This document is a technical specification section for Testing, Adjusting, and Balancing (TAB) for HVAC systems at Tinker Air Force Base, Oklahoma, issued in April 2019.

The specification establishes comprehensive requirements for conducting duct air leakage testing (DALT) and TAB work on new and existing HVAC systems. The TAB contractor must be an independent first-tier subcontractor certified by AABC, NEBB, or TABB with current credentials valid through contract completion. The TAB team must include a supervisor with TAB certification, a field leader with minimum three years of full-time TAB supervision experience, and field technicians with minimum one year of documented TAB field experience. All team members must be full-time employees of the approved TAB agency. The specification references multiple industry standards including ASHRAE HVAC Applications Handbook, AABC National Standards for Total System Balance, NEBB Procedural Standards, and SMACNA standards for HVAC systems testing and sound measurement. TAB work must achieve measured flow rates within plus or minus 5 percent of design flow rates. DALT testing applies to up to 20 percent of total duct system linear footage selected by the Contracting Officer's Technical Representative, with completion required within 48 hours of selection. The contractor must submit four copies of TAB Schematic Drawings and Report Forms no later than 21 days before field measurements begin. Sound measurement work is required in mechanical rooms, adjacent spaces, and representative occupied rooms using ASA S1.4 Type 1 or 2 sound meters with octave band filters. Quality assurance includes COTR field acceptance testing with verification of random data selections and mandatory re-testing if measurements fall outside acceptable tolerances. Final TAB approval requires compliance with field acceptance testing requirements, and adjustment device settings must be permanently marked to allow restoration if disturbed.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Solicitation - FA813727R0002.pdf PDF
2026 TAFB Electrical Standard - Signed.pdf PDF
SOW Att 02c_Controlled Area Training - Certificate.pdf PDF
250063_ATT 3_RMDF.pdf PDF
23 05 15.pdf PDF
23 09 13.pdf PDF
09 90 00.pdf PDF
26 20 00.pdf PDF
08 51 23.pdf PDF
07 92 00.pdf PDF
07 14 00.pdf PDF
08 71 00.pdf PDF
07 84 00.pdf PDF
03 01 00.pdf PDF
05 05 23.16.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019

SECTI ON 23 05 93

TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ACOUSTI CAL SOCI ETY OF AMERI CA ( ASA)

ASA S1. 11 PART 1 ( 2014) Amer i can Nat i onal St andar d El ect r oacoust i cs – Oct ave- Band and Fr act i onal - Oct ave- Band Fi l t er s – Par t 1:

Specifications

ASA S1. 4 ( 1983; Amendment 1985; R 2006) Speci f i cat i on f or Sound Level Met er s ( ASA 47)

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE HVAC APP I P HDBK ( 2011) HVAC Appl i cat i ons Handbook, I - P Edition

ASHRAE HVAC APP SI HDBK ( 2015) HVAC Appl i cat i ons Handbook, SI Edition

ASSOCI ATED AI R BALANCE COUNCI L ( AABC)

AABC MN- 1 ( 2002; 6t h ed) Nat i onal St andar ds f or Tot al Syst em Bal ance

AABC MN- 4 ( 1996) Test and Bal ance Pr ocedur es

NATI ONAL ENVI RONMENTAL BALANCI NG BUREAU ( NEBB)

NEBB MASV ( 2006) Pr ocedur al St andar ds f or Measur ement s and Assessment of Sound and Vibration

NEBB PROCEDURAL STANDARDS ( 2005) Pr ocedur al St andar ds f or TAB ( Test i ng, Adj ust i ng and Bal anci ng) Envi r onment al Syst ems

SHEET METAL AND AI R CONDI TI ONI NG CONTRACTORS' NATI ONAL ASSOCI ATI ON

(SMACNA)

SMACNA 1780 ( 2002) HVAC Syst ems - Test i ng, Adj ust i ng and Bal anci ng, 3r d Edi t i on

SMACNA 1858 ( 2004) HVAC Sound And Vi br at i on Manual - Fi r st Edi t i on

Apr i l 2019 Page 1 SECTI ON 23 05 93

SMACNA 1972 CD ( 2012) HVAC Ai r Duct Leakage Test Manual - 2nd Edi t i on

1. 2 DEFINITIONS

a. AABC: Associ at ed Ai r Bal ance Counci l

b. COTR: Cont r act i ng Of f i cer ' s Techni cal Repr esent at i ve

c. DALT: Duct ai r l eakage t est

d. DALT' d: Duct ai r l eakage t est ed

e. HVAC: Heat i ng, vent i l at i ng, and ai r condi t i oni ng; or heat i ng, vent i l at i ng, and cool i ng f . NEBB: Nat i onal Envi r onment al Bal anci ng Bur eau

g. Out - of - t ol er ance dat a: Per t ai ns onl y t o f i el d accept ance t est i ng of Fi nal DALT or TAB r epor t . When appl i ed t o DALT wor k, t hi s phase means When appl i ed t o TAB wor k t hi s phase means " a measur ement t aken dur i ng TAB f i el d accept ance t est i ng whi ch does not f al l wi t hi n t he r ange of pl us 5 t o mi nus 5 per cent of t he or i gi nal measur ement r epor t ed on t he TAB Repor t f or a speci f i c par amet er . "

h. Season of maxi mum heat i ng l oad: The t i me of year when t he out door t emper at ur e at t he pr oj ect s i t e r emai ns wi t hi n pl us or mi nus 30 degr ees Fahr enhei t of t he pr oj ect s i t e' s wi nt er out door desi gn t emper at ur e, t hr oughout t he per i od of TAB dat a r ecor di ng.

i . Season of maxi mum cool i ng l oad: The t i me of year when t he out door t emper at ur e at t he pr oj ect s i t e r emai ns wi t hi n pl us or mi nus 5 degr ees Fahr enhei t of t he pr oj ect s i t e' s summer out door desi gn t emper at ur e, t hr oughout t he per i od of TAB dat a r ecor di ng.

j . Season 1, Season 2: Dependi ng upon when t he pr oj ect HVAC i s compl et ed and r eady f or TAB, Season 1 i s def i ned, t her eby def i ni ng Season 2.

Season 1 coul d be t he season of maxi mum heat i ng l oad, or t he season of maxi mum cool i ng l oad.

k. Sound measur ement s t er mi nol ogy: Def i ned i n AABC MN- 1, NEBB MASV, or

SMACNA 1858 ( TABB) .

l . TAB: Test i ng, adj ust i ng, and bal anci ng ( of HVAC syst ems)

m. TAB' d: HVAC Test i ng/ Adj ust i ng/ Bal anci ng pr ocedur es per f or med

n. TAB Agency: TAB Fi r m r . TABB: Test i ng Adj ust i ng and Bal anci ng Bur eau

1. 2. 1 Si mi l ar Ter ms

I n some i nst ances, t er mi nol ogy di f f er s bet ween t he Cont r act and t he TAB St andar d pr i mar i l y because t he i nt ent of t hi s Sect i on i s t o use t he i ndust r y st andar ds speci f i ed, al ong wi t h addi t i onal r equi r ement s l i s t ed her ei n t o pr oduce opt i mal r esul t s.

The f ol l owi ng t abl e of s i mi l ar t er ms i s pr ovi ded f or c l ar i f i cat i on onl y.

Apr i l 2019 Page 2 SECTI ON 23 05 93

Cont r act r equi r ement s t ake pr ecedent over t he cor r espondi ng AABC, NEBB, or TABB r equi r ement s wher e di f f er ences exi st .

SI MI LAR TERMS

Cont r act Ter m AABC Ter m NEBB Ter m TABB Ter m

TAB St andar d Nat i onal St andar ds f or Test i ng and Bal anci ng Heat i ng, Vent i l at i ng, and Ai r Condi t i oni ng Syst ems

Pr ocedur al St andar ds f or Test i ng, Adj ust i ng and Bal anci ng of Envi r onment al Syst ems

International St andar ds f or Environmental Syst ems Bal ance

TAB Speci al i st TAB Engi neer TAB Super vi sor TAB Super vi sor

Syst ems Readi ness Check

Const r uct i on Phase Inspection

Fi el d Readi ness Check & Pr el i mi nar y Fi el d Pr ocedur es

Fi el d Readi ness Check & Pr el i m.

Fi el d Pr ocedur es

1. 3 WORK DESCRI PTI ON

The wor k i ncl udes duct ai r l eakage t est i ng ( DALT) and t est i ng, adj ust i ng, and bal anci ng ( TAB) of new ( and exi st i ng, wher e i dent i f i ed on dr awi ngs) heat i ng, vent i l at i ng, and cool i ng ( HVAC) ai r and/ or wat er di st r i but i on syst ems i ncl udi ng equi pment and per f or mance dat a, duct s, and pi pi ng whi ch ar e l ocat ed wi t hi n, on, under , bet ween, and adj acent t o bui l di ngs.

Per f or m TAB i n accor dance wi t h t he r equi r ement s of t he TAB pr ocedur al st andar d r ecommended by t he TAB t r ade associ at i on t hat appr oved t he TAB Fi r m' s qual i f i cat i ons. Compl y wi t h r equi r ement s of AABC MN- 1, NEBB PROCEDURAL STANDARDS, or SMACNA 1780 ( TABB) as suppl ement ed and modi f i ed by t hi s speci f i cat i on sect i on. Al l r ecommendat i ons and suggest ed pr act i ces cont ai ned i n t he TAB pr ocedur al st andar ds ar e consi der ed mandatory.

Conduct DALT and TAB of t he i ndi cat ed exi st i ng syst ems and equi pment and submi t t he speci f i ed DALT and TAB r epor t s f or appr oval . Conduct DALT t est i ng i n compl i ance wi t h t he r equi r ement s speci f i ed i n SMACNA 1972 CD, except as suppl ement ed and modi f i ed by t hi s sect i on. Conduct DALT and TAB wor k i n accor dance wi t h t he r equi r ement s of t hi s sect i on.

1. 3. 1 Ai r Di st r i but i on Syst ems

Test , adj ust , and bal ance syst em ( TAB) i n compl i ance wi t h t hi s sect i on.

Obt ai n Cont r act i ng Of f i cer ' s wr i t t en appr oval bef or e appl y i ng i nsul at i on t o ext er i or of ai r di st r i but i on syst ems as speci f i ed under Sect i on 23 07 00

THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS.

1. 3. 2 Wat er Di st r i but i on Syst ems

TAB syst em i n compl i ance wi t h t hi s sect i on. Obt ai n Cont r act i ng Of f i cer ' s wr i t t en appr oval bef or e appl y i ng i nsul at i on t o wat er di st r i but i on syst ems as speci f i ed under Sect i on 23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS. At Cont r act or ' s opt i on and wi t h Cont r act i ng Of f i cer ' s wr i t t en

Apr i l 2019 Page 3 SECTI ON 23 05 93 appr oval , t he pi pi ng syst ems may be i nsul at ed bef or e syst ems ar e TAB' d.

Ter mi nat e pi pi ng i nsul at i on i mmedi at el y adj acent t o each f l ow cont r ol val ve, aut omat i c cont r ol val ve, or devi ce. Seal t he ends of pi pe i nsul at i on and t he space bet ween ends of pi pe i nsul at i on and pi pi ng, wi t h wat er pr oof vapor bar r i er coat i ng.

Af t er compl et i on of wor k under t hi s sect i on, i nsul at e t he f l ow cont r ol val ves and devi ces as speci f i ed under Sect i on 23 07 00 THERMAL I NSULATI ON

FOR MECHANI CAL SYSTEMS.

1. 3. 3 TAB SCHEMATI C DRAWI NGS

Show t he f ol l owi ng i nf or mat i on on TAB Schemat i c Dr awi ngs:

1. A uni que number or mar k f or each pi ece of equi pment or t er mi nal .

2. Ai r quant i t i es at ai r t er mi nal s.

3. Ai r quant i t i es and t emper at ur es i n ai r handl i ng uni t schedul es.

4. Wat er quant i t i es and t emper at ur es i n t her mal ener gy t r ansf er equi pment schedules.

5. Wat er quant i t i es and heads i n pump schedul es.

6. Wat er f l ow measur ement f i t t i ngs and bal anci ng f i t t i ngs.

7. Duct wor k Const r uct i on and Leakage Test i ng Tabl e t hat def i nes t he DALT t est r equi r ement s, i ncl udi ng each appl i cabl e HVAC duct syst em I D or mar k, duct pr essur e c l ass, duct seal c l ass, and duct l eakage t est pr essur e. Thi s t abl e i s i ncl uded i n t he f i l e f or Gr aphi cs f or Uni f i ed Faci l i t i es Gui de Speci f i cat i ons:

http://www.wbdg.org/ccb/NAVGRAPH/graphtoc.pdf

Submi t f our ( 4) copi es of t he TAB Schemat i c Dr awi ngs and Repor t For ms t o t he Cont r act i ng Of f i cer , no l at er t han 21 cal endar days pr i or t o t he st ar t of TAB f i el d measur ement s.

1. 3. 4 Rel at ed Requi r ement s

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG.

Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL

PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Recor ds of Exi st i ng Condi t i ons; G

SD- 02 Shop Dr awi ngs

Apr i l 2019 Page 4 SECTI ON 23 05 93

TAB Schemat i c Dr awi ngs and Repor t For ms; G

SD- 03 Pr oduct Dat a

Equi pment and Per f or mance Dat a; G

TAB Rel at ed HVAC Submi t t al s; G

A l i s t of t he TAB Rel at ed HVAC Submi t t al s, no l at er t han 7 days af t er t he appr oval of t he TAB t eam engi neer .

SD- 06 Test Repor t s

Compl et ed Pr e- Fi nal DALT Repor t ; G

Cer t i f i ed Fi nal DALT Repor t ; G

SD- 07 Cer t i f i cat es

I ndependent TAB Agency and Per sonnel Qual i f i cat i ons; G

DALT and TAB Submi t t al and Wor k Schedul e; G

TAB Pr e- Fi el d Engi neer i ng Repor t ; G

1. 5 QUALI TY ASSURANCE

1. 5. 1 I ndependent TAB Agency and Per sonnel Qual i f i cat i ons

To secur e appr oval f or t he pr oposed agency, submi t i nf or mat i on cer t i f y i ng t hat t he TAB agency i s a f i r st t i er subcont r act or who i s not af f i l i at ed wi t h any ot her company par t i c i pat i ng i n wor k on t hi s cont r act , i ncl udi ng desi gn, f ur ni shi ng equi pment , or const r uct i on. Fur t her , submi t t he f ol l owi ng, f or t he agency, t o Cont r act i ng Of f i cer f or appr oval :

a. I ndependent AABC or NEBB or TABB TAB agency:

TAB agency: AABC r egi st r at i on number and expi r at i on dat e of cur r ent cer t i f i cat i on; or NEBB cer t i f i cat i on number and expi r at i on dat e of cur r ent cer t i f i cat i on; or TABB cer t i f i cat i on number and expi r at i on dat e of cur r ent cer t i f i cat i on.

TAB t eam super vi sor : Name and copy of AABC or NEBB or TABB TAB super vi sor cer t i f i cat e and expi r at i on dat e of cur r ent certification.

TAB t eam f i el d l eader : Name and document ed evi dence t hat t he t eam f i el d l eader has sat i sf act or i l y per f or med f ul l - t i me super vi s i on of TAB wor k i n t he f i el d f or not l ess t han 3 year s i mmedi at el y pr ecedi ng t hi s cont r act ' s bi d openi ng dat e.

TAB t eam f i el d t echni c i ans: Names and document ed evi dence t hat each f i el d t echni c i an has sat i sf act or i l y assi st ed a TAB t eam f i el d l eader i n per f or mance of TAB wor k i n t he f i el d f or not l ess t han one year i mmedi at el y pr ecedi ng t hi s cont r act ' s bi d openi ng dat e.

Cur r ent cer t i f i cat es: Regi st r at i ons and cer t i f i cat i ons ar e cur r ent , and val i d f or t he dur at i on of t hi s cont r act . Renew

Apr i l 2019 Page 5 SECTI ON 23 05 93

Cer t i f i cat i ons whi ch expi r e pr i or t o compl et i on of t he TAB wor k, i n a t i mel y manner so t hat t her e i s no l apse i n r egi st r at i on or cer t i f i cat i on. TAB agency or TAB t eam per sonnel wi t hout a cur r ent r egi st r at i on or cur r ent cer t i f i cat i on ar e not t o per f or m TAB wor k on t hi s cont r act .

b. TAB Team Member s: TAB t eam appr oved t o accompl i sh wor k on t hi s cont r act ar e f ul l - t i me empl oyees of t he TAB agency. No ot her per sonnel i s al l owed t o do TAB wor k on t hi s cont r act .

c. Repl acement of TAB t eam member s: Repl acement of member s may occur i f each new member compl i es wi t h t he appl i cabl e per sonnel qual i f i cat i ons and each i s appr oved by t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 WORK DESCRI PTI ONS OF PARTI CI PANTS

Compl y wi t h r equi r ement s of t hi s sect i on.

3. 2 PRE- DALT/ TAB MEETI NG

Meet wi t h t he Cont r act i ng Of f i cer ' s t echni cal r epr esent at i ve ( COTR) and t he desi gni ng engi neer of t he HVAC syst ems t o devel op a mut ual under st andi ng r el at i ve t o t he det ai l s of t he DALT wor k and TAB wor k r equi r ement s.

Ensur e t hat t he TAB super vi sor i s pr esent at t hi s meet i ng. Requi r ement s t o be di scussed i ncl ude r equi r ed submi t t al s, wor k schedul e, and f i el d qual i t y cont r ol .

3. 3 DALT PROCEDURES

3. 3. 1 I nst r ument s, Consumabl es and Per sonnel

Pr ovi de i nst r ument s, consumabl es and per sonnel r equi r ed t o accompl i sh t he DALT f i el d wor k. Fol l ow t he same basi c pr ocedur e speci f i ed bel ow f or TAB Fi el d Wor k, i ncl udi ng mai nt enance and cal i br at i on of i nst r ument s, accur acy of measur ement s, pr el i mi nar y pr ocedur es, f i el d wor k, wor kmanshi p and t r eat ment of def i c i enci es. Cal i br at e and mai nt ai n i nst r ument s i n accor dance wi t h manuf act ur er ' s wr i t t en pr ocedur es.

3. 3. 2

On compl et i on of t he i nst al l at i on of each duct syst em i ndi cat ed t o be DALT' d, not i f y t he Cont r act i ng Of f i cer i n wr i t i ng pr i or t o t he COTR' s duct sel ect i on f i el d v i s i t .

3. 3. 3 Duct wor k To Be DALT' d

Fr om each duct syst em i ndi cat ed as subj ect t o DALT, t he COTR wi l l r andoml y sel ect sect i ons of each compl et ed duct syst em f or t est i ng by t he Cont r act or ' s TAB Fi r m. The sect i ons sel ect ed wi l l not exceed 20 per cent of t he t ot al measur ed l i near f oot age of duct syst ems i ndi cat ed as subj ect t o DALT. Sect i ons of duct syst ems subj ect t o DALT wi l l i ncl ude 20 per cent of mai n duct s, br anch mai n duct s, br anch duct s and pl enums f or suppl y, r et ur n, exhaust , and pl enum duct wor k.

Apr i l 2019 Page 6 SECTI ON 23 05 93

I t i s accept abl e f or an ent i r e duct syst em t o be DALT' d i nst ead of di sassembl i ng t hat syst em i n or der t o DALT onl y t he 20 per cent por t i on speci f i ed above.

3. 3. 4 DALT Test i ng

Per f or m DALT on t he HVAC duct sect i ons of each syst em as sel ect ed by t he COTR. Use t he duct c l ass, seal c l ass, l eakage cl ass and t he l eak t est pr essur e dat a i ndi cat ed on t he dr awi ngs, t o compl y wi t h t he pr ocedur es speci f i ed i n SMACNA 1972 CD.

I n spi t e of speci f i cat i ons of SMACNA 1972 CD t o t he cont r ar y, DALT duct wor k of const r uct i on c l ass of 3- i nch wat er gauge st at i c pr essur e and bel ow i f i ndi cat ed t o be DALT' d. Compl et e DALT wor k on t he COTR sel ect ed duct wor k wi t hi n 48 hour s af t er t he par t i cul ar duct wor k was sel ect ed f or DALT. Separ at el y conduct DALT wor k f or l ar ge duct syst ems t o enabl e t he DALT wor k t o be compl et ed i n 48 hour s.

3. 3. 5 Compl et ed Pr e- Fi nal DALT Repor t

3. 3. 6 Qual i t y Assur ance - COTR DALT Fi el d Accept ance Test i ng

I n t he pr esence of t he COTR and TAB t eam f i el d l eader , ver i f y f or accur acy Pr e- f i nal DALT Repor t dat a sel ect ed by t he COTR. For each duct syst em, t hi s accept ance t est i ng shal l be conduct ed on a maxi mum of 50 per cent of t he duct sect i ons DALT' d.

Fur t her , i f any dat a on t he Pr e- f i nal DALT r epor t f or m f or a gi ven duct sect i on i s out - of - t ol er ance, t hen f i el d accept ance t est i ng shal l be conduct ed on dat a f or one addi t i onal duct sect i on, pr ef er abl y i n t he same duct syst em, i n t he pr esence of t he COTR.

3. 3. 7 Addi t i onal COTR Fi el d Accept ance Test i ng

I f any of t he duct sect i ons checked f or a gi ven syst em ar e det er mi ned t o have a l eakage r at e measur ed t hat exceeds t he l eakage r at e al l owed by SMACNA Leak Test Manual f or an i ndi cat ed duct const r uct i on c l ass and seal ant c l ass, t er mi nat e dat a checki ng f or t hat sect i on. The associ at ed Pr e- f i nal DALT Repor t dat a f or t he gi ven duct syst em wi l l be di sappr oved.

Make t he necessar y cor r ect i ons and pr epar e a r evi sed Pr e- f i nal DALT Repor t . Reschedul e a f i el d check of t he r evi sed r epor t dat a wi t h t he COTR.

3. 3. 8 Cer t i f i ed Fi nal DALT Repor t

3. 3. 9 Pr er equi s i t e f or TAB Fi el d Wor k

Do not commence TAB f i el d wor k pr i or t o t he compl et i on and appr oval , f or al l syst ems, of t he Fi nal DALT Repor t .

3. 4 TAB PROCEDURES

3. 4. 1 TAB Fi el d Wor k

Test , adj ust , and bal ance t he HVAC syst ems unt i l measur ed f l ow r at es ( ai r

Apr i l 2019 Page 7 SECTI ON 23 05 93 and wat er f l ow) ar e wi t hi n pl us or mi nus 5 per cent of t he desi gn f l ow r at es as speci f i ed or i ndi cat ed on t he cont r act document s.

That i s, compl y wi t h t he t he r equi r ement s of AABC MN- 1 or SMACNA 1780 ( TABB) and SMACNA 1858 ( TABB) , except as suppl ement ed and modi f i ed by t hi s section.

Pr ovi de i nst r ument s and consumabl es r equi r ed t o accompl i sh t he TAB wor k.

Cal i br at e and mai nt ai n i nst r ument s i n accor dance wi t h manuf act ur er ' s wr i t t en pr ocedur es.

Test , adj ust , and bal ance t he HVAC syst ems unt i l measur ed f l ow r at es ( ai r and wat er f l ow) ar e wi t hi n pl us or mi nus 5 per cent of t he desi gn f l ow r at es as speci f i ed or i ndi cat ed on t he cont r act document s. Conduct TAB wor k, i ncl udi ng measur ement accur acy, and sound measur ement wor k i n conf or mance wi t h t he AABC MN- 1 and AABC MN- 4, or NEBB TABES and NEBB MASV, or SMACNA 1780 ( used by TABB) and SMACNA 1858 sound measur ement pr ocedur es, except as suppl ement ed and modi f i ed by t hi s sect i on. The onl y wat er f l ow and ai r f l ow r epor t i ng whi ch can be def er r ed unt i l t he Season 2 i s t hat dat a whi ch woul d be af f ect ed i n t er ms of accur acy due t o out si de ambi ent condi t i ons.

3. 4. 2 Pr el i mi nar y Pr ocedur es

Use t he appr oved pr e- f i el d engi neer i ng r epor t as i nst r uct i ons and pr ocedur es f or accompl i shi ng TAB f i el d wor k. TAB engi neer i s t o l ocat e, i n t he f i el d, t est por t s r equi r ed f or t est i ng. I t i s t he r esponsi bi l i t y of t he sheet met al cont r act or t o pr ovi de and i nst al l t est por t s as r equi r ed by t he TAB engi neer .

3. 4. 3 TAB Ai r Di st r i but i on Syst ems

3. 4. 3. 1 Uni t s Wi t h Coi l s

Repor t heat i ng and cool i ng per f or mance capaci t y t est s f or hot wat er , chi l l ed wat er , DX and st eam coi l s f or t he pur pose of ver i f y i ng t hat t he coi l s meet t he i ndi cat ed desi gn capaci t y. Submi t t he f ol l owi ng dat a and cal cul at i ons wi t h t he coi l t est r epor t s:

a. For ai r handl er s wi t h capaci t i es gr eat er t han 7. 5 t ons ( 90, 000 Bt u) cool i ng, such as f act or y manuf act ur ed uni t s, cent r al bui l t - up uni t s and r oof t op uni t s, conduct capaci t y t est s i n accor dance wi t h AABC MN- 4, pr ocedur e 3. 5, " Coi l Capaci t y Test i ng. "

Do not det er mi ne ent er i ng and l eavi ng wet and dr y bul b t emper at ur es by s i ngl e poi nt measur ement , but by t he aver age of mul t i pl e r eadi ngs i n compl i ance wi t h par agr aph 3. 5- 5, " Pr ocedur es" , ( i n subpar agr aph d. ) of AABC MN- 4, Pr ocedur e 3. 5, " Coi l Capaci t y Test i ng. "

Submi t par t - l oad coi l per f or mance dat a f r om t he coi l manuf act ur er conver t i ng t est condi t i ons t o desi gn condi t i ons; use t he dat a f or t he pur pose of ver i f y i ng t hat t he coi l s meet t he i ndi cat ed desi gn capaci t y i n compl i ance wi t h AABC MN- 4, Pr ocedur e 3. 5, " Coi l Capaci t y Test i ng, " par agr aph 3. 5. 7, " Act ual Capaci t y Vs. Desi gn Capaci t y" ( i n subpar agr aph c. ) .

b. For uni t s wi t h capaci t i es of 7. 5 t ons ( 90, 000 Bt u) or l ess, such as f an coi l uni t s, duct mount ed r eheat coi l s associ at ed wi t h VAV t er mi nal uni t s, and uni t ar y uni t s, such as t hr ough- t he- wal l heat pumps:

Apr i l 2019 Page 8 SECTI ON 23 05 93

Det er mi ne t he appar ent coi l capaci t y by cal cul at i ons usi ng si ngl e poi nt measur ement of ent er i ng and l eavi ng wet and dr y bul b t emper at ur es; submi t t he cal cul at i ons wi t h t he coi l r epor t s.

3. 4. 3. 2 Ai r Handl i ng Uni t s

Ai r handl i ng uni t syst ems i ncl udi ng f ans ( ai r handl i ng uni t f ans, exhaust f ans and wi nt er vent i l at i on f ans) , coi l s, duct s, pl enums, mi xi ng boxes, t er mi nal uni t s, var i abl e ai r vol ume boxes, and ai r di st r i but i on devi ces f or suppl y ai r , r et ur n ai r , out s i de ai r , mi xed ai r r el i ef ai r , and makeup air.

3. 4. 3. 3 Roof t op Ai r Condi t i oni ng

Roof t op ai r condi t i oni ng syst ems i ncl udi ng f ans, coi l s, duct s, pl enums, and ai r di st r i but i on devi ces f or suppl y ai r , r et ur n ai r , and out si de ai r .

For r ef r i ger at i on compr essor s/ condenser s/ condensi ng uni t s/ evapor at or s, r epor t dat a as r equi r ed by NEBB, AABC, and TABB st andar d pr ocedur es, i ncl udi ng r ef r i ger at i on oper at i onal dat a.

3. 4. 3. 4 Heat i ng and Vent i l at i ng Uni t s

Heat i ng and vent i l at i ng uni t syst ems i ncl udi ng f ans, coi l s, duct s, pl enums, r oof vent s, r egi st er s, di f f user s, gr i l l es, and l ouver s f or suppl y ai r , r et ur n ai r , out s i de ai r , and mi xed ai r .

3. 4. 3. 5 Makeup Ai r Uni t s

Makeup ai r uni t syst ems i ncl udi ng f ans, coi l s, duct s, pl enums, r egi st er s, di f f user s, gr i l l es, and l ouver s f or suppl y ai r , r et ur n ai r , out s i de ai r , and mi xed ai r .

3. 4. 3. 6 Ret ur n Ai r Fans

Ret ur n ai r f an syst em i ncl udi ng f an duct s, pl enums, r egi st er s, di f f user s, gr i l l es, and l ouver s f or suppl y ai r , r et ur n ai r , out s i de ai r , and mi xed air.

3. 4. 3. 7 Fan Coi l s

Fan coi l uni t syst ems i ncl udi ng f ans, coi l s, duct s, pl enums, and ai r di st r i but i on devi ces f or suppl y ai r , r et ur n ai r , and out si de ai r .

3. 4. 3. 8 Exhaust Fans

Exhaust f an syst ems i ncl udi ng f ans, duct s, pl enums, gr i l l es, and hoods f or exhaust ai r .

3. 4. 4 TAB Wat er Di st r i but i on Syst ems

3. 4. 4. 1 Chi l l ed Wat er

Chi l l ed wat er syst ems i ncl udi ng chi l l er s, condenser s, cool i ng t ower s, pumps, coi l s, syst em bal ance val ves and f l ow measur i ng devi ces.

For wat er chi l l er s, r epor t dat a as r equi r ed by AABC, NEBB and TABB st andar d pr ocedur es, i ncl udi ng r ef r i ger at i on oper at i onal dat a.

Apr i l 2019 Page 9 SECTI ON 23 05 93

3. 4. 4. 2 Heat i ng Hot Wat er

Heat i ng hot wat er syst ems i ncl udi ng boi l er s, hot wat er conver t er s ( e. g. , heat exchanger s) , pumps, coi l s, syst em bal anci ng val ves and f l ow measur i ng devices.

3. 4. 4. 3 Dual Temper at ur e Wat er

Dual t emper at ur e wat er syst ems i ncl udi ng boi l er s, conver t er s, chi l l er s, condenser s, cool i ng t ower s, pumps, coi l s, and syst em bal anci ng val ves, and f l ow measur i ng devi ces.

3. 4. 5 Sound Measur ement Wor k

3. 4. 5. 1 Ar eas To Be Sound Measur ed

I n t he f ol l owi ng spaces, measur e and r ecor d t he sound power l evel f or each oct ave band l i s t ed i n ASHRAE HVAC APP I P HDBK Noi se Cr i t er i a:

a. Al l HVAC mechani cal r ooms, i ncl udi ng machi ner y spaces and ot her spaces cont ai ni ng HVAC power dr i ver s and power dr i ven equi pment .

b. Al l spaces shar i ng a common bar r i er wi t h each mechani cal r oom, i ncl udi ng r ooms over head, r ooms on t he ot her s i de of s i de wal l s, and r ooms beneat h t he mechani cal r oom f l oor .

c. Repr esent at i ve non- mechani cal r ooms whi ch ar e occupi ed by any per sonnel and ar e ser ved by each t ype of pr i mar y HVAC ai r movi ng syst em and HVAC wat er movi ng syst ems. I ncl ude r ooms ser ved by l i ke pr i mar y syst ems whi ch have si gni f i cant l y di f f er ent sound af f ect i ng conf i gur at i ons. 3. 4. 5. 2 Procedure

Measur e sound l evel s i n each r oom, when unoccupi ed except f or t he TAB t eam, wi t h al l HVAC syst ems t hat woul d cause sound r eadi ngs i n t he r oom oper at i ng i n t hei r noi s i est mode. Recor d t he sound l evel i n each oct ave band. At t empt t o mi t i gat e t he sound l evel and br i ng t he l evel t o wi t hi n t he speci f i ed ASHRAE HVAC APP I P HDBK noi se cr i t er i a goal s, i f such mi t i gat i on i s wi t hi n t he TAB t eam' s cont r ol . St at e i n t he r epor t t he ASHRAE HVAC APP I P HDBK noi se cr i t er i a goal s. I f sound l evel cannot be br ought i nt o compl i ance, pr ovi de wr i t t en not i ce of t he def i c i ency t o t he Cont r act or f or r esol ut i on or cor r ect i on.

3. 4. 5. 3 Timing

Measur e sound l evel s at t i mes pr escr i bed by AABC or NEBB or TABB.

3. 4. 5. 4 Meters

Measur e sound l evel s wi t h a sound met er compl yi ng wi t h ASA S1. 4, Type 1 or 2, and an oct ave band f i l t er set compl yi ng wi t h ASA S1. 11 PART 1. Use measur ement met hods f or over al l sound l evel s and f or oct ave band sound l evel s as pr escr i bed by NEBB.

3. 4. 5. 5 Calibration

Cal i br at e sound l evel s as pr escr i bed by AABC or NEBB or TABB, except t hat cal i br at or s emi t t i ng a sound pr essur e l evel t one of 94 dB at 1000 her t z ( Hz) ar e al so accept abl e.

Apr i l 2019 Page 10 SECTI ON 23 05 93

3. 4. 5. 6 Backgr ound Noi se Cor r ect i on

Det er mi ne backgr ound noi se component of r oom sound ( noi se) l evel s f or each ( of ei ght ) oct ave bands as pr escr i bed by AABC or NEBB or TABB.

3. 4. 6 TAB Wor k on Per f or mance Test s Wi t hout Seasonal Li mi t at i ons

3. 4. 6. 1 Per f or mance Test s

I n addi t i on t o t he TAB pr opor t i onat e bal anci ng wor k on t he ai r di st r i but i on syst ems and t he wat er di st r i but i on syst ems, accompl i sh TAB wor k on t he HVAC syst ems whi ch di r ect l y t r ansf er t her mal ener gy. TAB t he oper at i onal per f or mance of t he heat i ng syst ems and cool i ng syst ems.

3. 4. 6. 2 Ambi ent Temper at ur es

On each t ab r epor t f or m used f or r ecor di ng dat a, r ecor d t he out door and i ndoor ambi ent dr y bul b t emper at ur e r ange and t he out door and i ndoor ambi ent wet bul b t emper at ur e r ange wi t hi n whi ch t he r epor t f or m' s dat a was r ecor ded. Recor d t hese t emper at ur es at begi nni ng and at t he end of dat a taking.

3. 4. 6. 3 Sound Measur ement s

Compl y wi t h t he par agr aph SOUND MEASUREMENT WORK, speci f i cal l y, t he r equi r ement t hat a r oom must be oper at i ng i n i t s noi s i est mode at t he t i me of sound measur ement s i n t he r oom. The maxi mum noi se l evel measur ement s coul d depend on seasonal l y r el at ed heat or cool i ng t r ansf er equi pment .

3. 4. 7 TAB Wor k on Per f or mance Test s Wi t h Seasonal Li mi t at i ons

3. 4. 7. 1 Per f or mance Test s

3. 4. 7. 2 Season Of Maxi mum Load

3. 4. 7. 3 Ambi ent Temper at ur es

On each t ab r epor t f or m used f or r ecor di ng dat a, r ecor d t he out door and i ndoor ambi ent dr y bul b t emper at ur e r ange and t he out door and i ndoor ambi ent wet bul b t emper at ur e r ange wi t hi n whi ch t he r epor t f or m' s dat a was r ecor ded. Recor d t hese t emper at ur es at begi nni ng and at t he end of dat a taking.

3. 4. 7. 4 Sound Measur ement s

Compl y wi t h t he par agr aph SOUND MEASUREMENT WORK, speci f i cal l y, t he r equi r ement t hat a r oom must be oper at i ng i n i t s noi s i est mode at t he t i me of sound measur ement s i n t he r oom. The maxi mum noi se l evel measur ement s coul d depend on seasonal l y r el at ed heat or cool i ng t r ansf er equi pment .

3. 4. 8 Workmanship

Conduct TAB wor k on t he HVAC syst ems unt i l measur ed f l ow r at es ar e wi t hi n pl us or mi nus 5 per cent of t he desi gn f l ow r at es as speci f i ed or i ndi cat ed

Apr i l 2019 Page 11 SECTI ON 23 05 93 on t he cont r act document s. Thi s TAB wor k i ncl udes adj ust ment of bal anci ng val ves, bal anci ng damper s, and sheaves. Fur t her , t hi s TAB wor k i ncl udes changi ng out f an sheaves and pump i mpel l er s i f r equi r ed t o obt ai n ai r and wat er f l ow r at es speci f i ed or i ndi cat ed. I f , wi t h t hese adj ust ment s and equi pment changes, t he speci f i ed or i ndi cat ed desi gn f l ow r at es cannot be at t ai ned, cont act t he Cont r act i ng Of f i cer f or di r ect i on.

3. 4. 9 Deficiencies

St r i ve t o meet t he i nt ent of t hi s sect i on t o maxi mi ze t he per f or mance of t he equi pment as desi gned and i nst al l ed. However , i f def i c i enci es i n equi pment desi gn or i nst al l at i on pr event TAB wor k f r om bei ng accompl i shed wi t hi n t he r ange of desi gn val ues speci f i ed i n t he par agr aph WORKMANSHI P, pr ovi de wr i t t en not i ce as soon as possi bl e t o t he Cont r act or and t he Cont r act i ng Of f i cer descr i bi ng t he def i c i ency and r ecommended cor r ect i on.

Responsi bi l i t y f or cor r ect i on of i nst al l at i on def i c i enci es i s t he Cont r act or ' s. I f a def i c i ency i s i n equi pment desi gn, cal l t he TAB t eam super vi sor f or t echni cal assi st ance. Responsi bi l i t y f or r epor t i ng desi gn def i c i enci es t o Cont r act or i s t he TAB t eam super vi sor ' s.

3. 4. 10 TAB Repor t s

3. 4. 11 Qual i t y Assur ance - COTR TAB Fi el d Accept ance Test i ng

3. 4. 11. 1 TAB Fi el d Accept ance Test i ng

Dur i ng t he f i el d accept ance t est i ng, ver i f y, i n t he pr esence of t he COTR, r andom sel ect i ons of dat a ( wat er , ai r quant i t i es, ai r mot i on, ) r ecor ded i n t he TAB Repor t . Poi nt s and ar eas f or f i el d accept ance t est i ng ar e t o be sel ect ed by t he COTR. Measur ement and t est pr ocedur es ar e t he same as appr oved f or TAB wor k f or t he TAB Repor t .

Fi el d accept ance t est i ng i ncl udes ver i f i cat i on of TAB Repor t dat a r ecor ded f or t he f ol l owi ng equi pment gr oups:

Gr oup 1: Al l chi l l er s, boi l er s, r et ur n f ans, comput er r oom uni t s, and ai r handl i ng uni t s ( r oof t op and cent r al st at i ons) .

Gr oup 2: 25 per cent of t he VAV t er mi nal boxes and associ at ed di f f user s and r egi st er s.

Gr oup 3: 25 per cent of t he suppl y di f f user s, r egi st er s, gr i l l es associ at ed wi t h const ant vol ume ai r handl i ng uni t s.

Gr oup 4: 25 per cent of t he r et ur n gr i l l es, r et ur n r egi st er s, exhaust gr i l l es and exhaust r egi st er s.

Gr oup 5: 25 per cent of t he suppl y f ans, exhaust f ans, and pumps.

Fur t her , i f any dat a on t he TAB Repor t f or Gr oups 2 t hr ough 5 i s f ound not t o f al l wi t hi n t he r ange of pl us 5 t o mi nus 5 per cent of t he TAB Repor t dat a, addi t i onal gr oup dat a ver i f i cat i on i s r equi r ed i n t he pr esence of t he COTR. Ver i f y TAB Repor t dat a f or one addi t i onal pi ece of equi pment i n t hat gr oup. Cont i nue t hi s addi t i onal gr oup dat a ver i f i cat i on unt i l out - of - t ol er ance dat a ceases t o be f ound.

Apr i l 2019 Page 12 SECTI ON 23 05 93

3. 4. 11. 2 Addi t i onal COTR TAB Fi el d Accept ance Test i ng

I f any of t he accept ance t est i ng measur ement s f or a gi ven equi pment gr oup i s f ound not t o f al l wi t hi n t he r ange of pl us 5 t o mi nus 5 per cent of t he TAB Repor t dat a, t er mi nat e dat a ver i f i cat i on f or al l af f ect ed dat a f or t hat gr oup. The af f ect ed dat a f or t he gi ven gr oup wi l l be di sappr oved.

Make t he necessar y cor r ect i ons and pr epar e a r evi sed TAB Repor t .

Reschedul e accept ance t est i ng of t he r evi sed r epor t dat a wi t h t he COTR.

3. 4. 11. 3 Pr er equi s i t e f or Appr oval

Compl i ance wi t h t he f i el d accept ance t est i ng r equi r ement s of t hi s sect i on i s a pr er equi s i t e f or t he f i nal Cont r act i ng Of f i cer appr oval of t he TAB Repor t submi t t ed.

3. 5 MARKI NG OF SETTI NGS

Upon t he f i nal TAB wor k appr oval , per manent l y mar k t he set t i ngs of HVAC adj ust ment devi ces i ncl udi ng val ves, gauges, spl i t t er s, and damper s so t hat adj ust ment can be r est or ed i f di st ur bed at any t i me. Pr ovi de per manent mar ki ngs cl ear l y i ndi cat i ng t he set t i ngs on t he adj ust ment devi ces whi ch r esul t i n t he dat a r epor t ed on t he submi t t ed TAB r epor t .

3. 6 MARKI NG OF TEST PORTS

The TAB t eam i s t o per manent l y and l egi bl y mar k and i dent i f y t he l ocat i on poi nt s of t he duct t est por t s. I f t he duct s have ext er i or i nsul at i on, make t hese mar ki ngs on t he ext er i or s i de of t he duct i nsul at i on. Show t he l ocat i on of t est por t s on t he as- bui l t mechani cal dr awi ngs wi t h di mensi ons gi ven wher e t he t est por t i s cover ed by ext er i or i nsul at i on.

- - End of Sect i on - -

Apr i l 2019 Page 13 SECTI ON 23 05 93