TE F DID A003 Task Implementation Plan 20200603 for Solicitation Only.pdf
PDF 193 KB Posted
- Solicitation number
- W91151-21-R-0012
About this file
This document contains a Data Item Description and a solicitation for Test Technology Support Services. The solicitation seeks proposals to provide systems engineering, software support, operations and integration services, execution center support, analytical support and studies, and instrumentation support for operational test events conducted by the U.S. Army Operational Test Command and Intelligence and Electronic Warfare Test Directorate. Services will be performed in the continental U.S. and outside the continental U.S. The requirement will be set aside for competitive 8(a) small businesses. Proposals are due by April 14, 2021. The contract will be a single-award indefinite delivery, indefinite quantity contract for a five-year ordering period with a maximum value of $41.5 million. The contract type will be cost-plus-fixed-fee.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1664, APR 89 Previous editions are obsolete Page 1 of 2
DATA ITEM DESCRIPTION Form Approved
OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503.
1. TITLE
A003, Task Implementation Plan (TIP)
2. IDENTIFICATION NUMBER
3. DESCRIPTION/PURPOSE
To provide a written description of how the contractor intends to accomplish an assigned tasking and what resources are required.
4. APPROVAL DATE (YYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR)
USAOTC G4
6A. DTIC APPLICABLE
6B. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
This Task Implementation Plan (TIP) is the contractor’s plan for executing tasks described in the Task Authorization Request (TAR), along with an estimate of the resources (e.g., labor, government furnished property, funding) required to accomplish the work. Before the contractor can provide services under a TAR, the Contracting Officer must approve the associated TIP.
8. APPROVAL LIMITATION
N/A
9A. APPLICABLE FORMS
N/A
9B. AMSC NUMBER
N/A
10. PREPARATION INSTRUCTIONS
10.1 The TIP shall be submitted to the Government as one document, identified by the TAR number and title. The contractor shall also identify the POC or Lead responsible for accomplishing the task, with telephone number.
10.2 How to accomplish the requirement.
a. Describe the proposed methodology, procedures and plans to accomplish the requirement in your own format.
b. List the milestone and delivery schedule.
c. List potential problems and recommended solutions.
d. List actions or situations requiring Government action.
e. List exceptions to the Government requirement.
f. Address the following when applicable:
(1) Property administration.
(2) Safety and security (including computer viruses) measures.
(3) Maintenance of GFP and post test repair of equipment and instrumentation to operational status.
(4) Communications capabilities and procedures.
(5) Data collection and data management.
(6) Physical and COMSEC security measures.
(7) Technologydevelopment/integration.
a. Technology, simulation/stimulation support
b. Simulation and Stimulation Development
11. DISTRIBUTION STATEMENT
DISTRIBUTION STATEMENT A: Approved for public release; distribution unlimited.
DD Form 1664, APR 89 Previous editions are obsolete Page 2 of 2
A003, Task Implementation Plan (TIP) Continued
10.3 Estimate of Required Resources (Template listed under letter e.)
a. Labor Requirement and Costs Shows the labor requirements by job position and man hours to the nearest man-hour, the hourly burdened rate and the total cost of each position. Provide subtotals for man-hour and costs.
(1) Direct Labor.
(2) Overtime.
(3) Premium overtime
b. Non-Labor Requirements and Costs. Show all requirements, their costs and subtotals for the following:
(1) Travel.
(2) Commercial supplies, materials and shipping.
(3) Subcontracts. List all subcontracting efforts and suggested sources of supply.
(4) GSA, MILSTRIP, GBL, and POL supplies and materials.
(5) DOL maintenance.
(6) Insurance, fees and other cost factors as required.
c. Contractor purchased Information Technology Resource (ITR) cost.
d. Required resources currently not available, including estimated costs.
File details come from the government source that posted it. Updated .