POND 2
BASIN 2
X XE' □ 5/
l!! - □) $= ii
3======
0-P)
(I fl ,2LPOST
J C
BASIN 1
I o679
I — ll
1 -
BASIN DELINEATION LINE (TYP.)
| 1.O r I □l. 1
| II
SWALE0
POND 1
LD)
O O cP 008 O.n o0 O.OOUTFALL PIPE Ootc ovO
N s DRKS)
DATE:DESCRIPTION: APPROVED BY:PROJECT:FBDESIGNED
PinellasIM DRAWN POST WATERSHED PLANCROSS BAYOU BALLFIELDSCounty 004556B
RP SHEET:DATECHECKED PUBLIC WORKSREV. BYREV. NO. DATE WS-02DESCRIPTION
AIMEE SHIELDS, P.E.
FLA. LIC. NO 6801 1
OU
OU
CS-02
-TYPE E
0)
I l
I I m O
LO)
L
O L
A <L
OU
ou
(U O ou
I O)
BYPASS -
FIELDS
‘1 IT
O
I
TOP @ 7.51 (4.33 W X 3.33 H)
OUTFALL PIPE - 79 LF OF 18” RCP @ INV. 5.50 TO
EXISTING MANHOLE @ 5.28
U
CS-01
TYPE E
SBF UNDERDDRAIN @ 1.75
J
O
I I I I I I I I I
O)5
I I I I
O o Q w I O
U
£ o
ID
CD
I
04/19/2023
PROJECT NO.
I
WEIR @ 6.02 (3.50 W X 1.62 H)
TOP @ 7.64 (4.33 W X 3.33 H)
46 LT OF 18” RCP © INV. 4.50 TO
--------------- SWALE @ 4.25---------
APPENDIX B-3
Curve Number Calculations
Table 1 - Runoff Curve Number
Project: Cross Bayou By: FCD Date: 4/22/2024
Location: Pre Basin 1 Checked: Date:
Circle one: Present Developed
Runoff Curve Number (CN)
Soil Name Cover Description CN Area Product and of
Hydrologic (cover type, treatment, and acres CN x area group hydrologic condition; Tab. Fig. Fig. mi percent impervious; 2-2 2-3 2-4 % unconnected/connected impervious
(Appendix A) area ratio)
A Impervious 98 1.42 139.2
A pond 100 0.00 0.0
A Open Space 80 4.22 337.6
Totals = 5.64 476.8
CN (weighted) = total product/total area Use CN = 85
Reference: Urban Hydrology for Small Watersheds
Technical Release 55, Soil Conservation
Service, June 1986
Project: Cross Bayou By: FCD Date: 6/12/2024
Location: Pre Basin 2 Checked: Date:
Circle one: Present Developed
Runoff Curve Number (CN)
Soil Name Cover Description CN Area Product and of
Hydrologic (cover type, treatment, and acres CN x area group hydrologic condition; Tab. Fig. Fig. mi percent impervious; 2-2 2-3 2-4 % unconnected/connected impervious
(Appendix A) area ratio)
A Impervious 98 0.70 68.6
A compacted park ing area 91 2.79 253.9
A Open Space 80 1.45 116.2
Totals = 4.94 438.7
CN (weighted) = total product/total area Use CN = 89
Reference: Urban Hydrology for Small Watersheds
Project: Cross Bayou By: FCD Date: 4/5/2024
Location: Basin 1 Checked: Date:
Circle one: Present Developed
Runoff Curve Number (CN)
Soil Name Cover Description CN Area Product and of
Hydrologic (cover type, treatment, and acres CN x area group hydrologic condition; Tab. Fig. Fig. mi percent impervious; 2-2 2-3 2-4 % unconnected/connected impervious
(Appendix A) area ratio)
A Impervious 98 2.69 264.0
A pond 100 0.71 71.3
A Open Space 80 4.70 375.9
Totals = 8.11 711.1
CN (weighted) = total product/total area Use CN = 88
Reference: Urban Hydrology for Small Watersheds
Location: Basin 2 Checked: Date:
Circle one: Present Developed
Runoff Curve Number (CN)
Soil Name Cover Description CN Area Product and of
Hydrologic (cover type, treatment, and acres CN x area group hydrologic condition; Tab. Fig. Fig. mi percent impervious; 2-2 2-3 2-4 % unconnected/connected impervious
(Appendix A) area ratio)
A Impervious 98 0.37 36.7
A pond 100 0.09 9.3
A Open Space 80 2.00 160.2
Totals = 2.47 206.2
CN (weighted) = total product/total area Use CN = 84
Reference: Urban Hydrology for Small Watersheds
Location: Post By Pass Fields Checked: Date:
Circle one: Present Developed
Runoff Curve Number (CN)
Soil Name Cover Description CN Area Product and of
Hydrologic (cover type, treatment, and acres CN x area group hydrologic condition; Tab. Fig. Fig. mi percent impervious; 2-2 2-3 2-4 % unconnected/connected impervious
(Appendix A) area ratio)
A Impervious 98 0.50 49.1
A pond 100 0.00 0.0
A Open Space 80 2.80 223.9
Totals = 3.30 273.0
CN (weighted) = total product/total area Use CN = 83
Reference: Urban Hydrology for Small Watersheds
Technical Release 55, Soil Conservation
Service, June 1986
Table 1 - Runoff Curve Number
Project: Cross Bayou By: FCD Date: 4/5/2024
Location: Pre By Pass Fields Checked: Date:
Circle one: Present Developed
Runoff Curve Number (CN)
Soil Name Cover Description CN Area Product and of
Hydrologic (cover type, treatment, and acres CN x area group hydrologic condition; Tab. Fig. Fig. mi percent impervious; 2-2 2-3 2-4 % unconnected/connected impervious
(Appendix A) area ratio)
A Impervious 98 0.49 48.4
A pond 100 0.00 0.0
A Open Space 80 2.81 224.5
Totals = 3.30 272.9
CN (weighted) = total product/total area Use CN = 83
Reference: Urban Hydrology for Small Watersheds
Time of concentration (Tc) or travel time (Tt)
Project : Cross Bayou By: FCD Date:
Location : Pre Basin 1 Checked: Date:
Circle One: Present Developed
Circle One: Tc Tt through subarea
NOTES: Space for as many as two segments per flow type can be used for each worksheet.
Include map, schematic, or description of flow segments.
Sheet flow (Applicable to Tc only)
Segment ID
1. Surface description (Table 3-1) grass
2. Mannings roughness coeff., n (Table 3-1) 0.02
3. Flow length, L (total L < 100ft.) ft 100
4. Two-yr 24-hr rainfall, P2 in 4.92 4.92
5. Calculated Land slope, s ft/ft 0.003
5a. Land Elevation For Upper End Of Flow Path 9.67
5b. Land Elevation For Lower End Of Flow Path 9.39
6. Compute Tt hr 0.07 + = 0.07
Shallow concentrated flow
Segment ID
7. Surface description (Paved or Unpaved) grass
8. Flow length, L ft 270
9. Calculated Watercourse slope, s ft/ft 0.005
9a. Land Elevation For Upper End Of Flow Path 9.39
9b. Land Elevation For Lower End Of Flow Path 8.00
10. Average velocity, V (Figure 3-1) ft/s 1.16
11. Tt = L/3600V Compute Tt hr 0.06 + = 0.06
Pipe/Gutter/Ditch flow
Segment ID
12 V = 1.5 ft/s (Assumed) ft/s 1.5 1.5
13. Flow length, L ft
14. Tt = L/3600V Compute Tt hr 0.00 + 0.00 = 0.00
15. Watershed or subarea Tc or Tt (add Tt in steps 6,11, and 14) hr 0.13
Reference: Urban Hydrology for Small Watersheds
Technical Release 55, Soil Conservation Service
U.S. Department of Agriculture, June 1986
Use Time Of Concentration = 8 Minutes
6/13/2024
Location : Pre Basin 2 Checked: Date:
Circle One: Present Developed
Circle One: Tc Tt through subarea
NOTES: Space for as many as two segments per flow type can be used for each worksheet.
Include map, schematic, or description of flow segments.
Sheet flow (Applicable to Tc only)
Segment ID
1. Surface description (Table 3-1) grass
2. Mannings roughness coeff., n (Table 3-1) 0.02
3. Flow length, L (total L < 100ft.) ft 100
4. Two-yr 24-hr rainfall, P2 in 4.92 4.92
5. Calculated Land slope, s ft/ft 0.000
5a. Land Elevation For Upper End Of Flow Path 8.53
5b. Land Elevation For Lower End Of Flow Path 8.48
6. Compute Tt hr 0.13 + = 0.13
Shallow concentrated flow
Segment ID
7. Surface description (Paved or Unpaved)
8. Flow length, L ft 70
9. Calculated Watercourse slope, s ft/ft 0.007
9a. Land Elevation For Upper End Of Flow Path 8.48
9b. Land Elevation For Lower End Of Flow Path 8.00
10. Average velocity, V (Figure 3-1) ft/s 1.34
11. Tt = L/3600V Compute Tt hr 0.01 + = 0.01
Pipe/Gutter/Ditch flow
Segment ID
12 V = 1.5 ft/s (Assumed) ft/s 1.5 1.5
13. Flow length, L ft
14. Tt = L/3600V Compute Tt hr 0.00 + 0.00 = 0.00
15. Watershed or subarea Tc or Tt (add Tt in steps 6,11, and 14) hr 0.15
Reference: Urban Hydrology for Small Watersheds
Technical Release 55, Soil Conservation Service
U.S. Department of Agriculture, June 1986
Use Time Of Concentration = 9 Minutes
Location : By Pass Fields Checked: Date:
Circle One: Present Developed
Circle One: Tc Tt through subarea
NOTES: Space for as many as two segments per flow type can be used for each worksheet.
Include map, schematic, or description of flow segments.
Sheet flow (Applicable to Tc only)
Segment ID
1. Surface description (Table 3-1) grass
2. Mannings roughness coeff., n (Table 3-1) 0.02
3. Flow length, L (total L < 100ft.) ft 100
4. Two-yr 24-hr rainfall, P2 in 4.92 4.92
5. Calculated Land slope, s ft/ft 0.001
5a. Land Elevation For Upper End Of Flow Path 8.50
5b. Land Elevation For Lower End Of Flow Path 8.45
6. Compute Tt hr 0.13 + = 0.13
Shallow concentrated flow
Segment ID
7. Surface description (Paved or Unpaved)
8. Flow length, L ft 90
9. Calculated Watercourse slope, s ft/ft 0.003
9a. Land Elevation For Upper End Of Flow Path 8.45
9b. Land Elevation For Lower End Of Flow Path 8.15
10. Average velocity, V (Figure 3-1) ft/s 0.93
11. Tt = L/3600V Compute Tt hr 0.03 + = 0.03
Pipe/Gutter/Ditch flow
Segment ID
12 V = 1.5 ft/s (Assumed) ft/s 1.5 1.5
13. Flow length, L ft
14. Tt = L/3600V Compute Tt hr 0.00 + 0.00 = 0.00
15. Watershed or subarea Tc or Tt (add Tt in steps 6,11, and 14) hr 0.16
Reference: Urban Hydrology for Small Watersheds
Technical Release 55, Soil Conservation Service
U.S. Department of Agriculture, June 1986
Use Time Of Concentration = 10 Minutes
APPENDIX B-4
Wet Detention Pond Calculations
PROJECT: Cross Bayou
PROJECT # R220415.01
DATE: 4/18/2025
WET DETENTION CALCULATIONS:
Land Use: Residentail Site Receiving Waters: Class III Pond Designation: Pond 1 & 2 (Wet) Basin Area (Ac): 10.58 (Including Pond) Basin Impervious Area (Ac): 3.07 (Top of Bank) Basin % Impervious: 29.0% (Not Including Pond) Basin Coeff. of Runoff: 0.49
Stage-Area-Pool Volume relationship:
Stage Stage Area Area Vol. Pool Vol. Det Vol.
(ft) Desc (sf) (Ac) (Ac-Ft) (Ac-Ft) (Ac-Ft)
0.00 BOT 20622 0.47 0.00 0.00
2.75 Trans 25216 0.58 1.45 1.45
5.00 NWL 39292 0.90 3.11 3.11 0.00
5.91 TV 43945 1.01 3.98 0.88
8.50 TOB 57190 1.31 6.99 3.88
1. Required Treatment Volumes:
a. 1" Runoff from Drainage Basin:
Vd = Area(Ac) x 1" / 12" per foot Vd = 10.58 x 1" / 12" per foot Vd = 0.88 Ac - Ft
2. Set Elevation of Control Structure:
Overflow Weir
Using Stage vs Storage Curve w/ Treatment Volume = 0.88 Ac - Ft therefore Weir Elv = 5.91 Ft (min.)
Design Weir ELv.= 5.91 feet w/ volume = 1.01 Ac-Ft Initial Stage = 5.91 - 5.00 = 0.91 Ft
3. Calculate Minimum Permanent Pool Volume:
Project Coeff of Runoff (C)= 0.4858713
Min. Pool Volume = Area(Ac) x C x 30" x 14 Days 12" x 122 Days/Year
Min. Pool Volume = 10.575055 x 0.49 x 30" x 14 Days 12" x 122 Days/Year
Min. Pool Volume Required= 1.47 Ac - Ft Pool Volume Provided = 3.11 Ac - Ft
Littoral Zone Check Surface Area Between NWL & Trans. Elv.= 14076.03 sf Surface Area at Normal Water Level = 39292.00 sf
Littoral Zone Ratio= 35.8%
4. Check the Mean Depth of the Pond:
Mean Depth (ft) = permanent pool vol / area @ orifice el
= 3.11 / 0.90 = 3.45 ft
Project Name Date
City/County State FL Designed By
Media WQ Flow Rate TP TN
ECT 1 45% 45%
acres ECT3 1 25% 25% acres CTS 0.052 95% 75% inches ICS 0.104 95% 85%
Hours
Notes:
153,699.12
76,849.56
Media Type
Post-Dev Catchment Area
Area of Pond (NWL)
Treatment Depth
Water Management District
Bold & Gold Filter Water Quality Analysis
Cross Bayou Ballfields
Pinellas County
Inputs
11/26/2024
JKB
Curve Number, CN
Percent DCIA
Dewatering Time
83.00
23.00
EIApond
EIADCIA
acres acres inches acres acres
2.25
7.52
0.24
Impervious Area
Pervious Area
Runoff Depth
Min. Square Feet of Media Required
EIApervious
Effective Impervious Area, EIA
Media Flow Rate
Treatment Volume
1/2 Treatment Volume
Filter Sizing Results
Gallons
Gallons sf acres acres
GPM/SF
Acre-ft
Acre-ft
0.47
Southwest Florida
CTS
10.58
0.81
1.25
EIA Results
*ECT3/ECT Media for NRFS and Baffle Boxes
*CTS and ICS Media for Side Bank Filters/Vertical Flow Filters
*Total Removal = Removal Eff * Hydraulic Efficiency
*Hydraulic Eff based on filter's TV relative to the size of the EIA
0.24
1,026.30
0.81
2.25
1.47
4.528
0.05
% FERGUSON
WATERWORKS
Date 11/26/2024 State FL Designed By JKB
0.47 ac-ft 1288.98 ft
0.83 ft/hr 6.00 in
5.56 ft 4.50 ft
5.00 ft 0.01
4.13 ft 0.002 ft/ft 10 4 :1
2.00 ft
2.23 ft
5.00 ft 0.00 CF
5.56 ft 20548.01 CF
8.50 ft 128937.60 CF
Elev.
(ft.)
Storage
(cf)
Incr.
Storage
(V)(cf)
Elevation
Change
(H) (ft.)
Avg. Flow
Distance
(D) (ft.)
Hydraulic
Gradient
(i)
Avg. Filter
Flow Area
(A)(SF)
Instant.
Discharge
(Q) (CFH)
Avg.
Discharge
Per Increm.
(Q)(CFH)
Drawdown
Time Per
Increm.
(t)(hrs.)
5.558 20548.01 0.81 2.00 0.40 2875.83 967.93
2054.80 934.51 2.20
5.502 18493.21 0.75 2.00 0.38 2875.83 901.09
2054.80 867.67 2.37
5.446 16438.41 0.70 2.00 0.35 2875.83 834.25
2054.80 800.84 2.57
5.390 14383.61 0.64 2.00 0.32 2875.83 767.42
2054.80 734.00 2.80
5.335 12328.81 0.58 2.00 0.29 2875.83 700.58
2054.80 667.16 3.08
5.279 10274.01 0.53 2.00 0.26 2875.83 633.75
2054.80 600.33 3.42
5.223 8219.20 0.47 2.00 0.24 2875.83 566.91
2054.80 533.49 3.85
5.167 6164.40 0.42 2.00 0.21 2875.83 500.07
2054.80 466.66 4.40
5.112 4109.60 0.36 2.00 0.18 2875.83 433.24
2054.80 399.82 5.14
5.056 2054.80 0.31 2.00 0.15 2875.83 366.40
2054.80 332.98 6.17
5.000 0.00 0.25 2.00 0.13 2875.83 299.57
= 36.00 hrs.
= 5.98 in.
1026.30 SF
2878.11 SF
2878.11 SF
Filter Media Depth (D) Filter Media Width
Mannings n
Basin Berm Slope
Length of Pipe (L) Pipe Diameter (d)
Runoff Volume Filter Permeibility
Pipe Invert Elevation
Slope
Top of TV Bottom of TV Tailwater Elev.
Number of Increments
Bold & Gold Filter Drawdown Analysis
Cross Bayou Ballfields Pinellas County
Project Name City/County
Minimum Filter Area
Stage Storage Estimator
Bottom of TV:
Top of TV:
Stage Above TV:
Storage Volume:
Treatment Volume:
Storage Volume:
Drawdown Time Calculation
Draw Down Time Total Required Pipe Capacity
Comparative Analaysis
DETERMINING FACTOR
Water Quality Result
Hydraulic Drawdown Result
%FERGUSON
Project Name Cross Bayou Ballfields Date 11/26/2024
City/County Pinellas County State FL Designed By JKB
Inputs
Media Type CTS Media Types
Removal
Rate Removal Rate 0.20 mg OP / g ECT Mixes 0.20 Filter Volume Provided 5,751.67 cf CTS 0.20 Saturated Weight 95 lb/cf ICS 0.60 Fraction OP in TP 1.00 *ECT3/ECT Media for NRFS and Baffle Boxes Annual TP Removed 0.68 kg/yr *CTS Media for Side Bank Filters/Vertical Flow Filters
Expectancy
Removal Capacity = Filter Volume (cf) * Moist Weight (lb/cf) * 454 (g/lb) * Media Capacity (mg/g) Removal Capacity = mg
OP Removed per Year = Fraction of OP in TP * Mass Removed (kg/yr) * 1,000,000 mg/kg OP Removed per Year = mg/yr
Service Life = Removal Capacity (mg) / OP Removed per year (mg/yr) Service Life = yr
Bold & Gold Filter Life Expectancy
72.96
680,000.00
49,613,880.83
Saturated Weight
(lb/cf)
K FERGUSON
Basin ID Total Area Pervious Impervious Imp % Pond
Basin 1 8.11 4.70 2.69 33% 0.71
Basin 2 2.47 2.00 0.37 15% 0.09
Parking Surface, Buildings, Sidewalks, etc.
Semi
Impervious
(Field Clay)
Total
Impervious Imp % Pervious Pond
Total
Area
Basin 1 2.25 0.44 2.69 33% 4.70 0.71 8.11
Basin 2 0.23 0.15 0.37 15% 2.00 0.09 2.47
By pass 0.00 0.50 0.50 15% 2.80 0.00 3.30
Total Project 2.48 1.09 3.57 9.50 0.80 13.88
Impervious area breakdown:
NOTE: All semi impervious areas (Clay within the ball fields) is accounted as impervious area for CN calculations.
APPENDIX C-1
AdICPR Input Report
C:\Users\delvafc\Desktop\ICPR\Cross Bayou - Pre\Pre Development_ICPR\ 6/13/2024 17:14
Simple Basin: Pre Basin 1 Scenario: Scenario1
Node: Swale 1 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 5.6400 ac
Curve Number: 85.0 % Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Pre Basin 2 Scenario: Scenario1
Node: Swale 2 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 4.9400 ac
Curve Number: 89.0 % Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Pre Bypass Fields Scenario: Scenario1
Node: Tailwater Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
PRE DEVELOPMENT ICPR INPUT DATA
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 3.3000 ac
Curve Number: 83.0 % Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Node: Swale 1 Scenario: Scenario1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 6.00 ft Warning Stage: 7.50 ft
Stage [ft] Area [ac] Area [ft2]
6.00 0.0400 1742
7.50 0.2700 11761
Comment:
Node: Swale 2 Scenario: Scenario1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 6.00 ft Warning Stage: 7.50 ft
Stage [ft] Area [ac] Area [ft2]
6.00 0.0600 2614
7.50 0.3100 13504
Comment:
Node: Tailwater Scenario: Scenario1
Type: Time/Stage Base Flow: 0.00 cfs
Initial Stage: 4.13 ft Warning Stage: 6.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft] 0 0 0 0.0000 4.13 0 0 0 30.0000 4.13
Comment: Tailwater information for the existing and proposed project was obtained from permit no. 43041400.00 submitted to SWFWMD in application 685225.
Pipe Link: L-0040P Scenario: Scenario1
From Node: Swale 1 To Node: Tailwater
Link Count: 1 Flow Direction: Both
Damping: 0.0000 ft Length: 445.00 ft
FHWA Code: 0 Entr Loss Coef: 0.00 Exit Loss Coef: 0.00
Bend Loss Coef: 0.00 Bend Location: 0.00 dec Energy Switch: Energy
Upstream Downstream Invert: 5.79 ft Invert: 4.42 ft
Manning's N: 0.0130 Manning's N: 0.0130 Geometry: Circular Geometry: Circular
Max Depth: 2.50 ft Max Depth: 2.50 ft Bottom Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000 Top Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000 Comment:
Pipe Link: L-0050P Scenario: Scenario1
From Node: Swale 2 To Node: Swale 1
Link Count: 1 Flow Direction: Both
Damping: 0.0000 ft Length: 69.00 ft
FHWA Code: 0 Entr Loss Coef: 0.00 Exit Loss Coef: 0.00
Bend Loss Coef: 0.00 Bend Location: 0.00 dec Energy Switch: Energy
Upstream Downstream Invert: 6.23 ft Invert: 6.08 ft
Manning's N: 0.0130 Manning's N: 0.0130 Geometry: Circular Geometry: Circular
Max Depth: 2.00 ft Max Depth: 2.00 ft Bottom Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000 Top Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000 Comment:
Simulation: 10-24 Scenario: Scenario1
Run Date/Time: 6/13/2024 10:06:02 AM Program Version: ICPR4 4.07.08
General Run Mode: Normal
Year Month Day Hour [hr] Start Time: 0 0 0 0.0000 End Time: 0 0 0 30.0000
Hydrology [sec] Surface Hydraulics [sec]
Groundwater [sec]
Min Calculation Time: 60.0000 0.1000 900.0000 Max Calculation Time: 60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000
Surface Hydraulics
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000
Groundwater
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 60.0000
Restart File Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables Rainfall Folder: Boundary Stage Set:
Reference ET Folder: Extern Hydrograph Set:
Unit Hydrograph
Folder:
Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Roughness Set:
Crop Coef Set:
Fillable Porosity Set:
Conductivity Set:
Leakage Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr Max Iterations: 6 ET for Manual Basins: False
Over-Relax Weight Fact:
0.5 dec dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Opt:
Global
Max dZ: 1.0000 ft OF Region Rain Opt: Global Link Optimizer Tol: 0.0001 ft Rainfall Name: ~FLMOD
Rainfall Amount: 7.50 in Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (2D): 0.0050 ft Dflt Damping (1D): 0.0050 ft Min Node Srf Area
(2D):
100 ft2 Min Node Srf Area
(1D):
100 ft2
Energy Switch (2D): Energy Energy Switch (1D): Energy
Comment:
Simulation: 100-24 Scenario: Scenario1
Run Date/Time: 6/13/2024 10:06:05 AM Program Version: ICPR4 4.07.08
General Run Mode: Normal
Year Month Day Hour [hr] Start Time: 0 0 0 0.0000 End Time: 0 0 0 30.0000
Hydrology [sec] Surface Hydraulics [sec]
Groundwater [sec]
Min Calculation Time: 60.0000 0.1000 900.0000 Max Calculation Time: 60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000
Surface Hydraulics
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000
Groundwater
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 60.0000
Restart File Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables Rainfall Folder: Boundary Stage Set:
Reference ET Folder: Extern Hydrograph Set:
Unit Hydrograph
Folder:
Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Roughness Set:
Crop Coef Set:
Fillable Porosity Set:
Conductivity Set:
Leakage Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr Max Iterations: 6 ET for Manual Basins: False
Over-Relax Weight Fact:
0.5 dec dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Opt:
Global
Max dZ: 1.0000 ft OF Region Rain Opt: Global Link Optimizer Tol: 0.0001 ft Rainfall Name: ~FLMOD
Rainfall Amount: 12.00 in Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (2D): 0.0050 ft Dflt Damping (1D): 0.0050 ft Min Node Srf Area
(2D):
100 ft2 Min Node Srf Area
(1D):
100 ft2
Energy Switch (2D): Energy Energy Switch (1D): Energy
Simulation: 25-24 Scenario: Scenario1
Run Date/Time: 6/13/2024 10:06:08 AM Program Version: ICPR4 4.07.08
General Run Mode: Normal
Year Month Day Hour [hr] Start Time: 0 0 0 0.0000 End Time: 0 0 0 30.0000
Hydrology [sec] Surface Hydraulics [sec]
Groundwater [sec]
Min Calculation Time: 60.0000 0.1000 900.0000 Max Calculation Time: 60.0000
Output Time Increments
Hydrology
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000
Surface Hydraulics
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 15.0000
Groundwater
Year Month Day Hour [hr] Time Increment [min] 0 0 0 0.0000 60.0000
Restart File Save Restart: False
Resources & Lookup Tables
Resources Lookup Tables Rainfall Folder: Boundary Stage Set:
Reference ET Folder: Extern Hydrograph Set:
Unit Hydrograph
Folder:
Curve Number Set:
Green-Ampt Set:
Vertical Layers Set:
Impervious Set:
Roughness Set:
Crop Coef Set:
Fillable Porosity Set:
Conductivity Set:
Leakage Set:
Tolerances & Options
Time Marching: SAOR IA Recovery Time: 24.0000 hr Max Iterations: 6 ET for Manual Basins: False
Over-Relax Weight Fact:
0.5 dec dZ Tolerance: 0.0010 ft Smp/Man Basin Rain Opt:
Global
Max dZ: 1.0000 ft OF Region Rain Opt: Global Link Optimizer Tol: 0.0001 ft Rainfall Name: ~FLMOD
Rainfall Amount: 9.00 in Edge Length Option: Automatic Storm Duration: 24.0000 hr
Dflt Damping (2D): 0.0050 ft Dflt Damping (1D): 0.0050 ft Min Node Srf Area
(2D):
100 ft2 Min Node Srf Area
(1D):
100 ft2
C:\Users\crabtjt\Downloads\Post Development_ICPR - REV3\ 12/9/2024 17:31
Simple Basin: Basin 1 Scenario: Scenario1
Node: Pond 1 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 8.1100 ac
Curve Number: 88.0 % Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: Basin 2 Scenario: Scenario1
Node: Pond 2 Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 2.4700 ac
Curve Number: 84.0 % Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Simple Basin: By Pass Ball Fields Scenario: Scenario1
Node: Tailwater Hydrograph Method: NRCS Unit Hydrograph Infiltration Method: Curve Number
Time of Concentration: 10.0000 min Max Allowable Q: 0.00 cfs
POST DEVELOPMENT ICPR INPUT DATA
Time Shift: 0.0000 hr Unit Hydrograph: UH256
Peaking Factor: 256.0 Area: 3.3000 ac
Curve Number: 83.0 % Impervious: 0.00
% DCIA: 0.00
% Direct: 0.00
Rainfall Name:
Comment:
Node: Pond 1 Scenario: Scenario1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 5.00 ft Warning Stage: 8.50 ft
Stage [ft] Area [ac] Area [ft2]
5.00 0.8090 35240
5.50 0.8480 36939
6.50 0.9290 40467
7.50 1.0120 44083
8.50 1.0980 47829
Comment:
Node: Pond 2 Scenario: Scenario1
Type: Stage/Area Base Flow: 0.00 cfs
Initial Stage: 5.00 ft Warning Stage: 8.50 ft
Stage [ft] Area [ac] Area [ft2]
5.50 0.1090 4748
6.50 0.1420 6186
7.50 0.1770 7710
8.50 0.2150 9365
5.00 0.0930 4051
Node: Tailwater Scenario: Scenario1
Type: Time/Stage Base Flow: 0.00 cfs
Initial Stage: 4.13 ft Warning Stage: 6.00 ft
Boundary Stage:
Year Month Day Hour Stage [ft] 0 0 0 0.0000 4.13 0 0 0 30.0000 4.13
Comment: Tailwater information for the existing and proposed project was obtained from permit no. 43041400.00 submitted to SWFWMD in application 685225.
Drop Structure Link: CS-01 Scenario: Scenario1
From Node: Pond 1 To Node: Tailwater
Link Count: 1 Flow Direction: Both
Solution: Combine Increments: 0 Pipe Count: 1
Damping: 0.0000 ft Length: 46.00 ft
FHWA Code: 0 Entr Loss Coef: 0.00 Exit Loss Coef: 0.00
Bend Loss Coef: 0.00 Bend Location: 0.00 dec Energy Switch: Energy
Upstream Pipe Downstream Pipe Invert: 4.50 ft Invert: 4.25 ft
Manning's N: 0.0130 Manning's N: 0.0130 Geometry: Circular Geometry: Circular
Max Depth: 1.50 ft Max Depth: 1.50 ft Bottom Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000 Top Clip
Default: 0.00 ft Default: 0.00 ft Op Table: Op Table:
Ref Node: Ref Node:
Manning's N: 0.0000 Manning's N: 0.0000
Pipe Comment:
Weir Component Weir: 1
Weir Count: 1 Weir Flow Direction: Both
Damping: 0.0000 ft Weir Type: Sharp Crested Vertical
Geometry Type: Rectangular Invert: 5.91 ft
Control Elevation: 5.91 ft Max Depth: 2.50 ft Max Width: 3.00 ft
Fillet: 0.00 ft
Bottom Clip Default: 0.00 ft
Op Table:
Ref Node:
Top Clip Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200 Weir Table:
Orifice Default: 0.600
Orifice Table:
Weir Comment:
Weir Component Weir: 2
Weir Count: 1 Weir Flow Direction: Both
Damping: 0.0000 ft Weir Type: Horizontal
Geometry Type: Rectangular Invert: 8.41 ft
Control Elevation: 8.41 ft Max Depth: 3.33 ft Max Width: 4.33 ft
Fillet: 0.00 ft
Bottom Clip Default: 0.00 ft
Op Table:
Ref Node:
Top Clip Default: 0.00 ft
Op Table:
Ref Node:
Discharge Coefficients
Weir Default: 3.200 Weir Table:
Orifice Default: 0.600 Orifice Table:
Weir Comment: Tyoe E Control Structure
Drop Structure Comment:
Drop Structure Link: CS-02 Scenario: Scenario1
From Node: Pond 2 To Node: Tailwater
Link Count: 1 Flow Direction: Both
Solution: Combine Increments: 0 Pipe Count: 1
Damping: 0.0000 ft Length: 79.00 ft
FHWA Code: 0 Entr Loss Coef: 0.00 Exit Loss Coef:…