25-0036-REQ_Plans-Electrical.pdf

PDF 2 MB Posted

Attached to
Cross Bayou Athletic Association Complex Improvements - Professional Design-Build Services (PID 004556B)
Solicitation number
25-0036-RFQ-DB
Issued by
Pinellas County, Clewiston City, Florida

About this file

This is an electrical site plan document prepared by professional engineer Krista Marie Taylor for the Cross Bayou Athletic Association Complex Improvements project in Seminole, Florida, under Pinellas County's jurisdiction. The plans detail electrical infrastructure for a baseball park reconstruction project located at the corner of 102nd Avenue and 98th Street North. The design includes two proposed electrical panels (LP1 and LP2), three utility transformers (UTXFMR-1, UTXFMR-2, and UTXFMR-M1), and an 800-ampere main service disconnect rated at 277/480 volts with three-phase, four-wire configuration in a NEMA 3R exterior rated enclosure. The electrical work encompasses connections for sports lighting via Musco lighting poles, a scoreboard with 120-volt service, a batting cage pitching machine, monument signage with flashing beacons, and an existing well pump. The plans establish a steel channel support rack system for equipment mounting and specify grounding requirements using number 1/0 copper conductors in one-inch conduit connected to a five-eighths-inch by thirty-foot copper-clad ground triad with three-point configuration.

All work must comply with the Florida Building Code, the 2017 National Electrical Code, and applicable state and local amendments as determined through coordination with Duke Energy and Musco Lighting. The contractor is responsible for field verification of all device and equipment locations prior to rough-in installation, managing voltage drop calculations to maintain maximum cumulative five percent at the furthest downstream equipment, and providing arc flash and shock hazard signage in accordance with NEC Article 110.16, NFPA 70E, and OSHA requirements. The design specifies Schneider Electric as the manufacturer basis for all power distribution equipment and requires the contractor to provide trenching, backfill, conduit, conductors, and transformer pad installation in coordination with the utility company. The electrical plans were last revised on July 12, 2024, and form part of the comprehensive design-build service delivery for the professional reconstruction of the baseball facility.

View the file

Other files

File Type Posted
25-0036-RFQ-DB_2-4-26.pdf PDF
APPENDIX_1_-_PERMITS_rev1_corrected.pdf PDF
Approved_RUP_24-00009.pdf PDF
Approved_RUP_24-00008.pdf PDF
Approved_RUP_24-00007.pdf PDF
Approved_RUP_24-00006.pdf PDF
Approved_STP_24-00002.pdf PDF
AREHNA_Geotech_Report_06-02-2023.pdf PDF
UTV_Summary_Report.pdf PDF
Topographic_Survey_Signed.pdf PDF
SWFWMD_Permit_43047961.0000_2025-02-24.pdf PDF
SWFWMD_Drainage_Report_Narrative_FD.pdf PDF
BDRS_Conditional_Approval_Letter.pdf PDF
Plans_Electrical.pdf PDF
Pinellas_County_-_Conveyance_Report.pdf PDF
Location_Map.pdf PDF
Flood_Plans.pdf PDF
Ecological_Assessment_Report.pdf PDF
Cross_Bayou_Ballfields.pdf PDF
Design_Criteria_Package_rev_01-20-2026_(2).pdf PDF
Sample_Agreement.pdf PDF
OKApproved-STP-24-00002.pdf PDF
Approved-RUP-24-00008.pdf PDF
Approved-RUP-24-00007.pdf PDF
Approved-RUP-24-00006.pdf PDF
Approved-RUP-24-00009.pdf PDF
Cross_Bayou_O&M_Manual.pdf PDF
OKCross_Bayou_Ball_Fields_GAI.pdf PDF
OKSWFWMD_Drainage_Report_04.18.25.pdf PDF
25-0036-REQ_Cross_Bayou_Topographic_Survey_Signed.pdf PDF
Cross_Bayou_SWFWMD_Financial_Capability_Certification.pdf PDF
PID_04556B_Cross_Bayou_Fixed_Price_Design-Build_RFP_12-09-2025.pdf PDF
OKR220415.01-Cross_Bayou_Little_League-EAR-20230818_FS.pdf PDF
Design_Criteria_Package_rev_01-20-2026.pdf PDF
OK004556B-FLOOD_Plans.pdf PDF
PID_04556B_DRAFT_Cross_Bayou_Fixed_Price_Design-Build_RFP_02-09-2024.docx DOCX document
TY2-23-15_Conditional_Apprvl_Ltr.pdf PDF
Email_re_Edits_to_DCP_for_04556B-Cross_Bayou_2026-1-16(Internal_Review_Only).pdf PDF
OKCross_Bayou_Conveyance_Report_09.27.2024.pdf PDF
OK43047961.000.pdf PDF
APPENDIX_1_PERMITS-rev1_corrected.pdf PDF
25-0036-REQ_AREHNA-Geotech_Report-06-02-2023.pdf PDF
25-0036-REQ_Project_Location_Map.pdf PDF
OKCost_Estimate_60%.xlsx XLSX spreadsheet
25-0036-REQ_FY24_SeminoleRecreationFacilities_PFO.pdf PDF
25-0036-REQ_Request_for_ITB_CCNA_RFP-9-11-24.docx DOCX document
25-0036-REQ_SBE_Letter-from_EOR.pdf PDF
ADD-UTV_Summary_Report.pdf PDF
Non-Competitive_Oversight_Committee_Justification_Form.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL SITE PLAN

SCALE: 1" = 30'1

PLAN NOTES

120V CONNECTION TO SCOREBOARD.

VERIFY EXACT LOCATION AND

REQUIREMENTS WITH OWNER AND

MANUFACTURER. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

PROVIDE 120V GFCI PROTECTED DUPLEX

CONVENIENCE RECEPTACLE IN

WEATHERPROOF BACK-BOX WITH

LOCKABLE IN-USE COVER.

120V CONNECTION TO BATTING CAGE

PITCHING MACHINE. VERIFY EXACT

REQUIREMENTS WITH OWNER AND

MANUFACTURER. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

120V CONNECTION TO MONUMENT SIGN.

VERIFY EXACT REQUIREMENTS WITH

OWNER AND MANUFACTURER. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

CONNECTION TO EXISTING WELL PUMP.

VERIFY EXACT REQUIREMENTS. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

CONTRACTOR SHALL VERIFY ALL SPORTS

LIGHTING LOCATIONS AND

REQUIREMENTS WITH FINAL LIGHTING

DESIGN.

T

UTXFMR-M1

PROPOSED PANEL LP1

LOCATION. SEE RISER

DIAGRAM FOR MORE

INFORMATION.

2 2

PROPOSED PANEL LP2 LOCATION.

SEE RISER DIAGRAM FOR MORE

INFORMATION.

MAINTENANCE

BUILDING #1

J

WELL

PUMP

10 10

10 10

LP2-6

MONUMENT SIGN

T

UTXFMR-1

PROPOSED UTILITY TRANSFORMER AND

METER LOCATION. SEE RISER DIAGRAM

FOR MORE INFORMATION.

PROPOSED UTILITY TRANSFORMER AND

METER LOCATION. SEE RISER DIAGRAM

FOR MORE INFORMATION.

UTXFMR-2

T

LP1-2

LP1-4

LP1-1

LP1-3

LP1-5

LP1-7

LP1-10

LP2-6

LP2-25

WP

WP

WP

WP

WP

WP

WP

MUSCO LIGHTING SERVICE TRANSFORMER, METER,

DISCONNECT SWITCH, DISTRIBUTION AND CONTROL PANEL

LOCATION. SEE RISER DIAGRAM FOR MORE INFORMATION.

RESTROOM/

CONCESSION

BUILDING #2

LP1-9

MUSCO LIGHTING

POLE LOCATION

(TYP.)

(TYP.)

MUSCO LIGHTING

POLE LOCATION

(TYP.)

(TYP.)

Krista Marie Taylor, P.E. #93024

3664 ROLLING HILLS LANE, APOPKA, FL 32712

407-703-3444 - www.TaylorAndTaylor.net

Feet 40200 10

07-12-2024

ELECTRICAL SITE PLAN

SCALE: 1" = 30'1

LP2-6

PROPOSED UTILITY TRANSFORMER AND

METER LOCATION. SEE RISER DIAGRAM

FOR MORE INFORMATION.

UTXFMR-2

T

LP1-1

LP2-6

LP2-1

LP2-3

LP2-9

LP2-14

LP2-16

WP

WP

WP

WP

RESTROOM/

CONCESSION

BUILDING #2

LP2-12

MUSCO LIGHTING

POLE LOCATION

(TYP.)

(TYP.)

PLAN NOTES

120V CONNECTION TO SCOREBOARD.

VERIFY EXACT LOCATION AND

REQUIREMENTS WITH OWNER AND

MANUFACTURER. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

PROVIDE 120V GFCI PROTECTED DUPLEX

CONVENIENCE RECEPTACLE IN

WEATHERPROOF BACK-BOX WITH

LOCKABLE IN-USE COVER.

120V CONNECTION TO BATTING CAGE

PITCHING MACHINE. VERIFY EXACT

REQUIREMENTS WITH OWNER AND

MANUFACTURER. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

120V CONNECTION TO FLASHING

BEACONS/SIGN. VERIFY EXACT

REQUIREMENTS WITH OWNER AND

MANUFACTURER.

CONNECTION TO EXISTING WELL PUMP.

VERIFY EXACT REQUIREMENTS. PROVIDE

DISCONNECTING MEANS AS REQUIRED.

CONTRACTOR SHALL VERIFY ALL SPORTS

LIGHTING LOCATIONS AND

REQUIREMENTS WITH FINAL LIGHTING

DESIGN.

Krista Marie Taylor, P.E. #93024

3664 ROLLING HILLS LANE, APOPKA, FL 32712

407-703-3444 - www.TaylorAndTaylor.net

07-12-2024

ELECTRICAL RISER DIAGRAM @ MUSCO LIGHTING DISTRIBUTION

SCALE: NONE1

800A

SERVICE

DISCONNECT

277/480V 3Ø-4W

NEMA 3R

EXTERIOR ELECTRICAL EQUIPMENT RACK @

MUSCO LIGHTING SERVICE

SERVICE

METER

UTILITY

TRANSFORMER

UTXFMR-1

120/240V 1Ø

SECONDARY

MAINTENANCE

BLDG. #1

PANEL LP1

200A MCB

120/240V

1Ø,3W

NEMA 1

ELECTRICAL RISER DIAGRAM @ BUILDING #1

SCALE: NONE2

ELECTRICAL RISER DIAGRAM @ BUILDING #2

SCALE: NONE3

UTILITY

TRANSFORMER

UTXFMR-M1

480V-3Ø

SECONDARY

TO UTILITY

PRIMARY

TO UTILITY

PRIMARY

MUSCO

LIGHTING

DISTRUBUTION

PANEL MLDP

800A

MLO

277/480V 3Ø-4W

NEMA 3R

MUSCO

LIGHTING

CONTROL

PANEL

MUSCO

LIGHTING

CONTROL

PANEL

MUSCO

LIGHTING

CONTROL

PANEL

NEMA 3R

T

6 6 6

GENERAL NOTESRISER DIAGRAM NOTES #

A. ALL WORK SHALL COMPLY WITH THE FLORIDA BUILDING CODE AND THE 2017

NATIONAL ELECTRIC CODE, AS WELL AS STATE AND LOCAL CODES AND/OR

AMENDMENTS.

B. DO NOT SCALE ELECTRICAL DRAWING FOR ANY DIMENSIONS.

C. PROVIDE GROUNDING AND BONDING PER NEC 250.

D. ALL CIRCUITS NOT SIZED ON DRAWING SHALL BE INSTALLED TO MEET MINIMUM SIZE

REQUIRED BY NEC. ALL CONDUCTORS SHALL HAVE AN EQUIPMENT GROUND WIRE

SIZED PER NEC.

E. FIELD VERIFY EXACT LOCATION OF ALL DEVICES AND EQUIPMENT PRIOR TO

ROUGH-IN.

F. CONTRACTOR SHALL PROVIDE PROVIDE ARC FLASH / SHOCK HAZARD SIGNAGE FOR

ALL SWITCHGEAR IN ACCORDANCE WITH NEC ARTICLE 110.16, NFPA 70E, AND OSHA.

INCLUDE ALL INFORMATION PER LATEST REQUIREMENTS INCLUDING NOMINAL

VOLTAGE, AVAILABLE FAULT CURRENT, CLEARING TIME FOR DEVICES, APPROACH

BOUNDARIES, AND REQUIRED LEVEL OF PPE.

G. PER NEC 110.24 SERVICE EQUIPMENT IN OTHER THAN DWELLING UNITS SHALL BE

LEGIBLY MARKED IN THE FIELD WITH THE MAXIMUM AVAILABLE FAULT CURRENT. THE

FIELD MARKING(S) SHALL INCLUDE THE DATE THE FAULT CURRENT CALCULATION

WAS PERFORMED AND BE OF SUFFICIENT DURABILITY TO WITHSTAND THE

ENVIRONMENT INVOLVED. WHEN MODIFICATIONS TO THE ELECTRICAL INSTALLATION

OCCUR THAT AFFECT THE MAXIMUM AVAILABLE FAULT CURRENT AT THE SERVICE,

THE MAXIMUM AVAILABLE FAULT CURRENT SHALL BE VERIFIED OR RECALCULATED AS

NECESSARY TO ENSURE THE SERVICE EQUIPMENT RATINGS ARE SUFFICIENT FOR

THE MAXIMUM AVAILABLE FAULT CURRENT AT THE LINE TERMINALS OF THE

EQUIPMENT. THE REQUIRED FIELD MARKING(S) IN 110.24(A) SHALL BE ADJUSTED TO

REFLECT THE NEW LEVEL OF MAXIMUM AVAILABLE FAULT CURRENT.

H. THE MANUFACTURER BASIS OF DESIGN FOR ALL POWER DISTRIBUTION EQUIPMENT IS

SCHNEIDER ELECTRIC.

I. INCREASE FEEDER CONDUCTOR AND CONDUIT SIZES (AS REQUIRED WHEN FINAL

FEEDER ROUTE IS ESTABLISHED) IN ORDER TO MAINTAIN A MAXIMUM CUMULATIVE

VOLTAGE DROP OF FIVE (5) PERCENT AT THE FURTHEST DOWNSTREAM EQUIPMENT.

VOLTAGE DROP SHALL BE DISTRIBUTED AMONGST FEEDERS AND BRANCH CIRCUITS

IN ACCORDANCE WITH FLORIDA ENERGY CODE REQUIREMENTS. WHERE EQUIPMENT

IS UNABLE TO ACCOMMODATE UPSIZED CONDUCTORS, PROVIDE LUG KITS (AS

REQUIRED). WHERE LUG KITS ARE UNABLE TO ACCOMMODATE UPSIZED

CONDUCTORS, SPLICE AND TRANSITION TO A SMALLER CONDUCTOR SIZE AT THE

POINT OF TERMINATION VIA AN AUXILIARY GUTTER, PULL BOX, WIREWAY, OR OTHER

SUITABLE DEVICE.

3 3 3

FRONT SIDE OF EQUIPMENT RACK REAR SIDE OF EQUIPMENT RACK

20'-0"

MIN

SERVICE

METER

CT CABINET

PANEL LP2

100A MCB

120/240V

1Ø,3W

NEMA 1

SERVICE

METER

UTILITY

TRANSFORMER

UTXFMR-2

120/240V 1Ø

SECONDARY

TO UTILITY

PRIMARY

CONCESSION /

RESTROOM BLDG. #2

SPD

SPD

SPD

2 2

FINISHED FLOOR

FINISHED FLOORGRADE

GRADEGRADE

FEEDER SCHEDULE #

NEMA 3R

S3

S1

SVC. ENTRANCE FEEDER SCHEDULE S#

1. UTILITY COMPANY PAD MOUNTED TRANSFORMER. CONTRACTOR SHALL

COORDINATE EXACT SERVICE LOCATION AND REQUIREMENTS WITH

DUKE ENERGY. PROVIDE TRENCHING, BACKFILL, CONDUIT,

CONDUCTORS AND TRANSFORMER PAD AS REQUIRED.

2. UTILITY METER AND/OR CT CABINET. VERIFY ALL REQUIREMENTS WITH

DUKE ENERGY.

3. PROVIDE STEEL CHANNEL SUPPORT RACK FOR ELECTRICAL

EQUIPMENT SIZED AS REQUIRED. POSTS MUST BE SPACED TO PROVIDE

STABLE MOUNTING FOR EQUIPMENT. RACK CROSS-MEMBERS MUST BE

STAINLESS STEEL FOR MOUNTING OF THE ELECTRICAL ENCLOSURES.

USE CHANNEL SUPPORT SYSTEM FOR ALL RACK MOUNTED EQUIPMENT.

EXTERIOR UNITS SHALL BE THOROUGHLY INSPECTED AFTER

INSTALLATION.

4. PROVIDE #1/0 CU GROUND IN 1" CONDUIT TO 5/8"x30' CU CLAD GROUND

THREE POINT GROUND TRIAD.

5. STEP-DOWN TRANSFORMER 1kVA 277-120/240V & 20A ENCLOSED

CIRCUIT BREAKER FOR LIGHTING CONTROL 120V CONTROL CIRCUIT.

6. CONTRACTOR SHALL VERIFY EXACT REQUIREMENTS FOR MUSCO

LIGHTING DISTRIBUTION AND CONTROL EQUIPMENT WITH MUSCO

LIGHTING FINAL DESIGN DOCUMENTS. ADJUST EQUIPMENT RACK AND

ALL RELATED COMPONENTS AS REQUIRED.

7. PROVIDE SERVICE GROUND PER NEC 250. SEE DETAIL.

800A: (2) SETS OF (4) #600, #1/0 GRD. IN EACH OF 3-1/2" C.

(2) #12, #12 GRD. 3/4" C.

S1. 800A: (2) SETS OF (4) #600, IN EACH OF 3-1/2" C.

S2. 100A: (3) #3, 1-1/4" C.

S3. 200A: (4) #1/0, 2" C.

S2

S1 1

ECB

(1) #12, 3/4" C.(1) #4 GEC, 3/4" C.

(1) #6 GEC , 3/4" C.

CT CABINET SERVICE

METER

GRADE

Krista Marie Taylor, P.E. #93024

3664 ROLLING HILLS LANE, APOPKA, FL 32712

04/19/202407-12-2024

Krista Marie Taylor, P.E. #93024

3664 ROLLING HILLS LANE, APOPKA, FL 32712

04/19/202407-12-2024

E-01
Sheets and Views
E-01
E-02
Sheets and Views
E-02
E-03
E003
E003
E-04
E004
E004