TE K DID A006 Test Instr Validation Rpts 20200603.pdf

PDF 213 KB Posted

Attached to
W91151-21-R-0012 Test Technology Support Services (TTSS) Solicitation
Solicitation number
W91151-21-R-0012
Issued by

About this file

This document contains a data item description and related federal contract opportunity solicitation. The data item description outlines minimum requirements for contractor-prepared test plans, procedures, and reports for test technology development and validation. It includes guidance on report structure and content for test plans, procedures, test reports, and updates.

The related federal contract opportunity is a solicitation seeking test technology support services. The U.S. Army Mission and Installation Contracting Command - Fort Hood is soliciting proposals on behalf of the U.S. Army Operational Test Command and Intelligence and Electronic Warfare Test Directorate. Services include systems engineering, software support, operations and integration, execution center support, analytical support and studies, and instrumentation support for operational test events conducted in the U.S. and overseas. The requirement will be set aside for competitive 8(a) small businesses. The NAICS code is 541330. The contract is a 60-month IDIQ with a maximum value of $41.5 million. Proposals are due by April 14, 2021.

View the file

Other files

File Type Posted
Attachment 4 Cost Proposal Version 4 Format 29 June 2021 (003).xls XLS spreadsheet
Amendment 6 W91151-21-R-0012 dtd 30 June 2021.pdf PDF
TE A TTSS PWS v2 5 May 2021 .pdf PDF
Amendment 5 dtd 5 May 2021.pdf PDF
Attachment 4 Cost Proposal ver 3 Format 5 May 2021.xls XLS spreadsheet
Attachment 4 Cost Proposal Format ver 3 4 May 2021.xls XLS spreadsheet
Amendment 4 dtd 29 April 2021.pdf PDF
TE A TTSS PWS v1 29 Apr 2021 .pdf PDF
TE AB IEWTD Base TAR Recompete 29 Apr 21.pdf PDF
TE AC1 PWS Deliverable Schedule 23 Apr 21.pdf PDF
TE O1 Wage Determination Texas and Arizona 23 Apr 21.pdf PDF
TE V1 DD 254 Addendum 23 Apr 21.pdf PDF
Amendment 3 dtd 23 April 2021.pdf PDF
Attachment 4 Cost Proposal Format ver 2 23 April 2021.xls XLS spreadsheet
TE A TTSS PWS v1 23 Apr 2021 .pdf PDF
TE AA Fort Hood Base TAR Recompete 20210324 16 Apr 21.pdf PDF
TE I Baseline Staffing and Historical Data 20210324 16 Apr 21.xlsx XLSX spreadsheet
TE AB IEWTD Base TAR Recompete 20210324 16 Apr 21.pdf PDF
Attament 4 Cost Proposal dtd 16 Apr 21.xls XLS spreadsheet
Amendment 2 16 April 2021.pdf PDF
TE F DID A003 Task Implementation Plan 20210324 for Solicitation Only 16 Apr 21.pdf PDF
Attachment 1 Sample Test Scenario TAR 20210329 16 Apr 21 .pdf PDF
TE V DD 254 DoD Contract Security Classification Specification 20210324 16 Apr 21.pdf PDF
Attachment 7 Sample Test TAR Postion and Labor Proposal 16 Apr 21.xlsx XLSX spreadsheet
TE A TTSS PWS 20210414 16 Apr 21.pdf PDF
TTSS Amendment 1 W91151-21-R-0012 FH 9 Apr 2021.pdf PDF
Attachment 3 TTSS Site Map and Facility Fort Hood PDF.pdf PDF
TE A TTSS PWS 20210127 .pdf PDF
TE A6 TTSS_CDRL A016-A017 20200518.pdf PDF
TE O Wage Determination.pdf PDF
TE N DID A009 Technical Manuals.pdf PDF
TE A5 TTSS CDRL A015 20200518.pdf PDF
TE U Vehicle Inspection Sheet.pdf PDF
TE AB- IEWTD Base TAR Re-compete 20200603.pdf PDF
TE W DID A015 GFP Master Report .pdf PDF
TE Y DID A017 Annual Incidental Property Inventory.pdf PDF
TE I Baseline Staffing Infomation and Historical Data.xlsx XLSX spreadsheet
TE AA Fort Hood Base TAR Re-compete 20200603.pdf PDF
Attachment 5 Subcontractor Consent Form.pdf PDF
TE G DID A004 Weekly Task Order Cost Report .pdf PDF
TE L DID A007 Sensitive Item Inventory.pdf PDF
Attachment 1-Sample Test Scenario TAR 2020603 .pdf PDF
TE P DID A010 Software Documentation.pdf PDF
TE M DID A008 Technical Reports.pdf PDF
Attachment 6 Past Performance Questionairee.pdf PDF
TE E DID A002 Quarterly Progress Briefing 20200518.pdf PDF
TE R TTSS Supported Software-Nework List Revised 20200518.xlsx XLSX spreadsheet
Attachment 2 IEWTD Site Map and Facilities.pdf PDF
Attachment 4 Cost Proposal Template.xlsx XLSX spreadsheet
TE AC PWS Deliverable Schedule.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1664, APR 89 Previous editions are obsolete Page 1 of 3

DATA ITEM DESCRIPTION Form Approved

OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.

1. TITLE

A006, Test Technology and Validation Reports

2. IDENTIFICATION NUMBER

3. DESCRIPTION/PURPOSE

To prescribe minimum requirements for contractor prepared test plans, test procedures, and test reports for test technology development and validation.

4. APPROVAL DATE (YYMMDD)

5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)

USAOTC G4

6A. DTIC APPLICABLE

6B. GIDEP APPLICABLE

7. APPLICATION/INTERRELATIONSHIP

This Data Item Description is applicable to all types of testing performed by the contractor to demonstrate conformance to Task Order requiring technology acquisition or development. Types of test included are: technology evaluations, systems integration, software verification, delivery acceptance, and quality conformance. The resulting documents are subject to Government approval before being accepted as a deliverable.

8. APPROVAL LIMITATION

9A. APPLICABLE FORMS

9B. AMSC NUMBER

10. PREPARATION INSTRUCTIONS

10.1 Reports can be presented in the contractor’s format unless otherwise specified. The Contractor shall provide technology development/validation plans, and reports that meet the requirements of the task order and paragraph 10.3. below.

10.2 Definitions. Applicable to this data item only.

a. Engineering evaluation – exploratory type tests conducted to measure and record the performance characteristics of hardware, software, or systems.

b. Software verification – tests conducted on computer software and firmware, prior to system integration, to verify requirements in the work statement.

c. System integration – test conducted on systems, consisting of two or more items that have undergone separate testing, or consisting of both hardware and software, to demonstrate conformance of the system to the requirements of the work statement.

d. Quality conformance – inspections and tests, conducted at a manufacturer or sub-contractor facility, to verify and demonstrate conformance with the work statement.

e. Delivery acceptance – tests conducted after delivery to the Government facility to assure that the item is free from shipping damage and to verify function and safe operating characteristics.

f. Verification and Validation and Accreditation (V&V) – documentation needed to gain ATEC accreditation that the technology, simulation, or stimulation provides and accurate representation of the real world and that the information collected is accurate and usable.

i. Verification and Validation and Accreditation (V&V) Software- Plans for, results of, and recommendations resulting from Software VV testing

10.3 One overall report that includes test plans, procedures and reports as required by the task order. The report shall include the following items:

a. Test Plans:

(1) Title Page

(2) Table of Contents

(3) List of Illustrations

(4) Introduction/Purpose

(5) Test dates and location

(6) References

(7) Test Procedures

(8) Test Results

(9) Conclusion

(10) Recommendations

11. DISTRIBUTION STATEMENT

DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited.

DD Form 1664, APR 89 Previous editions are obsolete Page 2 of 3

OMB NO. 0704-0188

10.3. Test plans… (continued)

- The test plan describes what the contractor intends to do to fulfill test requirements and in addition to “10.4 a” above, all test plans shall include:

(1) Basic test philosophy and approach

(2) Government furnished property (GFP), if required.

(3) Acceptance/rejection criteria

- Test Plan (software). In addition to “10.3 a.” above, all test plans involving software shall include:

(1) Interface requirements - This portion of the plan shall describe all interface conditions which must be satisfied. It shall include interface data for the following:

(a) Hardware I/O (Input/Output)

(b) Executive program

(c) Other supporting software

(d) Errors

(2) Software test environment

(3) Test identification

(4) Timing requirements

(5) Volume requirements (data)

(6) Input data format

b. Test Procedures. The test procedure describes in detail how the examinations and tests are to be performed, all test procedures shall include:

(1) Scope

(2) Technical approach

(3) Functional block diagram of test set up

(4) Identification of test equipment required

(5) Number of test units or lot size and sampling plan

(6) Step-by-step procedures to be followed referenced to the particular requirement in the work statement.

(7) Data reduction and analysis

(8) Acceptance/rejection criteria

(9) Definitions and abbreviations

(10) Sample data sheets

(11) List of required GFP

(12) Planned test to be subcontracted

- Test Procedures (software): In addition to “10.4 d” above, all test procedures involving software shall include:

(1) A full description of the procedures, giving particular attention to the following:

(a) Describe the function tested.

(b) Arrange test sequence for optimum performance.

(c) Provide detailed step-by-step procedures required to obtain desired results.

(d) Identify test results expected and provide for recording the actual results obtained.

(2) A description of all operating procedures including the following:

(a) Initial system set up and pre-operating procedures

(b) Normal operation modes

(c) Program completion notes

(d) Error conditions (and operator action, if applicable)

(e) Messages (and operator action, if applicable)

(f) Halts (and restart procedures, if applicable)

c. Test Report: The test report shall, in addition to “10.4 a” above include: [Note: Sections (1) through (6) shall be included in the main body of the report. Section (7) and (8) shall be included as an appendix].

(1) Executive Summary

(2) Description of test facility and conduct of the test including a description of how the test article was operated during the test. Brief description of test article.

(3) Manpower requirements

(4) Identification of test equipment and its calibration status

(5) Summary of tests results. Where these tests were to show compliance with a given statement of work and/or specification

(6) Functional block diagram of test set up

OMB NO. 0704-0188

DD Form 1664, APR 89 Previous editions are obsolete Page 3 of 3

10.3. Test Report… (continued)

(7) Deviation from test conditions. If value of data has been compromised due to test conditions, the reason and implication shall be stated.

(8) Data Collection and reduction

(9) Recorded test data or logs as appropriate, including instrument readings, correction factors, and reduced results presented in tabular or graphic form.

(10) Test log

(11) Certification that the test results are authentic, accurate, current, and in accordance with approved test procedures.

- Recorded test data or logs as appropriate, including instrument readings, correction factors, and reduced results presented in tabular or graphic form.

- Test Report Addendum: This report used to update the test report when design changes made and test are performed after the test report has been published. The updated information shall be related to the previous data in the test report.

- Interim Test Report. Interim reports are prepared when reporting of test status is required during the period of the test.

(1) Initial interim reports shall contain the same contents as for test reports, except that the results and conclusions shall be preliminary.

(2) Subsequent interim reports need not include descriptive data provided in the initial report, but only changes thereto.

10.4 Explanation of terms in paragraph 10.3: Self-explanatory terms are not listed. Other terms are listed to aid the contractor in understanding the requirement. Items listed under each term are to be included as applicable.

a. Basic test philosophy and approach.

(1) Facility requirements

(2) Test preparation plans

(3) Key personnel responsibilities

(4) Sub-contracting plan

(5) Description of test content and conduct

(6) Documentation requirement

(7) Logistics support

(8) Applicable MIL-STDs

b. Schedule of events.

(1) Network diagrams

(2) Gantt charts

c. Government Furnished Property (GFP)

(1) Describe contractor plan for maintenance and repair.

(2) Describe security measures to be taken for safeguarding.

(3) Describe accountability procedures.

d. General test approach.

(1) Facility requirements

(2) General description of the test content and conduct (i.e., will environmental test be conducted? Will test article be operated during the test?

e. Data reduction and analysis.

(1) Types of data to be recorded.

(2) Data reduction process and time test.

(3) Description of method for data reduction and analysis.

f. Subcontracting.

(1) Show which portions of the test are to be performed by the prime contractor.

(2) Show which portions of the test are to be performed by the sub-contractor(s).

(3) Identify sub-contractors by name and address.

g. Accept/reject criteria.

(1) Statements of test objectives are sufficient for exploratory type tests.

(2) Include criteria to be evaluated with pass/fail levels.

(3) Include exceptions or deviations (good or bad) and resulting impact.

File details come from the government source that posted it. Updated .