TE-JJ-1_Generator_Hour_Report_Revision 1.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
Base Operations Support Services, Dugway Proving Ground, Utah
Solicitation number
W5168W23R0002
Issued by

View the file

Other files

File Type Posted
Attachment S - PIEE Solicitation Vendor Posting Offer Training.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 15 JUN 23.xlsx XLSX spreadsheet
Amendment 0008 W5168W23C0002.pdf PDF
Amendment 0007 RPF W5168W23R0002-0007.pdf PDF
Attachment H - Dugway Pricing Matrix Revised 14 JUN 23 Cell J31 Formula.xlsx XLSX spreadsheet
Attachment H - Dugway Pricing Matrix CLIN Structure revised 14 JUN 2023.xlsx XLSX spreadsheet
W5168W23R0002 MOD 0006_Contracting Officer POC Update.pdf PDF
W5168W23R0002-0005 DOCUMENTS.zip ZIP file
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_Conformed Copy.pdf PDF
Amended_RFP_W5168W23R0002_0005_DPG_BASOPS_12JUN2023_w_Changes.pdf PDF
Attachment H - Dugway Pricing Matrix CLIN Structure revised 30 May 2023.xlsx XLSX spreadsheet
Amended_RFP_W5168W23R0002_0004_DPG_BASOPS_31MAY2023.pdf PDF
Amended_RFP_W5168W23R0002_0004_DPG_BASOPS_31MAY2023-Conformed Version.pdf PDF
Attachment P - Past Performance Questionnaire Rev 1.docx DOCX document
Amended RFP W5168W23R0002-0003-Conformed Document -.pdf PDF
AMENDMENT 0003 DPG BASOPS TECHNICAL EXHIBITS.zip ZIP file
Amended RFP W5168W23R0002-0003.pdf PDF
W5168W23R0002 0003 Attachments.zip ZIP file
Amended_RFP_W5168W23R0002_0002_DPG_BASOPS_27APR2023.pdf PDF
Amended_RFP_W5168W23R0002_0001_DPG_BASOPS_23MAR2023.pdf PDF
DGP BaseOps Site visit Sign-in Roster 2-2-2023.pdf PDF
Attachment 5 - Past Performance Questionnaire.docx DOCX document
Attachment 6 - Pricing Matrix.xlsx XLSX spreadsheet
TE-NN_Boiler_Operating_Log_Revision 1.xlsx XLSX spreadsheet
TE-WWWW Work Capability Levels.docx DOCX document
TE-Q_Real_Property_Facilities_C.5.2.2_Revision 1.xlsx XLSX spreadsheet
TE-ZZZZ Priority Facilities.xlsx XLSX spreadsheet
TE-C_ISR_Requirements_Revision 1.pdf PDF
Attachment 23 - CLS 503 Wastewater Services_12 Apr 22.docx DOCX document
TE-Z_Top_Dressing_Soil_Spec_Revision 1.pdf PDF
W5168W23R0002 -Solicitation BaseOps Dugway Proving Ground.pdf PDF
TE-UUUU OVERHEAD DOORS 20210512.xlsx XLSX spreadsheet
Attachment 10 - DBA Wage Determination - Highway.pdf PDF
Attachment 21 - CLS 500 Electrical Services_12 Apr 22.docx DOCX document
TE-KKKK Snow Ice and Sand Removal Plan.docx DOCX document
TE-XXX_Estimated_Appliances_Replacment_Revision 1.xlsx XLSX spreadsheet
TE-G_Burn_Rate_Example_Revision 1.xlsx XLSX spreadsheet
TE-SSSS Stored Presticides Report Example.xlsx XLSX spreadsheet
TE-H_GFP_and_CAP_Report_Revision 1.xlsx XLSX spreadsheet
TE-UUU_List_Back_Flow_Preventors_Revision 1.pdf PDF
TE-QQQ_Sewage_Treatment_Monthly_Log_Revision 1.xlsx XLSX spreadsheet
TE-LLL-2 DPW Utility Reimbursable Meters 18MAY2020.pdf PDF
TE-CCC_Auto_Gates_and_Arms_Revision 1.xlsx XLSX spreadsheet
TE-NNNN Monthly Pest Management Operations Record.xlsx XLSX spreadsheet
TE-AA_Pure_Live_Seed_Mix_Revision 1.pdf PDF
TE-AAAA ArMA Process.pdf PDF
TE-GGGG Water Line Flush Record Deliverable Example and Flush Point Drawing.pdf PDF
Attachment 3 - Installation Fueling Services_12 Apr 22.docx DOCX document
Attachment 13 - CLS 200 UPH Management Operation_12 Apr 22.docx DOCX document
Attachment 9 - DBA Wage Determination - Heavy.pdf PDF
Show 40 more

Latest 50 of 151 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

generators

MISSION & INSTALLATION CONTRACTING COMMAND
Dugway Proving Ground Contracting Office
Technical Exhibit JJ-1Revision 1
CONTRACTOR:
CONTRACT:
GENERATORS HOURSYearAutomated run time (min)JanuraryFebruaryMarchAprilMayJuneJulyAugustSeptemberOctoberNovemberDecember
BUILDINGSERIAL NUMBERFUELFUEL CAPACITY GALSKWKVAPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.EmergencyPRE
Meter readingPOST
meter readingMaint.Emergency
10
20
30

Brian Duncan: Brian Duncan:

1 un-explained40
50
60

Brian Duncan: Brian Duncan:

1.3 un-explained Brian Duncan: Brian Duncan:

1 un-explained70
80

Brian Duncan: Brian Duncan:

2.3 un-explained90
100
110
120

Brian Duncan: Brian Duncan:

1.2 un-explained130
140
150
160

Brian Duncan: Brian Duncan:

motherboard bad unit will not turn off after powere is restored Brian Duncan: Brian Duncan:

.3 un-explained160
170
180
190
200
210
220
230
240
25

: Robert Fisher:

THIS BLDG IS ACTUALLY 9545

Chad Weatherly: Chad Weatherly:

1.6 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

1.2 un-explained Brian Duncan: Brian Duncan:

1.3 un-explained Brian Duncan: Brian Duncan:

.7 Spyder Test Brian Duncan: Brian Duncan:

.9 bad transfer switch Brian Duncan: Brian Duncan:

1.1 un-explained Brian Duncan: Brian Duncan:

.4 un-explained Brian Duncan: Brian Duncan:

2.5 outage Brian Duncan: Brian Duncan:

2 Spyders Test Brian Duncan: Brian Duncan:

.3 un-explained Brian Duncan: Brian Duncan:

.4 un-explained Under DPW direction to run once a month Chad Weatherly: Chad Weatherly:

5.2 hrs. possible outage.

Brian Duncan: Brian Duncan:

.3 un-explained

Brian Duncan: Brian Duncan:

.4 un-explained 25 0

Brian Duncan: Brian Duncan:

1.7 un-explained 26 0

Brian Duncan: Brian Duncan:

1.2 un-explained Amy: Chad: ATS is not functioning. Genset ran under no load. WO submitted for repair.

Brian Duncan: Brian Duncan:

1.7 power outage Amy:

Chad: Automatic run time of .6hrs.270
280
290

Brian Duncan: Brian Duncan:

9.8 outages300
310
320
330

Brian Duncan: Brian Duncan:

busted display Chad Weatherly: Chad Weatherly:

.7 hrs. possible outage.

Brian Duncan: Brian Duncan:

busted display Brian Duncan: Brian Duncan:

1.3 un-explained Chad Weatherly: Chad Weatherly:

Total hours include generator PM and start up after batteries were replaced.

Chad Weatherly: Chad Weatherly:

Transfer switch is broken. Ran gen without load.

Amy: Chad: In phase monitor board out of calibration. May account for 1.8 run hours.

Chad Weatherly: Chad Weatherly:

Run time was only .5 hours under load. Tech was confused about Opacity test.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-expalined. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

1.3 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.5 hrs. un-explained. Multiple power bumps/ power outages. 34 0

Brian Duncan: Brian Duncan:

.5 un-explained Chad Weatherly: Chad Weatherly:

5.6 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.8 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

4.8 hrs. unexplained.

Brian Duncan: Brian Duncan:

.4 un-explained Chad Weatherly: Chad Weatherly:

3.4 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.5 hrs un-explained.

Brian Duncan: Brian Duncan:

1.7 new display and board Brian Duncan: Brian Duncan:

1.2 power outage Chad Weatherly: Chad Weatherly:

Includes automatic run time.

Amy: Chad: Possible Mechanics PM.

Chad Weatherly: Chad Weatherly:

Generator shut down. Engine issues.

Chad Weatherly: Chad Weatherly:

3.4 hrs. possible outage.350
360
370
380
390
400

Brian Duncan: Brian Duncan:

.7 un-explained Chad Weatherly: Chad Weatherly:

Run time includes PM of generator plus servicing of pilot lights.

Chad Weatherly: Chad Weatherly:

6.5 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

.6 un-explained Chad Weatherly: Chad Weatherly:

Mechanics ran for .3 hours.

Chad Weatherly: Chad Weatherly:

.6 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

2.1 hr possible outage.

Chad Weatherly: Chad Weatherly:

.7 hrs. un-explained.410
420

Brian Duncan: Brian Duncan:

.5 un-explained Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Amy: Chad: Generator is down for repairs. Bad water pump and injectors.

Chad Weatherly: Chad Weatherly:

1.3 hrs. un-explained. Multiple power bumps/ power outages.430
440
450
460
470
480

: Robert Fisher:

CHANGED FROM 10W

Chad Weatherly: Chad Weatherly:

1.1 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

2.3 hrs. possible outage.

Amy: Chad: Possible outage of 2.9 hrs.

Chad Weatherly: Chad Weatherly:

1.2 hrs. un-explained. Multiple power bumps/ power outages. 49 0 : Robert Fisher:

CHANGED FROM 10W

Chad Weatherly: Chad Weatherly:

Mechanics ran for .1 hours.

Amy: Chad: Possible outage 2.6 hrs.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

.2 un-explained Chad Weatherly: Chad Weatherly:

.5 hrs. possble outage.

Chad Weatherly: Chad Weatherly:

6.9 hrs. possible outage.

Brian Duncan: Brian Duncan:

.8 un-explained Chad Weatherly: Chad Weatherly:

Mechanics ran for .3 hours.

Chad Weatherly: Chad Weatherly:

Gen is down for repairs. Should be completed this week.

Brian Duncan: Brian Duncan:

36.1 bad circuit board Chad Weatherly: Chad Weatherly:

1.4 hrs. possible outage.

Brian Duncan: Brian Duncan:

.3 un-explained Brian Duncan: Brian Duncan:

2.4 power outage

Brian Duncan: Brian Duncan:

.3 un-explained Chad Weatherly: Chad Weatherly:

4.1 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.3 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

No entry into log for May but have a sheet with same readings as this month.

Brian Duncan: Brian Duncan:

.4 un-explained Chad Weatherly: Chad Weatherly:

.6 unexplained.

Chad Weatherly: Chad Weatherly:

.4 hrs. unexplained.

Brian Duncan: Brian Duncan:

.8 un-explained 50 0

Brian Duncan: Brian Duncan:

1 un-explained Chad Weatherly: Chad Weatherly:

.6 hrs. un-explained. Multiple power bumps/ power outages. 51 0

BD13: BD13:

.5 un-explained Chad Weatherly: Chad Weatherly:

1.6 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

26.5 hrs. un-explained. Multiple power bumps/ power outages.520
530
540
550
560

Brian Duncan: Brian Duncan:

.6 un-explained Chad Weatherly: Chad Weatherly:

.3 hrs. unknown.

Chad Weatherly: Chad Weatherly:

2.7 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

Readings are actual display readings dut to the fact the display has been changed.

Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.7 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

1.2 un-explained Brian Duncan: Brian Duncan:

.7 un-explained Brian Duncan: Brian Duncan:

2.6 Bad limit switch

in transfer switch; Under DPW direction to run once a month Brian Duncan: Brian Duncan:

.7 un-explained Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

1.8 hrs. possible outage. 57 0

Brian Duncan: Brian Duncan:

.9 un-explained Chad Weatherly: Chad Weatherly:

3.9 hrs. possible outage.

Amy: Chad: Possible outage of .8 hrs. 58 0

Brian Duncan: Brian Duncan:

2.6 power outage Chad Weatherly: Chad Weatherly:

.3 hours for Mechanics. .6 hours generator PM.

Chad Weatherly: Chad Weatherly:

2.0 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

Tech installed new pilot lights and tested for .2 hrs. Monthly PM was for .5 hrs.

Amy: Chad: Possible outage 2.9 hrs.

Chad Weatherly: Chad Weatherly:

1.2 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

.4 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

Mechanics ran for .3 hours.

Brian Duncan: Brian Duncan:

1.1 power outage Brian Duncan: Brian Duncan:

.8 Spyder Test Chad Weatherly: Chad Weatherly:

Display was changed out. This is actual run time on display.

Amy: Chad: Generator ran due to outage. Loss of primary fuse on 6/08 to 6/09. 24.9 hrs.

Chad Weatherly: Chad Weatherly:

1.2 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

.2 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

4.3 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.4 hours unexplained and an additional .1 hours for mechanical repairs from log book.

Chad Weatherly: Chad Weatherly:

.3 hrs unexplained.

Chad Weatherly: Chad Weatherly:

5.7 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.3 hrs. possible outage.590
600
610
620

Brian Duncan: Brian Duncan:

.3 un-explained Chad Weatherly: Chad Weatherly:

7.5 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.3 hrs. un-explained.

Chad Weatherly: Chad Weatherly:

5.1 hours outage.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

3.7 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.7 hrs. un-explained. Multiple power bumps/ power outages.

Brian Duncan: Brian Duncan:

.5 un-explained630
64

Brian Duncan: Brian Duncan:

.7 un-explained Chad Weatherly: Chad Weatherly:

.9 hours unexplained.

Chad Weatherly: Chad Weatherly:

Time counter was changed. Times are actual counter times.

Chad Weatherly: Chad Weatherly:

3.4 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.8 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

Includes .3 hors run time for mechanics PM.

Chad Weatherly: Chad Weatherly:

.8 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.8 hrs unknown.

Chad Weatherly: Chad Weatherly:

2.6 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1 hr. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

1.9 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

4.8 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

11.2 hrs unexplained.

Chad Weatherly: Chad Weatherly:

Hold Testing until October per DPW request.

Chad Weatherly: Chad Weatherly:

2.1 hr power outage Chad Weatherly: Chad Weatherly:

18.9 hours unexplained.

Chad Weatherly: Chad Weatherly:

Includes .3 hrs run time for mechanics PM.

Chad Weatherly: Chad Weatherly:

.1 hr unexplained.

Chad Weatherly: Chad Weatherly:

.2 hrs. unknown Chad Weatherly: Chad Weatherly:

.6 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.9 hrs. un-explained. Multiple power bumps/ power outages.

Chad Weatherly: Chad Weatherly:

2.2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

.6 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

.4 hours unexplained.

Chad Weatherly: Chad Weatherly:

.6 hours unexplained.

Chad Weatherly: Chad Weatherly:

Run time was only .4 hours under load. Tech was confused about Opacity test.

Chad Weatherly: Chad Weatherly:

2.6 hrs. possible outage.

Amy: Chad: Generator ran for appx. 4 days before being reported. Repaired bad transfer switch.

Chad Weatherly: Chad Weatherly:

.5 hrs. unexplained.

Chad Weatherly: Chad Weatherly:

2.1 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

8.8 hours possible outage.

Chad Weatherly: Chad Weatherly:

Includes 1 hr. generator test run plus .3 hrs generator maintenance by Mechanics.

Chad Weatherly: Chad Weatherly:

2 hrs. possible outage.

Chad Weatherly: Chad Weatherly:

1.6 hrs. unexplained Chad Weatherly: Chad Weatherly:

.5 hrs. possible outage. 65

Chad Weatherly: Chad Weatherly:

First PM performed on this generator.

Chad Weatherly: Chad Weatherly:

16.1 hrs. run time due to faulty transfer switch. WO# 610784 66

Chad Weatherly: Chad Weatherly:

New generator. First PM for this generator. 67

Chad Weatherly: Chad Weatherly:

Building turnover. New Generator and first PM.

&8FORM.4.51.069.A

January 3, 2013

File details come from the government source that posted it. Updated .