W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf

PDF 725 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
Solicitation number
W5168W23R0002
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Dugway Proving Ground, Utah, newest first.
File Type Posted
Attachment H - Dugway Pricing Matrix CLIN Structure revised 14 JUN 2023.xlsx XLSX spreadsheet
Attachment P - Past Performance Questionnaire Rev 1.docx DOCX document
W5168W23R0002 0003 Attachments.zip ZIP file
Attachment 2 - Annex B to OPORD 18-011 Facilities Maint Inst.docx DOCX document
Attachment 1 - Annex A Overarching PWS_12 Apr 22.docx DOCX document
Attachment 11 - DBA Wage Determination - Residential.pdf PDF
Attachment 8 - Davis Bacon - Building.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 23 - CLS 503 Wastewater Services_12 Apr 22.docx DOCX document
Attachment 21 - CLS 500 Electrical Services_12 Apr 22.docx DOCX document
Attachment 19 - CLS 414 Facility Maintenance_AFH_12 Apr 22.docx DOCX document
Attachment 20 - CLS 420 Facility Maintenance_Horizontal_12 Apr 22.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
TE-S_O and M-Plans_Revision 1.doc DOC document
TE-U_English_Village_Improved_Area_Revision 1.pdf PDF
TE-J Current GFE.xlsx XLSX spreadsheet
TE-Q-1 2019-2020 Historical Workload Data.xlsx XLSX spreadsheet
TE-WW_Air_Dryers_Revision 1.pdf PDF
TE-GGG_Fire_Alarm_and_Fire_Suppression_System_List_Revision 1.pdf PDF
TE-UUU_List_Back_Flow_Preventors_Revision 1.pdf PDF
TE-KKK-1_Amerigas_Owned_Propane_Tanks_Revision 1.pdf PDF
TE-P_Real_Property_PM_Task_List_Revision 1.xlsx XLSX spreadsheet
TE-LLL-2 DPW Utility Reimbursable Meters 18MAY2020.pdf PDF
TE-FF-1_Historical_Snowfall_Data_Revision 1.xlsx XLSX spreadsheet
TE-QQQ_Sewage_Treatment_Monthly_Log_Revision 1.xlsx XLSX spreadsheet
TE-NNN_Gas_Leak_and_Repair_Report_Revision 1.docx DOCX document
TE-Z_Top_Dressing_Soil_Spec_Revision 1.pdf PDF
TE-LLL-1 DPW Utility Meters 18MAY2020.xlsx XLSX spreadsheet
TE-KKKK Snow Ice and Sand Removal Plan.docx DOCX document
TE-LLLL Water Treatment Description.docx DOCX document
TE-JJ-1_Generator_Hour_Report_Revision 1.xlsx XLSX spreadsheet
TE-HH_PCB_SOP_Revision 1.docx DOCX document
TE-KKK_Government_Owned_Propane_Tanks_Revision 1 30oct18.xlsx XLSX spreadsheet
TE-H_GFP_and_CAP_Report_Revision 1.xlsx XLSX spreadsheet
TE-FFF_VTS_Location_and_Data_Revision 1.xlsx XLSX spreadsheet
TE-F_Subcontract_Report_Example_Revision 1.xlsx XLSX spreadsheet
TE-CCC_Auto_Gates_and_Arms_Revision 1.xlsx XLSX spreadsheet
TE-W_Mowing_Requirements_Ranges_Revision 1.docx DOCX document
Attachment 18 - CLS 411 Facility Maintenance_ Vertical_12 Apr 22.docx DOCX document
Attachment 22 - CLS 502 Water Services_12 Apr 22.docx DOCX document
Attachment 24 - CLS 510 Pest Management_12 Apr 22.docx DOCX document
Attachment 15 - CLS 404 Grounds Maintenance_12 Apr 22.docx DOCX document
TE-VVVV Master keys dupicate keys and locks.docx DOCX document
TE-L_Irrigation_Systems_Drawing_1-35 Revision 1.pdf PDF
TE-YY_Evaporative_Coolers_Revision 1.pdf PDF
TE-EE__Unpaved_Roads_Revision 1.pdf PDF
TE-U-1_Ditto_Improved_Area_Revision 1.pdf PDF
TE-V-2_MAAF_Avery_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-V-1_Ditto_Semi-Improved_Land_Area_Revision 1.pdf PDF
TE-DDDD OSHA 3138-01R 2004. Confined Spaces.pdf PDF
Show all 50

Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 24 Mar 2023

A X B X C

D

EX

X G F

126 - 138 H 139 - 144 tilson.h.dyer.civ@army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 144

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W5168W 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

TILSON H DYER 2102212143

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 57

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

58 J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

59 - 61 62 - 68

K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

69 - 122

PART II - CONTRACT CLAUSES

FDO FSH IRC

2371 INFANTRY POST RD, BLDG 602

FORT SAM HOUSTON TX 78234

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

123 - 125

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

27 Jan 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W5168W23R0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 10 Months Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.

FOB: Destination

PSC CD: S216

NET AMT

0002 10 Months CLS 200 UPH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0003 10 Months CLS 201 AFH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0004 10 Months CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0005 10 Months CLS 406 Real Property Administration

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0006 10 Months CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.

Mark-up Rate: __________________________

0007 10 Months CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0008 10 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0009 10 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0010 10 Months CLS 414 Army Family Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0011 10 Months OPTION CLS 414 Option AFH DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0012 10 Months CLS420 Facilities Maintenance Horizontal

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0013 10 Months OPTION CLS 420 Option FMH DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0014 10 Months CLS 500 Electrical Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0015 10 Months OPTION CLS 500 Option ES DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0016 10 Months CLS 502 Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0017 10 Months OPTION CLS 502 Option WS DMOs +20

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0018 10 Months CLS 503 Waste Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0019 10 Months OPTION CLS 503 Option WWS DMOs +5

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

0020 10 Months CLS 510 Pest Management (OWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0021 10 Months Installation Fueling Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0022 2 Months Phase-In (60 Days)

FFP

Contractor shall perform 60-days Phase-In activities in accordance with PWS Section 2.1.2.1. and the Contractor approved Phase-In Plan. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

0023 10 Months Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

1001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.

1002 12 Months OPTION CLS 200 UPH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1003 12 Months OPTION CLS 201 AFH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1005 12 Months OPTION CLS 406 Real Property Administration

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1006 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.

Mark-up Rate: __________________________

1007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1008 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1009 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1010 12 Months OPTION CLS 414 Army Family Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1011 12 Months OPTION CLS 414 Option AFH DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1012 12 Months OPTION CLS420 Facilities Maintenance Horizontal

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1013 12 Months OPTION CLS 420 Option FMH DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1014 12 Months OPTION CLS 500 Electrical Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1015 12 Months OPTION CLS 500 Option ES DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1016 12 Months OPTION CLS 502 Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1017 12 Months OPTION CLS 502 Option WS DMOs +20

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1018 12 Months OPTION CLS 503 Waste Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1019 12 Months OPTION CLS 503 Option WWS DMOs +5

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

1020 12 Months OPTION CLS 510 Pest Management (OWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1021 12 Months OPTION Installation Fueling Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

1022 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

2001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.

2002 12 Months OPTION CLS 200 UPH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2003 12 Months OPTION CLS 201 AFH Management

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2005 12 Months OPTION CLS 406 Real Property Administration

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2006 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.

Mark-up Rate: __________________________

2007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2008 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2009 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2010 12 Months OPTION CLS 414 Army Family Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2011 12 Months OPTION CLS 414 Option AFH DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2012 12 Months OPTION CLS420 Facilities Maintenance Horizontal

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2013 12 Months OPTION CLS 420 Option FMH DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2014 12 Months OPTION CLS 500 Electrical Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2015 12 Months OPTION CLS 500 Option ES DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2016 12 Months OPTION CLS 502 Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2017 12 Months OPTION CLS 502 Option WS DMOs +20

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2018 12 Months OPTION CLS 503 Waste Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2019 12 Months OPTION CLS 503 Option WWS DMOs +5

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

2020 12 Months OPTION CLS 510 Pest Management (OWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2021 12 Months OPTION Installation Fueling Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

2022 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

3001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.

3002 12 Months OPTION CLS 200 UPH Management Operatio

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3003 12 Months OPTION CLS 201 AFH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3004 12 Months OPTION CLS 404 Grounds Maintenenace

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3005 12 Months OPTION CLS 406 Real Property Administration

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3006 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.

Mark-up Rate: __________________________

3007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3008 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3009 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3010 12 Months OPTION CLS 414 Army Family Housing

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3011 12 Months OPTION CLS 414 Option AFH DMOs +50

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3012 12 Months OPTION CLS420 Facilities Maintenance Horizontal

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3013 12 Months OPTION CLS 420 Option FMH DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3014 12 Months OPTION CLS 500 Electrical Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3015 12 Months OPTION CLS 500 Option ES DMOs +10

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3016 12 Months OPTION CLS 502 Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3017 12 Months OPTION CLS 502 Option WS DMOs +20

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3018 12 Months OPTION CLS 503 Waste Water Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3019 12 Months OPTION CLS 503 Option WWS DMOs +5

FFP

This is an optional CLIN that require Contracting Officer (KO) approval to use.

This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.

3020 12 Months OPTION CLS 510 Pest Management (OWO)

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3021 12 Months OPTION Installation Fueling Services

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

3022 12 Months OPTION Project Work Orders

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section

2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.

PWO Mark-Up Rate:____________

4001 12 Months OPTION Program Management

FFP

This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment

1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.

4002 12 Months OPTION CLS 200 UPH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

4003 12 Months OPTION CLS 201 AFH Management Operation

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

4004 12 Months OPTION CLS 404 Grounds Maintenance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.

Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

4005 12 Months OPTION CLS 406 Real Property Administration

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

4006 12 Months OPTION CLS 408 Pavement Clearance

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.

Mark-up Rate: __________________________

4007 12 Months OPTION CLS 411 Facilities Maintenance Vertical

FFP

The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.

4008 12 Months OPTION CLS 411 Option DMOs +50

FFP

This is an optional CLIN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .