Attachment 36 - AMHE DIDs (DI-DLAMISC-00005 Power Requirements).pdf
PDF 83 KB Posted
- Attached to
- Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution Federal contract opportunity
- Solicitation number
- SP3300-20-R-5002
- Issued by
- Defense Logistics Agency Distribution
About this file
This document contains a Data Item Description (DID) for power requirements related to a federal contract opportunity for Logistics Modernization Integration Support (LMIS) for the Defense Logistics Agency (DLA) Distribution. The DID provides a comprehensive list of power requirements for all equipment to be furnished and installed by the contractor under the contract. It requires the contractor to list total power requirements by warehouse section and for each piece of equipment, and to provide facility drawings clearly identifying location requirements for any power equipment. The DID will be used by the government to evaluate available power. The related federal contract opportunity is solicitation number SP3300-20-R-5002 for LMIS support services to DLA Distribution.
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Modernization Integration Support (LMIS) for Defense Logistics Agency (DLA) Distribution has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form Approved OMB No. 0704-0188
Page ___ of ___ Pages
PREVIOUS EDITION MAY BE USED.DD FORM 1664, AUG 96 (EG)
DATA ITEM DESCRIPTION
1. TITLE 2. IDENTIFICATION NUMBER
3. DESCRIPTION/PURPOSE
4. APPROVAL DATE
(YYYYMMDD)
5. OFFICE OF PRIMARY RESPONSIBILITY (OPR) 6a. DTIC APPLICABLE 6b. GIDEP APPLICABLE
7. APPLICATION/INTERRELATIONSHIP
8. APPROVAL LIMITATION 9a. APPLICABLE FORMS 9b. AMSC NUMBER
10. PREPARATION INSTRUCTIONS
11. DISTRIBUTION STATEMENT
Distribution Statement A: Approved for public release; distribution is unlimited.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS.
Untitled
| 1 TITLE: Power Requirements |
| 2 IDENTIFICATION NUMBER: DI-DLAMISC-00005 |
| 3 DESCRIPTIONPURPOSE: 3.1 This documentation provides a comprehensive list of power requirements for the solution (including all equipment) furnished and installed by the Contractor. It is used by the Government to evaluate the power requirements to determine if sufficient power is available. |
| 4 APPROVAL DATE YYYYMMDD: N/A |
| 5 OFFICE OF PRIMARY RESPONSIBILITY OPR: DLA Distribution - DF |
| 6a DTIC APPLICABLE: N/A |
| 6b GIDEP APPLICABLE: N/A |
| 7 APPLICATIONINTERRELATIONSHIP: 7.1 This Data Item Description (DID) is applicable to all contractor performance and work actions necessary to comply with requirements described within the contract. |
7.2 This DID may be applied to programs or projects during Material Solution Analysis (MSA), Technology Maturation & Risk Reduction (TMRR), Engineering & Manufacturing Development (EMD), Production & Deployment (P&D), and Operations & Support (O&S) phases of the Defense Acquisition Life Cycle.
7.3 This DID may be invoked when it has been determined the Government must evaluate the power requirements of the solution (including all equipment) furnished and installed by the Contractor.
| 8 APPROVAL LIMITATION: N/A |
| 9a APPLICABLE FORMS: N/A |
| 9b AMSC NUMBER: N/A |
| 10 PREPARATION INSTRUCTIONS: 10.1 Format: The documentation must be in the Contractor's design unless otherwise specified on the Contract Data Requirements List (CDRL / DD Form 1423). Unless stated otherwise on the CDRL, the deliverable to the Government must be provided in digital format and viewable using the latest version of Microsoft Office or Adobe software products as applicable. |
10.2 Content: The documentation must list the power requirements by total for each warehouse section in addition to each piece of equipment furnished. The documentation must also provide facility drawings that clearly identify the location requirements for any power equipment.
10.3 Revisions: Unless otherwise indicated by revision and date, the documentation submitted by the Contractor to the Government as cited within this DID will be considered the most up to date iteration. Revisions to documentation must be provided by the Contractor with an accompanying summary that clearly identifies to the Government all changes at the time of submission.