TE-VVVV Master keys dupicate keys and locks.docx

DOCX document 21 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
Solicitation number
W5168W23R0002
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Dugway Proving Ground, Utah, newest first.
File Type Posted
Attachment H - Dugway Pricing Matrix CLIN Structure revised 14 JUN 2023.xlsx XLSX spreadsheet
Attachment P - Past Performance Questionnaire Rev 1.docx DOCX document
W5168W23R0002 0003 Attachments.zip ZIP file
W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf PDF
Attachment 2 - Annex B to OPORD 18-011 Facilities Maint Inst.docx DOCX document
Attachment 1 - Annex A Overarching PWS_12 Apr 22.docx DOCX document
Attachment 11 - DBA Wage Determination - Residential.pdf PDF
Attachment 8 - Davis Bacon - Building.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 23 - CLS 503 Wastewater Services_12 Apr 22.docx DOCX document
Attachment 21 - CLS 500 Electrical Services_12 Apr 22.docx DOCX document
Attachment 19 - CLS 414 Facility Maintenance_AFH_12 Apr 22.docx DOCX document
Attachment 20 - CLS 420 Facility Maintenance_Horizontal_12 Apr 22.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
TE-S_O and M-Plans_Revision 1.doc DOC document
TE-U_English_Village_Improved_Area_Revision 1.pdf PDF
TE-J Current GFE.xlsx XLSX spreadsheet
TE-Q-1 2019-2020 Historical Workload Data.xlsx XLSX spreadsheet
TE-WW_Air_Dryers_Revision 1.pdf PDF
TE-GGG_Fire_Alarm_and_Fire_Suppression_System_List_Revision 1.pdf PDF
TE-UUU_List_Back_Flow_Preventors_Revision 1.pdf PDF
TE-KKK-1_Amerigas_Owned_Propane_Tanks_Revision 1.pdf PDF
TE-P_Real_Property_PM_Task_List_Revision 1.xlsx XLSX spreadsheet
TE-LLL-2 DPW Utility Reimbursable Meters 18MAY2020.pdf PDF
TE-FF-1_Historical_Snowfall_Data_Revision 1.xlsx XLSX spreadsheet
TE-QQQ_Sewage_Treatment_Monthly_Log_Revision 1.xlsx XLSX spreadsheet
TE-NNN_Gas_Leak_and_Repair_Report_Revision 1.docx DOCX document
TE-Z_Top_Dressing_Soil_Spec_Revision 1.pdf PDF
TE-LLL-1 DPW Utility Meters 18MAY2020.xlsx XLSX spreadsheet
TE-KKKK Snow Ice and Sand Removal Plan.docx DOCX document
TE-LLLL Water Treatment Description.docx DOCX document
TE-JJ-1_Generator_Hour_Report_Revision 1.xlsx XLSX spreadsheet
TE-HH_PCB_SOP_Revision 1.docx DOCX document
TE-KKK_Government_Owned_Propane_Tanks_Revision 1 30oct18.xlsx XLSX spreadsheet
TE-H_GFP_and_CAP_Report_Revision 1.xlsx XLSX spreadsheet
TE-FFF_VTS_Location_and_Data_Revision 1.xlsx XLSX spreadsheet
TE-F_Subcontract_Report_Example_Revision 1.xlsx XLSX spreadsheet
TE-CCC_Auto_Gates_and_Arms_Revision 1.xlsx XLSX spreadsheet
TE-W_Mowing_Requirements_Ranges_Revision 1.docx DOCX document
Attachment 7 - Staffing Matrix.xlsx XLSX spreadsheet
Attachment 3 - Installation Fueling Services_12 Apr 22.docx DOCX document
Attachment 13 - CLS 200 UPH Management Operation_12 Apr 22.docx DOCX document
Attachment 17 - CLS 408 Pavement Clearance_12 Apr 22.docx DOCX document
Attachment 16 - CLS 406 Attachment 2 Real Property.docx DOCX document
TE-GGGG Water Line Flush Record Deliverable Example and Flush Point Drawing.pdf PDF
TE-MMMM Dugway Area Map Place of Performance.pdf PDF
TE-AAAA ArMA Process.pdf PDF
TE-R_Historic_Buildings_Revision 1.pdf PDF
TE-JJ_Generator_List_Revision 1.pdf PDF
TE-TTTT Pesticide Use Record Example.xlsx XLSX spreadsheet
Show all 50

Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE - QQQQ

Master Keys, Duplicate keys and Locks.

Master keys shall be to the building level only. Keying of interior doors shall meet physical security requirements as provided by. There are two (2) lock systems used on Dugway Proving Ground, Best and Medco. Best and Medco both use proprietary keyways for Dugway Proving Ground. Customers submit requests for addition key duplication. Rekeying of buildings will not occur unless directed by the KO.

Key Requests.

Accept key request letters directly from DES Physical Security Office and cut keys on a demand maintenance order and keep in a file system as determined by the KO and COR. Ensure the key request letter is electronically signed by the DES Physical Security Office.

Issuance of Keys.

The Contractor shall not issue a mechanical room key, master key of any kind, or any other key for O&M Contractor/DPW use, unless approved in writing by the Government.

Receipt of Keys.

Have the customer sign for requested key(s) upon receipt of the key(s). The priority level for key requests will be the same as any other service order. Make the priority decision for key requests based physical security office request.

Master Key & Lock Combination List.

Ensure master key and lock combination list are maintained on a stand-alone (non-networked) system that requires an individual to enter their password to gain access.

Maintain master keys and hard copy codes in a secure Class 3 GSA approved container.

Disclose Codes.

Do not disclose keying codes to anyone unless approved by the Government.

Re-coring.

When building security is compromised due to loss of key control by occupants or other issues make appropriate lock adjustments to ensure security is not compromised. This may include re-coring a single door up to a whole bldg. and cutting necessary keys for the occupants. Re-coring of facilities due to loss keys can only be done with KO approval via the COR and Physical Security Office. Provide a cost report to the COR for these requirements after work is completed.

Install & Replace.

Install or replace devices to increase security or safety requirements only with approval from the Government. Provide keys for new devices.

Electronic and Computerized Locks.

Electronic and computerized locks include, but are not limited to, keyless lock devices, secured access systems and their components, auditable combination locks, closed circuit systems, panic hardware, cipher locks, mortise locks, tubular locks, detention locks, and timed, auditable, and low voltage devices.

Repair, Replace, Maintain & Operate.

Repair, replace, maintain and operate electronic and computerized locks and components including, but not limited to, cores, batteries, circuit cards, cylinders, deadbolts, and latches IAW O&M manuals and manufacturers specifications.

Fully operational.

Locks shall function as designed by the manufacturer, be fully operational, and provide the intended level of security. External locks shall meet physical security requirement.

Vaults.

Vault components include, but are not limited to, SCIF door locks, cores, mechanical combination locks, vault or container locking mechanisms, deadbolts, throw bolts, rim latches, panic hardware, doors, metal plates, security rings, and hinges.

Remove, Repair, & Replace.

Remove, repair, and replace vault components IAW AR 380-5 Department of the Army Information Security Program, O&M manuals, and manufacturer’s specifications. Neutralize, repair, and set or change lock combinations on IAW Federal Standard 809B.

Function.

Locks shall function as designed by the manufacturer, be fully operational, and provide the intended level of security.

Mechanical Locks.

Mechanical locks include deadbolt, mortise, cabinet, pad, cipher, prison, arms room locks and others as directed by the Government.

Repair, replace and maintain.

Repair, replace, and maintain mechanical locks and associated components IAW O&M manuals and manufacturer’s specifications.

Function.

Ensure locks function as designed by the manufacturer and are fully operational.

File details come from the government source that posted it. Updated .