Attachment 37 - AMHE Compliance Checklist.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution Federal contract opportunity
Solicitation number
SP3300-20-R-5002
Issued by
Defense Logistics Agency Distribution

About this file

This document is an attachment to a solicitation for Logistics Modernization Integration Support services for the Defense Logistics Agency Distribution. The solicitation seeks a contractor to provide project management, systems engineering, and integration support services to modernize and transform DLA Distribution's logistics processes and systems. Key details include that the contractor will be responsible for implementing an integrated master schedule, ensuring personnel security and compliance with risk management frameworks and cybersecurity requirements, and assisting with the design and implementation of automated material handling conveyor systems, scanning equipment, labeling and printing systems, and material tracking software at DLA distribution centers. The period of performance is one base year with four one-year options, and the contractor must meet throughput requirements for handling various package sizes and comply with all standards for equipment, wiring, safety, and installation.

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution, newest first.
File Type Posted
LMIS RFP Questions and Responses Version 5.xlsx XLSX spreadsheet
RFP SP3300-20-5002 Rev. 4 (03.17.20) TC.docx DOCX document
LMIS RFP SP3300-20-R-5002 Amendment 0008.pdf PDF
LMIS RFP SP3300-20-R-5002 Amendment 0007.pdf PDF
LMIS RFP Questions and Responses Version 3.xlsx XLSX spreadsheet
Attachment 38 - Davis-Bacon Act Wage Determination.pdf PDF
RFP SP3300-20-5002 Rev. 2 (02.19.20).pdf PDF
LMIS RFP SP3300-20-R-5002 Amendment 0006.pdf PDF
RFP SP3300-20-R-5002 Amendment 0004.pdf PDF
Attachment 33 - AMHE SOW Rev. 1 - (01.14.20).pdf PDF
Attachment 2 - Past Performance Questionnaire Rev. 1 (01.21.20).docx DOCX document
Attachment 43 - TE 1.4 CIRS Tutorial.pdf PDF
Attachment 44 - TE 1.5 Contractor Investigative Request Sep 2016.pdf PDF
RFP SP3300-20-R-5002 Amendment 0002.pdf PDF
LMIS Pre-Proposal Conference Questions & Answers.pdf PDF
LMIS Pre-Proposal Conference PowerPoint Slides.pdf PDF
Directions - New Cumberland BLDG 2001.pdf PDF
LMIS Pre-Proposal Conference Agenda.pdf PDF
RFP SP3300-20-R-5002 Amendment 0001.pdf PDF
Attachment 34 -AMHE Drawings (NCDP2_17_01_01_01A_PR_R-.DWG).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00012 Project Management Plan).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00014 In-Progress Review (IPR) and Report Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00005 Power Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00005 DoD Architecture Framework Documentation).pdf PDF
Attachment 33 - AMHE SOW.pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00004 Software - Firmware Access Controls, User Roles, and Data Types).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00011 Integrated Master Schedule).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00006 Design Data and Calculations).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00009 Physical and Cybersecurity Features of End Devices Provided).pdf PDF
Attachment 13 - Implementation Project Schedule.pdf PDF
Attachment 32 - Pool 2 Continuation of Supplies Services Instructions.pdf PDF
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 6 - CDRLs (CDRL A002 - Small Business Participation Biannual Progress Report).pdf PDF
Attachment 1 - Basic IDIQ PWS.pdf PDF
Attachment 3 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00008 GFE & GFP Report Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00013 Certificate of Compliance).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00002 Commercial Manual).pdf PDF
Attachment 8 - Pool 1 Continuation of Supplies Services Instructions.pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_DE_R-.DWG).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00003 Warranty Information and Technical Representatives List).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00004 Training Baseline (TB) and Training Materials).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00006 Network Infrastructure and Comm Protocols, Ports, Services).pdf PDF
RFP SP3300-20-5002.pdf PDF
Attachment 31 - Pool 2 Schedule.xlsx XLSX spreadsheet
Attachment 35 - LMIS IDIQ -AMHE and Systems sample TO CDRL DD Form 1423.pdf PDF
Attachment 4 - TE 1.1 Contractor Personnel Security - UPDATE 26FEB2018.pdf PDF
Attachment 5 - TE 1.2 CAC Procedures.pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_EL_R-.DWG).pdf PDF
Attachment 34 - AMHE Drawings (AMHE Drawings).pdf PDF
Show all 50

Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

1. BACKGROUND43101.00
1.1. Existing AWOS System43101.00
1.2. Proposed New AWOS3 System43102.00
1.3. Glossary of Terms43103.00
1.4. Site Description43103.00
1.5. Work Area Description43103.00
2. REFERENCE AND STANDARDS:43132.00
2.1. Applicable Documents:43132.00
3. REQUIREMENTS:43160.00
3.1. Project Scope:43160.00
3.1.1. Decommission Existing Pre-Sort and AWOS2 Systems43160.00
3.1.2. New Pre-Sort Subsystem and AWOS1 Upgrade43164.00
3.1.3. New AWOS3 System43165.00
3.1.4. New AWOS3 Project Overview43180.00
3.1.5. Optional CLIN # 1 – Confirmation Omni-Directional Scanners43161.00
3.1.6. Optional CLIN # 2 – Wire Mesh Metal Carts43161.00
3.1.7. Optional CLIN # 3 – Additional MDR Accumulating Belt Conveyor to CCP Tilt Tray Sorter43161.00
3.1.8. Optional CLIN # 4 – Obtain Primary Power Supply from Substation Number 243161.00
3.2. System Components and Performance Parameter43162.00
3.2.1. Conveyor System Components43162.00
3.2.2. Cube-Scan-Weigh Components43170.00
3.2.3. Automatic Print and Apply Components43171.00
3.2.4. Tri-Wall Tilting Device43175.00
3.2.5. Tote Tipping Device43176.00
3.2.6. Communications and Control43176.00
3.2.7. Required System Speeds and Throughput43181.00
3.3. Materials to be Handled43183.00
3.3.1. Parcel Shipping Profiles43183.00
3.3.2. Orange Parcel Transport Tote43185.00
3.3.3. Red Storage Tote43186.00
3.3.4. CCP Packages Picked in Walk and Pick43186.00
3.4. Government Design43187.00
3.5. System Requirements (For All Project Sections & Optional CLINs)43187.00
3.5.1. General Requirements43187.00
3.5.2. Materials and Operating Conditions43187.00
3.5.3. Treatment and Painting43188.00
3.5.4. Lubrication and Adjustment43188.00
3.5.5. State-Of-The-Art Components43188.00
3.5.6. Energy Conservation Requirements43188.00
3.5.7. Manuals, Drawings, and Spare Parts List43189.00
3.5.8. Wiring and Numbering Guidelines13940.00
3.5.9. Electrical Connections13940.00
3.5.10. Panel Wiring14305.00
3.6. Control Equipment Specifications14671.00
3.6.1. Control Systems for AWOS3 Conveyor and Subsystems15036.00
3.6.2. Programmable Controllers17227.00
3.6.3. Voltage Stabilizer17593.00
3.6.4. Motors17958.00
3.6.5. Solenoid Valves17958.00
3.6.6. Disconnects17958.00
3.6.7. PREFERRED ELECTRICAL COMPONENTS18323.00
3.6.8. Programmable Logic Controllers19054.00
3.6.9. Clean Stabilized Control Power19054.00
3.6.10. PLC and PC Controller Power Backup19054.00
3.6.11. PLC Logic19054.00
3.6.12. AWOS3 System Rules of Communication19419.00
3.6.13. Omni-Directional Bar Code Scanner19419.00
3.6.14. Control Switches and Indicator Lights19784.00
3.7. Conveyor Systems19784.00
3.7.1. Powered Roller Conveyor19784.00
3.7.2. Belt on Slider Bed Conveyor20515.00
3.7.3. Belt On Slider Bed Incline/Decline Conveyor20880.00
3.7.4. V-Belt Driven Live Roller Curve Conveyor20880.00
3.7.5. Belt Driven Live Roller Spur Conveyor21245.00
3.7.6. Right Angle Transfers21245.00
3.7.7. Spring Balanced Lift Gate21245.00
3.7.8. Forklift Truck Guards:21245.00
3.8. Conveyor Safety Measures21245.00
3.8.1. Safety Netting21245.00
3.8.2. E-Stops Indicator Lights21610.00
3.8.3. Safety Bollards21610.00
3.9. Work Station Requirements21610.00
3.9.1. Nine (9) New PC Workstations & Nine (9) Stools21610.00
3.9.2. Tables21610.00
3.9.3. Table Legs21610.00
3.9.4. Back Stringer21610.00
3.9.5. Drawer21610.00
3.9.6. Top shelf & Task Light21610.00
3.9.7. Computer Provision21610.00
3.9.8. Electrical21610.00
3.9.9. Stools21610.00
3.10. Installation Hours21976.00
3.10.1. Normal Working Hours21976.00
3.10.2. Work Affecting Operations21976.00
3.11. Government Responsibilities21976.00
3.11.1. Material Storage21976.00
3.11.2. Location21976.00
3.11.3. Security, Safety, and Fire Protection21976.00
3.11.4. Utilities Available For Contractor Use21976.00
3.12. Contractor Responsibilities21976.00
3.12.1. Utility Requirements21976.00
3.12.2. Work Schedule & Pre-Construction Meeting21976.00
3.12.3. Dimensions22341.00
3.12.4. Hours of Work22341.00
3.12.5. Energy Conservation22341.00
3.12.6. Electrical Code Compliance22341.00
3.12.7. Protection of Government Property22341.00
3.12.8. Unloading of Equipment22341.00
3.12.9. Housekeeping22706.00
3.12.10. Warranty22706.00
3.12.11. Safety Requirements22706.00
3.12.12. Contractor Materials23071.00
3.12.13. Construction Equipment23071.00
3.12.14. Equipment Safety Markings23437.00
3.12.15. Fire Prevention23437.00
4. TESTING, DOCUMENTATION, AND ACCEPTANCE43191.00
4.1. Layout of Work43191.00
4.2. System Maintenance43191.00
4.2.1. Maintenance Prior to Final Acceptance43191.00
4.2.2. Special Technical Assistance/Maintenance43191.00
4.2.3. Contractor Technical Representatives43191.00
4.2.4. Warranty43191.00
4.3. System Check-Out43192.00
4.4. Contract Data Requirements43192.00
4.5. Inspection and Test43192.00
4.5.1. Responsibility for Inspection and Testing43192.00
4.5.2. Time Lost43194.00
4.6. Final Acceptance43194.00
4.7. Initial Operational Support43194.00
4.8. Training43194.00
4.8.1. Operator Training43195.00
4.8.2. On‑Site Maintenance Training43195.00
4.9. Offeror's Compliance43196.00
5. APPENDICES43221.00
5.1. Drawing Files Included43221.00
5.2. Data File Included43221.00
5.3. Offeror’s Compliance43222.00
5.3.1. CDRL A001 through A00643223.00
5.3.2. CDRL A007 through A01043226.00
5.3.3. CDRL 011 through A01243228.00
5.4. Data Item Description (DID)43230.00
5.4.1. A001 Installation Schedule DI-S-SAT143231.00
5.4.2. A002 Layout Drawings DI-E-SAT2 & A003 As-Built Drawings DI-E-SAT243232.00
5.4.3. A004 Operating Manual DI-E-SAT143233.00
5.4.4. A005 Maintenance Manual DI-E-SAT143234.00
5.4.5. A006 Contractor Technical Representative List DI-E-SAT143235.00
5.4.6. A007 Training Material and Schedules DI-E-SAT43236.00
5.4.7. A008 Power Requirements DI-P-SAT143237.00
5.4.8. A009 Design Data Calculation DI-E-24040A43238.00
5.4.9. A010 Certificate of Compliance DI-E-SAT1443239.00
5.4.10. A011 Test Plan DI-T-SAT143240.00
5.4.11. A012 Software Documentation Manual DI-S-SAT-243242.00
5.5. RFP Compliance Checklist43243.00

Sheet2

AMHE Project
COMPLIANCE CHECKLIST
SUPPLIER :
ITEMCONTRACT ITEM #CONTRACT SECTIONProposal Page #Comply/ Non ComplyRationale for Non-Comply
11.1Package types to be handled
21.2Complete AWOS systems
31.5Work area
42.0Comply with all standards
53.1Project scope
63.1.1Decommissioning requirements
73.1.3.2Decommissioning and replace requirements for Pre-Sort system
83.1.1.2Implement presort system replacement without lost warehouse production
93.1.1.3Interface with Existing AWOS1 system
103.1.2New Pre-Sort interfaces
113.1.3New AWOS3 system requirements
123.1.3.4Parcel collection
133.1.3.5Tote Emptying Subsystem
143.1.3.6Parcel singulation
153.1.3.7Parcel orientation
163.1.3.7Alternate solution to reduce recircs.
173.1.3.7MIL STD 1348 Label
183.1.3.8Cube-Scan-Weigh system
193.1.3.9Parcel Transport to Print and Apply
203.1.3.10Automatic print and apply Subsystems
213.1.3.10.1Confirmation of correct parcel
223.1.3.10.2Label requirements
233.1.3.10.4Confirmation of correctly labeled parcel
243.1.3.11Parcel sortation requirements
253.1.3.8.11.1Track parcels through sortation system
263.1.3.12Tri‐Wall Filling Subsystem
273.1.3.12Fill status monitoring and operator light tree alerts
283.1.4Provide optional CLIN#1 scanners
293.1.5Provide optional CLIN#2 wire carts
303.1.1.1All existing controls modified to function without decommissioned systems
313.2.1Provide conveyor equipment components as listed, provide functionality offered by proposed equipment
323.2.2Cube-scan-weigh with integrated six-side scan tunnel
333.2.3.1Print 4x6 labels
343.2.3.1Commercially available label stock
353.2.3.1Identify optimum print engine and provide full explanation
363.2.3.1Apply labels to varied package sizes and shapes
373.2.3.1Includes mislabel detection
383.2.3.2Control automatic print and apply via virtual server setup
393.2.3.5Print carrier compliant shipping labels and MSL (MIL STD 129)
403.2.3.5Scan MIL STD 1348 label and capture desired barcode information
413.2.5Interlocked personnel safety fence
423.2.6Provide controls interface and code updates to existing interfaced equipment
433.2.6.1PanelView Plus color HMI terminal
443.2.6.1All needed HMI screens with authorization level access
453.2.6.2Ability to run either or both AWOS systems, balance parcel feed when both are operational
463.2.6.3Ensure that only correctly oriented and sized parcels are transferred to label processing
473.2.6.5Track parcels through labeling system and provide controlled purge/reset functionality
483.2.6.6Determine a statistical threshold of no-reads when analyzing label confirmation scans
493.2.6.7Shipment confirmation signal to ECS upon positive sort lane divert
503.2.6.7Confirmed shipped confirmation at release to triwall with CLIN#1
513.2.6.8Regular and backed-up power feeds from substation #5
523.2.6.8Regular power feeds from substation #2 and backed-up power feeds from substation #5 with CLIN #4
533.2.6.9Plant air within 150' of project area
543.2.7Meets throughput rates
553.2.7Included potential recirculation volume in singulation system
563.3Material sizes and profiles accommodated in design
573.5System Requirements
583.5.1General Requirements
593.5.1.1Project Management
603.5.1.1.1Integrated Master Schedule (IMS)
613.6.1Personnel Security Requirements
623.6.2Risk Management Framework (RMF)
633.6.3Cyber Security Strength and Assurance Requirements
643.7Materials and Operating Conditions
653.7.1Treatment and painting
663.7.2Lubrication and Adjustment
673.7.3State-Of-The-Art Components
683.7.4Energy Conservation Requirements
693.7.4.1Energy conservation for motors
703.7.4.2Energy conservation for conveyors
713.7.5Manuals, Drawings, and Spare Parts List
723.7.5.1Software controls documentation
733.7.5.2Operations and maintenance manuals
743.7.5.3Machine drawings and schematics
753.7.5.4Preventative maintenance schedule
763.7.5.5Recommended spare parts list
773.7.5.6Other documentation
783.7.5.7Diagrams, data, nameplates, and identification requirements
793.7.5.7.1Drawing size
803.7.5.7.2Diagrams required
813.7.5.7.3Symbols and device identification
823.7.5.7.4Conductor identification
833.7.5.7.5Sub-assembly identification
843.7.5.8Schematic diagrams
853.7.5.8.1Logic diagrams
863.7.5.8.2Elementary diagrams
873.7.5.8.3Electronic schematic
883.7.5.9Panel layout and connection diagram
893.7.5.10Pushbutton & pilot light color codes
903.7.5.11Engineering parts list
913.7.5.12Sequence of operation
923.7.5.13Instruction manual
933.7.5.14Electrical layout
943.7.5.15Equipment nameplates
953.7.5.16Device identification
963.7.5.17identification plates
973.7.6Wiring and numbering guidelines
983.7.7Electrical connections
993.7.8Panel wiring
1003.7.8.1Panel wireways
1013.7.8.3Disconnects
1023.7.8.5Equipment wiring
1033.7.8.5.1Wireways and rigid conduits
1043.7.8.5.2Flexible connections
1053.7.8.5.3AC & DC wiring requirements
1063.8Control equipment specifications
1073.8.1AWOS3 conveyor and subsystems control system
1083.8.1.1Centrally located control panel
1093.8.1.2Control panels protection
1103.8.1.3HMI interface requirements
1113.8.1.4Maintenance control modes
1123.8.1.5Motor starters
1133.8.1.7Control and motor control panels
1143.8.1.7.2Separately powered panel light and convenience outlet
1153.8.1.7.3Forced filtered ventilation
1163.8.1.7.12Enclosure requirements
1173.8.1.7.14Component mounting
1183.8.1.8Photoelectric switches
1193.8.1.9Modes of operation
1203.8.1.12Interlocks and cascading start
1213.8.1.13Jam detection
1223.8.1.14Full line detection
1233.8.1.16Emergency cut-offs - fail safe design
1243.8.2Programmable controllers
1253.8.2.1ControlLogix PLC
1263.8.2.3Spare control capacity
1273.8.3Control voltage stabilization
1283.8.4Premium efficiency motors
1293.8.6Disconnects with lock-out/tag-out
1303.8.7Preferred equipment
1313.8.8Programmable logic controllers and PLC support
1323.8.10Battery backup for PLCs
1333.8.11PLC logic
1343.8.12AWOS3 system rules of communication
1353.8.13Omni-directional scanners
1363.8.1430.5mm control switches and indicators
1373.9Conveyor systems
1383.9.8Forklift guard rails
1393.1Safety measures
1403.10.1Safety netting on overhead conveyor
1413.10.2E-stop indicator light
1423.10.3safety bollards
1433.11Work station requirements
1443.11.19 Work stations
1453.11.2Tables
1463.11.3Table legs
1473.11.4Back stringer
1483.11.5Drawer
1493.11.6Top shelf & light
1503.11.7Computer provision
1513.11.8Electrical
1523.11.9Stools
1533.12.1Normal working hours
1543.12.2Working hours that will affect production
1553.14.1Utility requirement notification
1563.14.2Work schedule & pre-construction meeting (Contractor)
1573.14.3Dimensions (Contractor)
1583.14.4Hours of work (Contractor)
1593.14.5Energy conservation (Contractor)
1603.14.6Electrical code compliance (Contractor)
1613.14.7Protection of Government property (Contractor)
1623.14.8Unloading of Equipment (Contractor)
1633.14.9Housekeeping (Contractor)
1643.14.10Warranty (Contractor)
1653.14.11Safety - General requirements
1663.14.11.2Safety- Protective barriers & markings
1673.14.11.3Safety - Protective equipment
1683.14.11.4Hazardous Material
1693.14.11.5Disposal of Hazardous Material
1703.14.11.6Material Safety Data Sheets (MSDS)
1713.14.11.7Site smoking policy
1723.14.11.8Mishap reporting
1733.14.11.9Construction and Installation safety practices
1743.14.12Contractor material
1753.14.13Construction Equipment
1763.14.14Equipment Safety Markings
1773.14.15Fire Prevention procedures
1784.2.1Maintenance prior to final acceptance
1794.2.2Special Technical Assistance
1804.2.3Contractor Technical Representative
1814.2.4Warranty (Contractor)
1824.3System Checkout
1834.4Contract data requirements
1844.5.1Responsibility for Inspection & Testing
1854.5.1.1Component and Material Inspection
1864.5.1.2Quality Conformance Inspection & Test
1874.5.1.2.1Examination
1884.5.1.2.2In-process Inspection
1894.5.1.2.3Performance test
1904.5.1.2.4Functional test
1914.5.1.2.5Reliability test
1924.5.1.2.6Static and other tests
1934.5.2Time lost
1944.6Final acceptance
1954.7Initial operational support
1964.8Training
1974.8.1Operator Training
1984.8.2On-site Maintenance Training

File details come from the government source that posted it. Updated .