07 14 00.pdf
PDF 40 KB Posted
- Solicitation number
- FA813727R0002
About this file
This is a technical specification document for fluid-applied waterproofing work at Tinker Air Force Base in Oklahoma, dated April 2019 and designated as Section 07 14 00.
The specification establishes requirements for a complete fluid-applied waterproofing system including membrane application, priming, flashing, joint treatment, and protection board installation. The fluid-applied membrane must comply with ASTM C836/C836M and be applied at 60 mils thick (plus or minus 5 mils) over primed concrete surfaces. Membrane primer is required as recommended by the membrane manufacturer unless prohibited. The specification mandates elastomeric sheet materials with minimum one psi bond strength to the fluid-applied membrane, flexible foam-backed elastomeric sheet (1/2 inch minimum closed-cell foam per ASTM D1056), and protection board (1/8 inch minimum bitumen composition board or compatible alternative). Polystyrene foam insulation conforming to ASTM C578 Class IV is required at specified R-values, along with ASTM C33/C33M size No. 8 drainage course aggregate. The contractor must provide material submittals including product data for all components, with government approval required for designated submittals. Environmental conditions require ambient temperatures of 40°F or above for 24 hours prior to application and during cure, with substrate moisture testing mandatory before work begins. The specification requires a 20-year no-dollar-limit manufacturer warranty on the complete roof system and a two-year installer warranty for workmanship. Field quality control includes moisture testing with approved meters, wet film thickness measurement every 100 square feet, and a 24-hour flood test at 2-inch water depth after minimum 48-hour cure time. A prewaterproofing conference with the contracting officer and relevant subcontractors must occur seven days prior to application start, and government personnel instruction on maintenance and emergency repair procedures is required.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ti nker AFB, OK TAFB Techni cal Spr ci f i cat i ons 2019
SECTI ON 07 14 00
FLUI D- APPLI ED WATERPROOFI NG
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
ASTM I NTERNATI ONAL ( ASTM)
ASTM C33/ C33M ( 2016) St andar d Speci f i cat i on f or Concr et e Aggregates
ASTM C578 ( 2016) St andar d Speci f i cat i on f or Ri gi d, Cel l ul ar Pol yst yr ene Ther mal I nsul at i on
ASTM C836/ C836M ( 2015) Hi gh Sol i ds Cont ent , Col d Li qui d- Appl i ed El ast omer i c Wat er pr oof i ng Membr ane f or Use Wi t h Separ at e Wear i ng Course
ASTM D1056 ( 2014) St andar d Speci f i cat i on f or Fl exi bl e Cel l ul ar Mat er i al s - Sponge or Expanded Rubber
ASTM D1751 ( 2004; E 2013; R 2013) St andar d Speci f i cat i on f or Pr ef or med Expansi on Joi nt Fi l l er f or Concr et e Pavi ng and St r uct ur al Const r uct i on ( Nonext r udi ng and Resi l i ent Bi t umi nous Types)
ASTM D1752 ( 2004a; R 2013) St andar d Speci f i cat i on f or Pr ef or med Sponge Rubber Cor k and Recycl ed PVC Expansi on
1. 2 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 03 Pr oduct Dat a
Fl ui d- Appl i ed Membr ane
Membr ane Pr i mer
El ast omer i c Sheet
Fl exi bl e Foam- Backed El ast omer i c Sheet
Solvent
Apr i l 2019 Page 1 SECTI ON 07 14 00
Moi st ur e Met er
Pr ot ect i on Boar d
Bond Br eaker
Submi t mat er i al descr i pt i on and physi cal pr oper t i es, appl i cat i on det ai l s, and r ecommendat i ons r egar di ng shel f l i f e, appl i cat i on pr ocedur es, and pr ecaut i ons on f l ammabi l i t y and t oxi c i t y.
SD- 11 Cl oseout Submi t t al s
Warranty
I nf or mat i on Car d
I nst r uct i ons To Gover nment Per sonnel
I ncl ude copi es of Saf et y Dat a Sheet s f or mai nt enance/ r epai r materials.
1. 3 PREWATERPROOFI NG CONFERENCE
Pr i or t o st ar t i ng appl i cat i on of wat er pr oof i ng syst em, ar r ange and at t end a pr ewat er pr oof i ng conf er ence t o ensur e a c l ear under st andi ng of dr awi ngs and speci f i cat i ons. Gi ve t he Cont r act i ng Of f i cer 7 days advance wr i t t en not i ce of t he t i me and pl ace of meet i ng. Ensur e t hat t he mechani cal and el ect r i cal subcont r act or , f l ashi ng and sheet met al subcont r act or , and ot her t r ades t hat may per f or m ot her t ypes of wor k on or over t he membr ane af t er i nst al l at i on, at t end t hi s conf er ence.
1. 4 DELI VERY, STORAGE, AND HANDLI NG
Del i ver wat er pr oof i ng mat er i al s i n manuf act ur er ' s or i gi nal , unopened cont ai ner s, wi t h l abel s i nt act and l egi bl e. Cont ai ner s of mat er i al s cover ed by a r ef er enced speci f i cat i on number shal l bear t he speci f i cat i on number , t ype, and cl ass of t he cont ent s. Del i ver mat er i al s i n suf f i c i ent quant i t y t o cont i nue wor k wi t hout i nt er r upt i on. St or e and pr ot ect mat er i al s i n accor dance wi t h manuf act ur er ' s i nst r uct i ons, and use wi t hi n t hei r i ndi cat ed shel f l i f e. When hazar dous mat er i al s ar e i nvol ved, adher e t o speci al pr ecaut i ons of t he manuf act ur er , unl ess pr ecaut i ons conf l i c t wi t h l ocal , st at e, and f eder al r egul at i ons. Pr ompt l y r emove f r om t he si t e mat er i al s or i ncompl et e wor k adver sel y af f ect ed by exposur e t o moi st ur e or f r eezi ng. St or e mat er i al s on pal l et s and cover f r om t op t o bot t om wi t h canvas t ar paul i ns.
1. 5 ENVI RONMENTAL CONDI TI ONS
Appl y mat er i al s when ambi ent t emper at ur e i s 40 degr ees F or above f or a per i od of 24 hour s pr i or t o t he appl i cat i on and when t her e i s no i ce, f r ost , sur f ace moi st ur e, or v i s i bl e dampness on t he subst r at e sur f ace.
Appl y mat er i al s when ai r t emper at ur e i s expect ed t o r emai n above 40 degr ees F dur i ng t he cur e per i od r ecommended by t he manuf act ur er .
Moi st ur e t est f or subst r at e i s speci f i ed under par agr aph ent i t l ed " Moi st ur e Test . " Wor k may be per f or med wi t hi n heat ed encl osur es, pr ovi ded t he sur f ace t emper at ur e of t he subst r at e i s mai nt ai ned at a mi ni mum of 40 degr ees F f or 24 hour s pr i or t o t he appl i cat i on of t he wat er pr oof i ng, and r emai ns above t hat t emper at ur e dur i ng t he cur e per i od r ecommended by t he
Apr i l 2019 Page 2 SECTI ON 07 14 00 manufacturer.
1. 6 WARRANTY
Pr ovi de r oof syst em mat er i al and wor kmanshi p war r ant i es meet i ng speci f i ed r equi r ement s. Pr ovi de r evi s i ons or amendment t o st andar d membr ane manuf act ur er war r ant y t o compl y wi t h t he speci f i ed r equi r ement s. Mi ni mum manuf act ur er war r ant y shal l have no dol l ar l i mi t , cover f ul l syst em wat er - t i ght ness, and shal l have a mi ni mum dur at i on of 20 year s.
1. 6. 1 Roof Membr ane Manuf act ur er War r ant y
Fur ni sh t he r oof membr ane manuf act ur er ' s 20- year no dol l ar l i mi t r oof syst em mat er i al s and i nst al l at i on wor kmanshi p war r ant y, i ncl udi ng f l ashi ng, i nsul at i on, and accessor i es necessar y f or a wat er t i ght r oof syst em const r uct i on. Wr i t e t he war r ant y di r ect l y t o t he Gover nment commenci ng at t i me of Gover nment ' s accept ance of t he r oof wor k. Pr ovi de t he t he f ol l owi ng st at ement s f or such war r ant y:
a. I f wi t hi n t he war r ant y per i od t he r oof syst em, as i nst al l ed f or i t s i nt ended use i n t he nor mal c l i mat i c and envi r onment al condi t i ons of t he f aci l i t y , becomes non- wat er t i ght , shows evi dence of moi st ur e i nt r usi on wi t hi n t he assembl y, bl i s t er s, spl i t s, t ear s, cr acks, del ami nat es, separ at es at t he seams, or shows evi dence of excessi ve weat her i ng due t o def ect i ve mat er i al s or i nst al l at i on wor kmanshi p, t he r epai r or r epl acement of t he def ect i ve and damaged mat er i al s of t he r oof syst em assembl y and cor r ect i on of def ect i ve wor kmanshi p ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er . Al l cost associ at ed wi t h t he r epai r or r epl acement wor k ar e t he r esponsi bi l i t y of t he r oof membr ane manuf act ur er .
b. The war r ant y must r emai n i n f ul l f or ce and ef f ect , i ncl udi ng emer gency t empor ar y r epai r s per f or med by ot her s, when t he manuf act ur er or hi s appr oved appl i cat or f ai l t o per f or m t he r epai r s wi t hi n 72 hour s of notification.
1. 6. 2 Roof i ng Syst em I nst al l er War r ant y
The r oof syst em i nst al l er must war r ant f or a mi ni mum per i od of t wo year s t hat t he r oof syst em, as i nst al l ed, i s f r ee f r om def ect s i n i nst al l at i on wor kmanshi p, t o i ncl ude t he r oof membr ane, f l ashi ng, i nsul at i on, accessor i es, at t achment s, and sheet met al i nst al l at i on i nt egr al t o a compl et e wat er t i ght r oof syst em assembl y. Wr i t e t he war r ant y di r ect l y t o t he Gover nment . The r oof syst em i nst al l er i s r esponsi bl e f or cor r ect i on of def ect i ve wor kmanshi p and r epl acement of damaged or af f ect ed mat er i al s. The r oof syst em i nst al l er i s r esponsi bl e f or al l cost s associ at ed wi t h t he r epai r or r epl acement wor k.
1. 6. 3 Cont i nuance of War r ant y
Appr ove r epai r or r epl acement wor k t hat becomes necessar y wi t hi n t he war r ant y per i od and accompl i shed i n a manner so as t o r est or e t he i nt egr i t y of t he r oof syst em assembl y and val i di t y of t he r oof membr ane manuf act ur er war r ant y f or t he r emai nder of t he manuf act ur er war r ant y period.
Apr i l 2019 Page 3 SECTI ON 07 14 00
PART 2 PRODUCTS
2. 1 FLUI D- APPLI ED MEMBRANE
ASTM C836/ C836M.
2. 2 MEMBRANE PRI MER
As r ecommended by t he f l ui d- appl i ed membr ane manuf act ur er unl ess speci f i cal l y pr ohi bi t ed by t he manuf act ur er of t he f l ui d- appl i ed membr ane.
2. 3 SEALANT
As speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS.
2. 4 SEALANT PRI MER
As speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS.
2. 5 BACKI NG MATERI AL
Pr emol ded, c l osed- cel l , pol yet hyl ene, or pol yur et hane f oam r od havi ng a di amet er 25 per cent l ar ger t han j oi nt wi dt h bef or e bei ng compr essed i nt o j oi nt . Pr ovi de bond br eaker of pol yet hyl ene f i l m or ot her sui t abl e mat er i al bet ween backi ng mat er i al and seal ant .
2. 6 JOI NT FI LLER
As speci f i ed i n ASTM D1751 and ASTM D1752.
2. 7 BOND BREAKER
As r ecommended by t he f l ui d- appl i ed membr ane manuf act ur er . Bond br eaker shal l not i nt er f er e wi t h t he cur i ng pr ocess or ot her per f or mance pr oper t i es of t he f l ui d- appl i ed membr ane.
2. 8 ELASTOMERI C SHEET
Pr ef or med; as r ecommended by t he f l ui d- appl i ed membr ane manuf act ur er .
Bond st r engt h bet ween t he f l ui d- appl i ed membr ane and t he pr ef or med el ast omer i c sheet shal l be a mi ni mum of one psi when t est ed i n accor dance with ASTM C836/ C836M.
2. 9 ELASTOMERI C SHEET ADHESI VE
As r ecommended by t he el ast omer i c sheet manuf act ur er .
2. 10 FLEXI BLE FOAM- BACKED ELASTOMERI C SHEET
Fl exi bl e f oam- backed el ast omer i c sheet f or pr ot ect i on over pr ef or med el ast omer i c sheet at expansi on j oi nt s shal l be 1/ 2 i nch t hi ck, mi ni mum, c l osed cel l f oam conf or mi ng t o ASTM D1056, Type 2, Cl ass B, Gr ades 2 or 3, f act or y- bonded t o 1/ 16 i nch t hi ck, mi ni mum, pr ef or med el ast omer i c sheet .
2. 11 PROTECTI ON BOARD
Pr emol ded bi t umen composi t i on boar d, 1/ 8 i nch mi ni mum t hi ckness or ot her composi t i on boar d compat i bl e wi t h t he f l ui d- appl i ed membr ane.
Apr i l 2019 Page 4 SECTI ON 07 14 00
2. 12 DRAI NAGE COURSE AGGREGATE
ASTM C33/ C33M, s i ze No. 8.
2. 13 INSULATION
Pol yst yr ene f oam conf or mi ng t o ASTM C578, Cl ass I V, t hi ckness as r equi r ed by i ndi cat ed R- val ue.
PART 3 EXECUTI ON
3. 1 PREPARATION
Coor di nat e wor k wi t h t hat of ot her t r ades t o ensur e t hat component s t o be i ncor por at ed i nt o t he wat er pr oof i ng syst em ar e avai l abl e when needed.
I nspect and appr ove sur f aces i mmedi at el y bef or e appl i cat i on of wat er pr oof i ng mat er i al s. Remove l ai t ance, l oose aggr egat e, shar p pr oj ect i ons, gr ease, oi l , di r t , cur i ng compounds, and ot her cont ami nant s whi ch coul d adver sel y af f ect t he compl et e bondi ng of t he f l ui d- appl i ed membr ane t o t he concr et e sur f ace.
3. 1. 1 Flashings
Make penet r at i ons t hr ough sl eeves i n concr et e s l ab wat er t i ght bef or e appl i cat i on of wat er pr oof i ng. Af t er f l ashi ng i s compl et ed, cover el ast omer i c sheet wi t h f l ui d- appl i ed wat er pr oof i ng dur i ng wat er pr oof i ng application.
3. 1. 1. 1 Drains
Make dr ai n f l anges f l ush wi t h sur f ace of st r uct ur al s l ab. Appl y a f ul l el ast omer i c sheet ar ound t he dr ai n, wi t h edges f ul l y adher ed t o dr ai n f l ange and t o st r uct ur al s l ab. Do not adher e el ast omer i c sheet over j oi nt bet ween dr ai n and concr et e s l ab. Do not pl ug dr ai nage or weep hol es.
Cover el ast omer i c sheet wi t h f l ui d- appl i ed wat er pr oof i ng dur i ng wat er pr oof i ng appl i cat i on. Lap el ast omer i c sheet a mi ni mum of 4 i nches ont o concr et e s l ab.
3. 1. 1. 2 Penet r at i ons and Pr oj ect i ons
Fl ash penet r at i ons and pr oj ect i ons t hr ough st r uct ur al s l ab wi t h an el ast omer i c sheet adher ed t o t he concr et e s l ab and t he penet r at i on. Leave el ast omer i c sheet unadher ed f or one i nch over j oi nt bet ween penet r at i on and concr et e s l ab. Adher e el ast omer i c sheet a mi ni mum of 4 i nches ont o hor i zont al deck.
3. 1. 1. 3 Wal l s and Ver t i cal Sur f aces
Fl ash wal l i nt er sect i ons whi ch ar e not of monol i t hi c pour or const r uct ed wi t h r ei nf or ced concr et e j oi nt s wi t h an el ast omer i c sheet adher ed t o bot h ver t i cal wal l sur f aces and concr et e s l ab. Fl ash i nt er sect i ons whi ch ar e monol i t hi cal l y pour ed or const r uct ed wi t h r ei nf or ced concr et e j oi nt s wi t h ei t her an el ast omer i c sheet or a ver t i cal gr ade of f l ui d- appl i ed wat er pr oof i ng adher ed t o ver t i cal wal l sur f aces and concr et e s l ab. Leave sheet unadher ed f or a di st ance of one i nch f r om t he cor ner on bot h ver t i cal and hor i zont al sur f aces.
Apr i l 2019 Page 5 SECTI ON 07 14 00
3. 1. 2 Cr acks and Joi nt s
Pr epar e v i s i bl e cr acks and j oi nt s i n subst r at e t o r ecei ve f l ui d- appl i ed wat er pr oof i ng membr ane by pl aci ng a bond br eaker and an el ast omer i c s l i p sheet bet ween membr ane and subst r at e. Cr acks t hat show movement shal l r ecei ve a 2 i nch bond br eaker f ol l owed by an el ast omer i c sheet adher ed t o t he deck. Nonmovi ng cr acks shal l be doubl e coat ed wi t h f l ui d- appl i ed waterproofing.
3. 1. 3 Priming
Pr i me sur f aces t o r ecei ve f l ui d- appl i ed wat er pr oof i ng membr ane. Appl y pr i mer as r equi r ed by membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons.
3. 2 SPECI AL PRECAUTI ONS
Pr ot ect wat er pr oof i ng mat er i al s dur i ng t r anspor t and appl i cat i on. Do not di l ut e pr i mer s and ot her mat er i al s, unl ess speci f i cal l y r ecommended by mat er i al s manuf act ur er . Keep cont ai ner s c l osed except when r emovi ng cont ent s. Do not mi x r emai ns of unl i ke mat er i al s. Thor oughl y r emove r esi dual mat er i al s bef or e usi ng appl i cat i on equi pment f or mi xi ng and t r anspor t i ng mat er i al s. Do not per mi t equi pment on t he pr oj ect s i t e t hat has r esi due of mat er i al s used on pr evi ous pr oj ect s. Use cl eaner s onl y f or c l eani ng, not f or t hi nni ng pr i mer s or membr ane mat er i al s. Ensur e t hat wor ker s and ot her s who wal k on cur ed membr ane wear c l ean, sof t - sol ed shoes t o avoi d damagi ng t he wat er pr oof i ng mat er i al s.
3. 3 APPLICATION
Over pr i med sur f aces, pr ovi de a uni f or m, wet , monol i t hi c coat i ng of f l ui d- appl i ed membr ane, 60 mi l s t hi ck, pl us or mi nus 5 mi l s by f ol l owi ng manuf act ur er ' s pr i nt ed i nst r uct i ons. Appl y mat er i al by t r owel , squeegee, r ol l er , br ush, spr ay appar at us, or ot her met hod r ecommended by membr ane manuf act ur er . Check wet f i l m t hi ckness as speci f i ed i n par agr aph ent i t l ed " Fi l m Thi ckness" and adj ust appl i cat i on r at e as necessar y t o pr ovi de a uni f or m coat i ng of t he t hi ckness speci f i ed. Wher e possi bl e, mar k of f sur f ace t o be coat ed i n equal uni t s t o f aci l i t at e pr oper cover age. At expansi on j oi nt s, cont r ol j oi nt s, pr epar ed cr acks, f l ashi ng, and t er mi nat i ons, car r y membr ane over pr ef or med el ast omer i c sheet i n a uni f or m 60 mi l t hi ck, pl us or mi nus 5 mi l s, wet t hi ckness t o pr ovi de a monol i t hi c coat i ng. I f membr ane cur es bef or e next appl i cat i on, wi pe pr evi ousl y appl i ed membr ane wi t h a sol vent t o r emove di r t and dust t hat coul d i nhi bi t adhesi on of over l appi ng membr ane coat . Use sol vent r ecommended by t he membr ane manuf act ur er , as appr oved.
3. 3. 1 Wor k Sequence
Per f or m wor k so t hat pr ot ect i on boar d i s i nst al l ed pr i or t o usi ng t he wat er pr oof ed sur f ace. Do not per manent l y i nst al l pr ot ect i on boar d unt i l t he membr ane has passed t he f l ood t est speci f i ed under par agr aph ent i t l ed " Fl ood Test . " Move mat er i al st or age ar eas as wor k pr ogr esses t o pr event abuse of membr ane and over l oadi ng of st r uct ur al deck.
3. 3. 2 Pr ot ect i on Boar d
Pr ot ect f l ui d- appl i ed membr ane by pl aci ng pr ot ect i on boar d over membr ane at a t i me r ecommended by t he membr ane manuf act ur er . Pr ot ect membr ane appl i cat i on when pr ot ect i on boar d i s not pl aced i mmedi at el y. But t pr ot ect i on boar ds t oget her and do not over l ap.
Apr i l 2019 Page 6 SECTI ON 07 14 00
3. 3. 3 Dr ai nage Cour se
Pl ace dr ai nage cour se wher e shown af t er f l ood t est s ar e compl et ed and concr et e pr ot ect i on s l ab or wear i ng cour se i s r eady t o be i nst al l ed.
3. 3. 4 Insulation
Pl ace i nsul at i on of t hi ckness i ndi cat ed, on t op of dr ai nage cour se j ust pr i or t o pl acement of concr et e pr ot ect i on s l ab.
3. 4 FI ELD QUALI TY CONTROL
3. 4. 1 Moi st ur e Test
Pr i or t o appl i cat i on of f l ui d- appl i ed wat er pr oof i ng, measur e moi st ur e cont ent of subst r at e wi t h a moi st ur e met er i n t he pr esence of t he Cont r act i ng Of f i cer . An accept abl e devi ce i s t he Del mhor st Moi st ur e Met er , Model BD7/ 2E/ CS, Type 21 E. Si mi l ar met er s by ot her manuf act ur er s, whi ch ar e sui t abl e f or t he pur pose, may be used as appr oved by t he Cont r act i ng Of f i cer . Do not begi n appl i cat i on unt i l met er r eadi ng i ndi cat es " dr y" r ange.
3. 4. 2 Fi l m Thi ckness
Measur e wet f i l m t hi ckness ever y 100 squar e f eet dur i ng appl i cat i on by pl aci ng f l at met al pl at es on t he subst r at e or usi ng a mi l - t hi ckness gage especi al l y manuf act ur ed f or t he pur pose.
3. 4. 3 Fl ood Test
Af t er appl i cat i on and cur i ng i s compl et e, pl ug dr ai ns and f i l l wat er pr oof ed ar ea wi t h wat er t o a dept h of 2 i nches. A mi ni mum 48 hour cur e t i me, or l onger cur e t i me i f r ecommended by t he membr ane manuf act ur er , shal l be r equi r ed pr i or t o f l ood t est i ng. Al l ow wat er t o st and 24 hour s. Test wat er t i ght ness by measur i ng wat er l evel at begi nni ng and end of t he 24 hour per i od. I f wat er l evel f al l s , dr ai n wat er , al l ow i nst al l at i on t o dr y, and i nspect . Make r epai r s or r epl ace as r equi r ed and r epeat t he t est . Wor k shal l not pr oceed bef or e appr oval of r epai r s or replacement.
3. 5 I NSTRUCTI ONS TO GOVERNMENT PERSONNEL
Fur ni sh wr i t t en and ver bal i nst r uct i ons on pr oper mai nt enance pr ocedur es t o desi gnat ed Gover nment per sonnel . Fur ni sh i nst r uct i ons by a compet ent r epr esent at i ve of t he r oof membr ane manuf act ur er and i ncl ude a mi ni mum of 4 hour s on mai nt enance and emer gency r epai r of t he membr ane. I ncl ude a demonst r at i on of membr ane r epai r , and gi ve sour ces of r equi r ed speci al t ool s. Fur ni sh i nf or mat i on on saf et y r equi r ement s dur i ng mai nt enance and emer gency r epai r oper at i ons.
3. 6 I NFORMATI ON CARD
For each r oof appl i cat i on, f ur ni sh a mi ni mum 8- 1/ 2 i nch by 11 i nch i nf or mat i on car d f or f aci l i t y r ecor ds and a car d l ami nat ed i n pl ast i c and f r amed f or i nt er i or di spl ay at r oof access poi nt , or a phot oengr aved 0. 032 i nch t hi ck al umi num car d f or ext er i or di spl ay. I dent i f y f aci l i t y name and number ; l ocat i on; cont r act number ; appr oxi mat e r oof ar ea; det ai l ed r oof syst em descr i pt i on, i ncl udi ng deck t ype, membr ane, number of pl i es, met hod
Apr i l 2019 Page 7 SECTI ON 07 14 00 of appl i cat i on, manuf act ur er , i nsul at i on and cover boar d syst em and t hi ckness; pr esence of t aper ed i nsul at i on f or pr i mar y dr ai nage, pr esence of vapor r et ar der ; dat e of compl et i on; i nst al l i ng cont r act or i dent i f i cat i on and cont r act i nf or mat i on; membr ane manuf act ur er war r ant y expi r at i on, war r ant y r ef er ence number , and cont act i nf or mat i on. I nst al l car d at r oof t op or access l ocat i on as di r ect ed by t he Cont r act i ng Of f i cer and pr ovi de a paper copy t o t he Cont r act i ng Of f i cer .
Apr i l 2019 Page 8 SECTI ON 07 14 00
FORM 1
FLUI D- APPLI ED WATERPROOFI NG SYSTEM COMPONENTS
1. Cont r act Number
2. Dat e Wor k Compl et ed
3. Pr oj ect Speci f i cat i on Desi gnat i on
7. Wat er pr oof i ng
a. Membr ane
b. Seal ant
c. El ast omer i c Sheet
d. Mat er i al s Manuf act ur er ( s)
Apr i l 2019 Page 9 SECTI ON 07 14 00
FORM 1
FLUI D- APPLI ED WATERPROOFI NG SYSTEM COMPONENTS
14. War r ant y
a. Manuf act ur er war r ant y expi r at i on
b. War r ant y r ef er ence number
Cont r act or ' s Si gnat ur e Dat e Si gned
I nspect or ' s Si gnat ur e Dat e Si gned
- - End of Sect i on - -
Apr i l 2019 Page 10 SECTI ON 07 14 00
File details come from the government source that posted it. Updated .