AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to publish additional questions and answ ers and provide updated attachments and Technical Exhibits.
We are also extending the RFP closing date to 26 June 2023.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 70
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W5168W23R0002
X 9B. DATED (SEE ITEM 11)
27-Jan-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jun-2023
CODE
FDO FSH IRC
2371 INFANTRY POST RD, BLDG 602
FORT SAM HOUSTON TX 78234
W5168W 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W5168W23R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Jun-2023 02:00 PM to 26-Jun-
2023 02:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
Global Changes
CLIN 0001 -- CLIN 4028
The PROG code S10 has been added.
The WSC Equipment code 000 has been added.
The MDAP/MAIS Code 000 has been added.
CLIN 0009
The pricing detail quantity has decreased by 9.00 from 10.00 to 1.00.
The unit of issue has changed from Months to Each.
CLIN 0010
CLIN 0013
CLIN 0016
CLIN 0019
CLIN 0022
CLIN 0025
CLIN 0029
The pricing detail quantity has decreased by 1.00 from 2.00 to 1.00.
CLIN 1009
The pricing detail quantity has decreased by 11.00 from 12.00 to 1.00.
CLIN 1010
CLIN 1013
CLIN 1016
CLIN 1019
CLIN 1022
CLIN 1025
CLIN 2009
CLIN 2010
CLIN 2013
CLIN 2016
CLIN 2019
CLIN 2022
CLIN 2025
CLIN 3009
CLIN 3010
CLIN 3013
CLIN 3016
CLIN 3019
CLIN 3022
CLIN 3025
CLIN 4009
CLIN 4010
CLIN 4013
CLIN 4016
CLIN 4019
CLIN 4022
CLIN 4025
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been added by full text:
ADDITION QUESTION AND ANSWERS
Question and Answers for RFP W5168W23R0002 Dugway Proving Ground BASOPS
Question # Document/ Section Page Number Questions Answers
1 Amendment 0004 Attachment H Dugway Pricing Matrix CLIN Structure
Reference: The formula in cell J31 for calculating the Extended Year Price for Option Year 1 for CLIN X012 Band 5 is using the Base Year quantity of 10 instead of the Option Year 1 quantity of 12. The current formula is =+$E31*I31 but we believe it should be =+$H31*I31.
Question: Would the Government provide a revised 'Attachment H Dugway Pricing Matrix CLIN Structure' with this formula corrected?
Updated Pricing Matrix is provided in amendment 0005
2 Amendment 0004 Attachment H Dugway Pricing Matrix CLIN Structure
Reference: The FAR 52.217-8 Fixed Monthly Price for CLIN X008 Band 1 in cell T17 is equal to the Option Year 4 Fixed Monthly Price for CLIN X008 Band 2. We believe this should be equal to the Option Year 4 Fixed Monthly Price for CLIN X007 Band 1 instead. The current formula is current formula =R18 but we believe it should be =R17.
Question: Would the Government provide a revised 'Attachment H Dugway Pricing Matrix CLIN Structure' with this formula corrected?
Updated Pricing Matrix is provided in amendment 0005
3 Amendment 0004 Attachment H Dugway Pricing Matrix CLIN Structure
Reference: The formula in cell U66 to calculate the FAR 52.217-8 Extended Year Price for CLIN X022 adds the markup rate to one-half the value of the Option Year 4 Extended Year Price. We believe the formula should be equal to one-half the value of the Option Year 4 Extended Year Price only. The current formula is =S66/2+T66 but we believe it should be =S66/2.
Question: Would the Government provide a revised 'Attachment H Dugway Pricing Matrix CLIN Structure' with this formula corrected?
Updated Pricing Matrix is provided in amendment 0005
4 Amendment 0004 Attachment H Dugway Pricing Matrix CLIN Structure
Reference: Cells S22 and S23 are auto-populated with formulas.
Question: Would the Government confirm that Offerors may overwrite the extended year price in these cells?
Updated Pricing Matrix is provided in amendment 0005
5 Amendment 0004 Attachment H Dugway Pricing Matrix CLIN Structure
Reference: Reference: Cell T58 is blank. We believe this should be =R58.
Question: Would the Government provide a revised 'Attachment H Dugway Pricing Matrix CLIN Structure' with a formula included in this cell?
Updated Pricing Matrix is provided in amendment 0005
6 Amendment 0004 Attachment H Dugway Pricing Matrix CLIN Structure
Reference: The formula in cell U28 divides the FAR 52.217-8 Fixed Monthly Price by six (6). We believe it should be multiplying the FAR 52.217-8 Fixed Monthly Price by six (6) instead. The current formula is =T28/6 but we believe it should be =T28*6.
Question: Would the Government provide a revised 'Attachment H Dugway Pricing Matrix CLIN Structure' with this formula corrected?
Updated Pricing Matrix is provided in amendment 0005
7 Amendment 0003 Conformed Document, Section F
94-100 of 159 Reference: The period of performance for the Base Year is listed as June 1, 2024 through March 31, 2025.
However, Option Year 1 does not begin until two months later on June 1, 2025. We believe the period of performance for the Option Years should be April 1 through March 31.
Question: Would the Government clarify the period of performance dates for the option years?
POP updated in amendment 0005
8 Amendment 0003 Conformed Document, Section L.5.1
143 of 159 Reference: The instructions for the completion of Section B indicate that "All final monetary extensions shall be in whole dollars ONLY (to include unit prices)." As the unit prices within the Attachment H Dugway Pricing Matrix CLIN Structure are unrounded, the total pricing from Section B will differ slightly from the total pricing from Attachment H.
Question: Would the Government please confirm that it is acceptable for the total pricing from Section B to differ slightly from the total pricing from Attachment H due to rounding?
In section B, the prices can be round up to 4 decimal spaces. For example $2.0034
9 RFP, Section L 7.2.7 and 7.2.7.1 and
Amendment 0003, Question #246 Answer and
Reference: The response to Question #246 did not answer the question that was posed. The question referenced Section L, paragraph 7.2.7 instructions for affiliate past performance, which permits Offerors to provide the experience or past performance of a parent or affiliated company including an “affiliated company that is being otherwise proposed as a subcontractor on this effort” where the proposal demonstrates the affiliate will have meaningful involvement in contract performance. However, the Government’s response referenced Section L, paragraph 7.2.1.6.2 instructions on the elements that must be included in the Meaningful Relationship Commitment Letter.
Question: We request the Government clarify the intent of the phrase “affiliated company that is being otherwise proposed as a subcontractor on this effort.” May an offeror utilize the experience or past performance of an affiliated company where the affiliate is not proposed as a subcontractor, assuming that meaningful involvement is shown, or must the affiliate also be proposed as a subcontractor?
Subcontracting with affiliate is not required, however you will have to demonstrate the requirements for meaningful relationship as required in Section L of the solicitation.
10 N/A N/A Reference: CBA for Roads and Grounds labor positions Question: Can the Government provide the CBA for the labor positions that make up Roads and Grounds?
Refer to attachment J1 for wages not covered under the CBA. For wages not covered in Service Contract Act, a conformance request will be required.
See https://www.dol.gov/agencies/whd/g overnment-contracts/construction/faq/conforman ce
11 N/A N/A Reference: Health and Welfare Fund Participation Agreement Question: Can the Government provide the most recent Health and Welfare Fund Participation Agreement between the incumbent contractor and the Steelworkers Union?
This agreement does not have any affect on this action.
12 TE-Q-1+2019-
2020+Historical+Workload+Data.xlsx
Identification of work type (DMO, PWO, PMO, OWO) It is unclear how many of which type of work is listed in TE Q-1. Will the government provide the work type
(DMO, PWO, PMO, OWO)?
Priority 1, 2, 3 are DMO. I have added some historical sheets to the TE for PWO/IJO and OWO.
13 Attachment 15- Grounds Maintenance 2.29, 2.2.10
Service & Maint. Trees and Hedge & Shrub Maint Can you provide the numbers of trees by size and also the areas of the shrub and hedge square foot so we can compute pruning and also mulch placement?
Also, is the hardwood mulch material price a reimbursable cost?
The Government does not track this information
14 Attachment 15 Grounds- Sec 3.0 and or TE-WWWW Work Capability
Attach 15 Sec 3 shows Work Capability Levels and Frequencies and TE-WWWW also shows similar information Do both of these references apply since they show different frequencies of service?
Refer to revised TE WWWW in amendment 0005.
15 Attachment 15 Grounds- Ref Par 2.3 Semi-Improved and Ref TE-V,V-1,V- 2,V-3, ,V-4
Semi Improved acreage question and activities required.
Paragraph 2.3 of the subject Attach 15 indicates there is 328 acres of semi improved grounds that requires the following; “erosion control shall be the predominant grounds maintenance work performed in this area”. However, referring to the TE drawings totals 1201 acres of semi improved grounds. That’s quite a difference? Please clarify. Also, secondly, the Table 3.0 Work Capability Levels indicate quite a bit more activities for semi-improved grounds then just “ erosion control” as stated in 2.3. Please state what exactly is required for the semi-improved grounds?
The Government removed "328 Acres" from the language in the paragraph and also changed it to read "Fire Protection and Erosion Control". Table
3.0 is correct.
16 Exhibit TE-W Ranges -Mowing Acreage to mow and clarification of abbreviations.
The table shows categories 17854-17981 with a qty of 1 for each. What does the each mean ? Acre?
Secondly, the levels of work indicated in this TE-W conflicts with The Table 3.0 Work Capability Level for Fire Breaks and Ranges. Which one do we follow for Ranges which is a considerable area according to TE- W; approx. 4,400 acres.
Use section 3.0. Refer to revised TE-W
17 TE-L Irrigation systems Maintenance of irrigation systems TE-L shows all the different irrigation systems but no indication the total coverage acreage as the plans are not to scale. Can we be provided the coverage areas (sf or acreage) and can we be provided any historical information on the annual maintenance hours and or material replacements?
Approximately 328 sq acres
18 Grounds –Attach 15; Table 3.0; Work Capability Levels
Definitions for Column “Description of Service Performed” Ground Repair Services; Clean exchange sand in playgrounds. How much sand is required or what is the area to perform this annual replacement? Is the sand locally available? Also, Provide Periodic Lawn Treatment Service; Provide lawn treatment –water grassed areas. Question; The areas in question relating to the Improved grounds are all irrigated areas, correct? Provide Lawn treatment-rake /roll tamped surface and repair wearing layer –temped roll. Question- What exactly is this for and is this for the entire 364 acres in the Improved Grounds?
No sand in the playground areas. We are having them converted to the rubber/foam ground cover. Yes the improved grounds are irrigated. Yes rake/roll is for the improved areas.
19 Grounds-Attach 15; Par 2.2.1 Mowing The DPW will provide historical data for grass cutting in TE-U, V.
Looking through all the documents we cannot find this information on historical grass cutting? If available, please provide.
We don't track this information. The only thing we can produce is the history of OWO's in Te-Q-1. Refer to revised TE Q-1 refered in amendment 0003.
20 Annex H-FMV-Facil Maint Vert. Par
2.24 PM Barracks
PM inspection in Barracks Buildings Is there a list of equipment that requires annual inspection and maintenance in the Barracks buildings? Is this just for inspection purposes? Not maintenance? Question 2. What about all the other buildings? Do they require Inspection also?
TE Q is a list of buildings. The Barracks are 5140, 5132 and 5220. Find the boilers for the buildings in TE-PP. This is not all. Reference TE-Q-1 for historical PM associated with these buildings.
21 Annex H-FMV Par 2.4 Eye Wash & Showers
Specs say to inspect, test, and maintain eye washes and emergency safety showers.
How many eye washes and showers are we required to maintain?
Approximately 90 - 100
22 Annex H-FMV Par. 2.5 Roof gutters, downspouts, etc.
Contractor shall semi-annually inspect all roof gutters, drains, and downspouts. Is this requirement for all the buildings on Dugway including family and unaccompanied housing?
Yes. Housing gutters would be inspected annually during the annual
PM
23 Annex H-FMV Par. 2.8 Gates and Dock Levelers
Contractor shall inspect, test, and maintain gates and dock levelers listed in TE-CCC.
TE_CCC shows the gates but I don’t see the dock levelers? Can the number of these be provided?
What is listed on the TE is what we have here. We don't have any dock levelers.
24 Annex H-FMV Par.2.10 & 2.10.1 Plumbing Systems
PM for all plumbing systems , piping, fixtures, hot water tanks, etc.
Will a list be provided for all the plumbing equipment that needs PM to be done annually?
Reference TE-Q-1 for a historical PM record. Also section 2.3 contains a list of TE's with the information needed as well as TE-P
25 Annex H-FMV Par 2.10.3 Sump Pumps Contactor shall annually inspect, remove all debris, wash down, and operate sump pumps.
Can a complete list of sump pumps and sizes be provided?
TE-P contains all the equipment to be maintained. In the TE reference the waste water tab for sump pumps or pumps in a sewage lift station.
26 Annex H-FMV Par 2.10.4 Hot Water Tanks
The contractor shall inspect hot water tanks, Implement and maintain corrosion control methods for water distribution, steel water tanks and wells Can we be provided a list of hot water tanks that need to be maintained? Question 2: Does this work outlined in 2.10.4 to be included in the clin for Vertical PM work or the clin for Water Services?
TE-P under the tb water tanks. It would fall under vertical PM work
27 Annex H-FMV Par 2.10.8 Wash Facilities / racks
The contractor shall provide M&R to keep wash facilities properly operational Regarding PM work, what exactly is the equipment to be Maintained ; wash stations, valves, sediment basins, oil skimmers, sensors, , etc....”? Can we be provided a list and size of all the equipment associated with the wash facilities?
This is in reference to the vehicle wash facilities. There are two; one in English Village and one in Ditto.
28 PWS Facility Maint-Horizontal P.2.1.2 Pavement Marking
The Contractor shall mark pavement in dry weather when the temperature exceeds 40°F.
Is the marking of all the streets, parking, crosswalks;
to be done based on an IJO cost estimate or does this need to be included as a maintenance cost in this proposal for the seasonal marking? If so, can we be provided either quantities or maps, drawings;
indicating the areas that need seasonal striping and or marking which typically includes handicapped parking , etc?
Included as a maintenance cost for seasonal marking. See TE-DD Paved Roads & Parking Sections for quanitites and TE-MMMM Dugway Area Map Place of Performance for map of roads.
29 Attach. 20 PWS Facility Maint- Horizontal P.2 9.1 Landfill operation
Operation. Open and operate the DPG Landfill Monday through Thursday 0700 to 1200 and 1300 to 1800 hours; and Friday from 1000 to 1500 hours.
Inclement weather may require the Landfill's hours to be adjusted and may be accomplished by written approval by the KO as needed. The Contractor shall operate the DPG Landfill IAW Resource Conservation and Recovery Act (RCRA), Utah DEQ Class What should we consider for manpower to operate the landfill based on the requirements listed in this section?
The landfill staffing requires a heavy equipment operator during open hours and a scalehouse laborer. On occasion additional operator support is required.
30 Attach. 20 PWS Facility Maint- Horizontal P 2.2.10 Traffic Controls
The contractor shall semi-annually perform PM on traffic light controller devices listed in TE RRRR.
The document TE RRRR does not show any list for Lighted Traffic Control Devices. Can this list be provided?
There are 4 total lighted traffic lights.
Refer to updated TE RRRR
31 Attach. 15- CLS 404 Grounds P.2.2.6 Flower Beds
The contractor shall maintain flower beds.
Can we be provided either drawings or map indicating the size and shapes of the flower beds or an approximate quantity, or area in square foot so we can determine the level of work required for flower beds. Also, would also be good to understand how much edging and trimming is required for the landscaped areas in the improved and semi improved areas.
There is new information listed in TE- Q-1 for OWO's that was posted in amendment 0003. The work referenced in the question would be affiliated with an OWO.
32 Solicitation DFARS 252.223-7001 Hazard Warning Labels
Identifying Hazardous Materials The requirements of DFARS 252.223-7001 are dependent upon the Hazardous Materials Identification and Material Safety Data clause of the contract. However, FAR 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021) is not a part of the solicitation. Does the government intend to incorporate?
Clause is added in Amendment 0005
33 Solicitation FAR Clause 52.212-3 Emerging small businesses and target industry (TICs) categories Does this solicitation include an addendum indicating as being set-aside for emerging small businesses in one of the four designated industry groups (DIGs) or targeted industry categories?
FAR Clause 52.212-3 is not applicable to this action.
34 Attach 21- CLS 500 Electrical Sec 19 Airfield Lighting` Is the contractor to provide maintenance for all the flightline lighting and if so, do you have a quantity for the lights to be maintained?
Approximately 2,000
35 Attach 21- CLS 500 Electrical Sec 10
Capacitor Banks Can we get a quantity of capacitor banks to maintain quarterly?
10-15 basewide.
36 RFP Section 7.2.6 Past Performance Contract Reference Sheet Did the Army provide a template for filling in the Contract Reference Sheets? We were unable to locate this form among the RFP attachments on SAM.
If no template is available, should offerors follow the Reference Sheet content requirements given in RFP 7.2.6?
See attachment P2
37 Attach H Dugway :Pricing Matrix X015, X017, X019 Option Facilities Maintenance Vertical DMOs Please clarify if the government intends to have three additional CLINS for the “Option: Facilities Maintenance Vertical DMOs” as there are already two options in X008 and X009.
No
38 (Final) Attachment+18+- +CLS+411+Facility+Maintenance_+Vert ical_12+Apr+22.pdf
2.4 Eye wash & Safety Showers
What is the quantity of the eye wash and safety showers?
Approximately 90 - 100
39 (Final) Attachment+18+- +CLS+411+Facility+Maintenance_+Vert ical_12+Apr+22.pdf
PWS 2.45 Roof Gutters, Drains, and Downspouts What is the Square foot of Roof surface area and quantity of roof locations?
See TE-Q Real Property Facilities for square footage and quantity of real property facilities.
40 (Final) Attachment+18+- +CLS+411+Facility+Maintenance_+Vert ical_12+Apr+22.pdf & TE Q-1
DMO / PMO / OWO Workload Data PWS 2.1 Reference TE Q-1 to have PM Workload requirements for this service and included historical data from FY19 and FY20.
Of the workload data in TE Q-1, what part or line items are indicative of Preventive Maintenance Work Orders (PMO’s) and which workload history is Demand Work Orders (DMO’s)?
All history is DMO's.
41 (Final) Attachment+18+- +CLS+411+Facility+Maintenance_+Vert ical_12+Apr+22.pdf & TE Q-1
PWS 2.10.8 Wash Facilities and Wash Racks How many wash racks and facilities are there? In addition could you identify what equipment is associated with these facilities (ie.. electrical panels, Pumps (size and qty), Pressure Washers, Lights etc…)
2 car washes, 1 in Ditto and 1 in English Village
42 (Final) Attachment+1+- +Annex+A+Overarching+PWS_12+Apr+ 22.pdf
PWS 2.2.3.4 Materials This paragraph indicates the Contractor is responsible for all materials for DMO repair work. Will the government provide the average cost of repair work per DMO? or… Will the government disclose the which DMO workload data has associated material cost?
The government cannot provide any additional cost information.
43 Updated Document TE_Q-1 Updated TE-Q-1 Priority Level “Z” The table has the column E reflecting Priority;
denotes levels 1,2,3 (assume DMOs) and “Z”. What does the “Z” imply in this column?
Z in column E indicates Preventive Maintenance Order (PMO). Numerical priority is DMO's.
44 Updated Document TE_Q-1; 2021 and
Column Q –Total Actual Costs What does the actual costs include; does it include all labor, material, equipment , o/h, profit, for each line item.?
Costs include labor & material
45 Section B, Attachment H Dugway Pricing Matrix
X008, X009, X011, X013, X015, X017, X019 – these are all Option DMOs CLINs and only require filling in the Extended Price in the Pricing Matrix; however, Section B requires the Quantity and Unit Issue “Months”.
Please clarify if the “Unit Price” is required for each Options DMO CLINs in Section B.
Unit of issue was updated in amendment 0005.
46 Amended RFP Table 3.1.1 – Proposal Organization, Page 142 - 143 of 159
5.1 Volume I – Offerors are required to submit a
completed SF33, Section B, and Section K. The TAB C that was allotted for Section B in the previous RFP is now gone in the Amendment.
Would the government please clarify which tab Section B will be inserted?
Utilized the TAB B as required in amendment 0003.
SECTION E - INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0001 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
To:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0004 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0005 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0006 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0007 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0008 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0009 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0010 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0011 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0012 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0013 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0014 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0015 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0016 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0017 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0018 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0019 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0020 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0021 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0022 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0023 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0024 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0025 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0026 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0027 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0028 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 0029 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1001 has been changed from:
To:
The Acceptance/Inspection Schedule for CLIN 1002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1004 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1005 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1006 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1007 has been changed from:
The Acceptance/Inspection Schedule for CLIN 1008 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1009 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1010 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1011 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1012 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1013 has been changed from:
The Acceptance/Inspection Schedule for CLIN 1014 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1015 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1016 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1017 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1018 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1019 has been changed from:
The Acceptance/Inspection Schedule for CLIN 1020 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1021 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1022 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1023 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1024 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1025 has been changed from:
N/A N/A N/A Government
The Acceptance/Inspection Schedule for CLIN 1026 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1027 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 1028 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2004 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2005 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2006 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2007 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2008 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2009 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2010 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2011 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2012 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2013 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2014 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2015 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2016 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2017 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2018 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2019 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2020 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2021 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2022 has been changed from:
To:
The Acceptance/Inspection Schedule for CLIN 2023 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2024 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2025 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2026 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2027 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 2028 has been changed from:
The Acceptance/Inspection Schedule for CLIN 3001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3004 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3005 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3006 has been changed from:
The Acceptance/Inspection Schedule for CLIN 3007 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3008 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3009 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3010 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3011 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3012 has been changed from:
The Acceptance/Inspection Schedule for CLIN 3013 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3014 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3015 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3016 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3017 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3018 has been changed from:
The Acceptance/Inspection Schedule for CLIN 3019 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3020 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3021 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3022 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3023 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3024 has been changed from:
N/A N/A N/A Government
The Acceptance/Inspection Schedule for CLIN 3025 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3026 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3027 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 3028 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4001 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4002 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4003 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4004 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4005 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4006 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4007 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4008 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4009 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4010 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4011 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4012 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4013 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4014 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4015 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4016 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4017 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4018 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4019 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4020 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4021 has been changed from:
To:
The Acceptance/Inspection Schedule for CLIN 4022 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4023 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4024 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4025 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4026 has been changed from:
N/A N/A N/A Government
To:
The Acceptance/Inspection Schedule for CLIN 4027 has been changed from:
The Acceptance/Inspection Schedule for CLIN 4028 has been changed from:
N/A N/A N/A Government
To:
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0009 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
N/A N/A
FOB: Destination
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0010 has been changed from:
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0013 has been changed from:
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0016 has been changed from:
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0019 has been changed from:
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0022 has been changed from:
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0025 has been changed from:
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
CAGE
POP 01-JUN-2024 TO
31-MAR-2025
The following Delivery Schedule item for CLIN 0029 has been changed from:
CAGE
POP 01-APR-2024 TO
31-MAY-2024
CAGE
POP 01-APR-2024 TO
31-MAY-2024
The following Delivery Schedule item for CLIN 1001 has been changed from:
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1002 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1003 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1004 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1005 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1006 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1008 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1009 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1010 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1012 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1013 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1015 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1016 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1018 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1019 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1021 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1022 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1024 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1025 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1026 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1027 has been changed from:
CAGE
POP 01-JUN-2025 TO
31-MAY-2026
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 1028 has been changed from:
CAGE
POP 01-APR-2025 TO
31-MAR-2026
The following Delivery Schedule item for CLIN 2001 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2002 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2003 has been changed from:
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2004 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2005 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2006 has been changed from:
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2008 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2009 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2010 has been changed from:
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2012 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2013 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2015 has been changed from:
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2016 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2018 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2019 has been changed from:
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2021 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2022 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2024 has been changed from:
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2025 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2026 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2027 has been changed from:
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 2028 has been changed from:
CAGE
POP 01-JUN-2026 TO
31-MAY-2027
CAGE
POP 01-APR-2026 TO
31-MAR-2027
The following Delivery Schedule item for CLIN 3001 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3002 has been changed from:
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3003 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3004 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3005 has been changed from:
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3006 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3008 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3009 has been changed from:
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3010 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3012 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3013 has been changed from:
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3015 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3016 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3018 has been changed from:
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3019 has been changed from:
CAGE
POP 01-JUN-2027 TO
31-MAY-2028
CAGE
POP 01-APR-2027 TO
31-MAR-2028
The following Delivery Schedule item for CLIN 3021 has been changed from:
CA