TE X DID A016 Non Tactical Vehicle Utilization Report.pdf
PDF 198 KB Posted
- Solicitation number
- W91151-21-R-0012
About this file
This solicitation requests test technology support services. The U.S. Army Mission and Installation Contracting Command - Fort Hood, on behalf of the U.S. Army Operational Test Command at Fort Hood, Texas, seeks to provide systems engineering expertise, software support, operations and integration support, execution centers support, analytical support and studies, and instrumentation support for operational test events. Testing will occur at locations in the continental United States and outside the continental United States as identified in task authorization requests. The North American Industry Classification System code is 541330 and the size standard is $41.5 million. The contract type is cost-plus-fixed-fee for a 60-month ordering performance period with a 30-day phase-in period. The solicitation issues on March 15, 2021 with responses due by April 14, 2021 at 12:00 PM Central Standard Time. Questions are due by March 24, 2021.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form Approved OMB No. 0704-0188
Page 1 of 1 Pages PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)
DATA ITEM DESCRIPTION
1. TITLE
A016, Non Tactical Vehicle (NTV) Utilization Report
2. IDENTIFICATION NUMBER
3. DESCRIPTION/PURPOSE
To provide a utilization report of all NTV on a quarterly basis
4. APPROVAL DATE
(YYYYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
This DID contains the format requirements and preparation instructions for the information product generated by the specific and discrete task requirement as delineated in the contract.
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
11. DISTRIBUTION STATEMENT
Distribution Statement A: Approved for public release; distribution is unlimited.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
Downloaded from http://www.everyspec.com
USAOTC G4
10. PREPARATION INSTRUCTIONS
10.1 The contractor will provide a NTV utilization report to government personnel on a quarterly to the Addressees (January 1st, April 1st, July 1st, and October 1st).
10.2 The utilization rate will be calculated using the number of days each NTV was operated divided by the number of days the NTV was available per month.
10.3. This data is compiled monthly and reported quarterly. The report shall be delivered electronically in a spreadsheet using Microsoft Office Excel.
10.4. Initial Utilization Report submission will be from contract award date through the end of the quarter.
10.5. Subsequent submissions will be every quarter. Final submission will be within 14 calendar days of contract completion/ termination and shall include reutilization/disposition recommendations.
File details come from the government source that posted it. Updated .