250063_ATT 10_Submittal Register.xlsx
XLSX spreadsheet 70 KB Posted
- Solicitation number
- FA813727R0002
About this file
This is a Submittal Register for a construction project at Tinker Air Force Base that specifies all required submissions and documentation the contractor must provide throughout the project lifecycle. The project, WWYK250063 - Install REACT VII Facility B9001 Post V19, requires submissions across 531 line items organized by specification section and submittal type, including preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, operation and maintenance data, and closeout submittals. Key preconstruction requirements include a Health and Safety Plan, Quality Control Plan, Environmental Management System training, Baseline Construction and Design Schedules (due within 10 days of Notice to Proceed), Construction Debris Analysis Plan, and various personnel qualification documents for specialized trades such as welding, fire protection engineering, and HVAC balancing. The register mandates ongoing monthly submissions including Hazardous Material Usage Reports and Debris Management Reports throughout construction, weekly Quality Control Documentation and 3-Week Look Ahead Schedules with Contract Progress Reports, and monthly safety meeting records and training documentation.
Product and system submissions required include detailed specifications for concrete mix design and testing, structural design sealed by a licensed engineer, steel fabrication and erection drawings with welding qualifications, mechanical systems (HVAC, plumbing, fire protection sprinklers), electrical systems with arc flash studies, roofing and waterproofing systems with intumescent coatings, interior finishes (gypsum board, flooring, carpet), doors and windows, and building controls and automation systems. Closeout submittals include as-built and record drawings (provided in both electronic and hard copy formats), Operation and Maintenance Manuals, training completion validation, warranties, and specialized certifications for EPA and USDA designated items. The register indicates submissions are reviewed by either Government (G) or Architect/Engineer (A/E) reviewers, with specific approval timelines and action tracking requirements documented in columns tracking dates of submission, receipt, approval, and forwarding to other reviewers.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal Register_General Requ
| TITLE: | Tinker AFB General Requirements Specification (Div 00-01) | SUBMITTAL REGISTER | ||||||||||||||||
| JOB NAME: | WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19 | |||||||||||||||||
| LOCATION: | Tinker Air Force Base | |||||||||||||||||
| CONTRACT NO: | TBD | |||||||||||||||||
| CONTRACTOR: | TBD | |||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) |
| Line | Activity # | Transmittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Reviewer | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Reviewer | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 00 70 00 | 06 | Test Reports | Pre-Construction Testing Record | 1.3.11 | G | ||||||||||||||
| 2 | 00 70 00 | 07 | Certificates | Welding, Cutting and Brazing Permit | 1.4 | G | ||||||||||||||
| 3 | 00 71 00 | 01 | Preconstruction Submittals | Health and Safety Plan | 1.3 | G | ||||||||||||||
| 4 | 00 71 00 | 01 | Preconstruction Submittals | Entry Authority List | 1.5.2 | |||||||||||||||
| 5 | 00 71 00 | 01 | Preconstruction Submittals | Vehicle Entry Authority List | 1.5.2 | G | ||||||||||||||
| 6 | 00 71 00 | 07 | Certificates | Safety Meetings | 1.3 | |||||||||||||||
| 7 | 00 71 00 | 07 | Certificates | FOD Awareness and Prevention Training | 1.4 | |||||||||||||||
| 8 | 00 72 00 | 01 | Preconstruction Submittals | AF Form 3952 Chemical/Hazardous Material Request/Authorization | 1.4 | G | ||||||||||||||
| 9 | 00 72 00 | 01 | Preconstruction Submittals | Spray Painting Plan | 1.9 | G | ||||||||||||||
| 10 | 00 72 00 | 01 | Preconstruction Submittals | Environmental Management System Awareness Training | 1.1 | |||||||||||||||
| 11 | 00 72 00 | 03 | Product Data | Affirmative Procurement Documentation or Green Statement | 1.3.10 | G | Provide only one. Reference specification for additional information | |||||||||||||
| 12 | 00 72 00 | 07 | Cerificates | Monthly Hazardous Material Usage Report | 1.4 | G | Provide 1st week of each month during construction | |||||||||||||
| 13 | 00 72 00 | 08 | Manufacturer's Instructions | Safety Data Sheets/Material Safety Data Sheets | 1.4 | |||||||||||||||
| 14 | 00 72 00 - Attch 5 | 01 | Preconstruction Submittals | Construction Debris Analysis Plan | 1.2.3 | G | ||||||||||||||
| 15 | 00 72 00 - Attch 5 | 07 | Certificates | Monthly Debris Management Report | 2 | G | Provide 1st week of each month during construction | |||||||||||||
| 16 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Baseline Construction Schedule | 1.2 | G | Provide within 10 days of NTP. | |||||||||||||
| 17 | 01 32 16.00 20 | 01 | Preconstruction Submittals | Baseline Design Schedule | 1.2 | G | Provide within 10 days of NTP. | |||||||||||||
| 18 | 01 32 16.00 20 | 07 | Certificates | 3-Week Look Ahead Schedule | 1.6 | Provide weekly with the Contract Progress Report | ||||||||||||||
| 19 | 01 33 00 | 01 | Preconstruction Submittals | Submittal Register | 1.8 | G | ||||||||||||||
| 20 | 01 45 00.00 10 | 01 | Preconstruction Submittals | Quality Control (QC) Plan | 3.2 | G | ||||||||||||||
| 21 | 01 45 00.00 10 | 06 | Test Reports | QC Documentation | 3.9 | Provide weekly with the Contract Progress Report | ||||||||||||||
| 22 | 01 50 00 | 01 | Preconstruction Submittals | Request for Contractor Staging Area | 1.1 | G | ||||||||||||||
| 23 | 01 50 00 | 01 | Preconstruction Submittals | Photographic Record | 1.3 | |||||||||||||||
| 24 | 01 78 00 | 03 | Product Data | Warranty Letter | 1.7.1 | |||||||||||||||
| 25 | 01 78 00 | 03 | Product Data | Warranty Tags | 1.7.3 | |||||||||||||||
| 26 | 01 78 00 | 03 | Product Data | Spare Parts Data | 1.5 | |||||||||||||||
| 27 | 01 78 00 | 08 | Manufacturer's Instructions | Instructions | 1.7.1 | |||||||||||||||
| 28 | 01 78 00 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.4 | G | Provide (2) electronic sets (optical media) and (1) hard copy | |||||||||||||
| 29 | 01 78 00 | 11 | Closeout Submittals | Working As-Built Drawings | 3.1 | G | Provide (2) electronic sets (optical media) and (2) hard copies | |||||||||||||
| 30 | 01 78 00 | 11 | Closeout Submittals | Record Drawings | 3.3 | G | Provide (2) electronic sets (optical media) and (1) hard copy | |||||||||||||
| 31 | 01 78 00 | 11 | Closeout Submittals | Certification of EPA Designated Items | 2.3 | G | ||||||||||||||
| 32 | 01 78 00 | 11 | Closeout Submittals | Certification Of USDA Designated Items | 2.4 | G | ||||||||||||||
| 33 | 01 78 00 | 11 | Closeout Submittals | DD FORM 1354 | 3.6 | G | ||||||||||||||
| 34 | 01 78 23 | 10 | Operation and Maintenance Data | Operation and Maintenance Data | 1.2 | G | Provide 30 days prior to scheduled Training | |||||||||||||
| 35 | 01 78 23 | 10 | Operation and Maintenance Data | O&M Database | 1.3 | G | ||||||||||||||
| 36 | 01 78 23 | 10 | Operation and Maintenance Data | Training Plan | 3.1.1 | G | Provide 30 days prior to scheduled Final Inspection | |||||||||||||
| 37 | 01 78 23 | 10 | Operation and Maintenance Data | Training Content | 3.1.2 | G | Provide 14 days prior to scheduled Training | |||||||||||||
| 38 | 01 78 23 | 10 | Operation and Maintenance Data | Training Outline | 3.1.3 | G | Provide 14 days prior to scheduled Training | |||||||||||||
| 39 | 01 78 23 | 11 | Closeout Submittals | Validation of Training Completion | 3.1.6 | G | ||||||||||||||
| 40 | SOW | 01 | Preconstruction Submittals | Structural Design (Drawings, Analysis, Specifications, signed and sealed by a licensed structural engineer. | 3.5, 4.4.1 | G | ||||||||||||||
| 41 | SOW | 01 | Preconstruction Submittals | Concrete repair plan | 4.3.1.3 | G | ||||||||||||||
| 42 | SOW | 03 | Product Data | Concrete repair material | 4.3.1.3 | G | ||||||||||||||
| 43 | 02 41 00 | 01 | Preconstruction Submittals | Demolition Plan | 1.2.1 | G | ||||||||||||||
| 44 | 02 41 00 | 01 | Preconstruction Submittals | Deconstruction Plan | 1.2.1 | G | ||||||||||||||
| 45 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.1 | |||||||||||||||
| 46 | 02 41 00 | 07 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 47 | 02 41 00 | 11 | Closeout Submittals | Receipts | 1.6 | |||||||||||||||
| 48 | 03 01 00 | 01 | Preconstruction Submittals | Qualifications | 1.5.3 | G | ||||||||||||||
| 49 | 03 01 00 | 01 | Preconstruction Submittals | Work Plan | 1.5.5 | G | ||||||||||||||
| 50 | 03 01 00 | 03 | Product Data | Polymers | 2.6 | G | ||||||||||||||
| 51 | 03 30 00 | 03 | Product Data | Mechanical Reinforcing Bar Connectors | 2.5.2 | G | ||||||||||||||
| 52 | 03 30 00 | 03 | Product Data | Waterstops | 3.4 | |||||||||||||||
| 53 | 03 30 00 | 03 | Product Data | Local/Regional Materials | 1.8.1 | |||||||||||||||
| 54 | 03 30 00 | 03 | Product Data | Pumping Concrete | 3.7.2 | |||||||||||||||
| 55 | 03 30 00 | 05 | Design Data | Concrete Mix Design | 1.6.1.1 | G | ||||||||||||||
| 56 | 03 30 00 | 06 | Test Reports | Concrete Mix Design | 1.6.1.1 | G | ||||||||||||||
| 57 | 03 30 00 | 06 | Test Reports | Fly Ash | 2.4.1.1 | |||||||||||||||
| 58 | 03 30 00 | 06 | Test Reports | Pozzolan | 2.4.1.2 | |||||||||||||||
| 59 | 03 30 00 | 06 | Test Reports | Ground Granulated Blast-Furnace Slag | 2.4.1.4 | |||||||||||||||
| 60 | 03 30 00 | 06 | Test Reports | Tolerance Report | 3.3.8 | |||||||||||||||
| 61 | 03 30 00 | 06 | Test Reports | Compressive Strength Tests | 3.14.2.3 | G | ||||||||||||||
| 62 | 03 30 00 | 06 | Test Reports | Unit Weight of Structural Concrete | 3.14.2.5 | |||||||||||||||
| 63 | 03 30 00 | 06 | Test Reports | Air Content | 3.14.2.4 | |||||||||||||||
| 64 | 03 30 00 | 06 | Test Reports | Slump Tests | 3.14.2.1 | |||||||||||||||
| 65 | 03 30 00 | 06 | Test Reports | Water | 2.4.2 | |||||||||||||||
| 66 | 03 30 00 | 07 | Certificates | Reinforcing Bars | 2.5.1 | |||||||||||||||
| 67 | 03 30 00 | 07 | Certificates | Welder Qualifications | 1.9 | |||||||||||||||
| 68 | 03 30 00 | 07 | Certificates | Material Safety Data Sheets | 1.6.3.3 | |||||||||||||||
| 69 | 03 30 00 | 07 | Certificates | Forest Stewardship Council (FSC) Certification | 1.8.2 | |||||||||||||||
| 70 | 03 30 00 | 07 | Certificates | Field Testing Technician and Testing Agency | 1.6.6.2 | |||||||||||||||
| 71 | 03 30 00 | 08 | Manufacturer's Instructions | Liquid Chemical Floor Hardener | 2.6.1 | |||||||||||||||
| 72 | 03 30 00 | 08 | Manufacturer's Instructions | Curing Compound | 2.3.3 | |||||||||||||||
| 73 | 05 05 23.16 | 01 | Preconstruction Submittals | Welding Quality Assurance Plan | 1.3 | |||||||||||||||
| 74 | 05 05 23.16 | 03 | Product Data | Welding Procedure Qualifications | 1.3.1 | G | ||||||||||||||
| 75 | 05 05 23.16 | 03 | Product Data | Welder, welding operator and tacker qualifications | 1.3.5 | |||||||||||||||
| 76 | 05 05 23.16 | 03 | Product Data | Inspector qualification | 1.3.6 | |||||||||||||||
| 77 | 05 05 23.16 | 03 | Product Data | Previous qualifications | 1.3.2 | |||||||||||||||
| 78 | 05 05 23.16 | 03 | Product Data | Pre-qualified Procedures | 1.3.3 | |||||||||||||||
| 79 | 05 05 23.16 | 03 | Product Data | Welding Electrodes and Rods | 2.2 | |||||||||||||||
| 80 | 05 05 23.16 | 06 | Test Reports | Nondestructive Testing | 3.3.1 | |||||||||||||||
| 81 | 05 05 23.16 | 07 | Certificates | Certified welding procedure specifications | 1.3.1 | |||||||||||||||
| 82 | 05 05 23.16 | 07 | Certificates | Certified Brazing procedure specifications | 1.3.1 | |||||||||||||||
| 83 | 05 05 23.16 | 07 | Certificates | Certified procedure qualification records | 1.3.1 | |||||||||||||||
| 84 | 05 05 23.16 | 07 | Certificates | Certified welder performance qualifications | 1.3.1 | |||||||||||||||
| 85 | 05 05 23.16 | 07 | Certificates | Certified brazer performance qualifications | 1.3.1 | |||||||||||||||
| 86 | 05 12 00 | 01 | Preconstruction Submittals | Erection Drawings | 1.5.1.1 | G | ||||||||||||||
| 87 | 05 12 00 | 02 | Shop Drawings | Fabrication drawings including description of connections | 1.5.2 | G | ||||||||||||||
| 88 | 05 12 00 | 03 | Product Data | Shop Primer | 2.6.2 | |||||||||||||||
| 89 | 05 12 00 | 03 | Product Data | Welding electrodes and rods | 2.4 | |||||||||||||||
| 90 | 05 12 00 | 03 | Product Data | Direct Tension indicator washers | 2.3.2.3 | |||||||||||||||
| 91 | 05 12 00 | 03 | Product Data | Non-shrink Grout | 2.4.2 | |||||||||||||||
| 92 | 05 12 00 | 03 | Product Data | Tension Control Bolts | 2.3.3 | |||||||||||||||
| 93 | 05 12 00 | 06 | Test Reports | Class B Coating | 2.6.3 | |||||||||||||||
| 94 | 05 12 00 | 06 | Test Reports | Bolts, nuts, and washers | 2.3 | |||||||||||||||
| 95 | 05 12 00 | 06 | Test Reports | Weld inspection reports | 3.7.1.2 | |||||||||||||||
| 96 | 05 12 00 | 06 | Test Reports | Direct Tension indicator washers inspection reports | 3.7.2.1 | |||||||||||||||
| 97 | 05 12 00 | 06 | Test Reports | Bolt Testing reports | 3.7.3 | |||||||||||||||
| 98 | 05 12 00 | 06 | Test Reports | Embrittlement Test reports | 3.7.4 | |||||||||||||||
| 99 | 05 12 00 | 07 | Certificates | Steel | 2.2 | |||||||||||||||
| 100 | 05 12 00 | 07 | Certificates | Bolts, nuts, and washers | 2.3 | |||||||||||||||
| 101 | 05 12 00 | 07 | Certificates | Galvanizing | 2.5 | |||||||||||||||
| 102 | 05 12 00 | 07 | Certificates | Pins and rollers | 2.4.4 | |||||||||||||||
| 103 | 05 12 00 | 07 | Certificates | AISC Fabrication Plant Quality certification | 1.3 | |||||||||||||||
| 104 | 05 12 00 | 07 | Certificates | AISC Erector Quality Certification | 1.3 | |||||||||||||||
| 105 | 05 12 00 | 07 | Certificates | Welding Procedures and Qualifications | 1.5.3.1 | |||||||||||||||
| 106 | 05 12 00 | 07 | Certificates | Welding Electrodes and Rods | 2.4 | |||||||||||||||
| 107 | 05 30 00 | 02 | Shop Drawings | Fabrication Drawings | 1.3.5 | G | ||||||||||||||
| 108 | 05 30 00 | 03 | Product Data | Accessories | 2.2 | |||||||||||||||
| 109 | 05 30 00 | 03 | Product Data | Deck Units | 2.1 | |||||||||||||||
| 110 | 05 30 00 | 03 | Product Data | Galvanizing Repair Paint | 2.1.6 | |||||||||||||||
| 111 | 05 30 00 | 03 | Product Data | Mechanical Fasteners | 2.2.17 | |||||||||||||||
| 112 | 05 30 00 | 03 | Product Data | Touch-Up Paint | 2.1.6 | |||||||||||||||
| 113 | 05 30 00 | 03 | Product Data | Sound Absorbing Materials | 3.2.5.3 | |||||||||||||||
| 114 | 05 30 00 | 03 | Product Data | Welding Equipment | 3.2.1.1 | |||||||||||||||
| 115 | 05 30 00 | 03 | Product Data | Welding Rods and Accessories | 3.2.1.1 | |||||||||||||||
| 116 | 05 30 00 | 04 | Samples | Metal Roof Deck Units | 2.1.1 | |||||||||||||||
| 117 | 05 30 00 | 04 | Samples | Flexible Closure Strips | 2.2.4 | |||||||||||||||
| 118 | 05 30 00 | 04 | Samples | Acoustical Material | 3.2.5.3 | |||||||||||||||
| 119 | 05 30 00 | 05 | Design Data | Deck Units | 2.1 | G | ||||||||||||||
| 120 | 05 30 00 | 07 | Certificates | Powder-Actuated Tool Operator | 1.3.2 | |||||||||||||||
| 121 | 05 30 00 | 07 | Certificates | Welder Qualifications | 1.3.3 | |||||||||||||||
| 122 | 05 30 00 | 07 | Certificates | Welding Procedures | 1.3.3 | |||||||||||||||
| 123 | 05 30 00 | 07 | Certificates | Fire Safety | 1.3.4.1 | |||||||||||||||
| 124 | 05 30 00 | 07 | Certificates | Wind Storm Resistance | 1.3.4.2 | |||||||||||||||
| 125 | 05 30 00 | 07 | Certificates | Manufacturer's Certificate | 1.3.1 | |||||||||||||||
| 126 | 05 30 00 | 07 | Certificates | Stud Manufacture's Certification | 2.2.12 | |||||||||||||||
| 127 | 05 30 00 | 07 | Certificates | Stud Manufacture's Test Reports | 2.2.12 | |||||||||||||||
| 128 | 05 30 00 | 11 | Closeout Submittals | Recycled Content of Steel Products | 2.1 | G | ||||||||||||||
| 129 | 05 40 00 | 02 | Shop Drawings | Framing Components | 1.6.1 | G | ||||||||||||||
| 130 | 05 40 00 | 03 | Product Data | Steel Studs, Joists, Tracks, Bracing, Bridging and Accessories | 2.1 | |||||||||||||||
| 131 | 05 40 00 | 05 | Design Data | Metal Framing Calculations | 1.6.2 | G | ||||||||||||||
| 132 | 05 40 00 | 07 | Certificates | Load-Bearing Cold-Formed Metal Framing | 1.4 | |||||||||||||||
| 133 | 05 40 00 | 07 | Certificates | Welds | 1.6 | |||||||||||||||
| 134 | 05 40 00 | 11 | Closeout Submittals | Recycled Content of Steel Products | 2.1 | G | ||||||||||||||
| 135 | 05 50 13 | 02 | Installation Drawings | Floor Gratings and Roof Walkways | 2.9 | G | ||||||||||||||
| 136 | 05 50 13 | 03 | Product Data | Floor Gratings and Roof Walkways | 2.9 | G | ||||||||||||||
| 137 | 06 41 16.00 10 | 02 | Shop Drawings | Shop Drawings | 1.4.2 | G | ||||||||||||||
| 138 | 06 41 16.00 10 | 02 | Shop Drawings | Installation | 3.1 | G | ||||||||||||||
| 139 | 06 41 16.00 10 | 03 | Product Data | Wood Material | 2.1 | G | ||||||||||||||
| 140 | 06 41 16.00 10 | 03 | Product Data | Wood Finishes | 2.12.8.3 | G | ||||||||||||||
| 141 | 06 41 16.00 10 | 03 | Product Data | Finish Schedule | 2.1 | G | ||||||||||||||
| 142 | 06 41 16.00 10 | 03 | Product Data | Cabinet Hardware | 2.7 | G | ||||||||||||||
| 143 | 06 41 16.00 10 | 04 | Samples | Plastic Laminates | 2.3 | G | ||||||||||||||
| 144 | 06 41 16.00 10 | 07 | Certificates | Quality Assurance | 1.4 | G | ||||||||||||||
| 145 | 07 14 00 | 03 | Product Data | Fluid-Applied Membrane | 2.1 | |||||||||||||||
| 146 | 07 14 00 | 03 | Product Data | Membrane Primer | 2.2 | |||||||||||||||
| 147 | 07 14 00 | 03 | Product Data | Elastomeric Sheet | 2.8 | |||||||||||||||
| 148 | 07 14 00 | 03 | Product Data | Bond Breaker | 2.7 | |||||||||||||||
| 149 | 07 14 00 | 11 | Closeout Submittals | Warranty | 1.6 | |||||||||||||||
| 150 | 07 14 00 | 11 | Closeout Submittals | Information Card | 3.6 | |||||||||||||||
| 151 | 07 14 00 | 11 | Closeout Submittals | Instructiions to Government Personnel | 3.5 | |||||||||||||||
| 152 | 07 21 16 | 03 | Product Data | Blanket Insultatuion | 2.2 | |||||||||||||||
| 153 | 07 21 16 | 11 | Closeout Submittals | Recycled Content for Insulation Materials | 2.1.1 | |||||||||||||||
| 154 | 07 21 16 | 11 | Closeout Submittals | Reduce Volatile Organinc Compounds (VOC) for Insulation Materials | 2.1.2 | |||||||||||||||
| 155 | 07 21 16 | 03 | Product Data | Mineral Fiber blanket insulation | 2.1 | G | ||||||||||||||
| 156 | 07 21 16 | 03 | Product Data | Mineral Fiber blanket insulation | 2.2 | G | ||||||||||||||
| 157 | 07 21 16 | 03 | Product Data | Mechanical Fasteners | 2.6.2 | G | ||||||||||||||
| 158 | 07 21 16 | 08 | Manufacturer's Instructions | Mineral Fiber blanket insulation | 3.3 | G | ||||||||||||||
| 159 | 07 60 00 | 02 | Shop Drawings | Covering on flat, sloped, or curved surfaces | 3.1.25 | G | ||||||||||||||
| 160 | 07 81 00 | 07 | Certificates | Intumescent Coating Installer Qualifications | 1.4.1 | G | ||||||||||||||
| 161 | 07 81 00 | 06 | Test Reports | Intumescent Coating adhesion testing | 1.4.1 | G | ||||||||||||||
| 162 | 07 81 00 | 06 | Test Reports | Intumescent Coating thickness testing | 1.4.1 | G | ||||||||||||||
| 163 | 07 81 00 | 07 | Reports | Manufacturer's Inspection Report | 3.6.3 | G | ||||||||||||||
| 164 | 07 81 00 | 01 | Preconstruction Meeting | Intumescent Coating - metting | 1.4.2 | G | ||||||||||||||
| 165 | 07 81 00 | 01 | Preconstruction Meeting | Intumescent Coating - metting Minutes. | 1.4.2 | G | ||||||||||||||
| 166 | 07 84 00 | 02 | Shop Drawings | Firestopping System | 2.1 | G | ||||||||||||||
| 167 | 07 84 00 | 03 | Product Data | Firestopping Materials | 2.2 | G | ||||||||||||||
| 168 | 07 84 00 | 06 | Test Reports | Inspection | 3.3 | G | ||||||||||||||
| 169 | 07 84 00 | 07 | Certificates | Inspector Qualifications | 1.5.2 | G | ||||||||||||||
| 170 | 07 84 00 | 07 | Certificates | Firestopping Materials | 2.2 | G | ||||||||||||||
| 171 | 07 84 00 | 07 | Certificates | Installer Qualifications | G | |||||||||||||||
| 172 | 07 92 00 | 03 | Product Data | Sealants | 2.1 | G | ||||||||||||||
| 173 | 07 92 00 | 11 | Closeout Submittals | Volatile Organic Compounds (VOC) Content | ||||||||||||||||
| 174 | 07 92 00 | 03 | Product Data | Acoustical Sealant | 1.3 | G | ||||||||||||||
| 175 | 07 92 00 | 07 | Certificates | Acoustical Sealant | 1.4 | G | ||||||||||||||
| 176 | 07 92 00 | 04 | Samples | Acoustical Sealant mock-Up | 1.7.3 | G | ||||||||||||||
| 177 | 07 92 00 | 06 | Test Reports | Acoustical Sealant | 2.1 | G | ||||||||||||||
| 178 | 07 92 00 | 03 | Product Data | Bond Breaker tape | 2.3 | G | ||||||||||||||
| 179 | 08 11 13 | 02 | Shop Drawings | Doors | 2.1 | G | ||||||||||||||
| 180 | 08 11 13 | 02 | Shop Drawings | Frames | 2.7 | G | ||||||||||||||
| 181 | 08 11 13 | 03 | Product Data | Doors | 2 | G | ||||||||||||||
| 182 | 08 11 13 | 03 | Product Data | Frames | 2.7 | G | ||||||||||||||
| 183 | 08 11 13 | 03 | Product Data | Accessories | 2.5 | |||||||||||||||
| 184 | 08 11 13 | 02 | shop Drawings | Steel Doors & Frames | 1.2 | G | ||||||||||||||
| 185 | 08 11 13 | 02 | shop Drawings | Schedule of Steel Doors, Frames & locations | 1.2 | G | ||||||||||||||
| 186 | 08 11 13 | 03 | Product Data | Doors | 2.1 | G | ||||||||||||||
| 187 | 08 11 13 | 03 | Product Data | Insulated Doors | 2.6 | G | ||||||||||||||
| 188 | 08 11 13 | 03 | Product Data | Welded Frames | 2.7.1 | G | ||||||||||||||
| 189 | 08 11 13 | 03 | Product Data | door anchors | 2.7.4 | G | ||||||||||||||
| 190 | 08 11 13 | 03 | Product Data | FIRE AND SMOKE DOORS AND FRAMES | 2.8 | G | ||||||||||||||
| 191 | 08 33 23 | 02 | Shop Drawings | Overhead Coiling Doors | 2.1.1 | |||||||||||||||
| 192 | 08 33 23 | 03 | Product Data | Overhead Coiling Doors | 2.2.1 | |||||||||||||||
| 193 | 08 33 23 | 03 | Product Data | Hardware | 2.2.2 | |||||||||||||||
| 194 | 08 33 23 | 03 | Product Data | Counterbalancing Mechanism | 2.2.3 | |||||||||||||||
| 195 | 08 33 23 | 03 | Product Data | Manual Door Operators | 2.2.4 | |||||||||||||||
| 196 | 08 33 23 | 05 | Design Data | Overhead Coiling Doors | 2.1.1 | |||||||||||||||
| 197 | 08 33 23 | 05 | Design Data | Hardware | 2.2.2 | |||||||||||||||
| 198 | 08 33 23 | 05 | Design Data | Counterbalancing Mechanism | 2.2.3 | |||||||||||||||
| 199 | 08 33 23 | 05 | Design Data | Manual Door Operators | 2.2.4 | |||||||||||||||
| 200 | 08 33 23 | 10 | Operation and Maintenance Data | Operation and Maintenance Manuals | 3.3.2 | |||||||||||||||
| 201 | 08 33 23 | 10 | Operation and Maintenance Data | Materials | 3.3.2 | |||||||||||||||
| 202 | 08 33 23 | 10 | Operation and Maintenance Data | Devices | 3.3.2 | |||||||||||||||
| 203 | 08 33 23 | 10 | Operation and Maintenance Data | Procedures | 3.3.2 | |||||||||||||||
| 204 | 08 33 23 | 10 | Operation and Maintenance Data | Manufacture's Brochures | 3.3.2 | |||||||||||||||
| 205 | 08 33 23 | 10 | Operation and Maintenance Data | Parts Lists | 3.3.2 | |||||||||||||||
| 206 | 08 33 23 | 11 | Closeout Submittals | Warranty | 3.3.1 | |||||||||||||||
| 207 | 08 33 23 | 02 | shop Drawings | Overhead Coiling Doors | 2.1.1.1 | G | ||||||||||||||
| 208 | 08 33 23 | 03 | Product Data | Overhead Coiling Doors | 2.1/2.2 | G | ||||||||||||||
| 209 | 08 33 23 | 01 | Preconstruction Submittals | Overhead Coiling Doors-Sample Warranty | 3.3.1 | G | ||||||||||||||
| 210 | 08 33 23 | 01 | Preconstruction Submittals | Overhead Coiling Doors-Sample Warranty | 3.3.1 | G | ||||||||||||||
| 211 | 08 33 23 | 11 | Closeout Submittals | Overhead Coiling Doors- Warranty | 3.3.1 | G | ||||||||||||||
| 212 | 08 33 23 | 11 | Closeout Submittals | Overhead Coiling Door O&M | 3.3.2 | G | ||||||||||||||
| 213 | 08 51 23 | 02 | Shop Drawings | Windows | ||||||||||||||||
| 214 | 08 51 23 | 03 | Product Data | Steel Framing Materials | ||||||||||||||||
| 215 | 08 51 23 | 03 | Product Data | Fixed Steel Windows-Sample Warranty | 2.2/2.10.1 | G | ||||||||||||||
| 216 | 08 51 23 | 02 | shop Drawings | Fixed Steel WindowsWarranty | 1.2 | G | ||||||||||||||
| 217 | 08 71 00 | 02 | Shop Drawings | Manufacturer's Detail Drawings | 1.3 | G | ||||||||||||||
| 218 | 08 71 00 | 02 | Shop Drawings | Verification of Exsisting Conditions | 1.3 | G | ||||||||||||||
| 219 | 08 71 00 | 02 | Shop Drawings | Hardware Schedule | 1.5 | G | ||||||||||||||
| 220 | 08 71 00 | 03 | Product Data | Hardware Items | 2.3 | G | ||||||||||||||
| 221 | 08 71 00 | 08 | Manufacturer's Instructions | Installation | 3.1 | |||||||||||||||
| 222 | 08 71 00 | 10 | Operation and Maintenance Data | Hardware Schedule Items, Data Package 1 | 1.5 | G | ||||||||||||||
| 223 | 08 71 00 | 03 | Product Data | Door Hardware | 1.2/2.3 | G | ||||||||||||||
| 224 | 08 71 00 | 02 | Manufacturer's Detail Drawings | Door Hardware | 1.2 | G | ||||||||||||||
| 225 | 08 71 00 | 08 | Manufacturer's Instructions | Door Hardware | 1.2 | G | ||||||||||||||
| 226 | 08 71 00 | 02 | Hardware Schedule | Door Hardware | 1.2/1.5 | G | ||||||||||||||
| 227 | 08 71 00 | 10 | Operation and Maintenance Data | Door Hardware | 1.2 | G | ||||||||||||||
| 228 | 08 81 00 | 02 | Shop Drawings | Installation | ||||||||||||||||
| 229 | 08 81 00 | 03 | Product Data | Insulating Glass | ||||||||||||||||
| 230 | 08 81 00 | 07 | Certificates | Insulating Glass | ||||||||||||||||
| 231 | 08 81 00 | 08 | Manufacturer's Instructions | Setting and Sealing Materials | 3.1 | |||||||||||||||
| 232 | 08 81 00 | 08 | Manufacturer's Instructions | Glass Setting | 3.2 | |||||||||||||||
| 233 | 08 81 00 | 03 | Product Data | Metal framed window with tempered glazing | 1.2/2.2.6 | G | ||||||||||||||
| 234 | 08 81 00 | 02 | Manufacturer's Detail Drawings | Metal framed window with tempered glazing | 1.2 | G | ||||||||||||||
| 235 | 08 81 00 | 08 | Manufacturer's Instructions | Metal framed window with tempered glazing | 1.2/2.1 | G | ||||||||||||||
| 236 | 09 29 00 | 03 | Product Data | Gypsum Board | 2.2.1 | |||||||||||||||
| 237 | 09 22 00 | 03 | Product Data | SUPPORTS FOR YPSUM BOARD | 1.2/2.1 | G | ||||||||||||||
| 238 | 09 22 00 | 02 | shop Drawings | SUPPORTS FOR YPSUM BOARD | 1.2/3.1.2.2 | G | ||||||||||||||
| 239 | 09 29 00 | 03 | Product Data | Gypsum Board | 1.2/2.2 | G | ||||||||||||||
| 240 | 09 29 00 | 08 | Manufacturer's Instructions/SDS | Gypsum Board | 1.4/ | G | ||||||||||||||
| 241 | 09 29 00 | 07 | Certificates | Gypsum Board-Asbestos Free | 1.2/2.2 | G | ||||||||||||||
| 242 | 09 29 00 | 07 | Closeout Submittals | Recycled Content for Gypsum Board | 1.2/2.2.1 | S | ||||||||||||||
| 243 | 09 29 00 | 07 | Certificates | Gypsum Board-Indoor Air Quality | 1.2 | G | ||||||||||||||
| 244 | 09 29 00 | 07 | Certificates | Gypsum Board-installer Qualifications | 1.5 | G | ||||||||||||||
| 245 | 09 29 00 | 03 | Product Data | Gypsum Board Accessories | 2.2.11 | G | ||||||||||||||
| 246 | 09 29 00 | 03 | Product Data | Fire resistive Constructionn | 1.7 | G | ||||||||||||||
| 247 | 09 29 00 | 03 | Product Data | Shaftwall Liner Panel | 2.2.10 | G | ||||||||||||||
| 248 | 09 29 00 | 08 | Manufacturer's Instructions | Shaftwall Liner Panel | 3.8 | G | ||||||||||||||
| 249 | 09 67 23.13 | 03 | Product Data | Joint Sealant | 2.1 | G | ||||||||||||||
| 250 | 09 67 23.13 | 03 | Product Data | Thin Film Flooring System | 2.2 | G | ||||||||||||||
| 251 | 09 67 23.13 | 03 | Product Data | White Aluminum Oxide Non-Skid Grit | 2.3 | G | ||||||||||||||
| 252 | 09 67 23.13 | 07 | Certificates | Joint Sealant Certificates | 1.3.5.5 | G | ||||||||||||||
| 253 | 09 67 23.13 | 07 | Certificates | Thin Film Flooring System Certificates | 1.3.5.6 | G | ||||||||||||||
| 254 | 09 67 23.13 | 07 | Certificates | Qualifications of Coating Contractors | 1.3.5.4 | G | ||||||||||||||
| 255 | 09 67 23.13 | 07 | Certificates | Warranty | 1.8 | G | ||||||||||||||
| 256 | 09 68 00 | 02 | Shop Drawings | Installation Drawings | 3.4 | G | ||||||||||||||
| 257 | 09 68 00 | 03 | Product Data | Carpet | 2.1 | G | ||||||||||||||
| 258 | 09 68 00 | 06 | Test Reports | Moisture and Alkalinity Tests | 3.2 | G | ||||||||||||||
| 259 | 09 68 00 | 07 | Certificates | Carpet | 1.3 | |||||||||||||||
| 260 | 09 68 00 | 08 | Manufaturer's Instruction | Installation | 3.4 | |||||||||||||||
| 261 | 09 68 00 | 10 | Operation and Maintenance Data | Carpet | 3.5 | G | ||||||||||||||
| 262 | 09 68 00 | 03 | Product Data | Carpet Tile & Walk-off Carpet tile | 1.2/3.4.2/1.2/3.4.3 | |||||||||||||||
| 263 | 09 68 00 | 08 | Manufacturer's Instructions/SDS | Carpet Tile & Ealk-off Carpet tile& transitions strips | 1.2 / 2.5 /3.4 | |||||||||||||||
| 264 | 09 68 00 | 06 | Test Reports | 1.3/ | ||||||||||||||||
| 265 | 09 68 00 | 01 | Preconstruction Submittals | Sample warranty Carpet system & Transitions Sample(9s) | 1.6 | |||||||||||||||
| 266 | 09 68 00 | 07 | Closeout Submittals | Carpet system Cleaning & Protection | 3.5 | |||||||||||||||
| 267 | 09 68 00 | 02 | Shop Drawings | Carpet Tile & Ealk-off Carpet tile& transitions strips | 1.2/ | |||||||||||||||
| 268 | 09 68 00 | 04 | Samples | Carpet Tile & Walk-off Carpet tile& transitions strips | 1.2/2.1 | |||||||||||||||
| 269 | 09 68 00 | 07 | Closeout Submittals | Carpet system Cleaning & Protection | 3.5 | |||||||||||||||
| 270 | 09 68 00 | 07 | Closeout Submittals | Carpet system Warranty | 1.6 | |||||||||||||||
| 271 | 09 90 00 | 03 | Product Data | Coating | G | |||||||||||||||
| 272 | 09 90 00 | 03 | Product Data | Manufacturer's Technical Data Sheets | 2.1 | |||||||||||||||
| 273 | 09 90 00 | 08 | Manufaturer's Instruction | Application instructions | 3.7 | |||||||||||||||
| 274 | 09 90 00 | 08 | Manufaturer's Instruction | Mixing | 3.7.2 | |||||||||||||||
| 275 | 09 90 00 | 03 | Product Data | Paint | 1.2 | |||||||||||||||
| 276 | 09 90 00 | 08 | Manufacturer's Instructions/SDS | Paint/Surfaces | 1.2/3.3 | |||||||||||||||
| 277 | 10 14 00.10 | 03 | Product Daata | Exterior Signage | 1.2 | |||||||||||||||
| 278 | 10 14 00.10 | 04 | Samples | Exterior Signage | 1.2 | |||||||||||||||
| 279 | 10 14 00.10 | 07 | Certificates | Exterior Signage Installer Qualifications | 1.5 | |||||||||||||||
| 280 | 10 14 00.10 | 01 | Preconstruction Submittals | Exterior Signage Waranty Sample | 1.6 | |||||||||||||||
| 281 | 10 14 00.10 | 07 | Closeout Submittals | Exterior Signage Waranty | 3.5 | |||||||||||||||
| 282 | 10 14 00.10 | 02 | Shop Drawings | Exterior Signage schedule | 1.2 | |||||||||||||||
| 283 | 10 14 00.10 | 10 | Exterior Signage Maintenance | |||||||||||||||||
| 284 | 10 22 13 | 02 | Shop Drawings | Wire Mesh Partitions | ||||||||||||||||
| 285 | 10 22 13 | 03 | Product Data | Wire Mesh Partitions | 2.2 | |||||||||||||||
| 286 | 10 26 00 | 02 | Shop Drawings | Corner Guards | 2.1 | G | ||||||||||||||
| 287 | 10 26 00 | 03 | Product Data | Corner Guards | 2.2 | G | ||||||||||||||
| 288 | 10 26 00 | 06 | Test Reports | Corner Guards | ||||||||||||||||
| 289 | 10 26 00 | 07 | Certificates | Corner Guards | ||||||||||||||||
| 290 | 10 44 16 | 01 | Preconstruction Submittals | Manufacturer's Data | G | |||||||||||||||
| 291 | 10 44 16 | 02 | Shop Drawings | Cabinets | 2.0. | G | ||||||||||||||
| 292 | 10 44 16 | 03 | Product Data | Fire Extinguishers | 2.1 | G | ||||||||||||||
| 293 | 10 44 16 | 03 | Product Data | Cabinets | 2.2.1 | G | ||||||||||||||
| 294 | 10 44 16 | 07 | Certificates | Manufacturer's Warranty with Inspection Tag | G | |||||||||||||||
| 295 | 21 13 13 | 1 | Preconstruction Submittals | Qualified Fire Protection Engineer (QFPE) | 1.2.3 | G | ||||||||||||||
| 296 | 21 13 13 | 1 | Preconstruction Submittals | Sprinkler System Designer | 1.4.2.1 | G | ||||||||||||||
| 297 | 21 13 13 | 1 | Preconstruction Submittals | Sprinkler System Installer | 1.4.2.2 | G | ||||||||||||||
| 298 | 21 13 13 | 2 | Shop Drawings | Shop Drawing | 1.2.1.1 | G | ||||||||||||||
| 299 | 21 13 13 | 3 | Product Data | Fittings | 2.2.1.2 | G | ||||||||||||||
| 300 | 21 13 13 | 3 | Product Data | Valves | 2.2.4 | G | ||||||||||||||
| 301 | 21 13 13 | 3 | Product Data | Sprinklers | 2.4 | G | ||||||||||||||
| 302 | 21 13 13 | 3 | Product Data | Pipe Hangers and Supports | 2.2.3 | G | ||||||||||||||
| 303 | 21 13 13 | 3 | Product Data | Sprinkler Alarm Switch | 2.3.1 | G | ||||||||||||||
| 304 | 21 13 13 | 3 | Product Data | Valve Supervisory (Tamper) Switch | 2.3.2 | G | ||||||||||||||
| 305 | 21 13 13 | 3 | Product Data | Air Vent | 2.5.5 | G | ||||||||||||||
| 306 | 21 13 13 | 5 | Design Data | Hydraulic Calculations | 1.2.1.2 | G | ||||||||||||||
| 307 | 21 13 13 | 6 | Test Reports | Test Procedures | 3.6.1 | G | ||||||||||||||
| 308 | 21 13 13 | 7 | Certificates | Verification of Compliant Installation | 3.6.2.1 | G | ||||||||||||||
| 309 | 21 13 13 | 7 | Certificates | Request for Government Final Test | 3.6.2.2 | G | ||||||||||||||
| 310 | 21 13 13 | 10 | Operation and Maintenance Data | Operating and Maintenance (O&M) Instructions | 3.8 | G | ||||||||||||||
| 311 | 21 13 13 | 10 | Operation and Maintenance Data | Spare Parts | 1.6 | G | ||||||||||||||
| 312 | 21 13 13 | 11 | Closeout Submittals | As-built drawings | 3.8 | G | ||||||||||||||
| 313 | 22 00 00 | 03 | Product Data | Kitchen Sinks | 2.5.9 | G | ||||||||||||||
| 314 | 22 00 00 | 03 | Product Data | Electric Water Heaters (Tankless) | 2.11.3 | G | ||||||||||||||
| 315 | 22 00 00 | Product Data | Reverse Osmosis Device | P601 | G | |||||||||||||||
| 316 | 22 00 00 | 03 | Product Data | Fixtures | 2.5 | G | ||||||||||||||
| 317 | 22 00 00 | 03 | Product Data | Thermostatic Mixing Valves | 2.4.7 | G | ||||||||||||||
| 318 | 22 00 00 | 03 | Product Data | Floor and Shower Drains | 2.7.1 | G | ||||||||||||||
| 319 | 22 00 00 | 10 | Operation and Maintenance Manuals | Kitchen Sinks | 2.5.9 | G | ||||||||||||||
| 320 | 22 00 00 | 10 | Operation and Maintenance Manuals | Electric Water Heaters (Tankless) | 2.11.3 | |||||||||||||||
| 321 | 22 00 00 | 10 | Operation and Maintenance Manuals | Reverse Osmosis Device | P601 | G | ||||||||||||||
| 322 | 22 00 00 | 10 | Operation and Maintenance Manuals | Fixtures | 2.5 | |||||||||||||||
| 323 | 22 00 00 | 10 | Operation and Maintenance Manuals | Thermostatic Mixing Valves | 2.4.7 | G | ||||||||||||||
| 324 | 22 00 00 | 10 | Operation and Maintenance Manuals | Floor and Shower Drains | 2.7.1 | |||||||||||||||
| 325 | 22 00 00 | 06 | Testing | System Flushing | 3.9.3 | G | ||||||||||||||
| 326 | 22 00 00 | 06 | Testing | Operational Test | 3.9.4 | G | ||||||||||||||
| 327 | 22 00 00 | 06 | Testing | Disinfection | 3.9.5 | G | ||||||||||||||
| 328 | 23 00 00 | 03 | Shop Drawings | Detail Drawings | 1.4.5 | |||||||||||||||
| 329 | 23 00 00 | 03 | Product Data | Air Handling Units | 2.11 | G | ||||||||||||||
| 330 | 23 00 00 | 03 | Product Data | Variable Volume, Single Duct Terminal Units | 2.12.3.2 | G | ||||||||||||||
| 331 | 23 00 00 | 03 | Product Data | Energy Recovery Devices | 2.13.5 | G | ||||||||||||||
| 332 | 23 00 00 | 03 | Product Data | Supply Air Fan | 2.10.1.2 | G | ||||||||||||||
| 333 | 23 00 00 | 03 | Product Data | Metal Duct | 2.9.1 | G | ||||||||||||||
| 334 | 23 00 00 | 03 | Product Data | Metallic Flexible Duct | 2.9.1.1 | G | ||||||||||||||
| 335 | 23 00 00 | 03 | Product Data | Registers and Grilles | 2.9.9.2 | G | ||||||||||||||
| 336 | 23 00 00 | 03 | Product Data | Manual Dampers | 2.9.4 | G | ||||||||||||||
| 337 | 23 00 00 | 03 | Product Data | 2-position Dampers | 2.9.5 | G | ||||||||||||||
| 338 | 23 00 00 | 06 | Test Reports | Damper Acceptance Test | 3.8 | G | ||||||||||||||
| 339 | 23 00 00 | 10 | Operation and Maintenance Manuals | Air Handling Units | 2.11 | G | ||||||||||||||
| 340 | 23 00 00 | 10 | Operation and Maintenance Manuals | Variable Volume, Single Duct Terminal Units | 2.12.3.2 | G | ||||||||||||||
| 341 | 23 00 00 | 10 | Operation and Maintenance Manuals | Energy Recovery Devices | 2.13.5 | G | ||||||||||||||
| 342 | 23 00 00 | 10 | Operation and Maintenance Manuals | Manual Dampers | 2.9.4 | G | ||||||||||||||
| 343 | 23 00 00 | 10 | Operation and Maintenance Manuals | 2-position Dampers | 2.9.5 | G | ||||||||||||||
| 344 | 23 05 93 | 01 | Preconstruction Submittals | Records of Existing Conditions | 1.3.3 | G | ||||||||||||||
| 345 | 23 05 93 | 01 | Preconstruction Submittals | Independent TAB Agency and Personnel Qualifications | 1.5.1 | G | ||||||||||||||
| 346 | 23 05 93 | 01 | Preconstruction Submittals | TAB Design Review Report | 1.5.1 | G | ||||||||||||||
| 347 | 23 05 93 | 01 | Preconstruction Submittals | TAB Firm | 1.5.1 | G | ||||||||||||||
| 348 | 23 05 93 | 01 | Preconstruction Submittals | TAB Team Assistants | 1.5.1 | G | ||||||||||||||
| 349 | 23 05 93 | 01 | Preconstruction Submittals | TAB Team Engineer | 1.5.1 | G | ||||||||||||||
| 350 | 23 05 93 | 01 | Preconstruction Submittals | TAB Specialist | 1.5.1 | G | ||||||||||||||
| 351 | 23 05 93 | 02 | Preconstruction Submittals | TAB Team Field Leader | 1.5.1 | G | ||||||||||||||
| 352 | 23 05 93 | 03 | Shop Drawings | TAB Schematic Drawings and Report Forms | 1.5.1 | G | ||||||||||||||
| 353 | 23 05 93 | 03 | Product Data | Equipment and Performance Data | 1.4 | G | ||||||||||||||
| 354 | 23 05 93 | 07 | Test Reports | TAB Final Report | 3.4.11 | G | ||||||||||||||
| 355 | 23 05 93 | 07 | Test Reports | Completed Pre-Final DALT Report | 3.3.5 | G | ||||||||||||||
| 356 | 23 05 93 | 07 | Certificates | Independent TAB Agency and Personnel Qualifications | 1.5.1 | G | ||||||||||||||
| 357 | 23 05 93 | 07 | Test Reports | Defencies Report | 3.4.9 | G | ||||||||||||||
| 358 | 23 05 93 | 07 | Certificates | DALT and TAB Submittal and Work Schedule | 3.2 | G | ||||||||||||||
| 359 | 23 05 93 | 07 | Certificates | TAB Pre-Field Engineering Report | 3.2 | G | ||||||||||||||
| 360 | 23 07 00 | 02 | Shop Drawings | MICA Plates | 2.1 | G | ||||||||||||||
| 361 | 23 07 00 | 02 | Shop Drawings | Duct Insulation Systems and Associated Accessories | 2.5 | G | ||||||||||||||
| 362 | 23 07 00 | 02 | Shop Drawings | Pipe Insulation Systems and Associated Accessories | 2.4 | G | ||||||||||||||
| 363 | 23 07 00 | 03 | Shop Drawings | Equipment Insulation Systems and Associated Accessories | 2.6 | G | ||||||||||||||
| 364 | 23 07 00 | 03 | Product Data | Pipe Insulation Systems | 2.4.1.2 | G | ||||||||||||||
| 365 | 23 07 00 | 04 | Product Data | Duct Insulation Systems | 2.5.4.1 | G | ||||||||||||||
| 366 | 23 07 00 | 02 | Samples | Thermal Insulation | 2.3.9.1 | G | ||||||||||||||
| 367 | 23 07 00 | 03 | Shop Drawings | Recycled content for insulation materials | 2.3.1 | G | ||||||||||||||
| 368 | 23 07 00 | 07 | Product Data | Equipment Insulation Systems | 2.5 | G | ||||||||||||||
| 369 | 23 07 00 | 08 | Certificates | Indoor air quality for adhesives | 2.2.1 | G | ||||||||||||||
| 370 | 23 07 00 | 08 | Manufacturer's Instructions | Pipe Insulation Systems | 3.2 | S | ||||||||||||||
| 371 | 23 07 00 | 08 | Manufacturer's Instructions | Duct Insulation Systems | 3.3 | G | ||||||||||||||
| 372 | 23 07 00 | 08 | Manufacturer's Instructions | Equipment Insulation Systems | 3.4 | G | ||||||||||||||
| 373 | 23 07 00 | 10 | Operation and Maintenance Manuals | Pipe Insulation Systems | 2.4.1.2 | G | ||||||||||||||
| 374 | 23 07 00 | 10 | Operation and Maintenance Manuals | Duct Insulation Systems | 2.5.4.1 | G | ||||||||||||||
| 375 | 23 07 00 | 10 | Operation and Maintenance Manuals | Thermal Insulation | 2.3.9.1 | G | ||||||||||||||
| 376 | 23 08 00 | 01 | Certificates | Commissioning Team | 1.1 | G | ||||||||||||||
| 377 | 23 08 00 | 07 | Test Reports | Test Procedures | 1.1 | G | ||||||||||||||
| 378 | 23 08 00 | 09 | Test Reports | Test Schedule | 1.1 | G | ||||||||||||||
| 379 | 23 08 00 | 09 | Test Reports | Final Report | 1.1 | G | ||||||||||||||
| 380 | 23 08 00 | 09 | Test Reports | Pre-Commissioning Checks | 3.2.1 | G | ||||||||||||||
| 381 | 23 08 00 | 09 | Test Reports | Functional Test Reports | 3.2.2 | G | ||||||||||||||
| 382 | 23 09 13 | Shop Drawings | DDC Contractor Design Drawings | 2.1 | G | |||||||||||||||
| 383 | 23 09 13 | Shop Drawings | Draft As-Built Drawings | 2.1 | G | |||||||||||||||
| 384 | 23 09 13 | Shop Drawings | Final As-Built Drawings | 2.1 | G | |||||||||||||||
| 385 | 23 09 13 | Product Data | Network Wiring | 2.4 | G | |||||||||||||||
| 386 | 23 09 13 | Product Data | Automatic Control Valves | 2.5.2.1 | G | |||||||||||||||
| 387 | 23 09 13 | Product Data | Ball Valves | 2.5.5 | G | |||||||||||||||
| 388 | 23 09 13 | Product Data | Butterfly Valves | 2.5.6 | G | |||||||||||||||
| 389 | 23 09 13 | Product Data | Dampers | 2.6 | G | |||||||||||||||
| 390 | 23 09 13 | Product Data | Temperature Sensors | 2.7.3 | G | |||||||||||||||
| 391 | 23 09 13 | Product Data | Relative Humidity Sensors | 2.7.4 | G | |||||||||||||||
| 392 | 23 09 13 | Product Data | Pressure Sensors | 2.7.5.2 | G | |||||||||||||||
| 393 | 23 09 13 | Product Data | Temperature gauges | 2.8.1 | G | |||||||||||||||
| 394 | 23 09 13 | Product Data | Pressure gauges | 2.8.2 | G | |||||||||||||||
| 395 | 23 09 13 | Product Data | Actuators, Electric: valves & Dampers | 2.9 | G | |||||||||||||||
| 396 | 23 09 13 | Test Reports | Final Test Reports | 3.1 | G | |||||||||||||||
| 397 | 23 09 23.02 | Product Data | Programming Software | 2.3 | G | |||||||||||||||
| 398 | 23 09 23.02 | Product Data | Network Hardware: Routers, Gateways, Switches | 2.1 | G | |||||||||||||||
| 399 | 23 09 23.02 | Product Data | Network Wiring | 2.2 | G | |||||||||||||||
| 400 | 23 09 23.02 | Product Data | DDC Hardware | 2.3 | G | |||||||||||||||
| 401 | 23 09 23.02 | Product Data | Manufacturer's Product Data: Analog Inputs/Outputs, Binary I/O, Relays, Displays | 2.3.1 | G | |||||||||||||||
| 402 | 23 09 23.02 | Product Data | Hardware; Alarms, Trending | 2.3.5 | G | |||||||||||||||
| 403 | 23 09 23.02 | Product Data | System Equipment Schematic | 3.2.1 | G | |||||||||||||||
| 404 | 23 09 23.02 | Product Data | Sequence of Operation | 3.2.1 | G | |||||||||||||||
| 405 | 23 09 23.02 | Product Data | Sensor Points Chart | 3.2.1 | G | |||||||||||||||
| 406 | 23 09 23.02 | Test Reports | Final System Test Report | 3.3.1 | G | |||||||||||||||
| 407 | 23 31 13.00 40 | 03 | Product Data | Galvanized Steel Ductwork Materials | 2.1, 2.3 | G | ||||||||||||||
| 408 | 23 31 13.00 40 | 03 | Product Data | Round Sheet Metal Duct Fittings | 2.2.1 | G | ||||||||||||||
| 409 | 23 31 13.00 40 | 03 | Product Data | Turning Vanes | 2.2.5 | G | ||||||||||||||
| 410 | 23 31 13.00 40 | 03 | Product Data | Dampers | 2.2.12.1 | G | ||||||||||||||
| 411 | 23 31 13.00 40 | 03 | Product Data | Flexible Connectors | 2.2.8 | G | ||||||||||||||
| 412 | 23 31 13.00 40 | 03 | Product Data | Flexible Duct Material | 2.2.11 | G | ||||||||||||||
| 413 | 23 31 13.00 40 | 03 | Product Data | Power Operated Dampers | 2.2.14 | G | ||||||||||||||
| 414 | 23 31 13.00 40 | 03 | Product Data | Manual Volume Dampers | 2.2.12 | G | ||||||||||||||
| 415 | 23 31 13.00 40 | 03 | Product Data | Louvers | 2.4.1 | G | ||||||||||||||
| 416 | 23 31 13.00 40 | 06 | Test Reports | Ductwork Leakage Test | 3.4.2 | G | ||||||||||||||
| 417 | 23 31 13.00 40 | 10 | Operation and Maintenance Data | Operation and Maintenance (O&M) Manuals | 3.5.1 | G | ||||||||||||||
| 418 | 23 31 13.00 40 | 11 | Closeout submittals | Record Drawings | 3.5.2 | G | ||||||||||||||
| 419 | 23 34 23.00 40 | 03 | Product Data | Supply Air Fan | 3.1 | G | ||||||||||||||
| 420 | 23 34 23.00 40 | 11 | Operation and Maintenance Manuals | Dampers | 3.1 | G | ||||||||||||||
| 421 | 23 34 23.00 40 | 11 | Operation and Maintenance Manuals | Manual Volume Dampers | 2.2.12 | G | ||||||||||||||
| 422 | 23 34 23.00 40 | 11 | Operation and Maintenance Manuals | Louvers | 2.4.1 | G | ||||||||||||||
| 423 | 23 34 23.00 40 | 11 | Operation and Maintenance Manuals | Duct Smoke Detectors | 2.5.1 | G | ||||||||||||||
| 424 | 23 34 23.00 40 | 11 | Closeout submittals | Record Drawings | 3.3 | G | ||||||||||||||
| 425 | 23 36 00.00 40 | 03 | Product Data | Variable Air Volume Terminals w/Electric Coils No Bypass | 2.1.2 | G | ||||||||||||||
| 426 | 23 36 00.00 40 | 10 | Operation and Maintenance Manual | Variable Air Volume Terminals w/Electric Coils No Bypass | 3.4.1 | G | ||||||||||||||
| 427 | 23 36 00.00 40 | 11 | Closeout submittals | Record Drawings | 3.1 | G | ||||||||||||||
| 428 | 23 64 26 | 03 | Product Data | Strainer | 2.7.1 | G | ||||||||||||||
| 429 | 23 64 26 | 03 | Product Data | Automatic Air Vent | 2.6.18 | G | ||||||||||||||
| 430 | 23 64 26 | 03 | Product Data | Butterfly Valves | 2.6.4 | G | ||||||||||||||
| 431 | 23 64 26 | 03 | Product Data | Calibrated Balancing Valves | 2.6.8 | G | ||||||||||||||
| 432 | 23 64 26 | 06 | Testing | Pressure Tests | 3.4.2 | G | ||||||||||||||
| 433 | 23 64 26 | 08 | Training | Instruction to Government Personnel | 3.5 | G | ||||||||||||||
| 434 | 23 64 26 | 10 | Operation and Maintenance Manuals | Strainer | 2.7.1 | |||||||||||||||
| 435 | 23 64 26 | 10 | Operation and Maintenance Manuals | Automatic Air Vent | 2.6.18 | G | ||||||||||||||
| 436 | 23 64 26 | 10 | Operation and Maintenance Manuals | Butterfly Valves | 2.6.4 | G | ||||||||||||||
| 437 | 23 64 26 | 10 | Operation and Maintenance Manuals | Calibrated Balancing Valves | 2.6.8 | G | ||||||||||||||
| 438 | 26 05 73 | 1 | Preconstruction Submittals | Field Examination Plan | 3.1 | G | ||||||||||||||
| 439 | 26 05 73 | 1 | Preconstruction Submittals | Arc Flash Label Formats | 3.2.9 | G | ||||||||||||||
| 440 | 26 05 73 | 7 | Certificates | System Analyzer | 1.4.1 | G | ||||||||||||||
| 441 | 26 05 73 | 11 | Closeout Submittals | Model Files | 3.3 | G | ||||||||||||||
| 442 | 26 05 73 | 11 | Closeout Submittals | Load Flow Study | 3.2.4 | G | ||||||||||||||
| 443 | 26 05 73 | 11 | Closeout Submittals | Fault Current Study | 3.2.5 | G | ||||||||||||||
| 444 | 26 05 73 | 11 | Closeout Submittals | System Coordination Study | 3.2.6 | G | ||||||||||||||
| 445 | 26 05 73 | 11 | Closeout Submittals | Arc Flash Hazard Study | 3.2.7 | G | ||||||||||||||
| 446 | 26 20 00 | 2 | Shop Drawings | Panelboards | 2.14 | G | ||||||||||||||
| 447 | 26 20 00 | 3 | Shop Drawings | Transformers | 2.17 | G | ||||||||||||||
| 448 | 26 20 00 | 3 | Product Data | Receptacles | 2.13 | G | ||||||||||||||
| 449 | 26 20 00 | 3 | Product Data | Circuit Breakers | 2.14.3 | G | ||||||||||||||
| 450 | 26 20 00 | 3 | Product Data | Switches | 2.11 | G | ||||||||||||||
| 451 | 26 20 00 | 3 | Product Data | Transformers | 2.17 | G | ||||||||||||||
| 452 | 26 20 00 | 6 | Product Data | Enclosed Circuit Breakers | 2.15 | G | ||||||||||||||
| 453 | 26 20 00 | 6 | Test Reports | 600-volt Wiring Test | 3.5.2 | G | ||||||||||||||
| 454 | 26 20 00 | 6 | Test Reports | Grounding System Test | 3.5.5 | G | ||||||||||||||
| 455 | 26 20 00 | 6 | Test Reports | Transformer Tests | 3.5.3 | G | ||||||||||||||
| 456 | 26 20 00 | 7 | Test Reports | Ground-fault Receptacle Test | 3.5.4 | G | ||||||||||||||
| 457 | 26 20 00 | 9 | Certificates | Fuses | 2.12 | G | ||||||||||||||
| 458 | 26 20 00 | 10 | Manufacturer's Field Reports | Transformer Factory Tests | 2.30.1 | G | ||||||||||||||
| 459 | 26 20 00 | 10 | Operation and Maintenance Data | Electrical Systems | 1.5.1 | G | ||||||||||||||
| 460 | 26 51 00 | 2 | Shop Drawings | Luminaire Drawings | 1.5.1 | G | ||||||||||||||
| 461 | 26 51 00 | 2 | Shop Drawings | Occupancy/Vacancy Sensor Coverage Layout | 1.5.5 | |||||||||||||||
| 462 | 26 51 00 | 2 | Shop Drawings | Lighting Control System One-Line Diagram | 1.7.2 | G | ||||||||||||||
| 463 | 26 51 00 | 3 | Shop Drawings | Sequence of Operation for Lighting Control System | 2.5.1 | G | ||||||||||||||
| 464 | 26 51 00 | 3 | Product Data | Luminaires | 2.2 | G | ||||||||||||||
| 465 | 26 51 00 | 3 | Product Data | Light Sources | 2.3 | G | ||||||||||||||
| 466 | 26 51 00 | 3 | Product Data | LED Drivers | 2.4 | G | ||||||||||||||
| 467 | 26 51 00 | 3 | Product Data | Luminaire Warranty | 1.6.1 | G | ||||||||||||||
| 468 | 26 51 00 | 3 | Product Data | Lighting Controls Warranty | 1.6.2 | G | ||||||||||||||
| 469 | 26 51 00 | 3 | Product Data | Switches | 2.5.2.1 | G | ||||||||||||||
| 470 | 26 51 00 | 3 | Product Data | Occupancy/Vacancy Sensors | 2.5.2.2 | G | ||||||||||||||
| 471 | 26 51 00 | 3 | Product Data | Power Packs | 2.5.2.2.4 | G | ||||||||||||||
| 472 | 26 51 00 | 3 | Product Data | Exit Signs | 2.6.1 | G | ||||||||||||||
| 473 | 26 51 00 | 5 | Product Data | Emergency Drivers | 2.6.2 | G | ||||||||||||||
| 474 | 26 51 00 | 5 | Design Data | Luminaire Design Data | 1.5.2 | G | ||||||||||||||
| 475 | 26 51 00 | 6 | Design Data | Photometric Plan | 1.5.4 | G | ||||||||||||||
| 476 | 26 51 00 | 7 | Test Reports | Occupancy/Vacancy Sensor Verification Test | 3.2.1.1 | G | ||||||||||||||
| 477 | 26 51 00 | 10 | Certificates | LED Driver and Dimming Switch Compatibility Certificate | 1.5.3 | G | ||||||||||||||
| 478 | 26 51 00 | 10 | Operation and Maintenance Data | Lighting System | 1.7.1 | G | ||||||||||||||
| 479 | 26 51 00 | 10 | Operation and Maintenance Data | Maintenance Staff Training Plan | 3.3.2.1 | G | ||||||||||||||
| 480 | 28 31 76 | 1 | Preconstruction Submittals | Qualified Fire Protection Engineer (QFPE) | 1.3.2 | G | ||||||||||||||
| 481 | 28 31 76 | 1 | Preconstruction Submittals | Fire alarm system designer | 1.9.2.1 | G | ||||||||||||||
| 482 | 28 31 76 | 1 | Preconstruction Submittals | Supervisor | 1.9.2.2 | G | ||||||||||||||
| 483 | 28 31 76 | 1 | Preconstruction Submittals | Technician | 1.9.2.3 | G | ||||||||||||||
| 484 | 28 31 76 | 1 | Preconstruction Submittals | Installer | 1.9.2.4 | G | ||||||||||||||
| 485 | 28 31 76 | 1 | Preconstruction Submittals | Test Technician | 1.9.2.5 | G | ||||||||||||||
| 486 | 28 31 76 | 1 | Preconstruction Submittals | Fire Alarm System Site-Specific Software Acknowledgement | 1.7 | G | ||||||||||||||
| 487 | 28 31 76 | 2 | Shop Drawings | Wiring Diagrams | 1.9.1.4 | G | ||||||||||||||
| 488 | 28 31 76 | 2 | Shop Drawings | System Layout | 1.9.1.5 | G | ||||||||||||||
| 489 | 28 31 76 | 2 | Shop Drawings | Notification Appliances | 1.9.1.6 | G | ||||||||||||||
| 490 | 28 31 76 | 2 | Shop Drawings | Initiating devices | 1.9.1.7 | G | ||||||||||||||
| 491 | 28 31 76 | 2 | Shop Drawings | Amplifiers | 1.9.1.8 | G | ||||||||||||||
| 492 | 28 31 76 | 2 | Shop Drawings | Battery Power | 1.9.1.9 | G | ||||||||||||||
| 493 | 28 31 76 | 2 | Shop Drawings | Voltage Drop Calculations | 1.9.1.10 | G | ||||||||||||||
| 494 | 28 31 76 | 3 | Product Data | Local Operating Console (LOC) | 1.4.3 | G | ||||||||||||||
| 495 | 28 31 76 | 3 | Product Data | Amplifiers | 1.9.1.8 | G | ||||||||||||||
| 496 | 28 31 76 | 3 | Product Data | Tone Generators | 2.5 | G | ||||||||||||||
| 497 | 28 31 76 | 3 | Product Data | Manual Stations | 2.6 | G | ||||||||||||||
| 498 | 28 31 76 | 3 | Product Data | Smoke Detectors | 2.7 | G | ||||||||||||||
| 499 | 28 31 76 | 3 | Product Data | Duct Smoke Detectors | 2.7.2 | G | ||||||||||||||
| 500 | 28 31 76 | 3 | Product Data | Heat Detectors | 3.2.3 | G | ||||||||||||||
| 501 | 28 31 76 | 3 | Product Data | Addressable Interface Devices | 2.8 | G | ||||||||||||||
| 502 | 28 31 76 | 3 | Product Data | Addressable Control Modules | 2.9 | G | ||||||||||||||
| 503 | 28 31 76 | 3 | Product Data | Isolation Modules | 1.9.1.5 | G | ||||||||||||||
| 504 | 28 31 76 | 3 | Product Data | Notification Appliances | 1.9.1.6 | G | ||||||||||||||
| 505 | 28 31 76 | 3 | Product Data | Textual Display Signs | 2.10.3 | G | ||||||||||||||
| 506 | 28 31 76 | 3 | Product Data | Batteries | 2.12.1 | G | ||||||||||||||
| 507 | 28 31 76 | 3 | Product Data | Battery Chargers | 2.12.2 | G | ||||||||||||||
| 508 | 28 31 76 | 3 | Product Data | Alarm Wiring | 2.13.1 | G | ||||||||||||||
| 509 | 28 31 76 | 3 | Product Data | Back Boxes and Conduit | 3.3.3 | G | ||||||||||||||
| 510 | 28 31 76 | 3 | Product Data | Ceiling Bridges | 3.2.5 | G | ||||||||||||||
| 511 | 28 31 76 | 6 | Test Reports | Test Procedures | 3.6.1 | G | ||||||||||||||
| 512 | 28 31 76 | 7 | Certificates | Verification of Compliant Installation | 3.6.2.1 | G | ||||||||||||||
| 513 | 28 31 76 | 7 | Certificates | Request for Government Final Test | 3.6.2.2 | G | ||||||||||||||
| 514 | 28 31 76 | 10 | Operation and Maintenance Data | Operation and Maintenance (O&M) Instructions | 3.8 | G | ||||||||||||||
| 515 | 28 31 76 | 10 | Operation and Maintenance Data | Instruction of Government Employees | 3.9 | G | ||||||||||||||
| 516 | 28 31 76 | 11 | Closeout Submittals | As-Built Drawings | 1.9.1.13 | G | ||||||||||||||
| 517 | SOW | 02 | Shop Drawings | Perimeter Coping | 4.2.4 (4) | G | ||||||||||||||
| 518 | SOW | 03 | Product Data | Fluid applied membrane | 4.5.2 (4) | G | ||||||||||||||
| 519 | SOW | 08 | Manufacturer's Instructions | Fluid applied membrane | 4.5.2 (4) | G | ||||||||||||||
| 520 | SOW | 02 | shop Drawings | Roof/Wall systems | 4.2.1 | G | ||||||||||||||
| 521 | SOW | 03 | Product Data | Intumescent Coating 2-Hour | 4.2.4 (4) | G | ||||||||||||||
| 522 | SOW | 08 | Manufacturer's Instructions | Intumescent Coating 2-Hour | 4.2.4 (4) | G | ||||||||||||||
| 523 | SOW | 03 | Product Data | Intumescent Coating 1-Hour | 4.2.5 | G | ||||||||||||||
| 524 | SOW | 08 | Manufacturer's Instructions | Intumescent Coating 1-Hour | 4.2.5 | G | ||||||||||||||
| 525 | SOW | 03 | Product Data | Epoxy Flooring System-water/Barrier | 4.2.7.2 | G | ||||||||||||||
| 526 | SOW | 08 | Manufacturer's Instructions/SDS | Epoxy Flooring System-water/Barrier | 4.2.7.2 | G | ||||||||||||||
| 527 | SOW | 06 | Test Reports | Epoxy Flooring System-Concrete moisture | 4.2.7.2 (3) | G | ||||||||||||||
| 528 | SOW | 03 | Product Data | Remedial Waterstop System | 4.2.5.2 (3) | G | ||||||||||||||
| 529 | SOW | 03 | Product Data | 2-Hour Expansion Joint and Cover | 4.2.7.2(8) | G | ||||||||||||||
| 530 | SOW | 03 | Product Data | 2-Hour Expansion Joint and Cover | 4.2.7.2(8) | G | ||||||||||||||
| 531 | SOW | 08 | Manufacturer's Instructions/SDS | Expansion Joints & Covers | 4.2.7.2(8) | G |