Technical_Specifications.pdf

PDF 1017 KB Posted

Attached to
Qualified Vendor List for Fencing Services over $24, 000.
Solicitation number
2518-MAkp
Issued by
Sacramento County, San Francisco City, California

About this file

The Technical Specifications document is a comprehensive set of technical specifications prepared by the Sacramento Housing and Redevelopment Agency (SHRA), a joint powers agency representing the City of Sacramento, County of Sacramento, and their respective Housing Authorities. The document outlines detailed technical requirements for a Qualified Vendor List for Fencing Services, covering multiple fencing types including chain link, redwood, and wrought iron fences and gates. The specifications provide extensive technical details for vendors, including material requirements, installation procedures, quality assurance standards, submittals, and execution guidelines for different fencing materials and project scenarios.

The technical specifications are structured to ensure high-quality fencing services across various project types, with precise requirements for material specifications, fabrication, installation, and finishing. The document includes specific standards for different fencing materials, such as galvanized steel for chain link fencing, redwood for traditional wooden fences, and structural steel for wrought iron installations. Each section provides comprehensive guidelines for vendors, including acceptable material grades, coating requirements, installation techniques, and performance expectations. The specifications are designed to create a standardized approach to fencing services that can be utilized by SHRA and its member agencies for various housing and community development projects.

View the file

Other files

File Type Posted
Qualified_Vendor_List_for_Fencing_Services_over_$24,000..pdf PDF
HUD_52158_Maintenance_Wage_Determination_blank_11152013.pdf PDF
Contract_-_AgencyInsurance_Requirements_5_12_2025.pdf PDF
Bonds_-_Payment_and_Performance_Bonds.pdf PDF
Section_00260_-_State_Wages_Only_4-18-18_(3).doc DOC document
SHRA_CONTRACT_COMPLIANCE_PACKAGE_-_2024_(6).pdf PDF
GENERAL_DECISION_CA20250007_#8,_06.27.2025.pdf PDF
GENERAL_DECISION_CA20250019_#11,_06.27.2025.pdf PDF
Construction_Contract_(11.7.22)_(4).pdf PDF
Supplemental_Attachments_(29)_(2).pdf PDF
Contract_Manual_-_1-31-2025_with_bonds.pdf PDF
Wages_-_State_Wages_Only_rev_4-18-18.pdf PDF
Contract_-_Federal_Requirements_Attachment.pdf PDF
Bonds_-_Bid_Bond.pdf PDF
Bid_&_Contract_Instructions_-_HUD-5369_(10-02)_-_Instructions_to_Bidders_for_Contracts_Public_&_Indian_Housing_Programs.pdf PDF
Bid_&_Contract_Instructions_-_Agency_Specific_Supplemental_Instructions_to_Bidders_for_Construction_Contracts_05-2025.pdf PDF
Awarded_Contractor_|_Posters_-_Worker_Rights_Davis_Bacon_Act_Poster_Spanish_rev_7_24.pdf PDF
Awarded_Contractor_|_Posters_-_Worker_Rights_Davis_Bacon_Act_Poster_English_rev_7_24.pdf PDF
Awarded_Contractor_|_Posters_-_Poster_Section_3_Notice_revised_4_28_25.pdf PDF
Awarded_Contractor_|_Posters_-_Know_Your_Rights_rev_6_27_2023.pdf PDF
Awarded_Contractor_|_HUD_Payment_&_Closeout_Forms_-_HUD_51004_-_Summary_of_Materials_Stored_-_11-30-2023.pdf PDF
Awarded_Contractor_|_HUD_Payment_&_Closeout_Forms_-_HUD_51003_-_Schedule_of_Materials_Stored_-_11-30-23.pdf PDF
Section_3_Contract_Compliance_Package_-_2025.pdf PDF
Awarded_Contractor_|_HUD_Payment_&_Closeout_Forms_-_HUD_51002_-_Schedule_of_Change_Orders.pdf PDF
Awarded_Contractor_|_HUD_Payment_&_Closeout_Forms_-_HUD_51001-_Periodic_Estimate_for_Partial_Payment.pdf PDF
Awarded_Contractor_|_HUD_Payment_&_Closeout_Forms_-_HUD_51000_-_Schedule_of_Amounts_for_Contract_Payments.pdf PDF
Awarded_Contractor_|_Closeout_&_Certifications_-_Guarantee_Form_rev_4_28_25.pdf PDF
Awarded_Contractor_|_Closeout_&_Certifications_-_Certificate_of_Substantial_Completion_rev_4_28_25.pdf PDF
CDBG_-_HUD-4010_Federal_Labor_Standards_Provisions_06-2022.pdf PDF
General_Conditions_&_Supplemental_Provisions_-_DBorSt-_Supplemental_General_Conditions_for_Construction_Contracts_NonACC.pdf PDF
General_Conditions_&_Supplemental_Provisions_-_General_Conditions_for_Construction_Contracts_01-2014_exp_11-30-23.pdf PDF
Bid_&_Contract_Instructions_-_Supplemental_Instructions_to_Offerors_Non-Construction_HUD_5369-B.pdf PDF
Bonds_-_Labor_&_Material_Payment_Bond.pdf PDF
Bonds_-_Quick_Quote_Bid_Bond.pdf PDF
Contract_-_OpenGov_Sample_Standard_SHRA_Contract.pdf PDF
Section_3_-_SHRA_CONTRACT_COMPLIANCE_PACKAGE_2025.pdf PDF
Wages_-_Public_Works_California_Labor_Code_rev_4_30_2025_.pdf PDF
Wages_-_State_or_Higher_Combined_Language_Prevailing_Wages_4-29-15.pdf PDF
Bonds_-_Performance_Bond.pdf PDF
Standard_Contract.pdf PDF
Awarded_Contractor_|_Contract_Forms_-Subcontracting_Information_Sheet_rev_4_30_2025.pdf PDF
Awarded_Contractor_|_Contract_Forms_-List_of_Designated_Subcontractors_06.29.23_Fillable.pdf PDF
CDBG_-_Supplemental_General_Conditions_for_Construction_Contracts_-_CDBG_non_ACC_.pdf PDF
CDBG_-_Supplemental_General_Conditions_for_Construction_Contracts_-_CDBG_ACC_.pdf PDF
CDBG_-_Supplemental_Federal_Labor_Standards_Provisions.pdf PDF
CDBG_-_CDBG_and_Other_Federal_Requirements_rev_9-20-23.pdf PDF
Scope_of_work.pdf PDF
2022-Resolution-No.-2021-22-Approval-of-2022-and-Subsequent-Years-Procurement-Authorization.pdf PDF
PH_Community_Directory_-_Shortcut.lnk LNK file
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A Joint Powers Agency

M E M B E R S

City of Sacramento

County of Sacramento

Housing Authority of the City of Sacramento

Housing Authority of the County of Sacramento

Sacramento Housing and Redevelopment Agency

Technical Specifications

RFQ No. 2518-MAkp

Qualified Vendor List for Fencing

Services

Issued: July 12, 2025

Sacramento Housing and Redevelopment Agency Procurement Services – 2nd Floor 801 12th Street Sacramento, CA 95814

00010: Table of Contents

Qualified Vendor List for Fencing Services

TECHNICAL SPECIFICATIONS MANUAL

TABLE OF CONTENTS

SECTION 00010: TABLE OF CONTENTS

DIVISION 1 – GENERAL REQUIREMENTS

SECTION TITLE

01010 Summary of Work 01035 Change Order and Contract Modification Procedures 01060 Regulatory Requirements 01090 Definitions and Reference Standards 01120 Alteration Procedures 01200 Project Meetings 01500 Construction Facilities and Temporary Controls 01535 Protection of Installed Work 01600 Material and Equipment 01605 Substitution Request Form 01700 Closeout

DIVISION 2 – SITE CONSTRUCTION

02055 Demolition 02820 Chain Link Fencing 02822 Redwood Fences & Gates 02830 Ornamental Iron Fence

DIVISION 3 – CONCRETE

03100 Concrete Formwork 03200 Concrete Reinforcing 03300 Cast-in-Place Concrete

DIVISION 4 – METALS

05500 Miscellaneous Metals

END OF SECTION

01010: Summary of Work

Qualified Vendor List for Fencing Services

SECTION 01010: SUMMARY OF WORK

SECTION 01010

SUMMARY OF WORK

PART 1 – GENERAL

1.01 WORK COVERED BY CONTRACT DOCUMENTS

A. The Intent of Work of this Contract is specified by the Agency “Contract Documents”, as shown in the Technical Specifications Manual, Drawings (if any), calculations, reports or any other information attached or referred to herein.

B. The term "NIC" shall be construed to mean that construction work is not to be furnished, installed or performed by Contractor. The term shall mean "Not in this Contract".

C. The Agency reserves the right for other divisions of the Agency to use this Contract after it has been fully executed.

1.02 CONTRACTOR ACCESS TO AND USE OF SITE

A. Agency Construction staff, if any, will designate an entrance to the Project site.

B. Use of premises for work, storage and vehicular parking is limited to areas designated by Agency Construction staff, if any.

C. All work on the Project should be performed during the times permitted by the local jurisdiction; provided no work shall be done on the Project by the Contractor between the hours of 7:00 p.m. and 7:00 a.m., nor on Sundays or legal Agency holidays (as listed below in Paragraph D) except work as is necessary for the proper care and protection of the Project or work directly associated with an emergency or special situation related to the Project, and in any case only with the prior permission of the Contracting Officer. It is understood, however, that after hours or non-working days work may be established as a regular procedure by the Contracting Officer. It is understood, however, that after hours or non-work days work may be established as a regular procedure by the Contractor if he, she, or it first obtains the written permission of the Contracting Officer and that such permission may be revoked at any time by the Contracting Officer, if the Contractor fails to maintain an adequate force and equipment for reasonable prosecution and inspection of the after hours or non-work days work.

D. The following are Agency holidays:

New Year's Day Martin Luther King, Jr. Day Washington-Lincoln Day Caesar Chavez Day Memorial Day Independence Day (Fourth of July) Labor Day Veterans Day Thanksgiving Day (Thursday & Friday) Christmas Eve (after 12:00 noon) Christmas Day New Year's Eve (after 12:00 noon)

Qualified Vendor List for Fencing Services

SECTION 01010: SUMMARY OF WORK

1.03 WORKPLACE BEHAVIOR

A. This Work will be accomplished in a family type neighborhood. Appropriate behavior will be required. Specifically:

1. No loud music will be allowed in the work place;

2. Language should be suitable to be heard by children;

3. Appropriate work clothing will be required at all times.

4. Residents will be treated with respect at all times.

5. Smoking is prohibited on property.

B. The Contractor shall employ only persons who are competent and skilled in their respective trades, and whenever the Contracting Officer shall notify the Contractor that any person working on the Project is, in his or her opinion, incompetent, unfaithful or disorderly, or refuses to carry out the provisions of the Contract Documents, or uses threatening or abusive language to any person at the Project representing the Agency or is otherwise unsatisfactory, the Contractor shall remove the person from the Project and such person shall not be returned to the Project without the Contracting Officer's consent based upon the Contractor's assurance that proper workmanship and proper conduct can be expected from such person.

1.04 AGENCY FURNISHED PRODUCTS (IF ANY)

A. Agency Construction staff or Architect, if any, responsibilities:

1. Arrange for and deliver the required Shop Drawings, Product Data and Samples to the Contractor.

2. Arrange and pay for product delivery to the Project site, in accordance with the construction schedule, as requested.

3. Deliver suppliers' bills of materials to Contractor.

4. Inspect deliveries jointly with Contractor.

5. Submit claims for transportation damage.

6. Arrange for replacement of damaged, defective and missing items.

7. Arrange for manufacturer’s guarantees, warranties, and bonds.

B. Contractor's Responsibilities:

1. Designate delivery date for each product required in the Work Order Request.

2. Review Shop Drawings, Product Data and Samples, and return to Agency Construction staff or Architect, if any, within ten (10) days, with notification of discrepancies or problems anticipated in the installation of the product or its being placed in service.

Qualified Vendor List for Fencing Services

SECTION 01010: SUMMARY OF WORK

3. Receive and unload products at the site. Promptly inspect products jointly with Agency Construction staff or Architect, if any, record shortages and damaged or defective items.

4. Handle products at the site, including uncrating and storage. Protect products from exposure to the elements, and from other damage.

5. Assemble, install, connect, adjust and finish products as specified in the applicable Specification Sections.

6. Repair or replace, as required, items damaged subsequent to inspection with Agency Construction staff or Architect, if any.

1.05 SURROUNDING SITE CONDITION SURVEY

A. Prior to commencement of Work, Contractor and Agency Construction staff or Architect, if any, shall jointly survey the site and existing buildings, paving, plant life, and other items, noting and recording existing damage such as cracks, sags, loose materials and other existing damage.

B. This record shall serve as a basis for determination of subsequent damage to these items due to settlement or movement due to demolition and construction operations.

C. Such damage, as noted, shall be suitably marked on the item, if possible, and the parties making the survey shall sign the official record of existing damage.

D. Cracks, sags or other damage to the site and adjacent buildings, paving and other items not noted in the original survey but subsequently observed shall be reported immediately.

1.06 INTERPRETATION OF SPECIFICATIONS, SCOPE OF WORK AND WORKING DRAWINGS (IF

ANY)

NOTE: Be advised: do not bid this project unless you read and understand the following.

A. Project Manual Technical Specifications Scope of Work Drawings, if any Working drawings, if any (Working drawings suitable for obtaining any and all necessary permits and for the proper prosecution of the work for each project are to be provided by the contractor.)

B. As no specific portion of work in this project is independent of all others, each trade shall be responsible for reviewing and understanding ALL sections of the scope of work, working drawings, if any, and specifications to determine how they will influence their particular portion of work. The Prime Contractor shall be responsible for assuring proper coordination and exchange of information between the trades as to how each relates to and is influenced by the others.

C. The intent of the scope of work, working drawings, if any, is to indicate critical dimensions, position, and kind of construction, and the specifications indicate qualities and methods.

Any work in the scope of work or on the working drawings, if any, not mentioned in the specifications, or any work described in the specifications and not detailed in the scope of work or working drawings, if any, shall be constructed as if they were fully detailed and

Qualified Vendor List for Fencing Services

SECTION 01010: SUMMARY OF WORK

described in both. Work not detailed, marked, or specified, shall be the same as similar parts that are detailed, marked, or specified. See Item G below.

The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both.

In the event of a conflict between the specifications or the drawings, the Contractor is to refer to and follow the document containing the most specification, detail, higher quality or most restrictive document. All the contract documents are essential parts of the Contract, and a requirement occurring in one is just as binding as though occurring in all. They are intended to be cooperative and to describe and provide information to complete the work of the Project. If there is a discrepancy or ambiguity, the matter shall be promptly submitted in writing to the Contracting Officer who shall promptly make a determination in writing.

The Contractor must provide written notice of any ambiguity to the Contracting Officer.

Should the Contractor not provide such notice and prepare its bid or commence with work without resolution of the ambiguity by the Contracting Officer, the Contractor proceeds at its own risk and expense.

D. All work is new “unless otherwise noted” (U.O.N.).

E. Critical dimensions (i.e. dimension required by code or regulation) shall be denoted as "clear". "Clear" denotes dimensions required between finished walls, components, etc.

All other dimensions will be from face of stud to face of stud, centerline to centerline, or outside face of stud to outside face of stud. Should any question arise concerning the dimensions, the Prime Contractor shall call the Agency immediately for clarification or proceed at his/her own risk. Due to production processes, under no circumstances should the working drawings, if any, be scaled.

F. The Contractor should visit the site prior to submitting a bid for the work. Failure to visit the site will not release the Prime Contractor from the responsibility of knowing the site, its existing conditions, and how it will influence his/her bid. At the site, the Prime Contractor shall acquaint him/herself with the existing conditions and how they will influence the scope and the intent of, and the subsequent bid for, the Work.

G. When reviewing the scope of work, working drawings, if any, or specifications prior to the bid, the Prime Contractor shall notify the Agency in writing of any discrepancies, unclear instructions, errors, etc. that he/she believes will influence the outcome of their bid and/or the construction of the work. This includes typical errors or ambiguities in the scope of work, the specifications or notational errors in the working drawings, if any, where the interpretation is doubtful or where the error or ambiguity is sufficiently apparent as to alert a responsible and responsive Prime Contractor that he/she should obtain clarification of the matter prior to completing his/her bid. The Agency and/or contractor shall issue clarifications, in the form of an addendum, to all plan holders to within ten days of the bid date. No verbal clarification shall be valid. With this exchange of information, it shall be assumed that the Contractor thoroughly understands the scope and intent of the scope of work, working drawings, if any, and specifications in relationship to all aspects of the Work. Claims of not understanding the scope and intent of the scope of work, working drawings, if any, or specifications SHALL NOT be considered reasonable grounds for any increase in the contract amount after the bid is awarded.

Qualified Vendor List for Fencing Services

SECTION 01010: SUMMARY OF WORK

1.07 ACCOMPLISHING THE WORK

A. Due to the nature of this work, the Prime Contractor will assume that when accomplishing a detailed portion of the work, if another portion is damaged or otherwise affected, the contractor shall repair and/or correct the affected portion and return it to its original or better condition at no additional cost to the Agency.

B. Should a discrepancy be discovered in: 1. Work done by others; or, 2. Work done by one trade that affects work to be done by another or other trades, the Prime Contractor shall notify the Contracting Officer at once and in writing. If the Contractor proceeds with the work so affected without having given such written notice and without receiving the necessary approval, decision, or instructions in writing from the Contracting Officer, then he/she shall have no valid claim against the Agency for the cost of so proceeding and shall make good any resulting damage or defect. No verbal approval, decision, or instruction shall be valid or be the basis for any claim against the Agency, its officers, employees, or agents.

C. If rehabilitation work is part of the Project, the Contractor shall be responsible for securing and preventing damage or thefts from the Agency's tenants within the Project site property during work in progress, and shall resolve all claims from such occurrence.

D. The Contractor shall give the Contracting Officer full information in advance of his, her or its plans for carrying on any part of the Project. If, at any time before the beginning or during the progress of the work, any part of the Contractor's plant, or equipment, or methods of execution of the work, appear to the Contracting Officer to be unsafe, inefficient, or inadequate, to insure the required quality or rate of progress of the work, the Contracting Officer may order the Contractor to increase or improve the Contractor's facilities or methods, and the Contractor shall promptly comply with such orders; but neither compliance with such orders nor failure of the Contracting Officer to issue such orders shall relieve the Contractor's obligation to secure the degree of safety, the quality of the work, and the rate of progress required by the Contract Documents. The Contractor alone shall be responsible for the safety, adequacy and efficiency of his, her or its plant, equipment and methods used for the Project.

PART 2 – PRODUCTS

Not Used.

PART 3 – EXECUTION

Not Used.

01035: Change Order and Contract Modification Procedures

Qualified Vendor List for Fencing Services

SECTION 01035: CHANGE ORDER AND CONTRACT MODIFICATION PROCEDURES

SECTION 01035

CHANGE ORDER AND CONTRACT MODIFICATION PROCEDURES

PART 1 – GENERAL

1.01 REQUIREMENTS INCLUDED

A. Promptly implement change order procedures.

1. Provide full written data required to evaluate changes as required by the Contracting Officer.

2. Maintain detailed records of work done on a time-and-material/force account basis, and submit records to the Agency Construction staff daily.

3. Provide full documentation to Agency Construction staff as requested.

B. Designate in writing the member of Contractor's organization:

1. Name of person who is authorized to accept changes in the Work.

2. Name of person who is responsible for informing others in the Contractor's employ of the authorization of changes in the Work.

C. The Contracting Officer is the ONLY person who is authorized to approve Potential Change Orders and execute Change Orders. Work may not begin on a Potential Change Order until authorization has been given by the Contracting Officer in writing. Work performed without written authorization by the Contracting Officer will be done at the contractor’s risk and expense.

1.02 RELATED REQUIREMENTS

A. Agreement: The amounts of established unit prices.

B. General Conditions:

1. Methods of determining cost or credit to Agency resulting from changes in Work.

2. Contractor's claims for additional costs.

C. Section 01025: Measurement and Payment.

D. Section 01700: Closeout

1.03 DEFINITIONS

A. Change Order: A form of contract used for amending construction contracts. It is comprised of approved Potential Change Orders.

B. Field Order: A written order to the Contractor, signed by Agency Contracting Officer which amends the Contract Documents as described, and authorizes Contractor to proceed with a change which may affect the Contract Amount or the Contract Time, for inclusion in a subsequent Change Order.

Qualified Vendor List for Fencing Services

SECTION 01035: CHANGE ORDER AND CONTRACT MODIFICATION PROCEDURES

C. Supplemental Instructions: A written order, instructions, or interpretations, signed by Agency Construction staff, making minor changes in the Work not involving a change in Contract Amount or Contract Time.

D. Potential Change Order (PCO): A proposal written by the contractor for work that may be included in a subsequent Agency-issued Change Order. Any contract modification shall be authorized by the Contracting Officer in writing.

1.04 PRELIMINARY PROCEDURES

A. Agency Construction staff may initiate changes by requesting a Potential Change Order (PCO) from the Contractor. When requesting a PCO, the Agency Construction staff may need to provide the following information:

1. Detailed description of the Change, Products, and location of the change in the Project.

2. Supplementary or revised Scope of Work, Drawings, if any, and Specifications.

3. The projected time span for making the change and a specific statement as to whether overtime work is, or is not, authorized.

4. A specific period of time during which the requested price will be considered valid.

5. Such request is for information only, and is not an instruction to execute the changes, or to stop Work in progress.

B. The contractor may also initiate changes by preparing the Potential Change Order without a directive to do so. In this case, the contractor shall include the applicable information as detailed in items 1 through 5 above so that the Agency may make an informed decision after reviewing the information. Work may not begin until the PCO is approved in writing by the Contracting Officer, or unless a Field Order is issued (see below).

1.05 FIELD ORDER

A. If justified, the Contracting Officer may issue a Field Order for the Contractor to proceed with a change for subsequent inclusion in a Potential Change Order. Field Orders are to be issued when there is a change that must be made immediately (e.g. an emergency) or within a time period that does not allow adequate time for a PCO to be written, negotiated and approved. By issuing the Field Order, the Contracting Officer is directing the contractor to perform the work as soon as possible, subject to an equitable adjustment to the contract price and time at a later date via a Change Order.

B. The Field Order will describe the reason for the order and, if necessary, will describe changes in the Work, both additions and deletions, with attachments of revised Contract Documents to define details of the change, if necessary.

C. The Contracting Officer will sign and date the Field Order as authorization for the Contractor to proceed with the changes. The contractor shall prepare a PCO for the work as soon as possible. Unless the work is authorized to be done on a Time and Materials or Unit Price basis, the breakdown of labor and materials shall be prepared as shown below in “Lump Sum Basis”.

Qualified Vendor List for Fencing Services

SECTION 01035: CHANGE ORDER AND CONTRACT MODIFICATION PROCEDURES

1.06 DOCUMENTATION OF POTENTIAL CHANGE ORDERS

A. “Lump Sum” basis: Support each quotation for a lump-sum proposal, and for each unit price, which has not previously been established, with sufficient substantiating data to allow Agency Contracting Officer to evaluate the quotation:

1. Labor required.

Calculation of labor wage rates for change order work shall be based on the following:

From the wage decision applicable to the project, for the type of work being performed (found in the Contract Manual), add the “Base” rate and the “Fringe” rate together, and to that subtotal, add a maximum of a 26% contractor’s labor burden to arrive at the total wage rate.

Example: if carpentry is being performed as part of the change order, then if the carpenter’s base wage rate (“rates”) is $26 and the fringe benefit wage rate (“fringes”) is $18, the subtotal of $44 per hour is the wage rate required to be paid the laborer. The contractor is allowed to add up to 26% to this amount (26% x $44 = $11.44) for a total hourly wage rate for the carpentry of $55.44. Again, this is an example; actual wage rates are to be taken from the wage decision for this particular project.

Contractor shall show a breakdown of labor when submitting a PCO for consideration. No lump sum amounts are to be shown. Number of labor hours multiplied by the wage rate as calculated above shall be shown for each of the categories of work being performed as part of the change order. Subcontractors are also required to itemize their labor in this manner. Subcontractor’s proposals to the General Contractor are required to be submitted along with the General Contractor’s PCO.

2. Materials and equipment required. Materials costs shall be itemized to the extent that a reasonable evaluation can be made. Where applicable, Contractor shall indicate the number of “units” of material multiplied by the unit price cost of that material (e.g. 3 cubic yards of concrete x $80 per cubic yard). Sales taxes should be indicated where applicable.

3. Profit and overhead. Once the labor and materials have been added together, a maximum total of 15% for profit and overhead (P+O=15% max.) may be added for work performed by the General Contractor’s own forces. For work performed by the General Contractor’s subcontractors, a maximum total of 10% may be added to the subcontractor’s total by the General Contractor.

4. Bonds. A bond premium of may be added to the profit and overhead, but the contractor must provide proof of the actual bond premium rate they are paying.

Compensation for the bond premium may not exceed 3%.

5. Credit for work deleted from Contract, similarly documented.

6. Justification for any change in Contract Time.

a. Justification will include the other work impacted and how that impacts the critical path of the schedule.

b. Documentation of the resources required in calculating the time needed for the additional work.

Qualified Vendor List for Fencing Services

SECTION 01035: CHANGE ORDER AND CONTRACT MODIFICATION PROCEDURES

B. Time-and-materials basis (as previously authorized): Support each claim for additional costs, and account basis, with documentation as required for a lump-sum proposal, plus additional information:

1. Name of the Contracting Officer who ordered the work, and date of the order.

2. Dates and times work was performed, and by whom.

3. Time record, summary of hours worked, and hourly rates paid.

4. Receipts and invoices for:

a. Equipment used, listing dates and times of use.

b. Products used, listing of quantities.

c. Subcontracts.

C. Unit Price basis: Amounts of the unit prices are to be:

1. Those stated in the Contract.

2. Those mutually agreed upon between Agency Construction staff and Contractor.

When quantities of each of the items affected by the Change Order can be determined prior to start of the work, the Contracting Officer will sign and date the contractor’s PCO (indicating the desire to proceed on a Unit Price basis) as authorization for Contractor to proceed with the changes.

When quantities of the items cannot be determined prior to start of the work:

1. Agency Contracting Officer will issue a Field Order directing Contractor to proceed with the change on the basis of unit prices and will cite the applicable unit prices.

2. At completion of the change, Agency Contracting Officer will determine the cost of such work based on the unit prices and quantities used.

a. Contractor shall submit documentation to establish the number of units of each item and any claims for a change in Contract Time.

D. Costs Due to Time Extensions

1. When a time extension is being requested, whether as a result of additional work or not, the Potential Change Order must include all costs (both direct and indirect) related to the work and the extended schedule.

2. The mark up for any costs associated with the time extension (not the actual costs of performing the work, but the actual cost to the general contractor due to a time extension) is a maximum of 5%.

1.07 PREPARATION OF CHANGE ORDERS

A. Agency Construction staff will prepare each Change Order. Multiple PCO’s may be combined into one Agency-issued Change Order.

Qualified Vendor List for Fencing Services

SECTION 01035: CHANGE ORDER AND CONTRACT MODIFICATION PROCEDURES

B. The Change Order will describe changes in the Work, both additions and deletions, with PCO’s and their associated documentation of the work performed as attachments to the Change Order.

C. The Change Order will provide an accounting of the adjustment in the Contract Amount and in Contract Time. The Agency Construction staff, the Contractor and the Contracting Officer will sign the Change Order. Once executed, the Change Order will amend the contract and contract purchase order with the proper addition or deletion to the contract amount and time period.

1.08 CORRELATION WITH CONTRACTOR'S SUBMITTALS

A. Revise Schedule of Amounts for Contract Payments and Request for Payment forms to record each change as a separate item of Work, and to record the adjusted Contract Amount.

B. Revise the Construction Schedule to reflect each change in Contract Time.

C. Upon completion of work under a Change Order, enter pertinent changes in Record Documents.

PART 2 – PRODUCTS

Not Used.

PART 3 – EXECUTION

Not Used.

01060: Regulatory Requirements

Qualified Vendor List for Fencing Services

SECTION 01060: REGULATORY REQUIREMENTS

SECTION 01060

REGULATORY REQUIREMENTS

PART 1 – GENERAL

1.01 SUMMARY

A. This Section covers general requirements for codes and standards pertaining to the work and is supplementary to the codes and standards mentioned or referenced elsewhere in the Contract Documents.

B. The Contractor shall coordinate all required inspections of the work with the Agency Construction staff. Upon receipt, the Contractor shall post all correction notices issued by the Building Department or other Authority Having Jurisdiction (AHJ) relating to the Project in a visible area available for the Contracting Officers’s/Agency Construction staff’s review, and shall, when requested, immediately mail all such notices to the Contracting Officer.

1.02 CODES AND STANDARDS

A. Requirements of Regulatory Agencies: Pertaining ordinances, laws, rules, codes, regulations, standards, and orders of public agencies having jurisdiction of the work where reference is made shall be applicable to this contract work. Such documents shall include, but not limited to those in the following listing. Contractor shall make available at the site such copies of the listed documents applicable to the work as Contracting Officer/Agency Construction staff may request.

1. Title 8, California Code of Regulations (CCR), Industrial Relations, Chapter 4, Division of Industrial Safety, Safety Orders (CAL/OSHA)

2. Title 19, CCR, Public Safety

3. Title 21, CCR, Public Works

4. Title 24, CCR, Part 2, Building Standards

5. California Building Code (CBC)

6. California Mechanical Code (UMC)

7. California Plumbing Code (UPC)

8. California Fire Code (UFC)

9. California Electrical Code (NEC)

10. National Fire Protection Association (NFPA)

11. State and Local Public Health Codes

01060: Regulatory Requirements

Qualified Vendor List for Fencing Services

SECTION 01060: REGULATORY REQUIREMENTS

12. Other laws, regulations, rules, orders, codes and ordinances specified in other Sections of these Specifications or bearing on the work

13. City or County Codes

B. Standard and Reference Type specifications

1. Specifying by reference to other portions of the contract documents shall be the same as if the referenced document were exactly repeated at the place where reference was made.

2. The standard or reference type specification documents shall be those of the current or adopted issue unless otherwise specified.

1.03 CONFLICTS

A. In case of conflict between the requirements of regulatory agencies and the referenced standard or reference type specification documents, the Contractor shall immediately notify the Contracting Officer/Agency Construction staff in the form of an official Request for Information.

PART 2 – PRODUCTS

Not Used.

PART 3 – EXECUTION

Not Used.

01090: Definitions and Reference Standards

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

SECTION 01090

DEFINITIONS AND REFERENCE STANDARDS

PART 1 – GENERAL

1.01 DEFINITIONS

A. General Requirements: The “General Requirements” are those provisions or requirements of Division - 1 sections. General Requirements apply to the entire Work.

B. Drawings: Means the drawings enumerated in the schedule of drawings contained in the Specifications.

C. As Shown, As Indicated, As Detailed, or similar terms: These terms are a cross reference to details, notes or schedules on Drawings, to other paragraphs or schedules in the Specifications and to similar means of recording requirements in Contract Documents. Where terms such as “indicated”, “shown”, “noted”, “scheduled” and “specified” are used, it shall be understood that the reference is made to the Contract Documents unless otherwise stated and it is for purpose of helping the reader locate cross-reference; no limitation of location is intended except as specifically noted.

D. Directed, Requested, etc.: Where not otherwise explained, terms such as "directed", "requested", "authorized", "selected", "approved", "required", "accepted" and "permitted" mean "directed by Agency Contracting Officer", "requested by Agency Contracting Officer", etc. However, no such implied meaning will be interpreted to extend Agency's responsibility into Contractor's area of construction supervision.

E. Approve: Where used in conjunction with Contracting Officer’s and/or Agency Construction staff’s response to submittals, requests, applications, inquiries, reports and claims by Contractor, the meaning of term "approved" will be held to limitations of Contracting Officer’s and/or Agency Construction staff’s responsibilities and duties as specified in General and Supplementary Conditions. In no case will "approval" by Contracting Officer and/or Agency Construction staff be interpreted as a release of Contractor from responsibilities to fulfill requirements of Contract Documents.

F. Furnish: Except as otherwise defined in greater detail, the term "furnish" means supply and install, complete and ready for intended use, as applicable in each instance.

G. Provide: Except as otherwise defined in greater detail, the term "provide" means supply and install, complete and ready for intended use, as applicable in each instance.

H. Installer: The entity (person or firm) engaged by Contractor or its subcontractor or sub-subcontractor for performance of a particular unit of work at project site, including installation, erection, application and similar required operations. It is a general requirement that such entities (installers) be expert in operations they are engaged to perform.

1.02 QUALITY ASSURANCE

A. Any material specified by references to the number, symbol, or title of a specific standard such as a commercial standard, a Federal Specification, a trade association standard, or other similar standard, shall comply with the requirements in the latest revision thereof

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

and any amendments or supplements thereto, in effect on the date of invitation for bids, except as limited to type, class, or grade, or modified in such reference.

B. The standard referred to, except as modified in these Specifications, shall have full force and effect as though printed in these Specifications. These standards are not furnished to bidders for the reason that the manufacturers and trades involved are assumed to be familiar with their requirements.

C. When required by individual Specifications Section, obtain copy of standard or code.

Maintain copy at jobsite during submittals, planning, and progress of the specific work, until completion.

D. If there appear to be discrepancies between codes and regulations and the Contract Documents, bring the discrepancies to the immediate attention of the Contracting Officer and/or Agency Construction staff, in writing, and do not proceed with the work in question until the discrepancy is resolved.

E. Where it is required in the Specifications that materials, products, processes, equipment, or the like be installed or applied in accordance with manufacturer’s instructions, directions, or specifications, or words to this effect, it shall be construed to mean that said application or installation shall be in strict accordance with printed instructions furnished by the manufacturer of the material concerned for use under conditions similar to those at the job site.

F. Wherever labeled fire resistive products or assemblies are required such labels shall meet California State Fire Marshal requirements.

G. Pursuant to Labor Code 6707, the Contractor shall include in his base bid all costs incident to the provisions of adequate sheeting, shoring, bracing, or equivalent method for the protection of life or limb, which shall conform to applicable Federal and State safety orders.

H. Work (including any temporary construction) shall be in full accord with the latest orders of the Division of Industrial Safety of the State of California and all codes and regulations as called for hereinafter in these Specifications.

I. When the Drawings or Specifications call for materials or construction of a better quality or larger sizes than required by the referenced rules and regulations, the provisions of the Drawings and/or Specifications shall take precedence.

1.03 SCHEDULE OF REFERENCES

Abbreviations and Names: The following acronyms or abbreviations as referenced in Contract Documents are defined to mean the associated names. Both names and addresses are subject to change, and are believed to be, but are not assured to be, accurate and up-to-date as of date of Contract Documents:

AA Aluminum Association 1525 Wilson Boulevard, Suite 600; Arlington, VA 22209; 703/358-2960 www.aluminum.org

AAMA American Architectural Manufacturers Association 1827 Walden Office Square, Suite 550; Schaumburg, IL 60173-4268; 847/303-5664 www.aamanet.org

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

ACI American Concrete Institute 38800 Country Club Drive; Farmington Hills, MI 48331; 248/848-3700 www.aci-int.org

ADC Air Diffusion Council 1901 North Roselle Road, Suite 800; Schaumburg, IL 60195; 847/706-6750 www.flexibleduct.org

AGA American Gas Association 400 North Capitol Street, NW; Washington, DC 20001; 202/824-7000 www.aga.org

AI Asphalt Institute 2696 Research Park Drive; Lexington, KY 40511-8480; 859/288-4960 www.asphaltinstitute.org

AISC American Institute of Steel Construction One East Wacker Drive, Suite 700; Chicago, IL 60601-1802; 312/670-2400 www.aisc.org

AISI American Iron and Steel Institute 1140 Connecticut Avenue, NW; Suite 705; Washington, DC 20036; 202/452-7100 www.steel.org

AITC American Institute of Timber Construction 7012 South Revere Parkway, Suite 140; Centennial, CO 80112; 303/792-9559 www.aitc-glulam.org

AMCA Air Movement and Control Association International, Inc.

30 West University Drive; Arlington Heights, IL 60004; 847/394-0150 www.amca.org

ANSI American National Standards Institute 1819 L Street, NW; 6th Floor; Washington, DC 20036; 202/293-8020 www.ansi.org

APA APA - The Engineered Wood Association 7011 South 19th; Tacoma, WA 98466; 253/565-6600 www.apawood.org

ARI Air Conditioning and Refrigeration Institute 4100 North Fairfax Drive, Suite 200; Arlington, VA 22203; 703/524-8800 www.ari.org

ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.

1791 Tullie Circle, NE; Atlanta, GA 30329; 404/636-8400 www.ashrae.org

ASME American Society of Mechanical Engineers International Three Park Avenue; New York, NY 10016-5990; 800/843-2763 www.asme.org http://www.ari.org/

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

ASPE American Society of Plumbing Engineers 8614 West Catalpa Avenue, Suite 1007; Chicago, IL 60656-1116; 773/693-2773 www.aspe.org

ASTM American Society for Testing and Materials 100 Barr Harbor Drive; P.O. Box C700; West Conshohocken, PA 19428-2959;

610/832-9585 www.astm.org

AWPA American Wood-Preservers' Association P.O. Box 361784; Birmingham, AL 35236-1784; 205/733-4077 www.awpa.com

AWPI American Wood Preservers Institute 2750 Prosperity Avenue, Suite 550; Fairfax, VA 22031-4312; 800/356-2974 www.preservedwood.com

AWS American Welding Society 550 N.W. LeJeune Road; Miami, FL 33126; 800/443-9353 www.aws.org

BHMA Builders Hardware Manufacturers Association 355 Lexington Avenue, 17th Floor; New York, NY 10017; 212/297-2122 www.buildershardware.com

CISPI Cast Iron Soil Pipe Institute 5959 Shallowford Road, Suite 419; Chattanooga, TN 37421; 423/892-0137 www.cispi.org

CRSI Concrete Reinforcing Steel Institute 933 North Plum Grove Road; Schaumburg, IL 60173-4758; 847/517-1200 www.crsi.org

CS Commercial Standard of NBS (U.S. Dept. of Commerce) Government Printing Office; Washington, DC 20402 (Obsolete - see NIST. May still be used in some definitions or reference standards.)

DODSSP Department of Defense Single Stock Point for Military Specifications, Standards & Related Publications Building 4/Section D; 700 Robbins Avenue; Philadelphia, PA 19111-5098; 215/697-2179 www.dodssp.daps.mil

FGMA Flat Glass Marketing Association (Obsolete- see GANA. May still be used in some definitions or reference standards.)

FMRC Factory Mutual Research Corporation (Division of FM Global) 1151 Boston-Providence Turnpike; Norwood, MA 02062; 781/762-4300 www.fmglobal.com

FS Federal Specification (General Services Administration) (See DODSSP.)

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

GA Gypsum Association 810 First Street, NE, Suite 510; Washington, DC 20002; 202/289-5440 www.gypsum.org

GANA The Glass Association of North America 2945 SW Wanamaker Drive, Suite A; Topeka, KS 66614-5321; 785/271-0208 www.glasswebsite.com or www.techstreet.com/info/gana.tmpl

HPVA Hardwood Plywood and Veneer Association 1825 Michael Faraday Drive; Reston, VA 20190; 703/435-2900 www.hpva.org

IESNA Illuminating Engineering Society of North American 120 Wall Street, Floor 17; New York, NY 10005; 212/248-5000 www.iesna.org

IILP International Institute for Lath & Plaster P.O. Box 1663; Lafayette, CA 94549; 925/283-5160 www.iilp.org

ISO International Organization for Standardization 1, rue de Varembe, Case postale 56; CH-1211 Geneva 20, Switzerland;

+41 22 749 01 11 www.iso.org

MCAA Mechanical Contractors Association of America 1385 Piccard Drive; Rockville, MD 20850; 301/869-5800 www.mcaa.org

MIL Military Standardization Documents (U.S. Dept. of Defense) Naval Publications and Forms (See DODSSP.)

MLSFA Metal Lath/Steel Framing Association (Now a Division of NAAMM – see NAAMM.)

NAAMM The National Association of Architectural Metal Manufacturers 800 Roosevelt Road, Building C, Suite 312; Glen Ellyn, IL 60137; 630/942-6591 www.naamm.org

NBS National Bureau of Standards (U.S. Dept. of Commerce) Gaithersburg, MD 20234 (Obsolete - see NIST. May still be used in some definitions or reference standards.)

NCMA National Concrete Masonry Association 13750 Sunrise Valley Drive; Herndon, VA 20171-4662; 703/713-1900 www.ncma.org

NEC National Electrical Code (by NFPA)

NECA National Electrical Contractors Association 3 Bethesda Metro Center, Suite 1100; Bethesda, MD 20814; 301/657-3110 www.necanet.org http://www.glasswebsite.com/ http://www.techstreet.com/info/gana.tmpl

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

NEMA National Electrical Manufacturers Association 1300 North 17th Street, Suite 1752; Rosslyn, VA 22209; 703/841-3200 www.nema.org

NFPA National Fire Protection Association 1 Batterymarch Park; Quincy, MA 02269-9101; 617/770-3000 www.nfpa.org

NIST National Institute of Standards and Technology 100 Bureau Drive, Stop 1070; Gaithersburg, MD 20899-3460; 301/975-6478 www.nist.gov

NRCA National Roofing Contractors Association 10255 West Higgins Road, Suite 600; Rosemont, IL 60018-5607; 847/299-9070 www.nrca.net

NSFI National Sanitation Foundation International P.O. Box 130140; 789 North Dixboro Road; Ann Arbor, MI 48113-0140; 800/673-6275 www.nsf.org

OSHA Occupational Safety & Health Administration (U.S. Department of Labor) 200 Constitution Avenue; Washington, DC 20210; 800/321-6742 www.osha.gov

PDI Plumbing and Drainage Institute 800 Turnpike Street, Suite 300; North Andover, MA 01845; 800/589-8956 www.pdionline.org

PS Product Standard of National Bureau of Standards (NBS) (U.S. Dept. of Commerce) Government Printing Office; Washington, DC 20402 (Obsolete - see NIST. May still be used in some definitions or reference standards.)

SCPI Southern California Plastering Institute (Obsolete - see IILP. May still be used in some definitions or reference standards.)

SDI Steel Door Institute c/o Wherry Associates; 30200 Detroit Road; Cleveland, OH 44145-1967; 440/899-0010 www.steeldoor.org

SMACNA Sheet Metal & Air Conditioning Contractors' National Association 4201 Lafayette Center Drive; Chantilly, VA 20151-1209; 703/803-2980 www.smacna.org

SSPC The Society for Protective Coatings (formerly Steel Structures Painting Council) 40 24th Street, 6th Floor; Pittsburgh, PA 15222-4656; 412/281-2331 www.sspc.org

TCNA Tile Council of North America, Inc.

100 Clemson Research Boulevard; Anderson, SC 29625; 864/646-8453 www.tileusa.com

UL Underwriters Laboratories Inc.

333 Pfingsten Road; Northbrook, IL 60062-2096; 847/272-8800 www.ul.com

Qualified Vendor List for Fencing Services

SECTION 01090: DEFINITIONS AND REFERENCE STANDARDS

WCLIB West Coast Lumber Inspection Bureau (Grading Rules); P.O. Box 23145; Portland, OR 97281; 503/639-0651 www.wclib.org

WI Woodwork Institute 3164 Industrial Boulevard; P.O. Box 980247; West Sacramento, CA 95798; 916/372-9943 www.wicnet.org

WRI Wire Reinforcement Institute 942 Main Street, Suite 300; Hartford, CT 06103; 800/552-4974 www.wirereinforcementinstitute.org

PART 2 – PRODUCTS

Not Used.

PART 3 – EXECUTION

Not Used.

01120: Alteration Procedures

Qualified Vendor List for Fencing Services

SECTION 01020: ALTERATION PROCEDURES

SECTION 01120

ALTERATION PROCEDURES

PART 1 – GENERAL

1.01 SUMMARY

A. Perform demolition, alteration and remodeling work indicated or required to produce finished results shown.

B. Coordinate alteration work and be responsible for division of work among the various subcontractors, if any.

C. Laws and Regulations: Intent of Contract Documents is to construct or rehabilitate buildings and sites in accordance with applicable requirements of codes and standards referenced in Section 01060.

1. Should conditions develop not covered by Contract Documents wherein finished work will not comply with said Codes, immediately notify Contracting Officer in writing and secure needed directions. If appropriate, a change order detailing and specifying required work shall be issued prior to proceeding with the work.

D. Drawings of Existing Buildings/Properties, where possessed by the Agency, will be made available for inspection at the Agency offices. The Agency makes no claim as to the accuracy of the information within these drawings. Any information obtained by the Contractor from such documents is to be done at the Contactor’s risk.

1.02 SUBMITTALS

A. Prior to cutting which affects structural safety, submit written request with substantiating data to Contracting Officer for permission to proceed with cutting.

1.03 JOB CONDITIONS

A. Occupancy: Agency may be continuously occupying areas of the building immediately adjacent to areas of demolition. Conduct demolition work in a manner that will minimize need for disruption of Agency's normal operations. Provide a minimum of 72 hours advance notice to Agency Construction staff of demolition activities which will severely impact Agency's normal operations.

B. Do not interfere with use of adjacent buildings. Maintain free and safe passage to and from adjacent buildings. Contractor is responsible for maintaining a safe path of travel for residents to access their dwelling units. The path of travel must maintain ADA accessibility standards.

1. Provide, erect and maintain barricades and guard rails as required by applicable regulatory agency or job conditions to protect occupants of building and workers.

C. Prevent movement or settlement of structures. Provide and place bracing or shoring and be responsible for safety and support of structure. Assume liability for such movement, settlement, damage or injury.

Qualified Vendor List for Fencing Services

SECTION 01020: ALTERATION PROCEDURES

1. Cease operations and notify the Agency Construction staff immediately, if safety of structure appears to be endangered. Take precautions to properly support structure. Do not resume operations until safety is restored and Agency Contracting Officer's permission is obtained.

D. Where demolition, removal or rework occurs, take necessary precautions to protect finished work from damage. Finished work damaged by operations under this contract shall be repaired or replaced to the acceptance of Agency Contracting officer at no extra cost to the Agency.

E. Asbestos or Hazardous Waste: If asbestos, suspected asbestos or any hazardous waste material not specifically identified in the contract documents is encountered, notify Agency Construction staff immediately. Do not disturb, handle or attempt to remove.

F. Utility Services: Maintain existing utilities indicated to remain, keep in service and protect against damage during demolition operations.

1. Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to governing authorities.

G. Environmental Controls: Use water sprinkling, temporary enclosures and other suitable methods to limit dust and dirt rising and scattering in air to lowest practical level. Comply with governing regulations pertaining to environmental protection.

1. Do not use water when it may create hazardous or detrimental conditions such as flooding, pollution or hazardous microbial growth.

H. Traffic: Conduct demolition operations and debris removal in a manner to ensure minimum interference with roads, streets, walks and other adjacent occupied or used facilities.

1. Do not close, block or otherwise obstruct streets, walks or other occupied or used facilities without compliance with authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by governing regulations.

PART 2 – PRODUCTS

2.01 PRODUCTS FOR PATCHING, EXTENDING AND MATCHING

A. General Requirements that Work be Complete:

1. Provide same products or types of construction as that in existing structure, as needed to patch, extend or match existing work.

a. Generally, Contract Documents will not define products or standards of workmanship present in existing construction; Contractor shall determine products by inspection and any necessary testing and fabrication and installation by use of the existing as a sample of comparison.

2. Presence of a product, finish or type of construction, requires that patching, extending or matching shall be performed as necessary to make work complete and consistent to identical standards of quality.

Qualified Vendor List for Fencing Services

SECTION 01020: ALTERATION PROCEDURES

PART 3 – EXECUTION

3.01 EXAMINATION

A. Examine existing conditions, including elements subject to movement or damage during remodeling work.

B. After uncovering the work, inspect conditions affecting installation of new work.

C. Discrepancies:

1. If uncovered conditions are not as anticipated, immediately notify Agency Construction staff and secure needed directions.

2. Do not proceed in areas of discrepancy until such discrepancies have been fully resolved.

D. Any time extension or any increase or decrease of cost resulting from such changes will be adjusted in the manner provided in the Contract Documents.

3.02 PREPARATION

A. Provide interior and exterior shoring, bracing, or support to prevent movement, settlement or collapse of structures to be demolished and adjacent facilities to remain.

1. Cease operations and notify Agency Contruction staff immediately if safety of structure appears to be endangered. Take precautions to support structure until determination is made for continuing operations.

B. Cover and protect furniture, equipment and fixtures to remain from soiling or damage when demolition work is performed in rooms or areas from which such items have not been removed.

C. Erect and maintain dust-proof partitions and closures as required to prevent spread of dust or fumes to occupied portions of the building.

1. Where alteration and demolition occurs immediately adjacent to occupied portions of the building, construct dust-proof partitions of minimum 4 inch studs, 5/8 inch gypsum wallboard (joints…