Attachment 15 - EDC Modernization CDRLs & DIDs Cross Reference.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution Federal contract opportunity
Solicitation number
SP3300-20-R-5002
Issued by
Defense Logistics Agency Distribution

About this file

This document outlines a Contract Data Requirements List (CDRL) for the Logistics Modernization Integration Support (LMIS) contract opportunity with the Defense Logistics Agency Distribution.

The CDRL identifies various reports and deliverables required from the contractor, including monthly status reports, integrated program management reports, training materials, and item unique identification marking reports. Submission due dates and frequencies are provided for each deliverable. The CDRL also cross-references the required deliverables to paragraphs within the contract's performance work statement and statement of objectives to identify where each deliverable is referenced.

Key deliverables include monthly contractor employee Common Access Card reports, quarterly small business participation reports, and training materials due 60 days prior to the start of training. Submission formats are identified, and most are to be delivered in Microsoft Office or Adobe PDF format with contractor formats requiring government approval. Revision requirements are also specified for deliverables requiring updates throughout the contract period of performance.

The related federal contract opportunity is for Logistics Modernization Integration Support services for the Defense Logistics Agency Distribution. The solicitation number is provided along with a brief description of the required services.

View the file

Other files for this federal contract opportunity

Other files attached to Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution, newest first.
File Type Posted
LMIS RFP SP3300-20-R-5002 Amendment 0010.pdf PDF
RFP SP3300-20-5002 Rev. 4 (03.17.20).pdf PDF
LMIS RFP Questions and Responses Version 4.xlsx XLSX spreadsheet
LMIS RFP Questions and Responses Version 3.xlsx XLSX spreadsheet
RFP SP3300-20-5002 Rev. 3 (02.28.20).pdf PDF
RFP SP3300-20-5002 Rev. 2 (02.19.20).pdf PDF
LMIS RFP SP3300-20-R-5002 Amendment 0006.pdf PDF
RFP SP3300-20-5002 Rev. 2 (02.19.20) (Tracked Changes).docx DOCX document
Attachment 19 - Davis-Bacon Act Wage Determination.pdf PDF
Attachment 43 - TE 1.4 CIRS Tutorial.pdf PDF
Attachment 44 - TE 1.5 Contractor Investigative Request Sep 2016.pdf PDF
Attachment 1 - Basic IDIQ PWS Rev. 1 (01.16.20).pdf PDF
Attachment 8 - Pool 1 Continuation of Supplies Services Instructions Rev. 1 (01.17.20).pdf PDF
RFP SP3300-20-R-5002 Amendment 0003.pdf PDF
LMIS Pre-Proposal Conference Questions & Answers.pdf PDF
LMIS Pre-Proposal Conference Sign-In Sheet (Day 1).pdf PDF
LMIS Pre-Proposal Conference Agenda.pdf PDF
RFP SP3300-20-R-5002 Amendment 0001.pdf PDF
LMIS Pre-Proposal Conference Instructions.pdf PDF
Attachment 13 - Implementation Project Schedule.pdf PDF
Attachment 32 - Pool 2 Continuation of Supplies Services Instructions.pdf PDF
Attachment 2 - Past Performance Questionnaire.docx DOCX document
Attachment 6 - CDRLs (CDRL A002 - Small Business Participation Biannual Progress Report).pdf PDF
Attachment 1 - Basic IDIQ PWS.pdf PDF
Attachment 3 - Subcontracting Plan Template -Includes Elements 1-15.docx DOCX document
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00008 GFE & GFP Report Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00013 Certificate of Compliance).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00002 Commercial Manual).pdf PDF
Attachment 8 - Pool 1 Continuation of Supplies Services Instructions.pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_DE_R-.DWG).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00003 Warranty Information and Technical Representatives List).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00004 Training Baseline (TB) and Training Materials).pdf PDF
Attachment 6 - CDRLs (CDRL A001 - Monthly Contractor Employee CAC Report).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00010 DoDM 8570 Report Requirements).pdf PDF
Attachment 10 - EDC Modernization Compliance Checklist.xlsx XLSX spreadsheet
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00007 Affirmation of Coding Integrity and Unused Software Services).pdf PDF
Attachment 34 - AMHE Drawings (NCDP2_17_01_01_01A_EX_R-.DWG).pdf PDF
Attachment 7 - Schedule Page (Pool 1).xlsx XLSX spreadsheet
Attachment 36 - AMHE DIDs (DI-DLAMISC-00001 Drawings, Engineering, and Associated Lists).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00001 Hardware Inventory Requirements).pdf PDF
Attachment 34 -AMHE Drawings (NCDP2_17_01_01_01A_PR_R-.DWG).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00012 Project Management Plan).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00014 In-Progress Review (IPR) and Report Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00005 Power Requirements).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00005 DoD Architecture Framework Documentation).pdf PDF
Attachment 33 - AMHE SOW.pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00004 Software - Firmware Access Controls, User Roles, and Data Types).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00011 Integrated Master Schedule).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMISC-00006 Design Data and Calculations).pdf PDF
Attachment 36 - AMHE DIDs (DI-DLAMGMT-00009 Physical and Cybersecurity Features of End Devices Provided).pdf PDF
Show all 50

Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL Cross Reference to PWS Logistics Modernization Integration Services (LMIS) Contract Data Requirements List (CDRL) Cross Reference - Base IDIQ PWS and EDC Task Order

BASIC IDIQ PWS

CDRLCDRL TitleDID/AuthorityDID/Authority TitleSubtitleDescriptionPWS ReferenceFrequencyRecommendations/Remarks
A001Monthly Contractor Employee Common Access Card (CAC) ReportTechnical Exhibit 1.2Common Access Card (CAC) ProceduresThe Monthly CAC Report provides information related to all employees working on a contract who have been issued CAC cards and a verification of whether each listed employee still requires a CAC.Base IDIQ: Para 2.5.2Monthly
A002Small Business Participation Biannual Progress ReportDLA Distribution J-7The Small Business Participation Report provides information related to the contract/business relationship between a Contractor and its associated Small Business Concern(s) (SBC). Provides actual SBC participation during any given period an information such as Company name, Cage Code, business category(ies), description of products or services, and NAICS code for each SBC and the current commitment with the SBC.N/AQuarterly

POOL #1: Enterprise Facility Modernization Pool (EDC Modernization) Part 3: Equipment Requirements

CDRLCDRL TitleDID/AuthorityDID/Authority TitleSubtitleDescriptionPWS ReferenceFrequencyRecommendations/Remarks
A001Installation Schedule / Integrated Master Schedule (IMS)DI-S-SAT1 / DI-J62MGMT-81861A
(01/30/2019) / (02/07/2020)Installation Schedule / Integrated Master Schedule (IMS)Contractor planned performance information to assist the government in timely project planning, and preliminary coordination actions at the installation site.
The Integrated Master Schedule (IMS) is an integrated schedule containing the networked, detailed tasks necessary to ensure successful program execution. The IMS is vertically traceable to the Program Management Plan (PMP) (if applicable), the Work Breakdown Structure (WBS), and the Statement of Work / Performance Work Statement (SOW / PWS). The IMS shall be used to verify attainability of contract objectives, to evaluate progress toward meeting program objectives, and to integrate the program schedule activities with all related components.PWS PART 2, PARA 3.1 - 3.5One/R/MTHLY* INITIAL DRAFT: 15 DAYS AFTER NOTICE TO PROCEED (NTP)

** FINAL DRAFT/MONTHLY UPDATES: 42 DAYS AFTER NTP / MTHLY IAW MSR

FORMAT: MS PROJECT AND ADOBE PDF

A001AProject Management Plan (PMP)DI-J62MGMT-81797
(02/07/2020)Program Management Plan (PMP)The Program Management Plan (PMP) provides technical, management, schedule, and cost data. It provides current information which is used to describe the approach, resources and needs of the contractor to perform the effort. The PMP also describes the contractor’s organization, assignment of functions, duties, and responsibilities, management procedures and policies, and reporting requirements for the conduct of contractually-imposed tasks, projects, or programs.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL DRAFT: 15 DAYS AFTER NOTICE TO PROCEED (NTP)

** FINAL DRAFT: 42 DAYS AFTER NTP

FORMAT: ADOBE PDF

A001BMonthly Status Report (MSR)DI-J62MGMT-80368A
(02/07/2020)Monthly Status Report (MSR)The Monthly Status Report (MSR) documents the status of contractor effort towards achieving contract objectives. It identifies accomplishments to date and difficulties encountered, and compare the status achieved to planned goals and the resources expended. It is used by the Government to monitor and evaluate contractor performance.PWS PART 2, PARA 3.1 - 3.5Monthly* NLT 15TH OF THE MONTH FOLLOWING THE FIRST 30 DAYS AFTER AWARD

** NLT 15TH OF MONTH FOLLOWING EACH MONTH ON CONTRACT

FORMAT: ADOBE PDF

A002Layout Drawings and As-Built DrawingsDI-E-SAT2
(01/30/2019)Drawings, Engineering and Associated ListsPreliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced PWS, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: AUTOCAD ON CD AND ADOBE PDF

A003Layout Drawings and As-Built DrawingsDI-E-SAT2
(01/30/2019)Drawings, Engineering and Associated ListsPreliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced PWS, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: AUTOCAD ON CD AND ADOBE PDF

A004Operating and Maintenance ManualsDI-E-SAT1
(01/30/2019)Commercial ManualsThis Data Item Description is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required. PWS PART 2, PARA 3.1 - 3.5 One/R * INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

A005Operating and Maintenance ManualsDI-E-SAT1
(01/30/2019)Commercial ManualsThis Data Item Description is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required. PWS PART 2, PARA 3.1 - 3.5 One/R * INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

A006Contracting Technical RepresentativeDI-E-SAT11
(01/30/2019)Technical Representatives ListThe purpose of this DID is to ensure that the government has availability of technical representative service/support.PWS THROUGHOUTOne/R* 20 DAYS AFTER CONTRACT AWARD

** AS REQUIRED DUE TO PERSONNEL CHANGES

A007Training Materials and SchedulesDI-E-SAT
(01/30/2019)Training MaterialTraining Materials include all materials required to support Supervisor, Train the Trainer, Operator, and Maintenance training on equipment and systems. This includes materials that provide specific definition and direction to the trainer and trainees on learning objectives, equipment, and instructional media for use during the conduct of training. It also includes updates in support of the life cycle maintenance of the training materials.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

A008Power RequirementsDI-P-SAT1
(01/30/2019)Power RequirementsThis item provides a comprehensive list of power requirements for all equipment to be furnished and installed by the contractor.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

* SHALL BE NOTE ON FACILITY DRAWING - LOCATION REQUIREMENTS

A009Design Data CalculationsDI-E-2040A
(01/30/2019)Design Data and CalculationsThis data consists of graphs, mathematical curves, analysis tables, drawings, and empirical data which reflects quantitatively and qualitatively the items to be furnished. The purpose of this data is to enable the Government to verify the items being furnished are in accordance with the contract.PWS PART 5, PARA 1.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS
A010Certificate of ComplianceDI-E-SAT14
(01/30/2019)Certificate of ComplianceThis document is to provide certification that all contractual requirements have been met by the contractor.accordance with the contract.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO PRELIMINARY TESTING START DATE

A011Test PlanDI-T-SAT1
(01/30/2019)Test PlanProvide an overall plan for verification of technical requirements defined in the SOW.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

* ELECTRONIC COPIES ONLY

POOL #1: Enterprise Facility Modernization Pool (EDC Modernization) Part 3: AGV Fleet Management Hardware

CDRLCDRL TitleDID/AuthorityDID/Authority TitleSubtitleDescriptionPWS ReferenceFrequencyRemarks
H001Installation Schedule / Integrated Master Schedule (IMS)DI-S-SAT1 / DI-J62MGMT-81861A
(01/30/2019) / (02/07/2020)Installation Schedule / Integrated Master Schedule (IMS)Contractor planned performance information to assist the government in timely project planning, and preliminary coordination actions at the installation site.
The Integrated Master Schedule (IMS) is an integrated schedule containing the networked, detailed tasks necessary to ensure successful program execution. The IMS is vertically traceable to the Program Management Plan (PMP) (if applicable), the Work Breakdown Structure (WBS), and the Statement of Work / Performance Work Statement (SOW / PWS). The IMS shall be used to verify attainability of contract objectives, to evaluate progress toward meeting program objectives, and to integrate the program schedule activities with all related components.PWS PART 2, PARA 3.1 - 3.5One/R/MTHLY* INITIAL DRAFT: 15 DAYS AFTER NOTICE TO PROCEED (NTP)

** FINAL DRAFT/MONTHLY UPDATES: 42 DAYS AFTER NTP / MTHLY IAW MSR

FORMAT: MS PROJECT AND ADOBE PDF

H002Layout Drawings and As-Built DrawingsDI-E-SAT2
(01/30/2019)Drawings, Engineering and Associated ListsPreliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced PWS, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: AUTOCAD ON CD AND ADOBE PDF

H003Layout Drawings and As-Built DrawingsDI-E-SAT2
(01/30/2019)Drawings, Engineering and Associated ListsPreliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced PWS, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: AUTOCAD ON CD AND ADOBE PDF

H004Operating and Maintenance ManualsDI-E-SAT1
(01/30/2019)Commercial ManualsThis Data Item Description is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required. PWS PART 2, PARA 3.1 - 3.5 One/R * INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

H005Operating and Maintenance ManualsDI-E-SAT1
(01/30/2019)Commercial ManualsThis Data Item Description is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required. PWS PART 2, PARA 3.1 - 3.5 One/R * INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

H006Contracting Technical RepresentativeDI-E-SAT11
(01/30/2019)Technical Representatives ListThe purpose of this DID is to ensure that the government has availability of technical representative service/support.PWS THROUGHOUTOne/R* 20 DAYS AFTER CONTRACT AWARD

** AS REQUIRED DUE TO PERSONNEL CHANGES

H007Training Materials and SchedulesDI-E-SAT
(01/30/2019)Training MaterialTraining Materials include all materials required to support Supervisor, Train the Trainer, Operator, and Maintenance training on equipment and systems. This includes materials that provide specific definition and direction to the trainer and trainees on learning objectives, equipment, and instructional media for use during the conduct of training. It also includes updates in support of the life cycle maintenance of the training materials.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

H008Power RequirementsDI-P-SAT1
(01/30/2019)Power RequirementsThis item provides a comprehensive list of power requirements for all equipment to be furnished and installed by the contractor.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

* SHALL BE NOTE ON FACILITY DRAWING - LOCATION REQUIREMENTS

H009Design Data CalculationsDI-E-2040A
(01/30/2019)Design Data and CalculationsThis data consists of graphs, mathematical curves, analysis tables, drawings, and empirical data which reflects quantitatively and qualitatively the items to be furnished. The purpose of this data is to enable the Government to verify the items being furnished are in accordance with the contract.PWS PART 5, PARA 1.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS
H010Certificate of ComplianceDI-E-SAT14
(01/30/2019)Certificate of ComplianceThis document is to provide certification that all contractual requirements have been met by the contractor.accordance with the contract.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO PRELIMINARY TESTING START DATE

H011Test PlanDI-T-SAT1
(01/30/2019)Test PlanProvide an overall plan for verification of technical requirements defined in the SOW.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

* ELECTRONIC COPIES ONLY

H012Software Documentation ManualDI-S-SAT-2
(12/02/2019)Software Documentation ManualOperating ManualThis document is to ensue all source code, programming, software and PLC Code is turned over to the Government prior to acceptance of the system for purposes of the Government maintaining the system after acceptance.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF; COPIES ON CD

A014Hardware Inventory RequirementsDI-DLAMGMT-00001
(12/02/2019)Hardware Baseline InventoryThis documentation provides information on all Contractor supplied hardware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: MICROSOFT OFFICE AND ADOBE PDF

A016GFE/GFP ReportDI-DLAMGMT-00008
(12/02/2019)Government Furnished Equipment (GFE) and Government Furnished Property (GFP) Report RequirementsThe GFE / GFP Report provides the Government active oversight of Contractor issued GFE / GFP for tracking of accountability purposes. This documentation is necessary for Government verification of successful inventory and maintaining of GFE / GFP in the Contractor's possession throughout the duration of performance on the contract.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* INITIAL DRAFT: 15 DAYS AFTER NOTICE TO PROCEED (NTP)

** FINAL DRAFT/MONTHLY UPDATES: 42 DAYS AFTER NTP / MTHLY IAW MSR

FORMAT: MS PROJECT AND ADOBE PDF

A022Physical and Cybersecurity FeaturesDI-DLAMGMT-00009
(12/02/2019)Physical & Cybersecurity Features of End Devices ProvidedThis documentation provides information on the deployed physical and cybersecurity features of the equipment deployed by the Contractor. This information is necessary to provide data required for Government documentation and retentionContractor's possession throughout the duration of performance on the contract.PWS Part 2, Para 3.1-3.5; Part 4One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: MICROSOFT OFFICE AND ADOBE PDF

POOL #1: Enterprise Facility Modernization Pool (EDC Modernization) Part 3: AGV Fleet Management Software

CDRLCDRL TitleDID/AuthorityDID/Authority TitleSubtitleDescriptionPWS ReferenceFrequencyRemarks
S001Software Development Plan (SDP)DI-IPSC-81427B
(03/13/2017)Software Development Plan (SDP)The Software Development Plan (SDP) with Agile, Cyber Security and Safety Assurance contains the format, content, and delivery timeframes for the SDP. The SDP provides the acquirer insight into, and a tool for monitoring, the processes to be followed for software development, the methods to be used, the approach to be followed for each activity, and project schedules, organization, and resources. This DID is useful for new development, modification, reuse, reengineering, maintenance, and other activities resulting in software products.activities resulting in software products.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S002Operational Concept Description (OCD)DI-IPSC-81430
(Revision A; Notice 1 07/08/2013)Operational Cocept Description (OCD)The Operational Concept Description (OCD) describes a proposed system in terms of the user needs it will fulfill, its relationship to existing systems or procedures, and the ways it will be used.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S003Software Requirements SpecificationDI-IPSC-81433
(Revision A; Notice 1 07/08/2013)Software Requirements SpecificationThe Software Requirements Specification (SRS) specifies the requirements for a Computer Software Configuration Item (CSCI) and the methods to be used to ensure that each requirement has been met. Requirements pertaining to the CSCI’s external interfaces may be presented in the SRS or in one or more Interface Requirements Specifications (IRSs) (DI-IPSC-81434) referenced from the SRS.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S004System/Subsystem Specification (SSS)DI-IPSC-81431
(Revision A; Notice 1 07/08/2013)System/Subsystem Specification (SSS)The System/Subsystem Specification (SSS) specifies the requirements for a system or subsystem and the methods to be used to ensure that each requirement has been met. Requirements pertaining to the system or
subsystem’s external interfaces may be presented in the SSS or in one or more Interface Requirements Specifications (IRSs) (DI-IPSC-81434) referenced from the SSS.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S005Interface Requirements Specification (IRS)DI-IPSC-81434
(Revision A; Notice 1 07/08/2013)Interface Requirements Specification (IRS)The Interface Requirements Specification (IRS) specifies the requirements imposed on one or more systems, subsystems, Hardware Configuration Items (HWCIs), Computer Software Configuration Items (CSCIs), manual operations, or other system components to achieve one or more interfaces among these entities. An IRS can cover any number of interfaces.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S006System/Subsystem Design Description (SSDD)DI-IPSC-81432
(Revision A; Notice 1 07/08/2013)System/Subsystem Design Description (SSDD)The System/Subsystem Design Description (SSDD) describes the system- or subsystem-wide design and the architectural design of a system or subsystem. The SSDD may be supplemented by Interface Design Descriptions (IDDs) (DI-IPSC-81436) and Database Design Descriptions (DBDDs) (DI-IPSC-81437).PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S007Software Design Description (SDD)DI-IPSC-81435
(Revision A; Notice 1 07/08/2013)Software Design Description (SDD)The Software Design Description (SDD) describes the design of a Computer Software Configuration Item (CSCI). It describes the CSCI-wide design decisions, the CSCI architectural design, and the detailed design
needed to implement the software. The SDD may be supplemented by Interface Design Descriptions (IDDs) (DI-IPSC-81436) and Database Design Descriptions (DBDDs) (DI-IPSC-81437).PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S008Database Design Description (DBDD)DI-IPSC-81437
(Revision A; Notice 1 07/08/2013)Database Design Description (DBDD)The Database Design Description (DBDD) describes the design of a database, that is, a collection of related data stored in one or more computerized files in a manner that can be accessed by users or computer programs via a database management system (DBMS). It can also describe the software units used to access or manipulate the data.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S009Interface Design Description (IDD)DI-IPSC-81436
(Revision A; Notice 1 07/08/2013)Interface Design Description (IDD)The Interface Design Description (IDD) describes the interface characteristics of one or more systems, subsystems, Hardware Configuration Items (HWCIs), Computer Software Configuration Items (CSCIs), manual operations, or other system components. An IDD may describe any number of interfaces.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S010Software Test Plan (STP)DI-IPSC-81438
(Revision A; Notice 1 07/08/2013)Software Test Plan (STP)The Software Test Plan (STP) describes plans for qualification testing of Computer Software Configuration Items (CSCIs) and software systems. It describes the software test environment to be used for the testing, identifies the tests to be performed, and provides schedules for test activities.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S011Software Test Description (STD)DI-IPSC-81439
(Revision A; Notice 1 07/08/2013)Software Test Description (STD)The Software Test Description (STD) describes the test preparations, test cases, and test procedures to be used to perform qualification testing of a Computer Software Configuration Item (CSCI) or a software system or
subsystem.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S012Software Test Report (STR)DI-IPSC-81440
(Revision A; Notice 1 07/08/2013)Software Test Report (STR)The Software Test Report (STR) is a record of the qualification testing performed on a Computer Software Configuration Item (CSCI), a software system or subsystem, or other software-related item.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S020Software User Manual (SUM)DI-IPSC-81443
(Revision A; Notice 1 07/08/2013)Software User Manual (SUM)The Software User Manual (SUM) tells a hands-on software user how to install and use a Computer Software Configuration Item (CSCI), a group of related CSCIs, or a software system or subsystem. It may also cover a particular aspect of software operation, such as instructions for a particular position or task.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S081Software Transition Plan (STrP)DI-IPSC-81429
(Revision A; Notice 1 07/08/2013)Software Transition Plan (STrP)The Software Transition Plan (STrP) identifies the hardware, software, and other resources needed for life cycle support of deliverable software and describes the developer’s plans for transitioning deliverable items to the support agency.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

S090Software Product Specification (SPS)DI-IPSC-81441
(Revision A; Notice 1 07/08/2013)Software Product Specification (SPS)The Software Product Specification (SPS) contains or references the executable software, source files, and software support information, including "as built" design information and compilation, build, and modification procedures, for a Computer Software Configuration Item (CSCI).PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF S092 Software/Firmware and Coding Inventory Requirements DI-DLAMGMT-00002 Software/Firmware and Coding Inventory Requirements This documentation provides information on all Contractor supplied software / firmware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF S093 Software and Firmware Access Controls, User Roles, and Data Types DI-DLAMGMT-00004 Software and Firmware Access Controls, User Roles, and Data Types This documentation provides information on all Contractor supplied software / firmware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF S094 DoD Architecture Framework Documentation DI-DLAMGMT-00005 DoD Architecture Framework Documentation This documentation describes the architectural framework and characteristics pertinent to the solution and its system, subsystem(s), and software furnished in accordance with the contract. It provides the Government with the necessary information to integrate, maintain, and understand cross organizational boundaries. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF S095 Network Infrastructure and Communication Protocols, Ports, & Services DI-DLAMGMT-00006 Network Infrastructure and Communication Protocols, Ports, & Services This documentation provides information on the supplied solution / system designed network environment with mannerisms in which it communicates. This information is necessary to provide data required for Government documentation and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF S096 DoDM 8570 Report DI-DLAMGMT-00010 DoDM 8570 Report The DoD 8570 report provides the Government oversight of Contractor compliance to DoD 8570.01-M Information Assurance Workforce Improvement Program. This documentation is necessary for Government verification of successful Contractor performance for Cybersecurity requirements throughout the duration of the contract. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF S097 Affirmation of Coding Integrity and Unused Software / Services DI-DLAMGMT-00007 Affirmation of Coding Integrity and Unused Software / Services This documentation provides formal certification that all security updates and patches for the solution / system do not contain malicious code prior to testing and installation. It also provides formal certification that all unnecessary and/or unused software / services for the solution / system were removed or disabled by the Contractor. This documentation is necessary for Government verification of successful contract completion and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF

POOL #1: Enterprise Facility Modernization Pool (EDC Modernization) Part 4: WES/WCS Hardware

CDRLCDRL TitleDID/AuthorityDID/Authority TitleSubtitleDescriptionPWS ReferenceFrequencyRemarks
J001Installation Schedule / Integrated Master Schedule (IMS)DI-S-SAT1 / DI-J62MGMT-81861A
(01/30/2019) / (02/07/2020)Installation Schedule / Integrated Master Schedule (IMS)Contractor planned performance information to assist the government in timely project planning, and preliminary coordination actions at the installation site.
The Integrated Master Schedule (IMS) is an integrated schedule containing the networked, detailed tasks necessary to ensure successful program execution. The IMS is vertically traceable to the Program Management Plan (PMP) (if applicable), the Work Breakdown Structure (WBS), and the Statement of Work / Performance Work Statement (SOW / PWS). The IMS shall be used to verify attainability of contract objectives, to evaluate progress toward meeting program objectives, and to integrate the program schedule activities with all related components.PWS PART 2, PARA 3.1 - 3.5One/R/MTHLY* INITIAL DRAFT: 15 DAYS AFTER NOTICE TO PROCEED (NTP)

** FINAL DRAFT/MONTHLY UPDATES: 42 DAYS AFTER NTP / MTHLY IAW MSR

FORMAT: MS PROJECT AND ADOBE PDF

J002Layout Drawings and As-Built DrawingsDI-E-SAT2
(01/30/2019)Drawings, Engineering and Associated ListsPreliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced PWS, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: AUTOCAD ON CD AND ADOBE PDF

J003Layout Drawings and As-Built DrawingsDI-E-SAT2
(01/30/2019)Drawings, Engineering and Associated ListsPreliminary engineering layout, equipment drawings, and material list for equipment to be supplied in accordance with referenced PWS, and as-built drawings of the equipment after installation. To provide data required for Government documentation and retention.PWS PART 2, PARA 3.1 - 3.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: AUTOCAD ON CD AND ADOBE PDF

J004Operating and Maintenance ManualsDI-E-SAT1
(01/30/2019)Commercial ManualsThis Data Item Description is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required. PWS PART 2, PARA 3.1 - 3.5 One/R * INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

J005Operating and Maintenance ManualsDI-E-SAT1
(01/30/2019)Commercial ManualsThis Data Item Description is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required. PWS PART 2, PARA 3.1 - 3.5 One/R * INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

J006Contracting Technical RepresentativeDI-E-SAT11
(01/30/2019)Technical Representatives ListThe purpose of this DID is to ensure that the government has availability of technical representative service/support.PWS THROUGHOUTOne/R* 20 DAYS AFTER CONTRACT AWARD

** AS REQUIRED DUE TO PERSONNEL CHANGES

J007Training Materials and SchedulesDI-E-SAT
(01/30/2019)Training MaterialTraining Materials include all materials required to support Supervisor, Train the Trainer, Operator, and Maintenance training on equipment and systems. This includes materials that provide specific definition and direction to the trainer and trainees on learning objectives, equipment, and instructional media for use during the conduct of training. It also includes updates in support of the life cycle maintenance of the training materials.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF COPIES ON CD

J008Power RequirementsDI-P-SAT1
(01/30/2019)Power RequirementsThis item provides a comprehensive list of power requirements for all equipment to be furnished and installed by the contractor.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

* APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

* SHALL BE NOTE ON FACILITY DRAWING - LOCATION REQUIREMENTS

J009Design Data CalculationsDI-E-2040A
(01/30/2019)Design Data and CalculationsThis data consists of graphs, mathematical curves, analysis tables, drawings, and empirical data which reflects quantitatively and qualitatively the items to be furnished. The purpose of this data is to enable the Government to verify the items being furnished are in accordance with the contract.PWS PART 5, PARA 1.5One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS
J010Certificate of ComplianceDI-E-SAT14
(01/30/2019)Certificate of ComplianceThis document is to provide certification that all contractual requirements have been met by the contractor.accordance with the contract.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO PRELIMINARY TESTING START DATE

J011Test PlanDI-T-SAT1
(01/30/2019)Test PlanProvide an overall plan for verification of technical requirements defined in the SOW.PWS THROUGHOUTOne/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

* ELECTRONIC COPIES ONLY

J012Software Documentation ManualDI-S-SAT-2
(12/02/2019)Software Documentation ManualOperating ManualThis document is to ensue all source code, programming, software and PLC Code is turned over to the Government prior to acceptance of the system for purposes of the Government maintaining the system after acceptance.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: HARD COPY; MICROSOFT OFFICE AND ADOBE PDF; COPIES ON CD

B014Hardware Inventory RequirementsDI-DLAMGMT-00001
(12/02/2019)Hardware Baseline InventoryThis documentation provides information on all Contractor supplied hardware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

FORMAT: MICROSOFT OFFICE AND ADOBE PDF

B015GFE/GFP ReportDI-DLAMGMT-00008
(12/02/2019)Government Furnished Equipment (GFE) and Government Furnished Property (GFP) Report RequirementsThe GFE / GFP Report provides the Government active oversight of Contractor issued GFE / GFP for tracking of accountability purposes. This documentation is necessary for Government verification of successful inventory and maintaining of GFE / GFP in the Contractor's possession throughout the duration of performance on the contract.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* INITIAL DRAFT: 15 DAYS AFTER NOTICE TO PROCEED (NTP)

** FINAL DRAFT/MONTHLY UPDATES: 42 DAYS AFTER NTP / MTHLY IAW MSR

FORMAT: MS PROJECT AND ADOBE PDF

B016Physical and Cybersecurity FeaturesDI-DLAMGMT-00009
(12/02/2019)Physical & Cybersecurity Features of End Devices ProvidedThis documentation provides information on the deployed physical and cybersecurity features of the equipment deployed by the Contractor. This information is necessary to provide data required for Government documentation and retentionContractor's possession throughout the duration of performance on the contract.PWS Part 2, Para 3.1-3.5; Part 4One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: MICROSOFT OFFICE AND ADOBE PDF

B022Physical and Cybersecurity FeaturesDI-DLAMGMT-00009
(12/02/2019)Physical & Cybersecurity Features of End Devices ProvidedThis documentation provides information on the deployed physical and cybersecurity features of the equipment deployed by the Contractor. This information is necessary to provide data required for Government documentation and retentionContractor's possession throughout the duration of performance on the contract.PWS Part 2, Para 3.1-3.5; Part 4One/R* INITIAL & ** FINAL SUBMISSIONS IAW APPROVED IMS

APPROVAL REQUIRED PRIOR TO DESIGN/MANUFACTURE

FORMAT: MICROSOFT OFFICE AND ADOBE PDF

POOL #1: Enterprise Facility Modernization Pool (EDC Modernization) Part 4: WES/WCS Software

CDRLCDRL TitleDID/AuthorityDID/Authority TitleSubtitleDescriptionPWS ReferenceFrequencyRemarks
T001Software Development Plan (SDP)DI-IPSC-81427B
(03/13/2017)Software Development Plan (SDP)The Software Development Plan (SDP) with Agile, Cyber Security and Safety Assurance contains the format, content, and delivery timeframes for the SDP. The SDP provides the acquirer insight into, and a tool for monitoring, the processes to be followed for software development, the methods to be used, the approach to be followed for each activity, and project schedules, organization, and resources. This DID is useful for new development, modification, reuse, reengineering, maintenance, and other activities resulting in software products.activities resulting in software products.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T002Operational Concept Description (OCD)DI-IPSC-81430
(Revision A; Notice 1 07/08/2013)Operational Cocept Description (OCD)The Operational Concept Description (OCD) describes a proposed system in terms of the user needs it will fulfill, its relationship to existing systems or procedures, and the ways it will be used.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T003Software Requirements SpecificationDI-IPSC-81433
(Revision A; Notice 1 07/08/2013)Software Requirements SpecificationThe Software Requirements Specification (SRS) specifies the requirements for a Computer Software Configuration Item (CSCI) and the methods to be used to ensure that each requirement has been met. Requirements pertaining to the CSCI’s external interfaces may be presented in the SRS or in one or more Interface Requirements Specifications (IRSs) (DI-IPSC-81434) referenced from the SRS.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T004System/Subsystem Specification (SSS)DI-IPSC-81431
(Revision A; Notice 1 07/08/2013)System/Subsystem Specification (SSS)The System/Subsystem Specification (SSS) specifies the requirements for a system or subsystem and the methods to be used to ensure that each requirement has been met. Requirements pertaining to the system or
subsystem’s external interfaces may be presented in the SSS or in one or more Interface Requirements Specifications (IRSs) (DI-IPSC-81434) referenced from the SSS.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T005Interface Requirements Specification (IRS)DI-IPSC-81434
(Revision A; Notice 1 07/08/2013)Interface Requirements Specification (IRS)The Interface Requirements Specification (IRS) specifies the requirements imposed on one or more systems, subsystems, Hardware Configuration Items (HWCIs), Computer Software Configuration Items (CSCIs), manual operations, or other system components to achieve one or more interfaces among these entities. An IRS can cover any number of interfaces.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T006System/Subsystem Design Description (SSDD)DI-IPSC-81432
(Revision A; Notice 1 07/08/2013)System/Subsystem Design Description (SSDD)The System/Subsystem Design Description (SSDD) describes the system- or subsystem-wide design and the architectural design of a system or subsystem. The SSDD may be supplemented by Interface Design Descriptions (IDDs) (DI-IPSC-81436) and Database Design Descriptions (DBDDs) (DI-IPSC-81437).PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T007Software Design Description (SDD)DI-IPSC-81435
(Revision A; Notice 1 07/08/2013)Software Design Description (SDD)The Software Design Description (SDD) describes the design of a Computer Software Configuration Item (CSCI). It describes the CSCI-wide design decisions, the CSCI architectural design, and the detailed design
needed to implement the software. The SDD may be supplemented by Interface Design Descriptions (IDDs) (DI-IPSC-81436) and Database Design Descriptions (DBDDs) (DI-IPSC-81437).PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T008Database Design Description (DBDD)DI-IPSC-81437
(Revision A; Notice 1 07/08/2013)Database Design Description (DBDD)The Database Design Description (DBDD) describes the design of a database, that is, a collection of related data stored in one or more computerized files in a manner that can be accessed by users or computer programs via a database management system (DBMS). It can also describe the software units used to access or manipulate the data.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T009Interface Design Description (IDD)DI-IPSC-81436
(Revision A; Notice 1 07/08/2013)Interface Design Description (IDD)The Interface Design Description (IDD) describes the interface characteristics of one or more systems, subsystems, Hardware Configuration Items (HWCIs), Computer Software Configuration Items (CSCIs), manual operations, or other system components. An IDD may describe any number of interfaces.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T010Software Test Plan (STP)DI-IPSC-81438
(Revision A; Notice 1 07/08/2013)Software Test Plan (STP)The Software Test Plan (STP) describes plans for qualification testing of Computer Software Configuration Items (CSCIs) and software systems. It describes the software test environment to be used for the testing, identifies the tests to be performed, and provides schedules for test activities.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T011Software Test Description (STD)DI-IPSC-81439
(Revision A; Notice 1 07/08/2013)Software Test Description (STD)The Software Test Description (STD) describes the test preparations, test cases, and test procedures to be used to perform qualification testing of a Computer Software Configuration Item (CSCI) or a software system or
subsystem.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T012Software Test Report (STR)DI-IPSC-81440
(Revision A; Notice 1 07/08/2013)Software Test Report (STR)The Software Test Report (STR) is a record of the qualification testing performed on a Computer Software Configuration Item (CSCI), a software system or subsystem, or other software-related item.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T020Software User Manual (SUM)DI-IPSC-81443
(Revision A; Notice 1 07/08/2013)Software User Manual (SUM)The Software User Manual (SUM) tells a hands-on software user how to install and use a Computer Software Configuration Item (CSCI), a group of related CSCIs, or a software system or subsystem. It may also cover a particular aspect of software operation, such as instructions for a particular position or task.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T081Software Transition Plan (STrP)DI-IPSC-81429
(Revision A; Notice 1 07/08/2013)Software Transition Plan (STrP)The Software Transition Plan (STrP) identifies the hardware, software, and other resources needed for life cycle support of deliverable software and describes the developer’s plans for transitioning deliverable items to the support agency.PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF

T090Software Product Specification (SPS)DI-IPSC-81441
(Revision A; Notice 1 07/08/2013)Software Product Specification (SPS)The Software Product Specification (SPS) contains or references the executable software, source files, and software support information, including "as built" design information and compilation, build, and modification procedures, for a Computer Software Configuration Item (CSCI).PWS Part 2: 3.1-3.5; Part 3: Para 3.24One/R* and ** IAW Approved IMS

Government review required for approval and acceptance Format: MS Office or Adobe PDF T092 Software/Firmware and Coding Inventory Requirements DI-DLAMGMT-00002 Software/Firmware and Coding Inventory Requirements This documentation provides information on all Contractor supplied software / firmware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF T093 Software and Firmware Access Controls, User Roles, and Data Types DI-DLAMGMT-00004 Software and Firmware Access Controls, User Roles, and Data Types This documentation provides information on all Contractor supplied software / firmware to perform proper asset management of the system and equipment. This information is necessary to provide data required for Government documentation and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF T094 DoD Architecture Framework Documentation DI-DLAMGMT-00005 DoD Architecture Framework Documentation This documentation describes the architectural framework and characteristics pertinent to the solution and its system, subsystem(s), and software furnished in accordance with the contract. It provides the Government with the necessary information to integrate, maintain, and understand cross organizational boundaries. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF T095 Network Infrastructure and Communication Protocols, Ports, & Services DI-DLAMGMT-00006 Network Infrastructure and Communication Protocols, Ports, & Services This documentation provides information on the supplied solution / system designed network environment with mannerisms in which it communicates. This information is necessary to provide data required for Government documentation and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF T096 DoDM 8570 Report DI-DLAMGMT-00010 DoDM 8570 Report The DoD 8570 report provides the Government oversight of Contractor compliance to DoD 8570.01-M Information Assurance Workforce Improvement Program. This documentation is necessary for Government verification of successful Contractor performance for Cybersecurity requirements throughout the duration of the contract. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF T097 Affirmation of Coding Integrity and Unused Software / Services DI-DLAMGMT-00007 Affirmation of Coding Integrity and Unused Software / Services This documentation provides formal certification that all security updates and patches for the solution / system do not contain malicious code prior to testing and installation. It also provides formal certification that all unnecessary and/or unused software / services for the solution / system were removed or disabled by the Contractor. This documentation is necessary for Government verification of successful contract completion and retention. PWS Part 2: 3.1-3.5; Part 3: Para 3.24 One/R * and ** IAW Approved IMS Government review required for approval and acceptance Format: MS Office or Adobe PDF

POOL #1: Enterprise Facility Modernization Pool (EDC Modernization) Part 5: Facility Requirements

This is the start of the file's text. The full file is on GovTribe.