Attachment 23 - CLS 503 Wastewater Services_12 Apr 22.docx

DOCX document 62 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah
Solicitation number
W5168W23R0002
Issued by

View the file

Other files

File Type Posted
Attachment S - PIEE Solicitation Vendor Posting Offer Training.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 15 JUN 23.xlsx XLSX spreadsheet
Amendment 0008 W5168W23C0002.pdf PDF
Amendment 0007 RPF W5168W23R0002-0007.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 14 JUN 23 Cell J31 Formula.xlsx XLSX spreadsheet
Attachment H - Dugway Pricing Matrix CLIN Structure revised 14 JUN 2023.xlsx XLSX spreadsheet
W5168W23R0002 MOD 0006_Contracting Officer POC Update.pdf PDF
W5168W23R0002-0005 DOCUMENTS.zip ZIP file
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_Conformed Copy.pdf PDF
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_w_Changes.pdf PDF
Attachment H - Dugway Pricing Matrix CLIN Structure revised 30 May 2023.xlsx XLSX spreadsheet
Amended_RFP_W5168W23R0002_0004_DPG_BASOPS_31MAY2023.pdf PDF
Amended_RFP_W5168W23R0002_0004_DPG_BASOPS_31MAY2023-Conformed Version.pdf PDF
Attachment P - Past Performance Questionnaire Rev 1.docx DOCX document
Amended RFP W5168W23R0002-0003-Conformed Document -.pdf PDF
AMENDMENT 0003 DPG BASOPS TECHNICAL EXHIBITS.zip ZIP file
Amended RFP W5168W23R0002-0003.pdf PDF
W5168W23R0002 0003 Attachments.zip ZIP file
Amended_RFP_W5168W23R0002_0002_DPG_BASOPS_27APR2023.pdf PDF
Amended_RFP_W5168W23R0002_0001_DPG_BASOPS_23MAR2023.pdf PDF
DGP BaseOps Site visit Sign-in Roster 2-2-2023.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
TE-NN_Boiler_Operating_Log_Revision 1.xlsx XLSX spreadsheet
TE-WWWW Work Capability Levels.docx DOCX document
TE-Q_Real_Property_Facilities_C.5.2.2_Revision 1.xlsx XLSX spreadsheet
TE-ZZZZ Priority Facilities.xlsx XLSX spreadsheet
TE-C_ISR_Requirements_Revision 1.pdf PDF
TE-Z_Top_Dressing_Soil_Spec_Revision 1.pdf PDF
W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf PDF
TE-UUUU OVERHEAD DOORS 20210512.xlsx XLSX spreadsheet
Attachment 10 - DBA Wage Determination - Highway.pdf PDF
Attachment 21 - CLS 500 Electrical Services_12 Apr 22.docx DOCX document
TE-KKKK Snow Ice and Sand Removal Plan.docx DOCX document
TE-XXX_Estimated_Appliances_Replacment_Revision 1.xlsx XLSX spreadsheet
TE-G_Burn_Rate_Example_Revision 1.xlsx XLSX spreadsheet
TE-SSSS Stored Presticides Report Example.xlsx XLSX spreadsheet
TE-H_GFP_and_CAP_Report_Revision 1.xlsx XLSX spreadsheet
TE-JJ-1_Generator_Hour_Report_Revision 1.xlsx XLSX spreadsheet
TE-UUU_List_Back_Flow_Preventors_Revision 1.pdf PDF
TE-QQQ_Sewage_Treatment_Monthly_Log_Revision 1.xlsx XLSX spreadsheet
TE-LLL-2 DPW Utility Reimbursable Meters 18MAY2020.pdf PDF
TE-CCC_Auto_Gates_and_Arms_Revision 1.xlsx XLSX spreadsheet
TE-NNNN Monthly Pest Management Operations Record.xlsx XLSX spreadsheet
TE-AA_Pure_Live_Seed_Mix_Revision 1.pdf PDF
TE-AAAA ArMA Process.pdf PDF
TE-GGGG Water Line Flush Record Deliverable Example and Flush Point Drawing.pdf PDF
Attachment 3 - Installation Fueling Services_12 Apr 22.docx DOCX document
Attachment 13 - CLS 200 UPH Management Operation_12 Apr 22.docx DOCX document
Attachment 9 - DBA Wage Determination - Heavy.pdf PDF
Show 40 more

Latest 50 of 151 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wastewater Services

11 May, 2021

Table of Contents

1.0General Information.1
1.1Overview1
1.2Components1
1.3Work Management and Control1
1.3.1Reporting Requirements1
1.3.2Certification1
2.0Description of Services1
2.1STP Operation2
2.1.1Operation and Maintenance2
2.2Laboratory Testing2
3.0Industrial Wastewater Treatment Plant (IWTP)2
3.1Scope.2
3.1.1Industrial Wastewater Treatment Plant (IWPT)2
3.1.2Lift Stations2
3.1.3Equalization Basins2
3.1.4Biological Ponds3
3.1.5Free Oil Separator (FOS) Facility3
3.2Components3
3.3Work Management and Control3
3.3.1Reporting Requirements3
3.4Services.3
3.4.1IWTP Operation3
3.4.2Samples4
3.4.3Systems and Components Operation4
3.4.4On-Site Operator4
3.4.5Operational Tours.4
3.4.6Scheduled Outages.4
3.4.7Emergency Outages.4

1.0 General Information.

1.1 Overview. The Dugway Proving Ground (DPW) sanitary wastewater treatment and collection system collects and delivers sanitary wastewater to the Sewage Treatment Plants (STP) from Avery, Baker, Carr, Ditto, and English Village by means of collection lines, sewer mains, and lift stations. There are approximately 150,000 linear feet (LF) of underground piping and approximately 357 manholes.

1.2 Components. Sanitary wastewater treatment and collection system components include, but are not limited to, electrical, electronic, and digital systems and controls; level controls, control panels, switches, metering devices, sewage basins, alarms, lift stations, wet wells, wastewater lagoons, dry wells, pumps, motors, air compressors, filters, piping, indicator lights, mounting hardware, meters, valves, and fittings, and laboratory equipment and components.

The Contractor's maintenance responsibility Includes all wastewater systems at Avery, Baker, Carr, Ditto, and English Village. The Contractor’s maintenance responsibility in the housing areas shall be limited to main lines and manholes.

The STP utilizes primary, secondary, and tertiary treatment. The STP design is 0.153 mgd and is intended to satisfy requirements of the current permits. A brief description of the major operational units in the STP can be found in TE LLL.

1.3 Work Management and Control.

1.3.1 Reporting Requirements.

1.3.1.1 The Contractor shall submit to the Contracting Officer (KO) for approval, a plan for accomplishing the Sanitary Wastewater Treatment and Collection System operation described in this Performance Work Statement (PWS).

1.3.1.2 The Contractor shall prepare and submit to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR) by the tenth (10th) day of each month a copy of DA Form 4247, Facilities Engineering Operating Log (Sewage General)), and DA Form 4178, Facilities Engineering Operating Log (Sewage Supplementary) (IAW PWS Annex A, Deliverable 6.069). The Contractor shall also maintain a daily operator's log notebook that includes routine operational duties, unusual conditions, accidents, and complaints. The Contractor shall submit an Annual Bio-Solids Report to the COR/ACOR not later than (NLT) February 15.

1.3.2 Certification. The Contractor shall provide certified operators in compliance with Federal/Utah Department of Public Health, and Environment Regulations.

2.0 Description of Services.

The Contractor shall operate the sanitary wastewater treatment and collection system and components in accordance with (IAW) AR 4201, TM 58141 (Sanitary and Industrial Waste Water Collection - Gravity Sewers and Appurtenances), TM 58142 (Sanitary and Industrial Wastewater Collection - Pumping Stations and Force Mains), Operations & Maintenance (O&M) manuals, and manufacturer’s specifications.

2.1 STP Operation. The Contractor shall operate the STP twenty-four (24) hours per day, every day of the year. Operations shall be in compliance with applicable permits. Any violation of the permit standards shall be reported to the KO within two (2) hours of the incident with a detailed explanation of the noncompliance. Typical daily operating tasks shall include, but not be limited to, the following: scum box pumping, clarifier washing, UV tube changing and cleaning, chemical feed and dosage rate adjustments, repacking of pumps, changing of charts, preparing sludge beds, coordinating with the Directorate of Public Works (DPW) for sludge removal, calibration and adjustment of electric and electronic controls, etc. The Contractor shall service portable latrines or pump sand traps in emergencies at the direction of the KO.

2.1.1 Operation and Maintenance. Operate and maintain the sewer system in accordance with established maintenance schedules, manufacturer’s recommendations and in compliance with permits. Report any violation of the permit standards to the COR and DPW-ED Environmental Compliance Branch within two hours of the incident with a detailed explanation of the noncompliance.

2.2 Laboratory Testing. The Contractor shall operate and perform Biochemical Oxygen Demand (BOD) testing and send to a state certified laboratory, IAW requirements established in permits, and additional standard plant operational analysis. The Contractor shall test according to all applicable permits. The Contractor shall maintain laboratory worksheets with results of analysis. The STP laboratory will be certified to conduct fecal coliform analysis IAW State standards.

3.0 Industrial Wastewater Treatment Plant (IWTP).

3.1 Scope.

3.1.1 Industrial Wastewater Treatment Plant (IWPT). The Industrial Waste Collection System (IWCS) consists of approximately 150,000 linear feet of four to twelve inches (4"12") collection lines from industrial facilities such as motor pool wash racks, hangers, and non-vehicle facilities.

3.1.2 Lift Stations. See TE QQQQ for lift stations.

3.1.3 Equalization Basins. Due to the variation in flow and the large amounts of suspended solids in the industrial wastewater, equalization basins are provided at the treatment plant site for settling, solids, flow equalization, storm water storage, and oil removal.

3.1.4 Biological Ponds. Aerated biological ponds are provided at the IWTP site to remove Biochemical Oxygen Demand (BOD).

3.1.5 Free Oil Separator (FOS) Facility.

3.2 Components. IWTP equipment and components include but are not limited to: chemical storage and pumping systems, channel and gate bypass systems, pumping and distribution systems, electrical and digital control systems, alarm systems, valves, piping and fittings, controllers, and regulators. The IWTP is subject to compliance inspections at any time without prior notification. IWTP operations include, but are not limited to, checking, evaluating, adjusting and maintaining operating pressures, levels, pump rates, temperatures, and process efficiencies based on environmental and fluctuating load conditions.

3.3 Work Management and Control.

3.3.1 Reporting Requirements.

3.3.1.1 The Contractor shall submit to the KO and COR/ACOR an operation plan for IWTP work described herein.

3.3.1.2 The Contractor shall submit a monthly report of samples to the COR/ACOR NLT the tenth (10th) calendar day of the following month.

3.3.1.3 The Contractor shall perform and record all monitoring IAW the maintenance plan and applicable permits. Wastewater monitoring equipment and procedures shall meet or exceed criteria in the Standard Methods for the Examination of Water and Wastewater and the standard used by Dugway Proving Ground) for chemical analysis. The Contractor shall follow the proper chain of custody procedures. Monitoring results shall be recorded and filed daily.

3.4 Services.

3.4.1 IWTP Operation. The Contractor shall keep the IWTP in continuous operation and meet or exceed manufacturers O&M manual requirements. IWTP shall be capable of processing to its rated treatment capacity. The Contractor shall notify the COR/ACOR within one (1) hour of initiating a system bypass, and again within one (1) hour after the system is returned to normal operating condition. Process waters, sludge, or lubricating oil shall not leak except as noted in O&M manuals, and manufacturer’s specifications. Discrepancies identified during operational tours shall be resolved upon discovery. Waste containers shall not be permitted to overflow.

3.4.1.1 Operation includes, but is not limited to, the following: operational checks of lift stations, scheduling sedimentation basin cleaning, and coordination with the STP for transferring water from remote locations to the industrial and domestic waste lagoons.

3.4.2 Samples. The Contractor shall collect samples for analysis IAW the IWTP, O&M plan, as requested by the KO, and as required by applicable permits. The Contractor shall prepare samples and submit to the appropriate laboratory for analysis.

3.4.3 Systems and Components Operation. The Contractor shall operate IWTP systems and components IAW O&M manuals, manufacturer’s specifications, and TM 58143, Domestic Wastewater Treatment Plant Laboratory Guidance. The Contractor shall notify the COR/ACOR of system bypasses and again after the system is returned to normal operation.

3.4.4 On-Site Operator. The Contractor shall provide an on-call certified operator twenty-four (24) hours a day, seven (7) days a week. The Contractor shall perform continuous wastewater treatment plant operation IAW the most current edition of Standard Methods for the Examination of Water and Wastewater, O&M manuals, applicable permits, and manufacturer’s specifications.

3.4.5 Operational Tours. The Contractor shall perform operational tours to evaluate plant operation and lift stations.

3.4.6 Scheduled Outages. When nonemergency maintenance or repairs require an outage of parts of the wastewater system, a signed outage permit shall be obtained before the water service will be disconnected IAW DPW outage permitting process. When applying for an outage permit, the Contractor shall notify the COR/ACOR of the proposed outage, provide an estimated outage time, identify the areas needed to be disconnected from service, and identify any safety related issues the outage may cause including but not limited to limiting drinking water to residents, or removing firefighting equipment from service. The Contractor shall follow the terms of the approved outage permit.

3.4.7 Emergency Outages. The Contractor shall notify the COR/ACOR within one (1) hour of an emergency that results in a failure of a wastewater distribution system IAW DPW outage permitting process. The Contractor shall respond to these conditions IAW UDEQ, DWQ, and the Emergency Response Plan.

File details come from the government source that posted it. Updated .