This amendment modifies a solicitation for alongside aircraft refueling services. The Defense Logistics Agency Energy is seeking proposals to manage, maintain, and operate government-owned fuel facilities and equipment at Naval Air Station Souda Bay in Greece. Services include providing technical support, personnel, supervision, equipment, tools, materials, and mobile fuel servicing equipment to support facilities, equipment, vehicles, and aircraft. The contractor will also provide maintained and operated contractor-furnished vehicles. The requirement is for a four-year base period from December 2023 through November 2027 with a five-year option period and potential six-month extension. The North American Industry Classification System code is 493190. The amendment clarifies that resumes are not required in proposals but must be submitted for key personnel within 30 days prior to period of performance.

View the file

Other files

File Type Posted
Amendment 0008.pdf PDF
Amendment 0007.PDF PDF
Amd 0007 Attach A PWS 11.15.2022.pdf PDF
Amd 5 Attach 3 SOFA.pdf PDF
Amd 5 Attach 7 Waste.pdf PDF
SPE60322R0506 Amend0005.PDF PDF
Amd 5 Attach 9 Maintenance Report 9.2021.pdf PDF
Amd 5 Attach 10 Maintenance Report 3.2022.pdf PDF
Amd 5 Attach 4 Air and Toxics.pdf PDF
Amd 5 Attach 8 Envir Management System.pdf PDF
Amd 5 Attach 6 Hazardous.pdf PDF
Amd 5 Attach 1 Q and A.pdf PDF
Amd 5 Attach 2 MARATHI PUMP.pdf PDF
Amd 5 Attach 5 water.pdf PDF
SPE60322R0506 Amend 0004.pdf PDF
SPE60322R0506 Amend 0003.pdf PDF
SPE60322R0506 Amend 0002.PDF PDF
Attach V QAPs.pdf PDF
Attach II PPQ form.pdf PDF
Attach III Consent Form.pdf PDF
Solicitation_SPE60322R0506.pdf PDF
Attach I PWS 5.5.22.pdf PDF
Attach IV QASP Souda Bay.pdf PDF
SF30_SPE60322R05060001.PDF PDF
Solicitation_SPE60322R0506.pdf PDF
Attach I PWS.pdf PDF
Attach V QAPs.pdf PDF
Attach III Consent Form.pdf PDF
Solicitation_SPE60322R0506.pdf PDF
Attach IV QASP Souda Bay.pdf PDF
Attach II PPQ form.pdf PDF
Attach I PWS.pdf PDF
Attach II PPQ form.pdf PDF
Attach I PWS.pdf PDF
Attach III Consent Form.pdf PDF
Solicitation SPE60322R0506.pdf PDF
Attach IV QASP Souda Bay.pdf PDF
Attach V QAPs.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE603 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE60322R0506

X

2022 APR 25

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA ENERGY

BULK PETROLEUM SERVICES

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

3. EFFECTIVE DATE

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 2 OF 2 PAGES

SPE60322R0506 - 0006

Amendment 0006 is hereby issued to revise the Amendment 0005, Attachment 1 QUESTIONS AND ANSWERS, QUESTION #3 in order to clarify the resume requirement.

QUESTION #3.

QUESTION: Please confirm if a resume needs to be provided for the role of Assistant Site Manager in the proposal.

ANSWER: Resumes for the key personnel are not required in the proposal. If resume is attached with the proposal, the resume will not be evaluated and will not affect the technical rating. According to PWS Appendix D, resume must be submitted for review and approval by DLA Energy within 30 days prior to start of the performance period.

All other terms and conditions of the solicitation remains the same.