This file is an equipment list template for the SMS Builder project at Building 9001 (WWYK facility). The spreadsheet is designed to document and track facility equipment with columns for project identification, equipment status (draft/interim/final), action type (new/replace/demo), specification section, in-service date, equipment type, unique identifiers, manufacturer and model information, serial numbers, capacity specifications, location details (building, floor, room), motor specifications (horsepower, voltage, phase), unit cost, warranty period, and additional notes. The template uses a standardized format to catalog equipment assets and appears to be version 0 dated August 17, 2023.

This equipment list corresponds to a solicitation (FA813727R0002) for the installation of the REACT VII Facility at Building 9001, issued by the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation is restricted to SBA Certified Women Owned Small Businesses (WOSB) only. Interested firms must submit an RSVP by October 10, 2026 to attend the mandatory Initial Site Visit scheduled for October 15, 2026 at 0900 CST at the Northwest Parking lot of Building 9001. Personnel requiring base access must be included in an Entry Access List submitted with the RSVP. Inquiries and RSVPs should be directed to SSgt Isaac Demmers and Tamra Torres at the provided Air Force email addresses.

View the file

Other files

File Type Posted
WWYK250063 - Site Visit Sign In Sheet.jpg JPG image
00 70 00.pdf PDF
07 14 00.pdf PDF
23 05 15.pdf PDF
09 90 00.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
z400i.pdf_safe.pdf PDF
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
220042 As Built Drawings.pdf PDF
017800_Attch2_DD1354 Checklist.docx DOCX document
dafi91-202.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
250063_ATT 3_RMDF.pdf PDF
08 71 00.pdf PDF
afman91-203_oc-alcsup.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
01 50 00.pdf PDF
250063_ATT 4_ODS.pdf PDF
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
Room finish schedule.xlsx XLSX spreadsheet
ARCH-COMBINED.pdf PDF
dafi21-101.pdf PDF
23 05 93.pdf PDF
4500-S.pdf PDF
07 84 00.pdf PDF
tinkerafb_INRMP_App G.pdf PDF
05 05 23.16.pdf PDF
007200_Attch13_AF487.pdf PDF
250063_SOW.pdf PDF
23 09 23.02.pdf PDF
05 40 00.pdf PDF
REACT VII SA-01.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
ufc_3_601_02_2021.pdf PDF
07 21 16.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
03 01 00.pdf PDF
afman48-148.pdf PDF
01 33 00.pdf PDF
EM_385-1-1.pdf PDF
08 11 13.pdf PDF
250063_ATT 10_Submittal Register.pdf PDF
lrad331965pd_spec.pdf PDF
dafi13-213_tinkerafbsup.pdf PDF
250063_ATT 6_OPSEC Review Memo.pdf PDF
HELICAL PILES NOTES.docx DOCX document
lk406gn05t4_spec.pdf PDF
23 03 00.pdf PDF
Show 40 more

Latest 50 of 135 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PROJECT #: WWYKTITLE:BUILDING #
CONTRACT #WORKSHEET STATUS (DRAFT, INTERIM, FINAL)
ACTION (NEW, REPLACE, DEMO)SPEC SECTIONPLACED IN SERVICE DATEEQUIPMENT TYPEUID/UNIT TAGMANUFACTURERMODEL #SERIAL #CAPACITYCAPACITY UOMLOCATIONFLOOR #ROOM/ COLUMNMOTOR CAPACITYUNIT COSTWARRANTY PERIODOTHER INFO
HPVOLTSPhASE

&"-,Bold"&16SMS BUILDER EQUIPMENT LIST

V0_08/17/23

File details come from the government source that posted it. Updated .