W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf
PDF 725 KB Posted
- Attached to
- Base Operations Support Services, Dugway Proving Ground, Utah Federal contract opportunity
- Solicitation number
- W5168W23R0002
- Issued by
- Department of the Army
View the file
Other files for this federal contract opportunity
Show all 50
Base Operations Support Services, Dugway Proving Ground, Utah has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 24 Mar 2023
A X B X C
D
EX
X G F
126 - 138 H 139 - 144 tilson.h.dyer.civ@army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 144
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W5168W 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
TILSON H DYER 2102212143
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 57
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
58 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
59 - 61 62 - 68
K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
69 - 122
PART II - CONTRACT CLAUSES
FDO FSH IRC
2371 INFANTRY POST RD, BLDG 602
FORT SAM HOUSTON TX 78234
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
123 - 125
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
27 Jan 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W5168W23R0002
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 10 Months Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.
FOB: Destination
PSC CD: S216
NET AMT
0002 10 Months CLS 200 UPH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0003 10 Months CLS 201 AFH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0004 10 Months CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0005 10 Months CLS 406 Real Property Administration
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0006 10 Months CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.
Mark-up Rate: __________________________
0007 10 Months CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0008 10 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0009 10 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0010 10 Months CLS 414 Army Family Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0011 10 Months OPTION CLS 414 Option AFH DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0012 10 Months CLS420 Facilities Maintenance Horizontal
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0013 10 Months OPTION CLS 420 Option FMH DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0014 10 Months CLS 500 Electrical Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0015 10 Months OPTION CLS 500 Option ES DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0016 10 Months CLS 502 Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0017 10 Months OPTION CLS 502 Option WS DMOs +20
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0018 10 Months CLS 503 Waste Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0019 10 Months OPTION CLS 503 Option WWS DMOs +5
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
0020 10 Months CLS 510 Pest Management (OWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0021 10 Months Installation Fueling Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0022 2 Months Phase-In (60 Days)
FFP
Contractor shall perform 60-days Phase-In activities in accordance with PWS Section 2.1.2.1. and the Contractor approved Phase-In Plan. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
0023 10 Months Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
1001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.
1002 12 Months OPTION CLS 200 UPH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1003 12 Months OPTION CLS 201 AFH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1005 12 Months OPTION CLS 406 Real Property Administration
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1006 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.
Mark-up Rate: __________________________
1007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1008 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1009 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1010 12 Months OPTION CLS 414 Army Family Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1011 12 Months OPTION CLS 414 Option AFH DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1012 12 Months OPTION CLS420 Facilities Maintenance Horizontal
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1013 12 Months OPTION CLS 420 Option FMH DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1014 12 Months OPTION CLS 500 Electrical Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1015 12 Months OPTION CLS 500 Option ES DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1016 12 Months OPTION CLS 502 Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1017 12 Months OPTION CLS 502 Option WS DMOs +20
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1018 12 Months OPTION CLS 503 Waste Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1019 12 Months OPTION CLS 503 Option WWS DMOs +5
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
1020 12 Months OPTION CLS 510 Pest Management (OWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1021 12 Months OPTION Installation Fueling Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
1022 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
2001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.
2002 12 Months OPTION CLS 200 UPH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2003 12 Months OPTION CLS 201 AFH Management
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2005 12 Months OPTION CLS 406 Real Property Administration
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2006 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.
Mark-up Rate: __________________________
2007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2008 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2009 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2010 12 Months OPTION CLS 414 Army Family Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2011 12 Months OPTION CLS 414 Option AFH DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2012 12 Months OPTION CLS420 Facilities Maintenance Horizontal
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2013 12 Months OPTION CLS 420 Option FMH DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2014 12 Months OPTION CLS 500 Electrical Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2015 12 Months OPTION CLS 500 Option ES DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2016 12 Months OPTION CLS 502 Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2017 12 Months OPTION CLS 502 Option WS DMOs +20
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2018 12 Months OPTION CLS 503 Waste Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2019 12 Months OPTION CLS 503 Option WWS DMOs +5
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
2020 12 Months OPTION CLS 510 Pest Management (OWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2021 12 Months OPTION Installation Fueling Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
2022 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
3001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.
3002 12 Months OPTION CLS 200 UPH Management Operatio
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3003 12 Months OPTION CLS 201 AFH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3004 12 Months OPTION CLS 404 Grounds Maintenenace
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3005 12 Months OPTION CLS 406 Real Property Administration
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3006 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.
Mark-up Rate: __________________________
3007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3008 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3009 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload above the optional amount provided for in CLIN X008 for work performed under CLS 411 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3010 12 Months OPTION CLS 414 Army Family Housing
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 414 Facility Maintenance_AFH, IAW the terms and conditions of the PWS and Attachment 19, CLS 414 Facility Maintenance_AFH. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3011 12 Months OPTION CLS 414 Option AFH DMOs +50
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 50 additional workload performed under CLS 414 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3012 12 Months OPTION CLS420 Facilities Maintenance Horizontal
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 420 Facility Maintenance_Horizontal, IAW the terms and conditions of the PWS and Attachment 20, CLS 420 Facility Maintenance_Horizontal. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3013 12 Months OPTION CLS 420 Option FMH DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 420 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3014 12 Months OPTION CLS 500 Electrical Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 500 Electrical Services, IAW the terms and conditions of the PWS and Attachment 21, CLS 500 Electrical Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3015 12 Months OPTION CLS 500 Option ES DMOs +10
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 10 additional workload performed under CLS 500 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3016 12 Months OPTION CLS 502 Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 502 Water Services, IAW the terms and conditions of the PWS and Attachment 22, CLS 502 Water Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3017 12 Months OPTION CLS 502 Option WS DMOs +20
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to 20 additional workload performed under CLS 502 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3018 12 Months OPTION CLS 503 Waste Water Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 503 Wastewater Services, IAW the terms and conditions of the PWS and Attachment 23, CLS 503 Wastewater Services.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3019 12 Months OPTION CLS 503 Option WWS DMOs +5
FFP
This is an optional CLIN that require Contracting Officer (KO) approval to use.
This CLIN will cover up to five (5) additional workload performed under CLS 503 that exceed the targed award band. The KO has the alternative of exercising this optional CLIN instead of selecting the next higher banding level. Refer to the Pricing Matrix, to confirm pricing and the applicable banding structure.
3020 12 Months OPTION CLS 510 Pest Management (OWO)
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 510 Pest Management, IAW the terms and conditions of the PWS and Attachment 24, CLS 510 Pest Management. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3021 12 Months OPTION Installation Fueling Services
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the functions for Installation Fuel Services as specified in Attachment 3, Installation Fueling Services. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
3022 12 Months OPTION Project Work Orders
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment and material required perform all the functions specified in Project Work Orders (PWO) as specified in PWS Section
2.2.6. The Contractor shall proposed markup rate that shall be applied to all negotiated PWOs and is inclusive of all applicable indirect rates such as G&A and profit. Please refer to the Pricing Matrix, to confirm pricing.
PWO Mark-Up Rate:____________
4001 12 Months OPTION Program Management
FFP
This Contract Line Item Number (CLIN) includes all program management and administrative labor to include General Fund Enterprise Business System (GFEBS) related costs, and related equipment and materials which is not directly allocable to a specific Common Level of Services (CLS) in accordance with (IAW) the terms and conditions of the Performance Work Statement (PWS) provided in Attachment
1. Refer to the Pricing Matrix (Attachment 6), to confirm monthly pricing.
4002 12 Months OPTION CLS 200 UPH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation IAW the terms and conditions of the PWS and Attachment 13, CLS 200 Unaccompanied Personnel Housing (UPH) Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
4003 12 Months OPTION CLS 201 AFH Management Operation
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 201 Army Family Housing (AFH) Management Operation, IAW the terms and conditions of the PWS and Attachment 14, CLS 201 AFH Management Operation. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
4004 12 Months OPTION CLS 404 Grounds Maintenance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 404 Grounds Maintenance, IAW the terms and conditions of the PWS and Attachment 15, CLS 404 Grounds Maintenance.
Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
4005 12 Months OPTION CLS 406 Real Property Administration
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 406 Real Property, IAW the terms and conditions of the PWS and Attachment 16, CLS 406 Real Property. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
4006 12 Months OPTION CLS 408 Pavement Clearance
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 408 Pavement Clearance, IAW the terms and conditions of the PWS Section 2.2.5, 2.2.6.2 and Attachment 17, CLS 408 Pavement Clearance. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure. The Contractor shall proposed markup rate that shall be applied to all negotiated Operations Work Orders (OWOs) and is inclusive of all applicable indirect rates such as G&A and profit.
Mark-up Rate: __________________________
4007 12 Months OPTION CLS 411 Facilities Maintenance Vertical
FFP
The Contractor shall provide overall management, supervision, personnel, labor, generalized or specialized equipment necessary to maintain, repair, operate, and perform all the CLS functions for CLS 411 Facility Maintenance_ Vertical, IAW the terms and conditions of the PWS and Attachment 18, CLS 411 Facility Maintenance_ Vertical. Refer to the Pricing Matrix (Attachment 6), to confirm pricing and the applicable banding structure.
4008 12 Months OPTION CLS 411 Option DMOs +50
FFP
This is an optional CLIN…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .