Topographic_Survey_Signed.pdf
PDF 1 MB Posted
- Attached to
- Cross Bayou Athletic Association Complex Improvements - Professional Design-Build Services (PID 004556B)
- Solicitation number
- 25-0036-RFQ-DB
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This is a topographic survey document related to Pinellas County, Florida's procurement for Design-Build services to reconstruct the Cross Bayou Athletic Association Baseball Park located at 102nd Avenue and 98th Street North in Seminole, Florida. The project encompasses demolition and reconstruction of seven athletic fields (four Little League fields ranging 200-220 feet, two 220-foot softball fields, and one 150-foot tee ball field), two prefabricated buildings (a 1,120-square-foot restroom/concession facility and a 1,200-square-foot maintenance building), four batting cages, bleachers, dugouts, backstops, site lighting, irrigation systems, stormwater management infrastructure, utility connections, and a mid-block pedestrian crossing. The procurement is structured in two phases: Phase 1 requires completion of 100% construction documents from existing 60% design plans within 190 calendar days of the Notice to Proceed, while Phase 2 encompasses complete construction and Certificate of Occupancy issuance within 455 calendar days. A mandatory site visit is scheduled for February 25, 2026 at 9:00 AM, written questions are due by March 3, 2026 at 3:00 PM Eastern Time, and all submittals must be uploaded to the OpenGov procurement platform by March 12, 2026 at 3:00 PM Eastern Time.
The estimated project budget is $10,000,000 for construction and design services, funded through the Penny for Pinellas capital improvement sales surtax approved for the Local Infrastructure Sales Surtax program. The Design-Build firm's Phase 2 fixed lump sum compensation must include a profit markup not exceeding 5%, with a Guaranteed Maximum Price proposal not to exceed $10,000,000, and 5% of monthly payments retained by the County during construction. Pinellas County's Small Business Program identifies approximately 10 percent of project work as available for Small Business Enterprise (SBE) subcontracting, including survey, erosion control, clearing and grubbing, grading, sidewalk installation, fencing, sodding, irrigation, and landscaping. The Design-Build team must provide a bid bond of 5% of the Phase 2 base bid and Performance and Payment Bonds equal to 100% of the agreement amount, with comprehensive insurance requirements including Workers' Compensation, Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), and Professional Liability insurance ($2,000,000 per occurrence/$2,000,000 aggregate for Phase 1). The firm must obtain all required permits, coordinate utilities with Duke Energy, TECO People's Gas, Charter Communications, and Frontier Communications, achieve FEMA compliance for flood zone AE requirements, and comply with Florida Building Code, Pinellas County ordinances, and FDOT specifications.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| �� | � | ����� |
| ����� | ���������� | ����� |
File details come from the government source that posted it. Updated .