Attachment 4 Cost Proposal ver 3 Format 5 May 2021.xls

XLS spreadsheet 195 KB Posted

Attached to
W91151-21-R-0012 Test Technology Support Services (TTSS) Solicitation
Solicitation number
W91151-21-R-0012
Issued by

About this file

This document package includes a cost proposal template and instructions for a federal contract solicitation seeking test technology support services.

The solicitation requires offerors to provide systems engineering expertise, software support, operations and integration support, execution center support, analytical support and studies, and instrumentation support for operational test events conducted by the U.S. Army Operational Test Command and Intelligence and Electronic Warfare Test Directorate. Testing will take place at locations in the continental U.S. and outside the continental U.S. The contract is set aside for 8(a) small businesses and has a total estimated value of $41.5 million over a five-year ordering period, including a 30-day phase-in. The anticipated contract type is cost-plus-fixed-fee. Offerors must submit cost proposals using the provided template by April 14, 2021. The template includes instructions and tables for entering direct labor costs, overhead rates, general and administrative costs, and other pricing details.

View the file

Other files

File Type Posted
Attachment 4 Cost Proposal Version 4 Format 29 June 2021 (003).xls XLS spreadsheet
Amendment 6 W91151-21-R-0012 dtd 30 June 2021.pdf PDF
TE A TTSS PWS v2 5 May 2021 .pdf PDF
Amendment 5 dtd 5 May 2021.pdf PDF
Attachment 4 Cost Proposal Format ver 3 4 May 2021.xls XLS spreadsheet
Amendment 4 dtd 29 April 2021.pdf PDF
TE A TTSS PWS v1 29 Apr 2021 .pdf PDF
TE AB IEWTD Base TAR Recompete 29 Apr 21.pdf PDF
TE AC1 PWS Deliverable Schedule 23 Apr 21.pdf PDF
TE O1 Wage Determination Texas and Arizona 23 Apr 21.pdf PDF
TE V1 DD 254 Addendum 23 Apr 21.pdf PDF
Amendment 3 dtd 23 April 2021.pdf PDF
Attachment 4 Cost Proposal Format ver 2 23 April 2021.xls XLS spreadsheet
TE A TTSS PWS v1 23 Apr 2021 .pdf PDF
TE AA Fort Hood Base TAR Recompete 20210324 16 Apr 21.pdf PDF
TE I Baseline Staffing and Historical Data 20210324 16 Apr 21.xlsx XLSX spreadsheet
TE AB IEWTD Base TAR Recompete 20210324 16 Apr 21.pdf PDF
Attament 4 Cost Proposal dtd 16 Apr 21.xls XLS spreadsheet
Amendment 2 16 April 2021.pdf PDF
TE F DID A003 Task Implementation Plan 20210324 for Solicitation Only 16 Apr 21.pdf PDF
Attachment 1 Sample Test Scenario TAR 20210329 16 Apr 21 .pdf PDF
TE V DD 254 DoD Contract Security Classification Specification 20210324 16 Apr 21.pdf PDF
Attachment 7 Sample Test TAR Postion and Labor Proposal 16 Apr 21.xlsx XLSX spreadsheet
TE A TTSS PWS 20210414 16 Apr 21.pdf PDF
TTSS Amendment 1 W91151-21-R-0012 FH 9 Apr 2021.pdf PDF
Attachment 3 TTSS Site Map and Facility Fort Hood PDF.pdf PDF
TE A TTSS PWS 20210127 .pdf PDF
TE A6 TTSS_CDRL A016-A017 20200518.pdf PDF
TE O Wage Determination.pdf PDF
TE N DID A009 Technical Manuals.pdf PDF
TE A5 TTSS CDRL A015 20200518.pdf PDF
TE U Vehicle Inspection Sheet.pdf PDF
TE AB- IEWTD Base TAR Re-compete 20200603.pdf PDF
TE W DID A015 GFP Master Report .pdf PDF
TE Y DID A017 Annual Incidental Property Inventory.pdf PDF
TE I Baseline Staffing Infomation and Historical Data.xlsx XLSX spreadsheet
TE AA Fort Hood Base TAR Re-compete 20200603.pdf PDF
Attachment 5 Subcontractor Consent Form.pdf PDF
TE G DID A004 Weekly Task Order Cost Report .pdf PDF
TE L DID A007 Sensitive Item Inventory.pdf PDF
Attachment 1-Sample Test Scenario TAR 2020603 .pdf PDF
TE P DID A010 Software Documentation.pdf PDF
TE M DID A008 Technical Reports.pdf PDF
Attachment 6 Past Performance Questionairee.pdf PDF
TE E DID A002 Quarterly Progress Briefing 20200518.pdf PDF
TE R TTSS Supported Software-Nework List Revised 20200518.xlsx XLSX spreadsheet
TE K DID A006 Test Instr Validation Rpts 20200603.pdf PDF
Attachment 2 IEWTD Site Map and Facilities.pdf PDF
Attachment 4 Cost Proposal Template.xlsx XLSX spreadsheet
TE AC PWS Deliverable Schedule.pdf PDF
Show 40 more

Latest 50 of 66 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Information

VOLUME VCost Proposal
GENERAL INFORMATION
The purpose of the requested information in the attached worksheets is to assist Government personnel in the review, analysis, and evaluation of cost proposals submitted by Offerors to ensure the final agreed-to price is fair and reasonable. Offerors are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the offeror must also bear the burden of proof in establishing reasonableness of proposed costs; therefore, it is in the offeror’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which offerors are required to submit certified cost or pricing data.
1. Contractor Name:3. Contractor CAGE Code:
1A. Contractor POC Name/Phone:4. RFP No. and/or Contractor's Prop. No.:
2. Contractor's Address:
5. Total Dollar Amount Proposed:6. Contractor Fiscal Year:
This proposal volume shall be prepared in accordance with the solicitation instructions contained in section L. Noncompliance with Section L may cause the Offeror's proposal to be determined nonresponsive and may result in the elimination of the proposal from further consideration for contract award.
This volume should be consistent with any other volume that is required and submitted.
The cost/price data submitted with this Volume, should be in a format consistent with the offeror's records.

Summary BY CLIN

SECTION B SUMMARY BY CLIN(This information must be consistent with the other submitted volumes in particular Volume I).
CLINTYPEPoPMONTHSESTIMATED COSTFIXED FEE (If Applicable)TOTAL PROPOSEDCROSSWALK TO 'TOTAL EFFORT - COST BREAKDOWN' Tab
BASE YEAR
0001 TTSS SERVICESCPFF18 JUL 2021 to 17 JUN 202611$ - 0$ - 0$ - 0For example (description for CLIN 0001), what amouts on columns J,K, and L on the following worksheet tie to total proposed in column G row 4 (in some cases certain burdens may be applied while others are not and profit/fee may be applied or not depneding on the CLIN)
0002 ODCCOST18 JUL 2021 to 17 JUN 202611$ 1,279,251$ - 0$ 1,279,251
0003 DELIVERY OF CAP - EQP, ST & STECOST18 JUL 2021 to 17 JUN 202611$ 559,000$ - 0$ 559,000
0004 DELIVERY OF CAP - MATERIALCOST18 JUL 2021 to 17 JUN 202611$ 100,000$ - 0$ 100,000
0005 SERVICE CONTRACT REPORTFFP18 JUL 2021 to 17 JUN 202611$ - 0$ - 0$ - 0
0006 DEFENSE BASE ACT INSURANCECOST18 JUL 2021 to 17 JUN 202611$ - 0$ - 0$ - 0
0007 (PHASE IN)FFP18 JUN 2021 to 17 JUL 20211$ - 0$ - 0$ - 0
SUBTOTAL$ 1,938,251$ - 0$ 1,938,251.20
ORDERING YEAR 1
0001 TTSS SERVICESCPFF18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0For example (description for CLIN 0001), what amouts on columns J,K, and L on the following worksheet tie to total proposed in column G row 4 (in some cases certain burdens may be applied while others are not and profit/fee may be applied or not depneding on the CLIN)
0002 ODCCOST18 JUL 2021 to 17 JUN 202612$ 1,279,251$ - 0$ 1,279,251
0003 DELIVERY OF CAP - EQP, ST & STECOST18 JUL 2021 to 17 JUN 202612$ 559,000$ - 0$ 559,000
0004 DELIVERY OF CAP - MATERIALCOST18 JUL 2021 to 17 JUN 202612$ 100,000$ - 0$ 100,000
0005 SERVICE CONTRACT REPORTFFP18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
0006 DEFENSE BASE ACT INSURANCECOST18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
SUBTOTAL$ 1,938,251$ - 0$ 1,938,251.20
ORDERING YEAR 2
0001 TTSS SERVICESCPFF18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0For example (description for CLIN 0001), what amouts on columns J,K, and L on the following worksheet tie to total proposed in column G row 4 (in some cases certain burdens may be applied while others are not and profit/fee may be applied or not depneding on the CLIN)
0002 ODCCOST18 JUL 2021 to 17 JUN 202612$ 1,279,251$ - 0$ 1,279,251
0003 DELIVERY OF CAP - EQP, ST & STECOST18 JUL 2021 to 17 JUN 202612$ 559,000$ - 0$ 559,000
0004 DELIVERY OF CAP - MATERIALCOST18 JUL 2021 to 17 JUN 202612$ 100,000$ - 0$ 100,000
0005 SERVICE CONTRACT REPORTFFP18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
0006 DEFENSE BASE ACT INSURANCECOST18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
SUBTOTAL$ 1,938,251$ - 0$ 1,938,251.20
ORDERING YEAR 3
0001 TTSS SERVICESCPFF18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0For example (description for CLIN 0001), what amouts on columns J,K, and L on the following worksheet tie to total proposed in column G row 4 (in some cases certain burdens may be applied while others are not and profit/fee may be applied or not depneding on the CLIN)
0002 ODCCOST18 JUL 2021 to 17 JUN 202612$ 1,279,251$ - 0$ 1,279,251
0003 DELIVERY OF CAP - EQP, ST & STECOST18 JUL 2021 to 17 JUN 202612$ 559,000$ - 0$ 559,000
0004 DELIVERY OF CAP - MATERIALCOST18 JUL 2021 to 17 JUN 202612$ 100,000$ - 0$ 100,000
0005 SERVICE CONTRACT REPORTFFP18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
0006 DEFENSE BASE ACT INSURANCECOST18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
SUBTOTAL$ 1,938,251$ - 0$ 1,938,251.20
ORDERING YEAR 4
0001 TTSS SERVICESCPFF18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0For example (description for CLIN 0001), what amouts on columns J,K, and L on the following worksheet tie to total proposed in column G row 4 (in some cases certain burdens may be applied while others are not and profit/fee may be applied or not depneding on the CLIN)
0002 ODCCOST18 JUL 2021 to 17 JUN 202612$ 1,279,251$ - 0$ 1,279,251
0003 DELIVERY OF CAP - EQP, ST & STECOST18 JUL 2021 to 17 JUN 202612$ 559,000$ - 0$ 559,000
0004 DELIVERY OF CAP - MATERIALCOST18 JUL 2021 to 17 JUN 202612$ 100,000$ - 0$ 100,000
0005 SERVICE CONTRACT REPORTFFP18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
0006 DEFENSE BASE ACT INSURANCECOST18 JUL 2021 to 17 JUN 202612$ - 0$ - 0$ - 0
SUBTOTAL$ 1,938,251$ - 0$ 1,938,251.20
SUBTOTAL$ 9,691,256$ - 0$ 9,691,256
52.217-8 OPTION TO EXTEND$ 969,126
GRAND TOTAL$ 9,691,256$ - 0$ 10,660,382

Offeror must show how each CLIN amount ties to the cost breakdown on the following tab 'Total Effort'. Explanations are to be entered in column I on the applicable CLIN row in this spreadsheet. Basically the cost buildup by CLIN.

IEWTD - Cost Breakdown

Cost Proposal Cost/ Fee Breakdown (Note 4)PHASE INBASE YEARORDERING PERIOD 1ORDERING PERIOD 2ORDERING PERIOD 3ORDERING PERIOD 4
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY/FY XX or XXCY/FY XX or XXCY/FY XX or XXCY/FY XX or XXCY/FY XX or XXCY/FY XX or XXTotal
6/18/21 to 7/17/217/18/21 - 6/17/226/18/22 - 6/17/236/18/23 - 6/17/246/18/24 - 6/17/256/18/25 - 6/17/26(NOTE 3)60-Months
Offeror's (PRIME's)Labor Category (NOTE 1)Identify as Exempt or Non-Exempt or Non-Exempt SCA CoveredCrosswalk or conform to BLS or Area Wage Determination labor category as applicableFT/PTAvailable HoursProductive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SubcontractsFile/Tab Name or Link
Subcontract Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional SubcontractorsIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Service Contract Report
Service Contract Report$0.00
Total Service Contract Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Defense Base Act Insurance
Defense Base Act Insurance$0.00
Total Defense Base Act Insurance$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 5)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
GOVERNMENT PROVIDED PLUG FIGURES
Other Direct Costs$1,279,251.20$1,279,251.20$1,279,251.20$1,279,251.20$1,279,251.20
Delivery of CAP - EQP, ST & STE$559,000.00$559,000.00$559,000.00$559,000.00$559,000.00
Delivery of CAP - Material$100,000.00$100,000.00$100,000.00$100,000.00$100,000.00
Total Estimated Costs Plus Fixed Fee$0.00$1,938,251.20$1,938,251.20$1,938,251.20$1,938,251.20$1,938,251.20$9,691,256.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "productive hours" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: The offeror is responsible for the data entries, inputs, outputs, formulas, and application of its rates in accordance with its Accounting System for this spreadsheet. Do not rely on the sample formulas or info in this spreadsheet to calculate any proposed costs/fee correctly pertaining to your particular company. Each offeror is responsible for its own proposal and its representations of any inputs into this spreadsheet. All information provided should be current, accurate, and complete and in accordance with approved company policies and procedures and all applicable regulations and solicitation instructions.
Note 5: Profit or fee is not allowed on cost reimbursable CLINS.
Note 6: This section must be consistent with the other submitted volumes in particular Volume II as well as the PWS.

&C&"Arial,Bold"&12&A &LOfferor: &CPage &P of &N Pages&R&F Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

The months during the phase in period of performance that these rates apply Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Indicate total months of base and all options Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

The months during the base period of performance that these rates apply Note:

The months during the ordering 1 period of performance that these rates apply Note:

The months during the ordering 2 period of performance that these rates apply Note:

The months during the ordering 3 period of performance that these rates apply Note:

The months during the ordering 4 period of performance that these rates apply Identify as Full Time or Part Time Employee Available hours are all hours including holidays, vacation, sick leave, and other leaves (excluding OT) Productive hours are available hours less Paid Time Off (PTO)

FTH - Cost Breakdown

Cost Proposal Cost/ Fee Breakdown (Note 4)PHASE INBASE YEARORDERING PERIOD 1ORDERING PERIOD 2ORDERING PERIOD 3ORDERING PERIOD 4
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY/FY XX or XXCY/FY XX or XXCY/FY XX or XXCY/FY XX or XXCY/FY XX or XXCY/FY XX or XXTotal
6/18/21 to 7/17/217/18/21 - 6/17/226/18/22 - 6/17/236/18/23 - 6/17/246/18/24 - 6/17/256/18/25 - 6/17/26(NOTE 3)60-Months
Offeror's (PRIME's)Labor Category (NOTE 1)Identify as Exempt or Non-Exempt or Non-Exempt SCA CoveredCrosswalk or conform to BLS or Area Wage Determination labor category as applicableFT/PTAvailable HoursProductive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursRateExtended $Productive HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
SubcontractsFile/Tab Name or Link
Subcontract Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional SubcontractorsIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Service Contract Report
Service Contract Report$0.00
Total Service Contract Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Defense Base Act Insurance
Defense Base Act Insurance$0.00
Total Defense Base Act Insurance$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 5)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
GOVERNMENT PROVIDED PLUG FIGURES FROM IEWTD LOCATION WILL APPLY TO BOTH IEWTD AND FTH LOCATIONS
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "productive hours" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: The offeror is responsible for the data entries, inputs, outputs, formulas, and application of its rates in accordance with its Accounting System for this spreadsheet. Do not rely on the sample formulas or info in this spreadsheet to calculate any proposed costs/fee correctly pertaining to your particular company. Each offeror is responsible for its own proposal and its representations of any inputs into this spreadsheet. All information provided should be current, accurate, and complete and in accordance with approved company policies and procedures and all applicable regulations and solicitation instructions.
Note 5: Profit or fee is not allowed on cost reimbursable CLINS.
Note 6: This section must be consistent with the other submitted volumes in particular Volume II as well as the PWS.

&C&"Arial,Bold"&12&A &LOfferor: &CPage &P of &N Pages&R&F Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year Note:

The months during the phase in period of performance that these rates apply Note:

The months during the base period of performance that these rates apply Note:

The months during the ordering 1 period of performance that these rates apply Note:

The months during the ordering 2 period of performance that these rates apply Note:

The months during the ordering 3 period of performance that these rates apply Note:

The months during the ordering 4 period of performance that these rates apply Indicate total months of base and all options Identify as Full Time or Part Time Employee Available hours are all hours including holidays, vacation, sick leave, and other leaves (excluding OT) Productive hours are available hours less Paid Time Off (PTO)

Escalation & Indirect Rates

LABOR ESCALATION
Option Year 1Option Year 2Option Year 3Option Year 4
Labor Category (Note 1)Base Labor Rate (and/or Wage Determination Rate)Detailed BOE narrative for base labor rates (including sources, Bureau of Labor Statistics (BLS) rationale (codes/percentiles), local salary surveys or other related data as well as Area Wage Determinations as required for SCLS EmployeesEscalation Rate/FactorEscalation Rate/FactorEscalation Rate/FactorEscalation Rate/FactorProvide detailed Narrative for the basis of esclation factors utilized/proposed (does the factor account for churn etc.)
i.e. Program Manager2.30%2.10%2.20%2.40%
Engineerxxxxxxxx
Engineer
Technician
Indirect Rates (Note 2)
BaseOption Year 1Option Year 2Option Year 3Option Year 4Provide detailed narrative for the basis of estimate for all indirect rates proposed.
Rate CategoryRateRateRateRateRateBasis of RateApplied Against
i.e. Fringe Benefitsi.e. Forward Pricing Rate Agreement (FPRA)/Forward Pricing Rate Proposal (FPRP) (and applicable dates etc.)
Labor Overheadi.e. if no FPRP/FPRA, provide element by element breakout of the base and pools with associated dollar amounts for each period of performance and 3 year trend histories on subsequent worksheets
Material Handling
General and Administrative
Facilities Cost of Money
Note 1:Add additional labor categories if needed.
Note 2:Add additional indirect rates as needed.

If SCLS covered employees refer to tab SCA covered employees

Subcontractor - Teaming

SUBCONTRACTOR COST DATA
Subcontracts/Interorganizational Transfers – A cost proposal as detailed as the Offeror’s cost proposal including support documentation will be required to be submitted by all proposed subcontractors and for all interorganizational transfers. The subcontract or interorganizational transfer proposal, along with supporting documentation, must be provided directly to the Contracting Officer or Contract Specialist upon request (if the infomration is not contained within the offeror's proposal). The subcontractor and interorganizational transfer proposals with supporting documentation must be received and reviewed before the Government can complete its cost analysis of the proposal and enter negotiations unless thresholds are identified.
The prime contractor should perform and provide a cost/price analysis of each subcontractor’s cost proposal. Offerors are required to obtain competition to the maximum extent practicable when selecting subcontractors; if the offeror has obtained competitive quotes, copies should be provided. If the Offeror has selected other than the low bid for inclusion in their proposal or intends to award the subcontract on a sole-source basis, the offeror should provide rationale for their decision.
Certified cost or pricing data may be required for subcontractor proposals.
*Note: Federal Acquisition Regulation provision 52.215-22 is incorporated into this solicitation by reference. The offeror is to exclude excessive pass-through charges from subcontractors. The offeror must identify in its proposal the percentage of effort it intends to perform and the percentage to be performed by each of its proposed subcontractors. If more than 70 percent of the total effort will be performed through subcontractors, the offeror must include the additional information required by the above-cited clause.
SubcontractorCompetitive/Sole SourceCost/price analysis included (Y/N)Competitive Quotes or Sole Source Documentation Included (Y/N)Total amount exceeds $2M (Y/N)
i.e.ABC CompanyCompetitiveYYN
XYZ CompanySole SourceYYY

&C&"Arial,Bold"&12&A &LOfferor: &CPage &P of &N Pages&R&F

SCA Covered Employees

Identify applicable AREA WAGE DETERMINATION No.:
Offeror's Service Contract Act Covered Employee's Labor CategoriesCross Reference (if applicable)Holiday HoursVacation hoursSick Leave HoursOther PTO hoursH&W RateFICA RateFUTA RateSUTA RateWorkers Comp Rate
i.e. Program Manager- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
Engineer- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
Technician- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
- 0- 0- 0- 0$ - 0$ - 0$ - 0$ - 0$ - 0
Provide rationale, BOEs, and any explantions and applications for each above category below

DCAA and System Info

PROVIDE NAME, ADDRESS, TELEPHONE NUMBER AND E-MAIL ADDRESS FOR THE FOLLOWING (if available)
A. CONTRACT ADMINISTRATION OFFICE (DCMA)B. AUDIT OFFICE (DCAA)
C. DO YOU HAVE AN ADEQUATE ACCOUNTING SYSTEM AS DETERMINED BY DCAA OR ANOTHER AGENCY?D. DO YOU REQUIRE GOVERNMENT CONTRACT FINANCING TO PERFORM THIS PROPOSED CONTRACT?(FFP ONLY) (If "Yes," complete Item 11B)E. TYPE OF FINANCING (Mark "x" for one type)
SPECIFY DATES/STATUS OF ACCOUNTING SYSTEM
E. HAS THE CONTRACTOR BEEN AWARDED ANY CONTRACTS OR SUBCONTRACTS FOR THE SAME OR SIMILAR ITEMS WITHIN THE PAST 3 YEARS? (If "Yes," identify item(s), customer(s), and contract number(s))F. IS THIS PROPOSAL CONSISTENT WITH ESTABLISHED ESTIMATING & ACCOUNTING PRACTICES & PROCEDURES & FAR PART 31 COST PRINCIPLES? (If "No," explain)
G. DO YOU HAVE AN ADEQUATE DISCLOSURE STATEMENT AS DETERMINED BY THE CFAO?G2. SPECIFY DATES and REFERENCE MEMO of ADEQUACY DETERMINATION in space below:H. DO YOU HAVE AN APPROVED PURCHASING SYSTEM IN ACCORDANCE WITH FAR PART 44?
Provide explanation if you do not have an adequate Disclosure Statement:Provide any explanations needed with H. above:
I. DO YOU HAVE AN APPROVED ESTIMATING SYSTEM?J. DO YOU ANY OUTSTANDING COST ACCOUNTING STANDARD (CAS) NONCOMPIANCES?
If Yes to J. above, list and describe the noncompliances here:

Yes No Yes No

ADVANCE PAYMENTS

GUARANTEED LOANS

Yes No Yes No No Yes No

PROGRESS PAYMENTS

Yes Yes No Yes No

FTE

Provide a detailed narrative on the calculation of your FTEs or productive hours:
Sample
BOE
Available hours/full man year2080
minusVacation
Sick
Holiday
Other (PTO)
Etc.
FTE

Uncompensated OT

In accordance with FAR 52.237-10, uncompensated OT must be identified
Provide a narrative and BOE and related policy on the accounting for uncompensated OT
Applicable PersonnelLabor CategoryHourly RateAdjusted Hourly RateProposed Regular Hours subject to the Adjusted RateProposed uncompensated OT Hours subject to the Adjusted Rate
i.e. Program Manager

Assumptions - BOEs

All submitted costs should have sound rationale, be current, accurate, and complete, and include detailed supporting BOEs.
Provide detailed BOEs with a narrative for all costs included in the proposal which have not been provided in other worksheets.
Provide any assumptions made as well as any economic efficiencies.

File details come from the government source that posted it. Updated .